Tun-Chi Yang Assistant Engineer
Tun-Chi Yang Assistant Engineer
2015 APEC Typhoon Symposium
River Dredging and Sediment Management after Typhoon
Morakot
MOEA
Ministry of Economic Affairs
22
outlineoutline
1 、 Problem description
2 、 Solutions
3 、 Achievements
MOEA
MOEA WRA
Sediment disasterSediment disaster Management problems Management problems
4 solutions 4 solutions
4 achievements 4 achievements
MOEA WRA 3
Landslides and collapses in the watershed has caused sediment disasters.
MOEA
3
Sediment disasterSediment disaster921 earthquakeClimate changeTyphoon Morakot
Unsteady soil layer
Unsteady soil layerConcentrated
RainfallConcentrated RainfallLandslide &
collapseLandslide & collapse
Problem descriptionProblem description
Sand pumper ships caused holes everywhere in the river.
4
There is excess sediment that must be dredged .There is excess sediment that must be dredged .
The pollution and traffic problems caused by the trucks from the dredging site.The pollution and traffic problems caused by the trucks from the dredging site.
Problems must be solved :
Problems must be solved :
No one is willing to deal with dredging engineering.No one is willing to deal with dredging engineering.
Management problemManagement problem
Incomplete policies
Lack of technology management systems
Pollution and traffic problems
Judicial authorities doubt WRA
Judicial authorities doubt WRA
Protests by local residents
Protests by local residents
Illegal excavating crimes
Illegal excavating crimes
MOEA
MOEA WRA
5
SolutionsSolutions
(2)Improve the dredging (2)Improve the dredging policypolicy
(1)Increase cooperation among government (1)Increase cooperation among government units units
(3)Develop new technology systems(3)Develop new technology systems(3)Develop new technology systems(3)Develop new technology systems
(4)Prevent pollution(4)Prevent pollution(4)Prevent pollution(4)Prevent pollution
(i)Digital Dredging Management System(DDMS) –(point)
(ii)The central remote monitoring system-(line)
(iii)Satellite remote sensing images-(surface)
MOEA WRA
MOEA
6
(1)Increase cooperation among government units (1)Increase cooperation among government units (1)Increase cooperation among government units (1)Increase cooperation among government units
Simplifed the administrative process
basinsrivers
bridges
slop lands
creeks
reservoirs watersheds
Implement the project of dredging for the entire basin
Offer sediment for public engineering
BeforeBefore AfterAfter
Speed up
Speed up
MOEA
(2)Improve the dredging policy(2)Improve the dredging policy(2)Improve the dredging policy(2)Improve the dredging policy
by one contractorby one contractor (early)(early)by one contractorby one contractor (early)(early)
7
1.excavation 2.sale
3.monitoring
MOEA
MOEA WRA
2006
More than three firmsMore than three firms (now)(now)More than three firmsMore than three firms (now)(now)
The quantity of sediment for sale is measurable now.
Active manageme
ntActive
management
weighbridge
8
(3)Develop new technology systems(3)Develop new technology systems(3)Develop new technology systems(3)Develop new technology systems
8
Mobile monitoring station
monitoring station
point-dredging site
managementline-monitoring along the entrance of the
river
surface-monitoring in the river
region
dredging site
Prevent illegal activities
MOEA
satellite remote
closed circuit television,
CCTV
weighbridge
MOEA WRA 9
Dredging site
(i)Digital Dredging Management System(DDMS) –(point)
internet
APP
mobile office
picture 、image、amount
picture 、image、amount
MOEA
Information integration
weighbridge
site
MOEA WRA 10
ExitExit
The excavation amount and
images are recorded
individually.
10
MOEA
EntryEntry
Entry timeEntry time
Exit timeExit time Entry weight Entry weight
Delivery weight(ton)Delivery weight(ton)
Exit weightExit weight
2nd
3rd
4th
5th
6th 7th
8th
9th
1st
10th
River Management Office(1st to 10th)
Dredging statistic display
module
11
The new efficient monitoring system helps reduce the necessary manpower.
Detect
Automatically
internet
Double-checked by a live person
Local security
deliver
respond
Mobile monitoring stationMobile monitoring station
(ii)The central remote monitoring system-(line)
MOEA
MOEA WRA
24 hour video surveillance 24 hour video surveillance
efficient
1212
Date
location
Truck driving in with garbage
The investigation results and photographs were uploaded and integrated into the web-based system.
entry
exitMOEA
MOEA WRA
trigger
Stop illegal quarrying and garbage dumping.
BeforeBefore
(iii)Satellite remote sensing images on monitoring the river –(surface)
River area :
Too vast to patrol
Too remote to locate
River area :
Too vast to patrol
Too remote to locate
Satellite remote sensing images
Satellite remote sensing images
Illegal excavation area is 100 m2, amount is 200 m3
.
13
Field investigation
Field investigation
MOEA
MOEA WRA
A wide range of detection. Regular detection in the change spots (every 2 weeks)
The change spots will be delivered to the security via digital system.
A wide range of detection. Regular detection in the change spots (every 2 weeks)
The change spots will be delivered to the security via digital system.
AfterAfter
Wide range
14
(4)Prevent pollution (4)Prevent pollution (4)Prevent pollution (4)Prevent pollution
Sprinkler
Truck washer
Anti-dust mesh
MOEA WRA
environmentally-friendly
MOEA
Specially-designed road in the river area
MOEA WRA
(1)The average annual dredging amount is 3.14(1)The average annual dredging amount is 3.14 times greater after Typhoon Morakottimes greater after Typhoon Morakot(1)The average annual dredging amount is 3.14(1)The average annual dredging amount is 3.14 times greater after Typhoon Morakottimes greater after Typhoon Morakot
2009~now (2015) total dredging amount 3.99 hundred million m3
2009~now (2015) total dredging amount 3.99 hundred million m3
(2009)
運載13,000萬方砂石車排列可繞地球4圈
15
AchievementAchievementMOEA
206 times 12 times
16Information is from Bureau Of Mines.
(2)The ratio of the sediment used for construction (2)The ratio of the sediment used for construction to the total supply increased from 44%to the total supply increased from 44% to 60% after to 60% after
Typhoon Morakot.Typhoon Morakot.
(2)The ratio of the sediment used for construction (2)The ratio of the sediment used for construction to the total supply increased from 44%to the total supply increased from 44% to 60% after to 60% after
Typhoon Morakot.Typhoon Morakot.
average=5,887
MOEA
MOEA WRA
Import
Land
sediment
The ratio of sediment
total
(104 m3)
20020099
20120100
20120111
20120122
20120133
20120144
20020088
20020077
20020066
20020055
20020044
(2009)
17
(3)The price of the end product has (3)The price of the end product has stabilized and now fluctuates only 3.5% stabilized and now fluctuates only 3.5% after 2010.after 2010.
(3)The price of the end product has (3)The price of the end product has stabilized and now fluctuates only 3.5% stabilized and now fluctuates only 3.5% after 2010.after 2010.
( 元 )
Raw material is referred to the sediment excavated by WRA dredging engineering.
( 元 /m3)
MOEA
MOEA WRA
Raw material price
The End product price
2010 2011 2012 2013 2014 2015
2004 2005 2006 2007 2008 2009
(NT/m3)
2004~2015 raw material price vs. the end product price
Typhoon MorakotTyphoon Morakot
Stable price
Information of The End product price is from Bureau Of Mines.
18
(4)The profit from selling sediment which (4)The profit from selling sediment which improves rivers and financially helps local improves rivers and financially helps local communities.communities.
(4)The profit from selling sediment which (4)The profit from selling sediment which improves rivers and financially helps local improves rivers and financially helps local communities.communities.
Provide 1.43 billion NT dollars for over 30 small towns.
Emergency flood protection
Donate to students that need money for their lunch
River and drainage improvement
Childbirth Subsidy
River environment improvement
MOEA WRA
Improve rivers
MOEA
Public roads improvement
Public welfare
19
ConclusionMOEA
~Thank you for your attention~~Thank you for your attention~
We had problems of severe sediment disaster, excess sediment that must be dredged, no one is willing to deal with dredging engineering, and the protests by local residents. Nevertheless, we not only cleaned out a lot of sediment for flood protection but also achieved the benefit of economic and public welfare by cooperating with other government units, improving policies, developing new technology systems, and preventing pollution.
We look forward to building a better environment.