PREFACE
Many miles of highway have adjacent rock slopes that
are subject to rockfall. This potential for rockfall
is due in part to past construction practices that
relied on overly aggressive excavation techniques.
Although these practices facilitated removal of broken
material, they commonly resulted in slopes more prone
to rockfall than necessary.
The Rockfall Hazard Rating System (RHRS) is intended
to be a tool that will allow transportation agencies
to address their rockfall hazards proactively instead
of simply reacting to rockfall accidents. The RHRS
provides a legally defensible, standardized way to
prioritize the use of the limited construction funds
available by numerically differentiating the apparent
risks at rockfall sites.
The Oregon Department of Transportation (ODOT) began
developing the RHRS in 1984. Funding from a Federal
Highway Administration (FHWA) sponsored, pooled-fund,
Highway Planning and Research (HPR) Grant allowed ODOT
to complete development of the system and test it at
more than 3,000 sites.
The workshop at which the RHRS is presented is
intended for the those personnel who will implement
*he RHRS and be responsible for evaluating and rating
the rockfall sites, and for the managers who will
decide whether their agency should adopt the RHRS.
For these managers, the first chapter and hour of the
workshop is an executive summary.
Those participants who will implement and perform the
RHRS will receive two days of training. Their first
day will be spent in a classroom setting, where they
will learn how to perform the ratings, create a
rockfall database, and use that information to set
rockfall remediation priorities. Their last day's
task will be a hands-on field exercise that requires
the participants to apply the RHRS's process at two
actual rockfall sites within the agency's
jurisdiction.
-
8/11/2019 009767 Rock Hazard Rating Sys
5/112
TABLE OF CONTENTS
Page
CHAPTER 1: EXECUTIVE SUMARY
1.1 Introduction
1.2 Evolution of the Rockfall Hazard Rating System
1.3 Summary of System Features
1.4 RHRS Benefits
1.4.1 Knowledge
1.4.2 Public Perception
1.4.3 Legal Protection
1.5 Implementation
1.5.1 RHRS Modification
1.5.2 Training
1.5.3 costs
1.6 Limitations
1.7 Conclusion
CHAPTER 2: SLOPE SURVEY
2.1 Purpose
2.2 Approach
2.3 Personnel
2.4 Information Gathered
CHAPTER 3: PRELIMINARY RATING
3.1 Purpose
3.2 Criteria
3.2.1 Estimated Potential for Rockfall on Roadway
3.2.2 Historical Rockfall Activity
3.3 Classification Description
3.4 How to Use the Preliminary Rating Results
3.5 Workshop Problem, Classroom Exercise 1
CHAPTER 4: DETAILED RATING
4.1 Purpose
4.2 Overview
4.3 Scoring System
4.4 Scoring Aids
4.4.1 Graphs
4.4.2 Exponent Formula
4.4.3 Scoring Tables
CHAPTER 5: DETAILED RATING CATEGORIES
5.1 Category Narratives
5.2 Category Photographs
5.3 Slope Height Category
5.3.1 Category Significance
5.3.2 Method of Measurement
5.3.3 Criteria Examples
5.3.4 Classroom Exercise 1
5.4 Ditch Effectiveness Category
5.4.1 Category Significance
5.4.2 Category Measurement
5.4.3 Criteria Narratives
6
6
;
10
12
13
14
14
14
ii
:i
::
:x
21
22
25
;z
25
;;
29
29
i
-
8/11/2019 009767 Rock Hazard Rating Sys
6/112
Page
5.4.4 Criteria Examples
5.5 Average Vehicle Risk (AVR) Category
5.5.1 Category Significance
5.5.2 Criteria Example
5.5.3 Classroom Exercise 1
5.6 Percent of Decision Sight Distance Category
5.6.1 Category Significance
5.6.2 Method of Measurement
5.6.3 AASHTO Decision Sight Distances
5.6.4 DSD Formula
5.6.5 Criteria Examples
5.6.6 Classroom Exercise 1
5.7 Roadway Width Category
5.7.1 Category Significance
5.7.2 Method of Measurement
5.7.3 Criteria Examples
5.7.4 Classroom Exercise 1
5.8 Geologic Character
5.8.1 Case One, Structural Condition Category
5.8.1.1 Category Significance
5.8.1.2 Criteria Narratives
5.8.1.3 Criteria Examples
5.8.2 Case One, Rock Friction Category
5.8.2.1 Category Significance
5.8.2.2 Criteria Narratives
5.8.2.3 Criteria Examples
5.8.3 Case Two, Structural Condition Category
5.8.3.1 Category Significance
5.8.3.2 Criteria Narratives
5.8.3.3 Criteria Examples
5.8.4 Case Two, Difference in Erosion Rates Category
5.8.4.1 Category Significance
5.8.4.2 Criteria Narratives
5.8.4.3 Criteria Examples
5.8.5 Selecting The Proper Case
5.8.6 Classroom Exercise 1
5.9 Block Size or Volume of Rockfall Per Event Category
5.9.1 Category Significance
5.9.2 Which Criterion to Use
5.9.3 Criteria Examples
5.9.4 Classroom Exercise 1
5.10 Climate and Presence of Water on Slope Category
5.10.1 Category Significance
5.10.2 Method of Evaluation
5.10.3 Information Source
5.10.4 Criteria Example
5.10.5 Classroom Exercise 1
5.11 Rockfall History Category
5.11.1 Category Significance
5.11.2 Criteria Narratives
5.11.3 Sources of Information
5.11.4 Classroom Exercise 1
5.12 Summary of Classroom Exercise 1
ii
-
8/11/2019 009767 Rock Hazard Rating Sys
7/112
Page
5.13
Epilogue
CHAPTER 6: PRELIMINARY DESIGN AND COST ESTIMATE
6.1 Approach to Rockfall Control
6.2 Rockfall Remediation Designs
6.2.1 Common Rockfall Remediation Techniques
6.2.2 Reviewing Preliminary Designs
6.3 Cost Estimate
, 6.4 Classroom Exercise 1
CHAPTER 7: PROJECT IDENTIFICATION AND DEVELOPMENT
7.1 Project Identification
7.1.1 Score Method
7.2.2 Ratio Method
7.2.3 Remedial Approach Method
7.2.4 Proximity Method
7.2 Rockfall Related Accidents
CHAPTER 8: ANNUAL REVIEW AND UPDATE
8.1 Review and Update
8.2 Review Purpose
CHAPTER 9: THE ROCKFALL DATABASE MANAGEMENT ROGRAM
9.1 The Value of an Automated Database (RDMP)
9.2 Tailoring the Database
9.3 About the Program
9.3.1 Generating Reports
CHAPTER 10: CLASSR00kl EXERCISES
10.1 Purpose
10.2 Exercise Procedure
10.2.1 Exercise 2 Procedure
10.2.2 Exercise 3 Procedure
10.3 Exercise 2
10.3.1 Preliminary Rating
10.3.2 Detailed Rating
10.3.3 Preliminary Design and Cost Estimate
10.4 Exercise 3
10.4.1 Preliminary Rating
10.4.2 Detailed Rating
10.4.3 Preliminary Design and Cost Estimate
10.5 Summaries of Classroom Exercises
70
::
71
72
:z
75
76
76
76
:9
77
78
:9
79
82
82
82
ii
86
ii:
86
ii;
90
8;
94
x:
99
101
REFERENCES 104
I I
111
-
8/11/2019 009767 Rock Hazard Rating Sys
8/112
5.2
5.3
E
5:;
5.8
5.9
5.10
5.11
5.12
5.13
5.14
5.15
5.16
5.17
5.18
5.19
5.20
5.21
5.22
5.23
5.24
5.25
5.26
LIST OF FIGURES
The public expects a safe trip.
Railroad accident caused by a rockfall.
"C" rated slope
"B" rated slope
"A" rated slope
Overhanging slope caused by differential erosion.
llO-foot high slope.
Ineffective roadside ditch.
Slope height scoring graph.
Rockfall is generated by the natural slope
above the highway cut.
When the slope is nearly vertical and there is access to
the top, the height can be measured with a tape.
Determine the vertical height of the slope not the slope
length. This 73-foot high slope is scored as 25 points.
The width of this fallout area provides good catchment.
The launch feature midway up the slope adds to the
ineffectiveness of this narrow roadside ditch.
Rockfall from this slope will land on the roadway.
The large volume events possible at this site would
not be retained in the ditch.'
Roadway curves with reduced posted speed limits
are common in rugged terrain. Remember to record
this information.
Example of a horizontal curve that could hide a
rock in the road ahead.
Vertical curves can also restrict sight distance.
The measured sight distance is 330 feet.
Only the width of the paved surface is rated. Note
the loss of the unpaved shoulder in the distance.
On divided highways, only the portion available
to the driver is measured.
The bedding is dipping towards the highway.
Randomly jointed rock.
Note the toppling failures. This, too, is an adverse
joint condition.
Continuous joints with adverse orientation.
An irregular joint.
Note the rough texture of the
exposed surface.
Exposed undulating joint surface.
A planar joint surface.
The surface is macro smooth.
Weathered joint surface.
Note the red colored clay
between the rock surfaces.
Rockfall caused by differential erosion.
Movement of material on an active talus slope is a
Case Two condition.
Layered material can be susceptible to d
erosion.
Oversteepened soil/rock slope.
The soil in the joints is more susceptib
than the resistant rock. The difference
ifferentia .l
'ion
e to eros
is large.
iv
Page
:
20
i i
22
z
27
33
34
34
37
ii
39
41
tt
45
47
t;
50
51
51
ii
54
54
56
56
;:
59
-
8/11/2019 009767 Rock Hazard Rating Sys
9/112
Figure
5.27
5.28
5.29
5.30
5.31
5.32
8.1
8.2
9.1
9.2
9.3
E
10:1
10.2
10.3
10.4
10.5
10.6
10.7
10.8
10.9
10.10
The cinders at the base of the slope are strongly
affected by freeze/thaw cycles and rain. The
differences are extreme.
Block size used to rate this event.
Either block size or volume could be used here to
obtain a maximum score.
Both the climate and water on the slope will eventu-
ally cause problems at this newly constructed site.
Rockfall History major events
A major event.
Note the large overhang in the distance.
When the large block fell, some of the debris reached
the roadway.
future rockfalls, which will be smaller,
should be retained in the ditch.
Screen print of the main state menu.
Sort menu with a request to sort database by Region,
Highway, and beginning Mile Point.
Ranking menu.
The largest value in the category to be
selected for ranking will be ranked 1.
Data ranked by cost-to-RHRS score.
Cost-to-RHRS data ranked by total score.
Overview of site 2. Slope height?
Ditch effectiveness?
AVR? Note the posted speed limit.
Geologic character?
Block size?
Overview of site 3. Slope height?
Ten-foot ditch is inadequate. Seventy-five percent
of rock reaches the roadway. Ditch Effectiveness?
Decision sight distance? Roadway width?
Geologic character?
Block size?
Page
60
63
63
80
83
84
95
8:
96
V
-
8/11/2019 009767 Rock Hazard Rating Sys
10/112
LIST OF TABLES
Table
Page
:::
:*:
1:5
43::
:::
1;::
ODOT's RHRS Costs (7/01,'90)
Description of Work Completed
Time Expenditures
Breakdown of Expenses
Expenditures Based on Percent of Time
Spent for Each Step
Preliminary Rating System
Summary Sheet of The Rockfall Hazard Rating System
Exponent Formulas
Decision Sight Distance
Rockfall Mitigation Techniques
Summary of Classroom Exercises
:;
;;
43
72
101
vi
-
8/11/2019 009767 Rock Hazard Rating Sys
11/112
-
8/11/2019 009767 Rock Hazard Rating Sys
12/112
-
8/11/2019 009767 Rock Hazard Rating Sys
13/112
In a subsequentpaper (2), Wyllie outlined a more detailed rating
procedure for prioritizing rockfall sites. Wyllies approach
included specific categories for evaluation. The categories were
scored using an exponential scoring system.
These were the two approachesutilized in developing the
prototype for the RHRS. From the earlier work of Brawner and
Wyllie, the idea of grouping sites in accordancewith a
subjective evaluation was adopted as part of the preliminary
rating. From Wyllies later work, the rating sheet format with
categories and the exponential scoring systemwere adopted as
part of the detailed rating. Some of the categories are similar to
Brawners and Wyllies while others are new. All have been
modified based on experiences n developing and applying the
RHRS statewide over the past several years. Detailed
narratives of the rating criteria have been added to promote
consistent understanding and application of the system.
The final phase of RHRS development began in July 1989, when
ODOT was selected to perform the HPR pooled-fund study
entitled the Rockfall Hazard Rating System. Funding support
for the study was provided by the following agencies:
State Highway Departments
1. Arizona 6. New Mexico
2. California 7. Ohio
3.
Idaho 8. Oregon
4. Massachusetts 9. Washington
5. New Hampshire 10. Wyoming
Federal Highway Administration
1. CTIP (Direct Federal)
3. Office of Research
2. Office of Implementation
The goal of the study was to finalize an effective RHRS.
Creation of the system was guided, and its value judged
according to several criteria:
1. Was the system understandable and easy to use?
2. Did the narratives adequately explain the criteria?
3. Could several different raters achieve uniform results?
4. Did the scores adequately reflect the rockfall hazard?
Through full-state implementation, the RHRS was tested at more
than 3,000
sites. The narratives were finalized and forms and
3
-
8/11/2019 009767 Rock Hazard Rating Sys
14/112
rating aids were developed. All pertinent information was
documented n the RHRS Users Manual (3). Nationally, the
test results were shared with State Highway Departments through
workshops presented at five regional Geotechnical Conferences
sponsoredby the FHWA.
The ODOTs engineering geology staff spent many hours
designing, testing, and redesigning the Rockfall Hazard Rating
System. Their specialized background and understanding of
rockfall made them uniquely qualified to create and maintain the
RHRS system and database.
1.3 Summary of System Features
The RI-IRS is a process that allows agencies to actively manage
the rock slopes along their highway system. It provides a
rational way for an agency to make informed decisions on where
and how to spend construction funds. The six steps n the
processare summarized below.
1. Slope Inventory - Creating a geographic databaseof
rockfall locations (chapter 2).
2. Preliminary Rating - Grouping the rockfall sites into
three, broad, manageably sized categories as A, B, and C
slopes (chapter 3).
3. Detailed Rating - Prioritizing the identified rockfall sites
from the least to the most hazardous (chapters 4 and 5).
4. Preliminary Design and Cost Estimate - Adding
remediation information to the rockfall database chapter 6).
5. Project Identification and Development - Advancing
rockfall correction projects toward construction (chapter 7).
6. Annual Review and Update - Maintaining the rockfall
database chapter 8).
Note that the RHRS uses wo types of slope ratings: the
preliminary rating performed during the initial slope inventory,
and the detailed rating. The preliminary rating eliminates many
slopes from any further consideration. This staged approach is
the most efficient and cost effective way to implement the RHRS
-
8/11/2019 009767 Rock Hazard Rating Sys
15/112
and is especially useful where agencieshave responsibility for
many slopes with a broad range of rockfall potential.
1.4 RHRS Benefits
The benefits associatedwith a fully implemented Rockfall
Hazard Rating System fall under three main headings:
1. Knowledge
2. Public Perception
3. Legal Protection
The bottom line of all three is that the necessarystepsare
being taken to understand the problem, and that the agency is
actively dealing with its rockfall problems.
1.4.1 Knowledge
Through implementation of the RHRS, management obtains
detailed information and a uniform process that can help them
make practical decisions on where to allocate money for rock-
slope projects. Until an agency knows the extent of its rockfall-
related problems, it cannot reasonably plan to deal with them.
As in all successfulphuming activities, a thorough understanding
of the problem is required
Oregon DOTs experience with the Rockfall Hazard Rating
System has been favorable. They welcome having quality
information to use in this area of project development. The
agency believes the issue of public safety is being properly
addressedand that greater legal protection is afforded the agency
by having the RHRS in place.
1.4.2 Public Perception
The public has come to realize that many risks are associated
with driving and that most of these risks are the result of human
error. In this respect, rockfall related accidents are out of the
5
-
8/11/2019 009767 Rock Hazard Rating Sys
16/112
ordinary. Very few highway accidents receive as much adverse
public attention as one caused by a rockfall. We are expected to
do something about the problem.
To offset this reaction, an agency must demonstrate to the public
that it is not only aware of the rockfall problem but is also
taking prudent steps toward reducing rockfall risks. The RHRS
is now recognized as an effective ,system for dealing with
rockfall. Using such a system demonstrates that the agency is
aware of its safety obligations and is taking a proactive approach
to the issue of rockfall.
1.4.3 Legal Protection
The courts have indicated that it is unreasonable to expect an
agency to have at its disposal enough funds to deal with all
safety related issues at any given time. However, a system must
be in place by which needed safety projects, including rockfall
remediation projects, can be identified and developed as funding
is made available. ODOTs experience has indicated that this
position is legally defensible.
The recently implemented RHRS has not been tested in court to
date. However, Oregon has for many years had a priority list
for developing rockfall construction projects. The sites listed
were those identified as having a history of accidents and/or
excessive maintenance costs. The list generally contained only
about 100 sites, selected not for their rockfall potential but for
their rockfall history. The sites were prioritized on the basis of
a benefit/cost analysis. Even so, because ODOT had a definite,
planned approach to deal with rockfall sites as funds were made
available, litigations brought against the state because of rockfall
were either settled out of court or resulted in findings favorable
to the state. Having a federally recognized, state-of-the-art
process for developing the priority list will serve agencies even
better in this regard.
1.5 Implementation
The RHRS process requires a greater commitment and focus on
the rock slope issue than is commonly the norm for many
6
-
8/11/2019 009767 Rock Hazard Rating Sys
17/112
agencies. The needed commitment entails additional working
hours and dollars to train the staff, complete the initial survey,
update the database egularly, and develop remedial programs
aimed at reducing the rockfall risk at the worst sites.
Several stepsare recommended or an agency to successfully
implement the RHRS. These steps can be grouped under the
following two headings:
1. RHRS modification.
2.
Staff Training.
Some customization of the RHRS may be necessary.
In
addition, a properly trained and experienced staff is needed to
perform the slope evaluations and to develop remedial designs.
The associatedcosts will vary, depending on an agencys past
experience in relation to the process, ts staff resources, and the
number of rock slopes it must evaluate.
1.5.1 RHRS Modification
It is understandable that some modifications are inevitabie.
Keep in mind, though, that the RI-IRS is a highly developed
system. Thinking through major modifications and retracing
many of ODOTs and FHWAs efforts will likely prove to be
unnecessary.
Within an implementing agency, a committee comprised of
representatives from the geotechnical, maintenance and project
development sections s helpful in guiding implementation of the
RHRS. This guidance helps to ensure that the finished product
is in the most useable form possible.
Consistency s an important aspect of the standard RHRS.
Any
necessarymodifications should be completed prior to full-scale
implementation. These modifications might include:
Changes to the basic RHRS to accommodate ocal
conditions.
Alterations in one or more of the data collection
forms, graphs or work sheets.
7
-
8/11/2019 009767 Rock Hazard Rating Sys
18/112
Changes to the Rockfall DatabaseManagement
Program (RDMP), or development of the agencys
own databasesystem.
Naturally, neither the scope of the rockfall problem nor the
physical conditions that cause t are the same n every agency.
The detailed rating portion of the system evaluates the physical
and historical conditions at a site. The criteria established for
the ratings is based on a wide spectrum of possible conditions.
If the conditions in your area are not covered by the proposed
criteria or if the majority of the slope conditions fall at one end
of the spectrum, then a modification of the criteria is
recommended. This change will allow for adequate score
separation and better identification of the more hazardous sites.
For example, in the slope height category, using the established
criteria, a slope must exceed 105 feet in height in order to
receive the maximum score of 100 points. If very few slopes n
your area are this high, then differentiating the relative risks
associatedwith this category through adequate score separation
will not occur. The criteria should be adjusted to avoid this
problem.
The forms in this manual were created to suit the requirements
of the RI-IRS and the RDMP. However, agencies ypically
differ both in the way they are organized and the way the
document geographic information. Modifying the forms to
conform to an agencys normal procedures may be necessary.
If the scoring criteria are altered, the exponent formulas used to
calculate a score based on the measuredcriteria will also need to
be modified. These formulas have been used to produce scoring
graphs and tables that facilitate the rating process. The scoring
graphs and tables will need to be redeveloped if criteria changes
are made.
A computer database s an important part of the RHRS. A great
deal of information will be generated that must be readily
accessible. In addition, since there are many ways of using the
RI-IRS data, having the flexibility to present the data in several
different formats is important. A hard copy file system will not
meet this need.
The FHWA has developed a Rockfall Database Management
Program (RDMP) that is PC based and designed specifically for
the RHRS. The program is a stand alone database hat requires
no supporting software. A copy is provided at no charge to the
8
-
8/11/2019 009767 Rock Hazard Rating Sys
19/112
states. The program operations are quite user friendly. The
RDMP is an excellent tool, and is highly recommended. If
assistance s needed to tailor the RDMP to an agencys needs,
that help is available through the FHWA.
If an agency already has a mainframe databasesystem, it may
want to adapt it to include the RI-IRS information.
Being able to
network through a statewide systemoffers the advantage of
allowing rapid transfer of information.
1.5.2 Training
Successfulcompletion of the RHRS depends on the efforts of
many people. The staff of raters, data entry personnel, and
designers all need training. In Oregons case, all these duties
were performed by its staff of engineering geologists. They
helped develop the RHRS, performed the ratings, entered the
data, and prepared the preliminary designs and cost estimates.
Becauseof proper training, they have since successfully
demonstrated hat reasonable and repeatable slope ratings can be
achieved and quality preliminary designs produced.
The responsibility for slope evaluations and design concepts
should rest with the more experienced staff.
Training should
consist of both a classroom style introduction to the RHRS and
additional hands-on field training beyond what was provided
during the second day of this course. Joint field exercises will
help the group reach a consensuson how to apply the criteria.
Communication within this group during implementation will
help maintain consistent application of the RHRS.
Prior to full-scale implementation, several rockfall sites should
be identified for rating. The sites should be selected to provide
as wide a variety of conditions as possible. Each rater should
rate all of the sections ndependently. A peer review of the
results should be undertaken to insure uniform application of the
criteria. (A smaller group of raters will promote more
consistent, reproducible, and useable results than a larger
group.) It is best to make any final modifications to the RI-IRS
or operational procedures at this time.
If a mainframe system s used, input of the RHRS information
into the databasemay be assigned to data entry personnel. Their
familiarity with data entry can reduce the training cost of this
9
-
8/11/2019 009767 Rock Hazard Rating Sys
20/112
effort to nearly zero. However, utilizing the extra staff to
ensure that the data is understandable to these individuals may
not make it the best option. If the raters input the data, some
time will be needed to familiarize them with the procedure.
The
PC based BUMP databasesystem was made as user friendly as
possible which should minimize the required training.
Developing state-of-the-art preliminary designs and cost
estimates s a specialized skill. This function may be outside an
agencys capabilities and may require contracting out. If the
agencys staff is capable in this area only routine review is
required, and little or no training will be necessary. Because
the designs are preliminary, less experienced raters may produce
these design concepts as long as their work is closely reviewed
by a qualified in-house specialist.
The new experience gained
by these raters will be beneficial.
1.5.3 costs
Cost is a primary concern for any agency considering
commitment of their resources o this kind of effort. The costs
associatedwith this commitment are jointly dependant on an
agencys pay scalesand the scope of the rockfall situation. One
way for an agency to estimate its costs s through comparison
with Oregons (in 1990 dollars). The following tables detail
ODGTs implementation costs.
Table 1.1 ODOTS RHRS Costs (7/01/90)
Middle Pay Step
Class (Loaded Rate)
Hours
Charged Total
Geologist 1
Geologist 2
Geologist 3
Supv Geol.
Office Spec.
Eng. Tech. 1
Maim. For. 2
Transp. Eng. 1
Total Overtime
Expenses
$21.81/hr.
$24.Ol/hr.
$27.84/hr.
$30.72&r.
$16.25&.
$16.29/hr.
$17.42/hr.
$24.Ol/hr.
variable
878.5
793.0
164.0
448.0
44.5
139.0
960.0
80.75
66.5
Total $87,169.52
$19,160.08
$19,039.93
$4,565.76
$13,762.56
$ 723.12
$2,264.31
$16,732.00
$ 1,942.ll
$ 1,654.65
%7,325.(M
10
-
8/11/2019 009767 Rock Hazard Rating Sys
21/112
Table 1.2 Description of Work Completed
Number of
Total slopes inventoried statewide.
All were
assigned an A,B,C rating.
1340
Slopes that were identified as
A or
B slopes and
were entered into the RHRS database.
501 Slopes that were designated as A slopes and were
further evaluated using the detailed rating.
* Estimated, since C rated slopes were not documented.
Table 1.3 Time Expenditures
Personnel
Involve
All
e
3493.5 hrs. or 436.68 days
Geologists (only)
2283.5 lm. or 285.00 days
Table 1.4 Breakdown of Expenses
All A, B, C cuts
A and B cuts only
A cuts only
Per r&me*
$29.00 spent per cut rated
$65.00 spent per cut rated
$174.00 spent per cut rated
* Total cost/no. of slopes n grouping.
11
-
8/11/2019 009767 Rock Hazard Rating Sys
22/112
Table 1.5 Expenditures Based on Percent of
Time Spent for Each Step
Training 10%
2%
$ 1,743.39
Prelim. Rating 50% 53% $46,199.84
Detailed Rating 30%
31% $27,022.55
Design/Cost Est.
10% 14% $12,203.73
* Suggestedas a guideline for implementing the RI-IRS.
Actual percentageswill vary from agency to agency.
When completed, the final RHRS product is a statewide database
that identifies all A and B rated slopes and includes a
preliminary design and cost estimate for all of the A rated
slopes. Table 1.4 indicates that the expenditure to complete this
estimate, based solely on the number of A rated slopes, is
$174.00 per slope. This cost is quite reasonable.
1.6 Limitations
Agencies will always be expected to react to rockfall accidents,
no matter where the accident area ranks on the RHRS priority
list. The tendency to overreact should be resisted. Sites where
an accident has occurred should be reevaluated using the detailed
rating to determine if the rockfall incident has increased or
decreased he rockfall potential. The level of investment at the
site should be consistent with the newly evaluated rockfall
potential relative to the other sites.
The Rockfall Hazard Rating System offers agencies a method to
prioritize their rockfall problems by providing a relative rating
among slopes. This rating is partially subjective. Although the
slope evaluation process s as straightforward as possible, there
is still a range of values that a particular slope could receive.
This depends to a large degree on the abilities of the raters and
how consistently they interpret and apply the rating criteria.
Keep in mind that any
A
rated slope is capable of sending
12
-
8/11/2019 009767 Rock Hazard Rating Sys
23/112
rock onto the roadway, whether it receives a detailed rating
score of 700 or 600 points.
1.7 Conclusion
Oregons experience with the RHRS has been favorable.
The
responseby agency managementhas been one of relief and
acceptance. They welcome having quality information to use in
this area of the project development process. They can now
make rational decisions on where to allocate money for rock
slope projects, a capability that was not possible before
implementation of the Rockfall Hazard Rating System.
13
-
8/11/2019 009767 Rock Hazard Rating Sys
24/112
CHAPTER 2: SLOPE SURVEY
2.1 Purpose
The purpose of the slope survey is to gather specific information
on where rockfall sites are located. This first step is an essential
feature of the RHRS. Only through this effort can an agency
understand the extent of the rockfall problem it faces.
2.2 Approach
It is best to approach the survey without preconceived ideas of
the location or number of hazardous sites. Few people will
already be aware of even the most critical rockfall sections
statewide.
The slope survey is an information gathering process hat, in the
beginning, may seemunreasonably burdensome. It is best to
break the effort into manageable asks. Using existing
maintenanceboundaries is a practical starting point.
Accurate delineation of the rockfall section is important.
For
the purpose of the RHRS, a rockfall section is defined as:
Any unint.errupti slope along a highway where the level
and occurring mode of rockfall are the same.
The limits of a rockfall section are established by the length of
the slope adjacent to the highway. Interruptions in the slope
may be due to numerous factors such as drainages, cross oads,
and taposraphy *
Within an uninterrupted section, the level (frequency and/or
amount) of rocl&ll can be markedly different. Two examples
of these differences are a change in the frequency or orientation
of the discontinuities and a difference in erosion rates. Where
this kind of variation occurs, the urgency and type of
remediation required may vary enough to make delineating
portions of the slope as separate ockfall sections appropriate.
The rockfall mode (the reason for the rockfall) may also vary.
Changes n rock type, slope geometry, or the size of the fallout
area can occur throughout an uninterrupted slope section. Thus,
the slope can have different material properties exposed, or
varying conditions that lead to rockfall on the highway. The
14
-
8/11/2019 009767 Rock Hazard Rating Sys
25/112
type of remediation will vary frequently becauseof these
variations and delineating additional sections s appropriate.
Establishing rockfall sections n this manner requires both skill
and effort.
The desired result is a flexible and usable database.
Grouping of sites can occur later, if needed, when project limits
are defined during the project development process.
2.3 Personnel
Two people are needed for the slope survey: the rater, who will
perform the preliminary rating and, if needed, the detailed
rating, and a person from highway maintenance. The mainte-
nance person should be the one who is most knowledgeable
about a highways rockfall history and associatedmaintenance
activities.
2.4 Information Gathered
The historic perspective provided by the maintenance person is
an important element of the preliminary rating.
Past rockfall
activity is a good indicator of what to expect in the future. Too
often, the rockfall history of a site is not well documented, and
is maintained only in the memory of the person who worb on
that section of highway. The slope survey provides an
opportunity to document the historic rockfall activity. The
following information should be covered:
1. Location of rockfall activity
2. Frequency of rockfall activity
3. Time of year when activity is highest
4. Size/quantity of rockfall per event
5. Physical characteristicsof rockfall material
6.
Where rockfalls have come to rest
7. Available accident history
8. Opinion of rockfall cause
9. Frequency of ditch cleaning/road patrol
10. Estimated cost of maintenance response
This information should be recorded in the Comments section of
the field data sheet shown on the next page.
15
-
8/11/2019 009767 Rock Hazard Rating Sys
26/112
RNRSIELD ATA RRET
REGl;N
PercentDecisionSite
Distance
SIGBT ISTANCE
CASE1
Structural ConditionD C/PR A
Rock riction R I 0 P C - S
CASE
Differential ErosionFeatures 0 N N
Differencen ErosionRatesS N L E
BlockSize/Volume ft/yd3
Climate
CASE
STRUCTCOND
ROCKRICTION
CASE
DIF ERFEATURES
DIP ERRATES
BUCKSIZE
Precipitation L WH
FreezingPeriodN S L
Water n Slope N I C
Rockfall History F 0 N C
amnERTs:
CLIHATE
ROCKFALLISmY
lwrAL SCORE
16
-
8/11/2019 009767 Rock Hazard Rating Sys
27/112
At the top of the data sheet, the highway name and number, the
region or district, the beginning and ending mile point, whether
the section is left or right of centerline, the county, the date, and
the raters name, should be recorded. The limits of the rockfall
section should be determined to the nearest hundredth of a mile.
17
-
8/11/2019 009767 Rock Hazard Rating Sys
28/112
CHAPTER 3: PRELIMINARY RATING
3.1 Purpose
The purpose of the preliminary rating is to group the rockfall
sections nspected during the slope inventory into three broad,
more manageably sized categories. Without this step, many
additional hours would be spent applying the detailed rating at
sites with only a low-to-moderate chance of ever producing a
hazardous condition. This rating is a subjective evaluation of
rockfall potential that requires experienced, insightful personnel
to make valid judgments.
3.2 Criteria
The criteria used in the preliminary rating to categorize sections
as A, B, or C slopes are shown below.
Table 3.1 Preliminaxv Rating System
CLASS
CRITERIA
ESTIMATED POTENTIAL
FOR ROCKFALL
ON ROADWAY
HISTORICAL
ROCKFALL ACTIVITY
A B
C
HIGH MODERATE LOW
HIGH MODERATE LOW
The RI-IRS is a proactive system, primarily aimed at the rockfall
potential at a site. The estimated potential for rockfall on
roadway criterion is therefore the controlling element of the
preliminary rating. For example, if a slope presentsa high
potential for rock on the roadway, (i.e., the slope contains a
large block that displays evidence of active displacement and
very limited fallout area is available), it would receive an A
rating, regardless of other past rockfall activity. The historical
18
-
8/11/2019 009767 Rock Hazard Rating Sys
29/112
-
8/11/2019 009767 Rock Hazard Rating Sys
30/112
-
8/11/2019 009767 Rock Hazard Rating Sys
31/112
-
8/11/2019 009767 Rock Hazard Rating Sys
32/112
-
8/11/2019 009767 Rock Hazard Rating Sys
33/112
-
8/11/2019 009767 Rock Hazard Rating Sys
34/112
The slope is over 100 feet tall and it shows the severe effects of
differential erosion (figure 3 S). The roadside ditch is not
adequate to restrict rockfall from reaching the roadway (figure
3.6). The maintenanceperson states hat the site is a major
maintenance problem. Cobble-size rocks from the upper
conglomerate unit fall on the road almost daily from November
to May (rainy period) and during summer storms. In addition,
about every 3 to 5 years a major rockfall event occurs, when too
much of the slope becomesunsupported. Water flowing out of
the slope between the two sedimentary units rapidly erodes the
lower unit, resulting in the overhang.
Based on this evidence, classify the criteria in accordancewith
the preliminary rating system shown on page 18.
Estimated Potential for Rock on Roadway = A B C
Historical Rockfall Activity = A B C
This rockfall section would be entered into the RI-IRS database
as
an A B classified slope.
24
-
8/11/2019 009767 Rock Hazard Rating Sys
35/112
CHAPTER 4: DETAILED RATING
4.1 Purpose
The purpose of the detailed rating is to numerically differentiate
the risk at the identified sites. Once rated, the sites can be
sorted and prioritized on the basis of their scores. These lists
are then used to help make decisions on where safety projects
should be initiated.
4.2 Overview
The detailed rating, shown on the next page, includes 12
categories by which slopes are evaluated and scored. (A
detailed explanation of these categories is included in chapter 5.)
The category scoresare then totaled. Slopes with higher scores
present the greater risk. These 12 categories represent the
significant elements of a rockfall section that contribute to the
overall hazard. The four columns of benchmark criteria to the
right correspond to logical breaks in the increasing risk
associatedwith each category.
4.3 Scoring System
Accordingly, as the risk increases rom left to right, the related
scoresabove each column increase from 3 to 8 1 points. These
set scores ncrease exponentially. An exponential scoring system
provides a rapid increase in score that distinguishes the more
hazardous sites. The set scoresare merely representatives of a
continuum of points from 1 to 100. When rating a slope, using
the full range of points instead of only the set points listed above
each column allows the rater greater flexibility in evaluating the
relative impact of conditions that are extremely variable.
Initially, novice raters feel more comfortable using the set
points. Less udgement is required. Continuing to use only the
set points, however, is not an optimal use of the system, and is
not recommended.
25
-
8/11/2019 009767 Rock Hazard Rating Sys
36/112
SHEET OF THE ROCKFALL HAZARD RATING SYSTEM
AVERAGEEHICLE
PERCENTF
DECISION
SIGBT
DISTANCE
ROADNAYIDTH
INCLDDINGAVFJ
sJlmERs
Adeguateight
distance,004
of lowdesign
value
44 eet
b&rate sight
distance,09
of lowdesign
value
36 eet
Limited ight
distance,01
of lowdesign
value
28 eet
Veryimitedsight
distance0%
of lowdesign
value
20 eet
G C Discontinuous Discontinuous Discontinuous Continuous
E A STRUCTURAL joints,
joints,
joints,
joints,
0 s CDNDITIDN favorable randon
adverse adverse
L E orientation orientation
orientation orientation
0
G 1
ROCK
Rough,
Claynf lling,
I
FRICTIDN
Irregular Undulating Planar or slickensided
C
c c
A
Few
Occasional
WY
Hajor
STRUCTURAL
A s
differential differential differential
differential
R E
CONDITION erosioneatures erosion erosion erosion
A
features features features
c 2
T
E
DIFFERENCEN Small Hoderate
Large
Extreme
R
EROSIONATES difference
difference difference difference
BLOCKHE
VGF
RocKFALL/AmT
CLINATEND
PRESENCE
OFWATER
ON LOPE
1 Foot
3cubic
Yards
Lowto
aoderate
precipitation:
no reezing
periods:o
water nslope
2Feet
6cubic
Yards
H&rate
precipitation
or short reezing
periodsr
inter&tent
water nslope
3 Feet
g-ii5
Y&
High recipitationr
long reeaing
periodsr
continual ater
onslope
4 Feet
12cubic
Y-
Bigh recipita-
tion andong
freeaingeriods
or continual
water nslope nd
long reezing
periods
ROCNFALLISTORY
Fewalls Occasionalalls Nanyalls Constantalls
26
-
8/11/2019 009767 Rock Hazard Rating Sys
37/112
4.4 Scoring Aids
To assistwith scoring, scoring graphs have been created for all
categories, and scoring tables have been developed for all of the
directly measurablecategories. These scoring aids promote
greater consistency in assigning scores, and increase the speed of
performing the detailed rating. The graphs are useful even for
the subjective categories, especially if previously rated slope
conditions are plotted directly on the graphs as a reference.
4.4.1 Graphs
The graphs relate the category evaluation to an appropriate
score. Even with the subjective categories, such as Ditch
Effectiveness, the graphs are quite useful in assigning a score to
a condition that falls somewherebetween the described
benchmarks.
The curve on the graph is the plot of the function
Y
= 3 which defines the exponential scoring system used for
all categories. These graphs are designed to match the
established criteria. If modifications to the criteria are made,
the graphs must be corrected to match the new criteria.
1
25 50 75 100
Slope Height (ft)
Figure 4.1 Slope height scoring graph.
27
-
8/11/2019 009767 Rock Hazard Rating Sys
38/112
-
8/11/2019 009767 Rock Hazard Rating Sys
39/112
4.4.2 Exponent Formula
Exact scorescan be tabulated for the measurable categories by
calculating the value of the exponent xl of the function y = 3.
The formulas that yield the exponent values are included in the
table below. Some agenciesmay prefer to include these
formulas in their databaseso that only the sites measurements
need to be entered. Remember, these formulas will need to be
modified if the rating criteria are changed.
Table 4.2 Exponent Formulas
SLOPE HElGKT ROADWAY WIDTH
X
Slopa Ht.@.) 52 - Roadway Width (ft.)
=
X
=
25 B
AVERAGE VE WLE RISK
I
BLOCK SIZE
X Time
x=
X
= Block Size (ft.)
25
SIGHT DISTANCE VOLUME
x=
120 - X Decision Sight D ist
x=
Volume (cu.R.)
20
3
4.4.3 Scoring Tables
Scoring tables have been produced using these exponent
formulas. Scores derived from these tables are always
reproducible. The only variations possible are those due to
human error or to a difference in the category measurement.
The scoring tables shown on the next page, along with useful
formulas used in the detailed rating, are included on the back of
each field data sheet.
29
-
8/11/2019 009767 Rock Hazard Rating Sys
40/112
SLOPE
HT.
u6r6
56 13
EEi
'9 13
59 13
60 14
61 15
375
2s
30
CL? 5 35
40
E
75
45
750 50
675
55
looo 60
lael 90 llnl 11 I
2 2
2.5 2
Elii
3
3.5 4
4 4
39 06 1 78 10
40 at 79 10
41 n 8a 9
42 .73 81
9
62 is
63 18
ij
64 17
% 17
143169 i62l 6 1
I
4.5 I 8 I
1
8
71
l-z-ma
27
l-t
lag, 3 I
61
1 13 1 loo I
67 46
66 46
33
99 so
90
52
lJst6 iaS
92 57
93 60
33
94 60
95 62
96 65
100
7
1241 xsiumleMlh
hike x
lul
7
Ys.~I-601
97
%
4
99
76
loo a1
33
01 %
102 66
103 92
E.P.
I
lope Height =
sina xsinfi XX
sin(a - 6)
+ H.I.
-1
Heightof Instrument
a
and/3
I
hottzontaldistancebetween
I
I
I DITCH HIGHWAY
30
-
8/11/2019 009767 Rock Hazard Rating Sys
41/112
5.1 Category Narratives
Before a decision can be made on how to score a rockfall section
the criteria for each category must be well understood and
carefully considered. As the RI-IRS evolved, it became clear
that the scoring criteria needed more clarification to limit the
degree to which the raters could interpret the criteria differently.
To improve rating consistency, narratives were written for each
category.
The narratives are based on extensive field testing of the system.
Some categories require a subjective evaluation, while others can
be directly measured and then scored. The narratives describe
the benchmark criteria in greater detail. This description
reduces the possible variation in scoring a category by limiting
the amount of interpretation required by the rater.
5 -2 Category Photographs
Photographs from several sites will be used as illustrations of the
category criteria. The photographic examples are valuable aids
for relating the criteria to actual slope conditions and, in some
cases, for demonstrating the intended limits of the criteria.
They
will be beneficial references should you consider possible
modifications to the criteria.
Classroom exercise 1, used as the preliminary rating example,
will also be used throughout this chapter. This exercise will be
the participants first opportunity to apply the detailed rating to a
slope. Photographs showing the condition to be rated will be
included at the end of each category discussion.
5.3 Slope Height Category
This category evaluates the risk associated with the height of a
slope. The height measured is the vertical height, not the slope
distance. The slope height measurement is to the highest point
31
-
8/11/2019 009767 Rock Hazard Rating Sys
42/112
from which rockfall is expected.
If rockfall is generated from
the natural slope above the cut slope, the measurement should
include both the cut height and the additional vertical height on
the natural slope to the rockfall source.
The benchmark heights
that coincide with the set points are listed below.
This category
is directly measured and scored.
SLOPE HEIGHT 25 ft
50 ft 75 ft 100ft
5.3.1 Category Significance
The higher a rock is located on a slope, the more potential ener-
gy it has. The increased energy potential is a greater hazard,
and thus a higher rating is given as the slope height increases.
5.3.2 Method of Measurement
The slope height can be obtained by using the relationship shown
below.
SLOPE HEIGHT DIAGRAM
TOTAL SLOPE HElGHT =
(X) sin a .
sin p
+ H.I.
(1)
sin( a - B )
Where: X = distance between angle measurements.
H.I. -
height of the instrument.
32
-
8/11/2019 009767 Rock Hazard Rating Sys
43/112
-
8/11/2019 009767 Rock Hazard Rating Sys
44/112
-
8/11/2019 009767 Rock Hazard Rating Sys
45/112
5.3.4 Classroom Exercise 1
Determine the height of the slope by using the method outlined
in section 5.3 -2. The measurements and related facts) were:
1. The clinometer was held at a height of 5 feet (H.I.).
2. The X distance from edge of pavement to edge of pavement
was 30 feet.
3. The Q and B angles measuredwere 70 and 57 degrees,
respectively.
Total Slope Height is
feet.
Using the scoring table in section 4.4.3 (page 30)) the Slope
Height Category score is .
35
-
8/11/2019 009767 Rock Hazard Rating Sys
46/112
5.4 Ditch Effectiveness Category
The effectiveness of a ditch is measuredby its ability to restrict
falling rock from reaching the roadway. Many factors must be
considered n evaluating this category. The reliability of the
result depends heavily on the raters experience. Ditch
Effectiveness is a subjective category. The benchmark criteria
are shown below.
DITCH
Good Moderate
Limited
No
EFFECTIVENESS catchment cat&rent catchment catchment
5 -4.1 Category Significance
The risk associatedwith a particular rock slope section is
dependent on how well the ditch is performing in capturing
rockfall. When little rock reaches the roadway, no matter how
much rockfall is released from the slope, the danger to the
public is low and the score assesseds low. Conversely, if
rockfall events are rare occurrencesbut the ditch is nonexistent,
the resulting hazard is greater and a higher score is assigned his
category.
5.4.2 Category Measurement
A wide fallout area does not necessarily guarantee that rockfall
will be restricted from the highway. In estimating the ditch
effectiveness, the rater should consider several factors, such as:
1) slope height and angle; 2) ditch width, depth and shape; 3)
anticipated volume of rockfall per event; and 4) impact of slope
irregularities (launching features) on falling rocks. Evaluating
the effect of slope irregularities is especially important because
they can completely negate the benefits expected from a fallout
area. Valuable information on ditch performance can be
obtained from maintenance personnel.
36
-
8/11/2019 009767 Rock Hazard Rating Sys
47/112
-
8/11/2019 009767 Rock Hazard Rating Sys
48/112
-
8/11/2019 009767 Rock Hazard Rating Sys
49/112
-
8/11/2019 009767 Rock Hazard Rating Sys
50/112
5.5 Average Vehicle Risk (AVR) Category
With the AVR category, the risk associatedwith the percentage
of time a vehicle is present in the rockfall section is evaluated.
The percentage s obtained by using the formula (shown below)
based on slope length, average daily traffic (ADT), and the
posted speed imit at the site.
ADT (cars/day) X Slope Length (miles) / 24 (hours/day)
XlOO%=AVR
Posted Speed Limit (miles/hour)
The results are rated based on the established benchmark criteria.
AVERAGE VEHICLE 25%
RISK of the
WR)
time
50%
of the
time
75%
of the
time
100%
of the
time
5 -5.1 Category Significance
Combining the ADT, the length of the rockfall section and the
posted speed imit produces a category that represents the
potential for a vehicle to be involved in a rockfall event. The
average percent of time a vehicle is present within the rockfall
section is calculated. Another way of looking at this is that it
shows how many vehicles are in the rockfall section at any one
time. A rating of 100% means hat on the average a vehicle
will be within the defined rockfall section 100% of the time.
Where high ADTs or longer slope lengths exist, values greater
than 100% will result. When this occurs, it means that at any
particular time, more than one vehicle is present within the
measured section. The result approximates the likelihood of
vehicles being present and thus involved in a rockfall incident.
The result also reflects the significance of the route.
40
-
8/11/2019 009767 Rock Hazard Rating Sys
51/112
-
8/11/2019 009767 Rock Hazard Rating Sys
52/112
5.6 Percent of Decision Sight Distance Category
The Decision Sight Distance category compares the amount of
sight distance available through a rockfall section to the low
design amount prescribed by AASHTO. Sight distance is the
shortest distance that a six-inch object is continuously visible to
a driver along a roadway. Decision sight distance (DSD) is the
length of roadway, in feet, required by a driver to perceive a
problem and then bring a vehicle to a stop.
PERCENT OF Adequate sight Moderate sight
Limited sight
Very limited
DECISION distance, 100% distance, 80 % distance, 60% sight distance,
SIGHT of low design of low design
of low design 40% of low
DISTANCE value value value design value
5 -6.1 Category Significance
The DSD is critical when obstacles on the road are difficult to
see, or when unexpected or unusual maneuvers are required.
Throughout a rockfall section the sight distance can change
appreciably. Horizontal and vertical highway curves along with
obstructions such as rock outcrops and roadside vegetation can
severely limit a drivers ability to notice and react to a rock in
the road.
5.6.2 Method of Measurement
First, record the posted speed limit throughout the rockfall
section.
Then drive through the site from both directions to
determine where the sight distance is most restricted.
Decide
which direction has the shortest line of sight. Both horizontal
and vertical sight distances should be evaluated. Normally an
object will be most obscured when it is located just beyond the
sharpest part of a curve.
Place a six-inch object in that position
on the fogline or on the edge of pavement if there is no fogline.
Then walk along the fogline (edge of pavement) in the opposite
direction to the traffic flow, measuring the distance it takes for
the object to disappear at an eye height of 3.5 ft above the road
surface. A roller tape is helpful for making this measurement.
42
-
8/11/2019 009767 Rock Hazard Rating Sys
53/112
5.6.3 AASHTO Decision Sight Distkes
The required decision sight distance, based on the posted speed
limit can be determined from the table below.
Table 5.1 Decision Sight Distance
Posted Speed Limit (mph)
25
30
35
40
45
50
55
60
65
Decision Sight
Distance (ft)
375
450
525
600
675
750
875
1,~
1,050
The relationships between decision sight distance and the posted
speed limit were modified from table III-3 of AASHTOs
Policy on Geometric Design of Highways and Streets (4).
The distances listed represent the low design value. The posted
speed imit throughout the rockfall section should be used
instead of the highway design speed.
5.6.4 DSD Formula
Once the actual sight distance is measured and the recommended
sight distance determined from the table, the two values can be
substituted into the following formula to calculate the Percent
of Decision Sight Distance.
Actual Sight Distance
x 100% = %
Decision Sight Distance
43
-
8/11/2019 009767 Rock Hazard Rating Sys
54/112
-
8/11/2019 009767 Rock Hazard Rating Sys
55/112
-
8/11/2019 009767 Rock Hazard Rating Sys
56/112
5.7 Roadway Width Category
The roadway width is measured perpendicular to the highway.
The minimum width throughout the rockfall section is used when
the roadway width is not constant. The unpaved shoulder
adjacent to the roadway is not included in the measurement.
The benchmark criteria are:
ROADWAY WIDTH
INCLUDING PAVED 44 feet 36 feet 28 feet 20 feet
SHOULDERS
L
5 -7.1 Category Significance
If a driver notices rocks in the road, or rocks falling, it is
possible for the driver to react and take evasive action to avoid
them. The more room there is for this maneuver, the greater
the likelihood the driver will successfully miss the rock without
hitting some other roadside hazard or oncoming vehicle. The
measurement represents the available maneuvering width of the
roadway.
5.7.2 Method of Measurement
The roadway width is measured perpendicular to the highway
centerline. The edges of pavement define the roadway. It is
difficult to get uniform estimates among different raters about
what is unpaved shoulder and what is unmaneuverable side
slope. For that reason, the unpaved shoulders are not included
in the measurement. When the roadway width varies throughout
the rockfaIl section, the section measured should be the area of
minimum width. On divided roadways, only the portion
available to the driver is measured.
46
-
8/11/2019 009767 Rock Hazard Rating Sys
57/112
-
8/11/2019 009767 Rock Hazard Rating Sys
58/112
5.7.4 Classroom Exercise 1
The road through this section consists of two 1Zfoot travel
lanes, a 4-foot paved shoulder on the south side of the road, and
a 2-foot paved shoulder on the north side near the slope.
According to the appropriate scoring table, what is the Roadway
Width Category score for this site?
Roadway Width Score =
5.8 Geologic Character
The geologic conditions of the rockfall section are evaluated
with these categories. Since the conditions that cause rockfall
generally fit into 2 categories, Case One and Case Two rating
criteria have been developed. Case One is for slopes where
joints, bedding planes, or other discontinuities, are the dominant
structural features that lead to rockfall.
Case Two is for slopes
where differential erosion or oversteepening is the dominant
condition that controls rockfall.
Whichever case best fits the slope should be used for the rating.
If both situations are present, and it is unclear which dominates,
both are scored, but only the worst case (highest score) is used
in the rating. The criteria for the two cases are shown below.
c
STRUCTURAL
Discontinuous Discontinuous Discontinuous Continuous
A
CONDITION
joints, joints, joints, joints,
S favorable random adverse adverse rientation
E orientation orientation orientation
G C
EH 1
ROCKRICTION Rough, Undulating Planar Clay nfilling,
0 A
Irregular or slickensided
L R
0 A
G C
I T
CE c
STRUCTURAL Few ifferential Occasional Hanyerosion Haor erosion
R i
CONDITION erosion eatures erosion eatures features features
E
DIFFERENCE
%a11 Moderate
Large
Large
IN difference difference
2
difference, difference,
EROSION favorable unfavorable
RATES structure structures
48
-
8/11/2019 009767 Rock Hazard Rating Sys
59/112
-
8/11/2019 009767 Rock Hazard Rating Sys
60/112
-
8/11/2019 009767 Rock Hazard Rating Sys
61/112
-
8/11/2019 009767 Rock Hazard Rating Sys
62/112
5.8.2 Case One, Rock Friction Category
The potential for rockfall by movement along discontinuities is
controlled by the condition of the joints. The condition of the
joints is described in terms of micro and macro roughness.
The
roughness is rated on the basis of the following criteria.
ROCK Rough,
FRICTION Irregular
Undulating Planar Clay infilling
or slickensided
5.8.2.1 Category Significance
This parameter directly affects the potential for a block to move
relative to another. Friction along a joint, bedding plane, or
other discontinuity is governed by the macro and micro
roughness of the surfaces.
Macro roughness is the degree of
undulation of the joint relative to the direction of possible
movement. Micro roughness is the texture of the surface. On
slopes where the joints contain hydrothermally altered or
weathered material, movement has occurred causing slickensides
or fault gouge to form, or the joints are open or filled with
water, the rockfall potential is greater.
5.8.2.2 Criteria Narratives
Following are the benchmark criteria descriptions.
3 points &Q& Irrea The surface of the joints are rough
and the joint planes are irregular enough to cause
interlocking.
9 points
m Macro rough but without the
interlocking ability.
27 points planar Macro smooth and micro rough joint
surfaces. Friction is derived strictly from the rough-
ness of the rock surface.
. . .
81points moor- Low friction materials
separate the rock surfaces, negating any micro or
macro roughness of the joint surfaces.
Slickensided
joints also have a lower friction angle, and belong in
this category.
52
-
8/11/2019 009767 Rock Hazard Rating Sys
63/112
-
8/11/2019 009767 Rock Hazard Rating Sys
64/112
-
8/11/2019 009767 Rock Hazard Rating Sys
65/112
5.8.3 Case Two, Structural Condition Category
This case is used for slopes where differential erosion or
oversteepening is the dominant condition that leads to rockfall.
Erosion features include oversteepened slopes, unsupported rock
units (overhangs), or exposed resistant rocks on a slope, which
may eventually lead to a rockfall event. The benchmark criteria
are:
I
TRUCTURAL Few differential Occasional
I
Many
Major
CONDITION erosion features erosion features erosion features erosion features
5.8.3.1 Category Significance
Rockfall is commonly caused by erosion that leads to a loss of
support either locally or throughout a slope. The types of slopes
that may be susceptible to this condition are: layered units
containing more easily erodible units that undermine more
durable rock; talus slopes; highly variable units, such as
conglomerates, and mudflows, that weather differentially,
allowing resistant rocks and blocks to fall; and rock/soil slopes
that weather allowing rocks to fall as the soil matrix material is
eroded.
5.8.3.2 Criteria Narratives
Scoring should be consistent with the following criteria
descriptions.
3 points
pew Dim Erosiom Minor differential
erosion features that are not distributed throughout
the slope.
9 points Occ~ Fro&n Fe- Minor differential
erosion features that are widely distributed
throughout the slope.
27 points
.
&&my Erom Featurs Differential erosion features
that are large and numerous throughout the slope.
81 points Major Erosion Fm Severe cases such as
dangerous erosion-created overhangs, or significantly
oversteepened soil/rock slopes or talus slopes.
55
-
8/11/2019 009767 Rock Hazard Rating Sys
66/112
-
8/11/2019 009767 Rock Hazard Rating Sys
67/112
-
8/11/2019 009767 Rock Hazard Rating Sys
68/112
5 -8.4 Case Two, Difference in Erosion Rates Category
The materials comprised in a slope can have markedly different
characteristics that control how rapidly weathering and erosion
occur. As erosion progresses, resulting in portions of the slope
becoming unsupported, the likelihood of a rockfall event
increases. The benchmark criteria listed below relate to the
difference in erosion,rates within a slope and how they affect the
risk of rockfall.
DIFFERENCE
IN EROSION
RATES
Small Moderate
difference difference
Law
difference,
favorable
structure
Law
difference,
unfavorable
structure
5.8.4.1 Category Significance
The rate of erosion on a Case Two slope directly relates to the
potential for a future rockfall event. As erosion progresses,
unsupported or oversteepened slope conditions develop. The
impact of the common physical and chemical erosion processes,
as well as the effects of mans actions, should be considered.
The degree of hazard caused by erosion and thus the score given
this category, should reflect the rate at which erosion is
occurring; the size of rocks, blocks, or units being exposed; the
frequency of rockfall events; and the amount of material released
during an event.
5.8.4.2 Criteria Narratives
Scoring should be consistent with the following criteria
descriptions.
3 points Small Differens Erosion features take many years
to develop. Slopes that are near equilibrium with
their environment are covered by this category.
9 points Moderate The difference in erosion rates
allows erosion features to develop over a period of a
few years.
58
-
8/11/2019 009767 Rock Hazard Rating Sys
69/112
-
8/11/2019 009767 Rock Hazard Rating Sys
70/112
-
8/11/2019 009767 Rock Hazard Rating Sys
71/112
If both situations are present, both are scored but only the worst
case (highest total Case One or Case Two score) is used in
determining the rating. If a localized area is causing a serious
rockfall problem, the overall length of the slope being rated
should be reduced, and the problem area should be rated
separately.
5.8.6 Classroom Exercise 1
The upper portion of the slope is a conglomerate unit with hard
quart&e and igneous rock cobbles suspended n a cemented sand
matrix. About 10 to 15 feet from the base of the slope is a near
horizontal contact between the conglomerate.unit and a poorly
cemented siltstone unit. Water flows from the slope year round
at the contact between the two units.
Two types of rockfall occur at this site, both causedby the same
geologic process - differential erosion. The difference in erosion
rates between the conglomerate and the siltstone units is
significant. The water daylighting in the slope at the contact
between these units accelerates he erosion of the siltstone
creating dangerous overhangs. The size of the overhang
increasesby several inches per year, until the overhanging
material breaks off in a major rockfall event. The failures occur
along vertical stress elief joints that form in the conglomerate
unit parallel to the slope face. These are the major events that
the maintenanceperson described as happening approximately
every 3 to 5 years. While this process s taking place, the
abundant ram and wind at the site erodes the matrix material of
the conglomerate causing the cobbles to fall on a regular basis.
The historic information combined with the knowledge of how
the geologic processes esult in the rockfall events, leads to the
conclusion that this is a Case Two slope.
Using the above information and the narratives for the
benchmark criteria found on pages 55 and 58, assign a score for
the two categories under Geologic Character, Case Two.
Structural Condition Score =
Difference in Erosion Rates Score =
61
-
8/11/2019 009767 Rock Hazard Rating Sys
72/112
5.9 Block Size or Volume of Rockfall Per Event Category
In some rockfall events, the failure is comprised of an individual
block. In others cases,. he event may include many blocks of
differing sizes. Which ever type of event is typical is rated
according to the following category benchmarks.
BLOCK SIZE
Ifi
QUANTITY OF 3 cubic
ROCKFALL/EVENT
yards
2ft
6 cubic
yards
3ft
9 cubic
yards
4ft
12 cubic
yards
5.9.1 Category Significance
Larger blocks or volumes of falling rock produce more total
kinetic energy and greater impact force than smaller events. In
addition, the larger events obstruct more of the roadway
reducing the possibility of safely avoiding the rock(s).
In either
case, the larger the blocks or volume the greater the hazard
created and thus the higher the assigned score.
5.9.2 Which Criterion to Use
This measurement should be representative of the type of
rockfall event most likely to occur. If individual blocks are
typical of the rockfall, block size should be used for scoring.
If
a mass of blocks tends to be the dominant type of rockfall,
volume per event should be used. A decision on which to use
can be determined from the maintenance history, or estimated
from observed conditions when no history is available. This
measurement will also be beneficial in determining remedial
measures.
62
-
8/11/2019 009767 Rock Hazard Rating Sys
73/112
-
8/11/2019 009767 Rock Hazard Rating Sys
74/112
5.9.4 Classroom Exercise 1
During the preliminary rating, the maintenance person explained
that this site has two different types of rockfall, both of which
occur on a regular basis.
One type consistsmostly of 3-to-5
inch cobbles that erode out of the conglomerate unit.
Occasionally, portions of the conglomerate up to about 3 feet in
diameter break off. The second ype of rockfall occurs when the
large overhang becomesunstable, and a large volume of rock
falls off at one time.
The volume of these singular events
usually exceeds50 cubic yards of material on the road.
Using the scoring tables, rate the two types of rockfall that occur
at the site, and determine which score to use for rating this
category.
Block Size Score =
Quantity of Rockfall/Event Score =
Score for this category =
5.10 Climate and Presence of Water on Slope Category
The effects of precipitation, freeze/thaw cycles, and water
flowing on the slope are evaluated with this category according
to the following benchmark criteria.
CLIMATE
AND
PRESENCE
OF WATER
ON SLOPE
LOWtO
Moderate
moderate
precipitation or
precipitation;
short freezing
no freezing periods; or
periods; no , intermittent water
, water on slope
I
on slo@e
High precipitation
or long freezing
periods; or
continual water on
slope
High precipitation
and long freezing
periods; or
continual water on
slope and long
, freezing periods
To assureproper score separation, the criteria for this category
should be adjusted to fit local conditions.
64
-
8/11/2019 009767 Rock Hazard Rating Sys
75/112
5.10.1 Category Significance
Water and freeze/thaw cycles both contribute to the weathering
and movement of rock materials and a reduction in overall slope
stability. This category evaluates the amount of precipitation
and duration of freezing periods, because hese are measurable
quantities that are directly related to features that cause ockfall.
In addition, water flowing on a slope promotes erosion and thus
is also considered in this category.
5.10.2 Method of Evaluation
If water is known to flow continually or intermittently from the
slope, it is rated accordingly. Areas receiving less than 20
inches per year are low precipitation areas. Areas receiving
more than 50 inches per year are considered high precipitation
areas. The impact of freeze/thaw cycles can be estimated from
knowledge of freezing conditions and their effects at the site.
The rater should note that the 27-point category is for sites with
long freezing periods or water problems such as high
precipitation or continually flowing water. The 81-point
category is reserved for sites that have both long
freezing
periods and one
of the two extreme water conditions.
5.10.3 Information Source
Information on average temperatures and length of freezing
periods can be obtained from National Oceanic and Atmospheric
Administration (NOAA) climatological publications (5). An
agency-wide precipitation map is a useful scoring aid. This
information is usually available from routinely maintained, state-
wide rain gauge data.
65
-
8/11/2019 009767 Rock Hazard Rating Sys
76/112
-
8/11/2019 009767 Rock Hazard Rating Sys
77/112
5.11 Rockfall History Category
This category rates the historical rockfall activity at a site as an
indicator of future rockfall events. Typically, the frequency and
magnitude of past events is an excellent indicator of the type of
events to expect. The benchmark criteria established for this
category are:
ROCKFALL
HISTORY
Few falls Occasional falls
Many falls Constant
falls
5.11.1 Category Significance
The rockfall history directly represents the known rockfall
activity at the site. This information is an important check on
the potential for future rockfalls. If the score you give a section
does not compare with the rockfall history, a review of the
rating is advisable.
5.11.2 Criteria Narratives
3 points
9 points
27 points
81 points
Few Falls Rockfalls occur only a few times a year
(or less), or only during severe storms. This
category is also used if no rockfall history data is
available.
Occasional F& Rockfall occurs regularly.
Rockfall can be expected several times per year and
during most storms.
&Qny FU Typically, rockfall occurs frequently
during a certain season, such as the winter or spring
wet period, or the winter freeze/thaw, etc. This
category is for sites where frequent rockfalls occur
during a certain season but are not a significant
problem during the rest of the year. This category
may also be used where severe rockfall events have
occurred.
Rockfalls occur frequently throughoutonstant Falls
the year. This category is also for sites where severe
rockfall events are common.
67
-
8/11/2019 009767 Rock Hazard Rating Sys
78/112
-
8/11/2019 009767 Rock Hazard Rating Sys
79/112
-
8/11/2019 009767 Rock Hazard Rating Sys
80/112
-
8/11/2019 009767 Rock Hazard Rating Sys
81/112
CHAPTER 6: PRELIMINARY DESIGN AND COST ESTIMATE
It is important, when planning highway construction projects, to
establish the desired result.
The desired result is what
determines such things as the project limits, the estimated
construction costs, and the right-of-way needs. Trying to
retrofit a different, more appropriate rockfall design after these
factors have been established is frustrating, at best, and can be
completely impossible.
The fourth step of the RHRS process accounts for this need by
requiring that a preliminary design and cost estimate be included
as part of the RHRS database. This information is used in the
final phase of the prioritization process, when project limits are
established and projects are advanced for construction.
6.1 Approach to Rockfall Control
During the detailed rating, the raters should gather enough site-
specific information to be able to recommend which rockfall
remediation measures are appropriate for the site. More than
one design approach will likely be needed for each site.
For management to make informed decisions on whether to take
a total correction approach or only reduce the rockfall hazard,
they will need to understand the costs and benefits associated
with both choices. Hazard reduction measures can vary from
limited duration improvements such as slope scaling, to more
aggressive steps, such as installing slope screening.
Frequently, a combination of several techniques will work best.
At this early stage, the goal is to provide an appropriate method
to deal with the rockfall problem. These preliminary concepts
can later be refined by more detailed investigation and analysis.
6.2 Rockfall Remediation Designs
Covering the field of rock mechanics is beyond the scope of this
manual. An excellent reference on the subject is the Federal
Highway Administrations publication No. FHWA-TS-89445,
71
-
8/11/2019 009767 Rock Hazard Rating Sys
82/112
titled Rock Slopes: Design, Excavation, Stabilization,
prepared by Golder and Associates, Seattle, Washington.
The value of having personnel skilled in this area can not be
stressed oo much. Experience is the best predictor of the
effectiveness of a rockfall remedial design. There are too many
gaps in our understanding of the mechanical properties of rock
masseso rely wholly on an analytical approach.
6.2.1 Common Rdckfail Remediation Techniques
Several techniques are routinely used to deal with rockfall. The
choice of techniques s dependent on several factors, including
the size or volume of anticipated rockfall, access o the rockfall
source, maintenance imitations, the construction budget, and the
desired result. The following table describescommon rockfall
mitigation techniques and their uses.
Table 6.1 Rockfall Mitigation Techniques
Technique
Scaling
Slope Screening
Catch Fences
Excavation
Artificial
Reinforcement
Description/Purpose
Removal of loose rock from slope by means of hand tools
and mechanical equipment. Commonly used in
conjunction with most other design elements.
Placement of wire or cable mesh on a slope face. Controls
the descent of falling rock. Rockfall accumulatesnear the
base of the slope for removal.
Wire or cable mesh draped from a fence to the roadside
ditch. The fence (impact section) captures the falling rock
and channels t beneath the mesh. The mesh attenuates he
rockfall energy, allowing the rock to come to rest short of
the roadway, in the catchment area.
Removal of slope material in order to create a rock fallout
area adjacent to the roadway. Use of modern construction
practices improves the condition of redeveloped cut slopes.
Improvement of slope stability by the installation of
mechanical supports including rock bolts, rock dowels, and
cable lashing. Used to hold material in place on the slope.
72
-
8/11/2019 009767 Rock Hazard Rating Sys
83/112
Shotcrete Mortar or concrete pneumatically projected at high velocity
onto a slope.
Primarily used to halt the effects of erosion
by protecting the shot surface from the elements. Also
helps retain rock on the slope.
Barrier Systems Installation of either rigid or flexible barriers systems
capable of handling the energy developed in a falling rock.
Examples include Jersey barriers, gabion baskets and
woven cable fences. Systemsare normally placed adjacent
to the roadway for easeof maintenance.
Drainage
Reduction of the water level within a slope through
installation of horizontal drains or adits. Commonly used
in conjunction with other design elements.
6.2.2 Reviewing Preliminary Designs
Inexperience can result in the wrong application of the above
techniques.
A review of the design concept by an experienced
staff member is recommended before the cost estimate is
calculated, or used to make decisions on project development.
6.3 Cost Estimate
The cost estimate is an important element of the rockfall
database. This information will be considered when final project
priorities are established. The costs of these different design
elements can vary a great deal nationally. For that reason, no
costsare included in this document.
The rockfall design cost calculated is strictly the cost of the
rockfall remedial measures. A project may eventually include
pavement widening, guardrail installation, structural pavement
overlay, etc. These cost items, as well as typical mobilization,
engineering, and contingency costs are not included as part of
the RHRS cost estimate. This approach simplifies the estimation
process, since, when rockfall sites and the costsof dealing with
them are compared, these additional cost items will not interfere.
A sample worksheet is shown on the next page.
73
-
8/11/2019 009767 Rock Hazard Rating Sys
84/112
Page of
-
Design Option
ROCKPALL MITIGATION COST ESTIMATE WORKSHEET
State Hwy Name:
Beginning M. P.
L or R of Centerline
Ending M. P.
County Name
Date of Rating(YYMMDD)
Name of Designer
#
#
. Average Daily Traffic
Posted Speed Limit
RHRS Score
GN OPTION D-ION
This approach is a rockfall correction
hazard reduction design.
DESIGN ELEMENTSESIGN ELEMENTS
1..
2..
3..
4..
COST P.ST-
OST P.ST-
Quantity X Unit Costuantity X Unit Cost
1..
X
2..
X
3. X
4. X
5. X
6.
X
7. X
8.
X
TOTAL OPTION COST:
5.
6.
7.
8.
$
$
Cost/RHRS Score Ratio
74
-
8/11/2019 009767 Rock Hazard Rating Sys
85/112
This work sheet is helpful in developing a cost estimate.
The
information on the sheet documents the location of the rockfall,
a narrative of the design concept, a list of the design elements, a
list of the costs of the design elements, the total option cost, and
the cost-to-RHRS score ratio. An agency may need to modify
this sheet to meet its specific needs.
6.4 Classroom Exercise 1
A preliminary design and cost estimate for site 1 is included below.
Note that the cost
estimate includes only the cost of the rockfall remediation d