!"#$%&'( $*%+',%(%+# -. /%012 3'$+1 /'+14%'($ 01'4 !"#$%&' !)*+),% -$*+,&#"& ./, $*) "% & 0&1"##&,2 3&,,"), !" $!%& '( ! %!)*'!+&*,- &!*.*/0" +',-% "1"&-2 Patrick Dunne School of Environmental Systems Engineering, University of Western Australia Supervisors: W/ Prof Carolyn Oldham School of Environmental Systems Engineering, University of Western Australia W/ Prof Andy Fourie School of Civil Engineering, University of Western Australia Alan Tandy Toro Energy Limited 2012

Upload: others

Post on 15-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

!"#$%&'()$*%+',%(%+#)-.)/%012)3'$+1)/'+14%'($)01'4)!"#$%&'(!)*+),%(-$*+,&#"&(./,($*)("%(&(0&1"##&,2(3&,,"),(

!"#$!%&#'(#!#%!)*'!+&*,-#&!*.*/0"#+',-%#"1"&-2!

Patrick Dunne School of Environmental Systems Engineering, University of Western Australia Supervisors: W/ Prof Carolyn Oldham School of Environmental Systems Engineering, University of Western Australia W/ Prof Andy Fourie School of Civil Engineering, University of Western Australia Alan Tandy Toro Energy Limited 2012

Page 2: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 2

This page has been intentionally left blank

Page 3: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 3

This thesis is presented in partial fulfilment of the requirements of the Bachelor of Engineering

(Environmental) at The University of Western Australia

Page 4: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 4

Abstract

A capillary barrier forms part of the tailings cover system proposed by Toro Energy for use at its

Centipede uranium mine near Wiluna, Western Australia. If successful, the capillary barrier,

which consists of a layer of high-suction fine material overlying a layer of low-suction coarse

material, will limit both the infiltration of rainfall and the upward movement of contaminants

through capillary forces.

Toro wishes to use locally available mined waste materials for the construction of its tailings

cover. In order to determine the suitability of these materials for use in a capillary barrier, a

variety of materials from the Centipede site were selected, collected and analysed in order to

determine their grain size distributions and water retention properties (based on a model

developed by van Genuchten (1980)).

Inputting this data into a simulation created by Heiberger (1996) using Hydrus-2D software

revealed that a simple capillary barrier constructed using unsorted mined waste from the

Centipede site is unlikely to be effective. Thus, it is probable that grain sorting will be required if

Toro wishes to use mined waste materials in its capillary barrier.

Page 5: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 5

Acknowledgements

I would like to acknowledge and thank my supervisors, Prof Carolyn Oldham, Prof Andy Fourie

and Alan Tandy for their guidance and support throughout this project

Thank you to Muhammad Suradi for his assistance with running my pressure plate tests. This

project couldn’t have been completed without your help.

Thanks to Toro fieldies James Schlipalius and Lindsay Ashwin for help collecting and sending

off my samples. And a huge thank you to Alan Tandy (again), Vanessa Guthrie, Sebastian Kneer,

Adrian Yurisich, John Baines, Greg Shirtliff, Lisa Chandler, Brendan Vagg and everyone else at

the Toro office for their help setting up this project and getting it off the ground.

Also thanks to all my family and friends who have been there throughout my thesis year and my

entire engineering degree.

Page 6: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 6

Table of Contents

Abstract!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!#!

Acknowledgements!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!$!

List of Abbreviations!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!%!

List of Figures!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!%!

List of Tables!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!&!

1. Introduction!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!'(!

2. Background and Literature Review!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!''!2.1 About Toro Energy!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!''!2.2 Wiluna Uranium Project!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!''!2.3 Local Lithology!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!')!2.4 Wiluna’s Climatic Conditions!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!')!2.5 Sonic Drilling Program!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!'$!2.6 Toro’s Tailings Cover Design!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!'*!2.7 Context!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!'&!2.8 Tailings Cover Design Practice!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!+(!2.9 Basic Capillary Barrier Design!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!+'!2.10 Risk of Preferential Flow Pathways in Capillary Barriers!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!++!2.11 Complex Capillary Barrier Design!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!+)!2.12 Modelling in Capillary Barrier Design!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!+)!2.13 The van Genuchten Model!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!+$!2.14 The Fredlund-Xing Fitting Curve!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!+*!2.15 Other Important Material Properties in Capillary Barrier Design!"""""""""""""""""""""""""""""""""""""""""""!+,!

3. Approach and Methodology!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!+%!3.1 Sampling!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!+%!3.2 Sample Preparation!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!)(!3.3 Grain Size Distribution Testing!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!))!3.4 Pressure Plate Testing!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!))!3.5 Determining Permeability Values!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!)$!3.6 Capillary Barrier Modelling!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!)$!

Page 7: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 7

4. Results!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!),!4.1 Grain Size Distribution Results!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!),!4.2 Pressure Plate Test Results!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!)%!4.3 Modelling Results!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!)&!

5. Discussion!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!#+!5.1 Sample Properties and Identification!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!#+!5.2 Capillary Barrier Performance!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!#)!5.3 Limitations!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!##!

6. Conclusions!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!#$!

7. Recommendations!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!#$!

8. References!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!#,!

Appendices!""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!$'!Appendix A: Full Grain Size Distribution Results!"""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""!$'!Appendix B: Full Pressure Plate Testing and Fredlund-Xing SWRC Results!"""""""""""""""""""""""""""""""""!$)!

Page 8: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 8

List of Abbreviations SWRC Soil water retention curve

Toro Toro Energy Limited

TSF Tailings storage facility

UWA University of Western Australia

VWC Volumetric water content

List of Figures

Figure 1: Wiluna Project location map (Toro Energy 2011) .................................................. 12

Figure 2: Centipede stratigraphy: typical cross-section (Yurisich 2012) ............................... 13!

Figure 3: Tailings storage facility, Centipede minesite (Yurisich 2012) ................................ 17!

Figure 4: Centipede tailings cover design, post-closure (Dunne 2012) ................................... 19!

Figure 5: Drill cores collected, Centipede site (Dunne 2012) .................................................. 29!

Figure 6: Finite elements mesh for a capillary barrier model (Heiberger 1996) .................. 36!

Figure 7: Grain size distribution curves; Wiluna mined waste samples (Dunne 2012) ........ 37!

Figure 8: Fredlund-Xing SWRCs for Wiluna waste samples (Dunne 2012) ......................... 38!

Page 9: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 9

List of Tables Table 1: Rainfall and evaporation averages for Wiluna, WA (BOM 2012) .......................... 14!

Table 2: Extreme storm events; Wiluna, WA (Knight Piesold 2010; ARR 1987) ................. 14!

Table 3: Sample locations and observed properties (Schneider/Toro Energy 2011) ............ 30!

Table 4: Prepared samples (Dunne 2012) ................................................................................. 30!

Table 5: Pressure plate testing apparatus (Dunne 2012) ......................................................... 34!

Table 6: Grain size distribution testing on Wiluna mined waste samples: key figures

(Dunne 2012) .................................................................................................................. 37!

Table 7: Van Genuchten parameter, dry density and permeability values; Wiluna waste

samples (Dunne 2012) ................................................................................................... 38!

Table 8: Capillary barrier simulations: water content after 10.5 hours runtime (Heiberger

1996; Dunne 2012) ......................................................................................................... 39!

Table 9: Capillary barrier simulations: Velocity vectors after 10.5 hours model runtime

(Heiberger 1996; Dunne 2012) ..................................................................................... 41!

Page 10: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 10

1. Introduction

As part of its proposed Centipede uranium mine near Wiluna, Western Australia, Toro Energy

must design a tailings cover system that is capable of containing radioactive tailings for 10,000

years (Yurisich 2012). A capillary barrier forms a part of Toro’s tailings cover design, as it

serves the duel purpose of limiting infiltration of rainfall (Parent & Cabral 2006) and preventing

upward movement of contaminants through capillary forces (Mudd & Patterson 2010).

A capillary barrier consists of two layers. The upper layer is fine grained, with a compromise

between strong suction and high hydraulic conductivity. The lower layer is coarse grained, with

weak suction. The contrast in suction between the two layers restricts water movement across the

interface (Khire et al 2000). The whole system is built on a slope- allowing infiltrating water to

drain through the upper layer away from the tailings (Parent & Cabral 2006). Toro Energy

wishes to use mined waste and non-mineralised overburden to construct its tailings cover system,

including the capillary barrier (Yurisich 2012). However, no studies have been done to determine

the suitability of using such materials for long-term tailings storage.

The project aims were to determine whether a capillary barrier is suitable for Toro’s tailing cover

system; to determine the grain size and water retention (i.e. suction) properties of several mined

waste materials; and to assess the suitability of these materials for use in the construction of a

capillary barrier.

Page 11: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 11

2. Background and Literature Review

2.1 About Toro Energy Toro Energy Limited is an Australian-based, publicly traded company engaged in the exploration

of uranium. It was formed through the amalgamation of the uranium interests of Oxiana Limited

and Minotaur Exploration Limited in South Australia. The company’s corporate office is located

in Norwood, South Australia.! The Wiluna and Theseus Uranium Projects, both located in

Western Australia, are Toro’s most major and advanced projects (Toro Energy 2012). Toro is

also a significant explorer in Western Australia, the Northern Territory, and in Namibia (Toro

Energy 2012). !

2.2 Wiluna Uranium Project

Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both

located near Wiluna in the northern Goldfields Region of Western Australia (Figure 1). The

Centipede deposit, located 30km south of Wiluna, is expected to be mined first, with an

estimated mine life of approximately 14 years. Toro Energy expects to mine up to 2Mt of ore

and between 6 and 8 Mt of non-mineralised waste per year. The uranium ore will be processed

using agitated leach methods producing approximately 1000 tonnes of uranium oxide

(UO4.2H2O) per year (Toro Energy 2011).

Page 12: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 12

Figure 1: Wiluna Project location map (Toro Energy 2011)

Page 13: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 13

In May 2012, Western Australia’s Environmental Protection Authority recommended that the

state Environment Minister approve the Wiluna project and, in October 2012, state government

approval was granted. This marks the first approval for a uranium mine in Western Australia

since the ban on uranium mining in the state was lifted in 2008 (Kean 2012). Subject to federal

government approval, financing outcomes and board decisions Toro anticipates construction of

its first mine, Centipede, through 2013 and 2014 with first uranium sales in the 2014/15 fiscal

year (Toro Energy 2012).

2.3 Local Lithology

The local lithology consists of a sequence of layers of calcrete, sand and clay, illustrated in

Figure 2, below.

Figure 2: Centipede stratigraphy: typical cross-section (Yurisich 2012)

2.4 Wiluna’s Climatic Conditions

Wiluna’s climate can be described as semi-arid desert (BOM 2012). The Shire of Wiluna is an

area of low rainfall, high evaporation and extreme temperatures. The daily temperature can vary

Page 14: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 14

from highs of well over 40 degrees in the summer months to nightly lows in the winter months

below zero (BOM 2012). Rainfall is low, as shown in Table 1, below.

Table 1: Rainfall and evaporation averages for Wiluna, WA (BOM 2012)

Month

Rainfall

Evaporation mean (mm) median (mm)

January 35 18 490

February 38 17 395

March 35 14 365

April 29 13 240

May 26 15 165

June 24 12 115

July 15 9 120

August 10 5 155

September 5 2 225

October 7 2 325

November 10 4 365

December 21 12 450

Annual 255 - 3410

The majority of Wiluna’s precipitation falls in storm events and it is during these events that

water infiltration to the tailings is most likely to occur. Knight Piesold (2010) made predictions

of extreme storm events in Wiluna based on Australian Rainfall and Runoff (1987) data,

summarised in Table 2, below.

Table 2: Extreme storm events; Wiluna, WA (Knight Piesold 2010; ARR 1987)

Page 15: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 15

Gee et al (1994) suggest that, in arid and semi-arid regions, recharge can be as much as 60% of

precipitation. This, combined with the fact that Wiluna experiences extreme storm events, means

rainwater infiltration into the tailings is a major concern at Centipede despite the low rainfall

(Khire et al 2000).

2.5 Sonic Drilling Program

Toro Energy (Toro) conducted a sonic drilling campaign on its Centipede Uranium deposit in

September and October 2011. Samples from the drill cores obtained were taken for use in this

project.

The aims of this drilling program were to obtain density data and to convert a portion of the

Centipede uranium resource from the ‘indicated’ resource category to the ‘measured’ category

and therefore increase confidence in the ore body (Schneider 2011). 73 holes were drilled in

total, and each drill hole was of 100mm diameter and between 5 and 15m deep (Schneider 2011).

Toro determined a variety of soil properties for the drill cores taken during this drilling program

(Schneider 2011):

• Density profile

• Observed geological formation

• Permeability (for five drill core samples)

• Gamma radiation profile

• Geochemical assays: U, Sr, Ca, Mg, S, Va (for 350 drill core samples)

Page 16: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 16

2.6 Toro’s Tailings Cover Design

Toro engaged Knight Piesold Pty Ltd to undertake the design of the tailings disposal system for

the Wiluna project.

The objectives of the design were defined as follows (Knight Piesold 2010):

• Permanent and secure containment of all solid waste materials

• Capacity of 12 million cubic metres

• Maximisation of facility storage capacity

• Minimisation of seepage

• Excess capacity to contain a 1 in 100 year storm event

• Rapid and effective rehabilitation

• Minimisation of impact of radioactivity

• Ease of operation

The tailings storage facility (TSF) will be established in the void developed from mining the

Centipede ore body. This area will be divided into three facilities, only one of which will be

active at any one time. Each facility will be divided into three cells for deposition control

purposes, however these cells will be interconnected to allow equalisation of water levels

(Knight Piesold 2010). The layout of the TSF is shown in Figure 3, below.

Page 17: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 17

!

Figure 3: Tailings storage facility, Centipede minesite (Yurisich 2012) !!

Page 18: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 18

It is envisaged that the tailings cover systems would comprise the following elements (starting

from the base of the cover) (Figure 3):

• Radiation control layer – nominal 600mm thickness of sandy / gravelly waste rock and

overburden.

• Shaping layer – variable thickness of non-mineralised waste rock and/or overburden to

produce a profile that will blend with local landforms and prevent ponding.

• Capillary break layer – A coarse-grained capillary break layer (potentially forming part

of the shaping layer) will be included to limit upward movement of soluble tailings

constituents. This layer is the bottom (coarse) layer of the capillary barrier.

• Surface water shedding layer - A fine-grained water shedding layer will be built over the

capillary break layer to reduce infiltration of rainfall into the tailings mass. The layer will

be sloped so that the top surface drains. This layer makes up the top (fine) layer of the

capillary barrier.

• Growth medium and topsoil - Any topsoil that has been stripped from the pit area will be

placed back over the top of the growth medium layer. The growth medium layer will

consist of non-mineralised overburden stripped from the pit area.

• Engineered clay base and TSF perimeter walls – Since the TSF is partly below the

water table; its base and perimeters will be constructed using impermeable clays. It is

envisioned that this will prevent groundwater flow into and out of the tailings confinement

system.

Page 19: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 19

Figure 4: Centipede tailings cover design, post-closure (Dunne 2012)

!

Toro Energy wishes to use mined waste material and non-mineralised overburden from its

Centipede mine to construct this tailings cover, including the two layers of the capillary barrier.

However, prior to this project no testing had been done to determine the suitability of these

materials, based especially on their hydraulic properties, for constructing a capillary barrier.

2.7 Context

If the Centipede mine becomes operational, it will be the first ever uranium mine in Western

Australia. This fact creates challenges for Toro Energy. The performance of the mine, including

its tailings cover system, will set a precedent for future uranium mines in the region and the state.

In a state where the public remains sceptical about the safety and environmental impact of

uranium mining, the success or failure of Toro’s tailings cover could also have huge social and

political ramifications that would affect the entire uranium industry in Western Australia.

Page 20: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 20

This project also has national context, given the importance of tailings storage in Australia’s

many uranium mines. Due to insubstantial tailings cover designs in the past, Australian uranium

mines do not have a particularly good track record when it comes to storing radioactive mine

tailings. Several poorly designed cover systems (such as at the Rum Jungle and Mary Kathleen

mines) have resulted in unacceptable levels of uranium being released into ground and surface

water (Mudd & Patterson 2010; Lottermoser & Ashley 2005). While cover design has improved

since these past failures, Australian uranium mines are under increased scrutiny from the

government, regulatory bodies, the media and the public, to store tailings safely (ARPANSA

2012).

The recent Fukushima incident in Japan has lead to recent worldwide scrutiny being placed on

the global nuclear industry (Moeller 2011) and thus Toro’s Wiluna project, including its tailings

cover, has increased global context. The Fukushima accident occurred due to an unprecedented

tsunami inundating emergency cooling systems at the Fukushima Daiichi nuclear power station,

causing fuel to melt in three reactors and resulting in large releases of radioactive material

(Moeller 2011). A global increase in anti-nuclear sentiment followed this disaster; uranium price

dropped dramatically and several countries (including Germany and Japan) scaled down or

abandoned their nuclear energy programs (Maeda & Sheldrick 2012). This global concern over

the safety of nuclear power has ramifications for Toro Energy’s Wiluna project as it means that

any environmental damage or breach in safety as a result of the project could cause a massive

public backlash against Toro with potentially damaging effects on the Australian uranium

mining industry.

2.8 Tailings Cover Design Practice

Early radioactive tailings cover designs relied on compacted soil layers to limit water infiltration

and radon release. However, soil fracturing and root intrusion by plants severely compromised

these systems by increasing the saturated hydraulic conductivity several orders of magnitude

above design targets (Waugh 2004). In Australia, preferential flow pathways have been largely

Page 21: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 21

responsible for the failure of compacted earth covers at the Rum Jungle (Mudd & Patterson

2010) and Mary Kathleen mines (Lottermoser & Ashley 2005).

Modern tailings covers are designed to mimic a natural soil-water balance, incorporating a fine-

grained growth medium overlying a two-layered capillary barrier (Waugh 2004).

2.9 Basic Capillary Barrier Design

The limitations of simple compacted soil tailings covers are overcome through the inclusion of a

capillary barrier, which serves the duel purpose of limiting infiltration of rainfall (Yanful et al

2005; Parent & Cabral 2006) and preventing upward movement of contaminants through

capillary and evaporative forces (Mudd & Patterson 2010). In Wiluna, with its extreme rainfall

events and high evaporation, both of these factors are a huge concern and thus incorporating a

capillary barrier in Toro’s TSF is instrumental. Furthermore, the moisture-retaining upper layer

of a capillary barrier can provide added benefit by functioning as an oxygen barrier, reducing the

generation of acid in mine tailings (Nicholson et al 1989).

The capillary barrier consists of two layers. The lower layer (capillary break layer) is

characterised by a weak suction and is constructed from coarse-grained material. The upper layer

(surface water shedding layer) is characterised by a compromise between strong suction and high

hydraulic conductivity and is built using fine-grained material. The contrast in unsaturated

hydraulic properties between the two layers restricts movement of water across the interface

between the layers (Khire et al 2000). The high hydraulic conductivity of the upper layer allows

flow of infiltrating rainfall to the edges of the system, away from the waste (Khire et al 2000).

Most capillary barriers (including Toro’s proposed capillary barrier) are sloped in order to assist

this diversion of water (Tidwell et al 2003). Indeed, Fala et al 2005 found an unsloped capillary

barrier to be completely non-effective for a tailings cover in Canada, while a sloped system was

successful in diverting infiltrating water. In an inclined system such as this the barrier can only

divert water so far downslope under saturated conditions before the upper layer can hold no more

Page 22: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 22

water and water infiltrates the coarse layer (Parent & Cabral 2005). The point that this happens is

called the critical distance (or diversion length) from the top of the slope.

The performance of the capillary barrier depends on several variables. Thickness and hydraulic

properties of the upper layer significantly affect the water balance of capillary barriers, while the

thickness of the lower layer has a much smaller impact (Khire et al 2000). Tidwell et al (2003)

found that in Yucca Mountain, Arizona, where soils are frequently dry, capillarity difference

between the two layers was required to be small (limited by the need of a fine-grained material

that does not filter into the coarse material under dry conditions). Given Wiluna’s arid climate,

material selection for the Centipede tailings cover’s capillary barrier is more than likely to be

limited by this factor also.

2.10 Risk of Preferential Flow Pathways in Capillary Barriers

Based on a review of relevant literature, it is unclear whether preferential flow pathways will

cause a problem for a capillary barrier in Toro’s TSF. Current literature on this topic is

conflicting. Walter et al (2000) suggest that capillary barriers can, under certain circumstances,

cause funnelled flow into the coarse layer at their critical distance, leading to groundwater

contamination. Meanwhile, it has been suggested that root intrusion into a capillary barrier can

lead to its long-term failure by facilitating preferential water flow through root pathways, albeit

at a lower rate than a simple compacted soil barrier (Suter et al 1993; Bowerman & Redent 1997;

Kampf & Montenegro 1997). Burrowing fauna may also cause long-term problems to a capillary

barrier in much the same way (Bowerman & Redent 1997; Kampf & Montenegro 1997).

Conversely, Tidwell et al (2003) determined that the effect of preferential flow pathways on the

performance of a capillary barrier at Yucca Mountain, USA, would be minimal.

Despite the potential long-term problems caused by the development of preferential flow

pathways, there is a general consensus that a capillary barrier can be very successful if long-term

monitoring is conducted and that inclusion of a capillary barrier is current best practice in

tailings cover design (Parent & Cabral 2005; Bowerman & Redent 1997; Khire et al 2000;

Waugh 2004).

Page 23: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 23

2.11 Complex Capillary Barrier Design

While a simple capillary barrier consists of two layers, several more complex systems involving

three or more layers have been envisioned. Mallants et al (1999) proposed a four layered

capillary barrier for a radioactive tailing cover in Belgium. This system consists of a coarse layer,

overlying a fine layer, overlying a second coarse layer, overlying a layer of very fine clay. This

arrangement allows the diversion of any water that infiltrates through the upper fine layer to flow

away from the tailings through the lower coarse layer (Mallants et al 1999). Essentially, the

system functions as two capillary barriers overlying each other and hence provides an extra

degree of safety against rainfall infiltration.

A complex, multi-layered capillary barrier such as the one proposed by Mallants et al has

potential for use as part of Toro’s tailing cover, if the increased performance is worth the added

construction and design costs. While in theory a simple capillary barrier will be adequate, the

added level of protection brought by using a complex capillary barrier should be analysed as an

option in the design of Toro’s TSF.

2.12 Modelling in Capillary Barrier Design

A numerical computer model is a useful tool when designing a tailings cover. Hydrological

water balance models have seen use around the world in the design of radioactive tailings covers

(Khire et al 2000; Parent & Cabral 2005). Hydrus 2D, the modelling software used in this

project, is a two-dimensional modelling environment for analysis of water flow and solute

transport in variably saturated porous media (Radcliffe & Simunek 2010). The software package

includes the two-dimensional finite element model HYDRUS2 for simulating the movement of

water, heat, and multiple solutes (Radcliffe & Simunek 2010). The model includes a parameter

optimization algorithm for inverse estimation of a variety of soil hydraulic and/or solute

transport parameters (Radcliffe & Simunek 2010). It is supported by an interactive graphical

Page 24: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 24

interface for data processing, generation of a structured mesh, and graphic presentation of the

results (Radcliffe & Simunek 2010).

Hydrus-2D is an effective tool in the simulation of water flow above simple and complex

capillary barriers (Radcliffe & Simunek 2010; Heiberger 1996; Mallants et al 1999) and has seen

use assisting the design of many tailings covers throughout the world; including the Laronde

waste rock pile in northern Canada (Fala et al 2005) and the Texas low-level radioactive waste

disposal site (Simunek et al 1999). In this project, the Hydrus 2D software was used to analyse

water flow in unsaturated media across a finite element mesh representing a capillary barrier.

In order to numerically model a capillary barrier, the following parameters are required (Yanful

et al 2005; Rabozzi 2005; Parent & Cabral 2005; Khire et al 2000):

• Layer thickness

• The dip and length of slope (if any)

• Physical properties of materials (permeability, water retention curve, bulk density etc.)

• Climate data, especially infiltration rate

• Water table elevation (not necessarily relevant for Toro, due to impermeable base and

walls of the TSF)

• Maximum acceptable infiltration rate

In a Hydrus 2-D capillary barrier simulation, all these factors are included. Capillary barrier

shape and slope are determined through a 2D finite element mesh, infiltration rates are included

as an upper boundary condition and water retention properties of the materials can be determined

using a range of ‘water retention curve’ models (Radcliffe & Simunek 2010). In this project,

solutions to a water retention curve model developed by van Genuchten (1980) were used as

input parameters into the capillary barrier simulation.

Page 25: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 25

2.13 The van Genuchten Model

The model stipulated by van Genuchten (1980) gives an equation for the soil-water content-

pressure head curve, ! (h). This particular form of the equation enables one to derive closed-form

analytical expressions for the relative hydraulic conductivity, Kr, when substituted in the

predictive conductivity models of Burdine (1953) or Mualem (1976),both of which use pore size

distribution as a tool to predict hydraulic conductivity.

The van Genuchten model was developed specifically as a tool to provide parameters for the

governing transfer equations in numerical models of unsaturated flow. Hydrus-2D represents a

modern version of the numerical models that van Genuchten had in mind when developing his

water retention curve equation.

The curve can be fit to experimental data, including results derived from a pressure plate test

(Kazimoglu et al 2005). This means that results from pressure plate testing (as conducted in this

project) can be used as input values into a Hydrus-2D capillary barrier simulation by way of the

van Genuchten water retention curve equation.

The equation is as follows:

(1)

Where:

• !(") is the water retention curve [L3L#3];

• |"| is suction pressure ([L#1] or cm of water);

• !s is saturated water content [L3L#3];

• !r is residual water content [L3L#3];

• $ is related to the inverse of the air entry suction, $ > 0 ([L#1], or cm#1); and,

• n is a measure of the pore-size distribution, n > 1 (dimensionless)

Page 26: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 26

2.14 The Fredlund-Xing Fitting Curve In this project, Fredlund-Xing water retention curves were developed (in addition to solutions for

the van Genuchten equation) in order to give a graphical representation of the water retention

properties (i.e. suction) of non-mineralised waste samples from Wiluna.

Like the van Genuchten model, the Fredlund-Xing equation (developed in 1994) gives a soil-

water retention curve that can be used to estimate various parameters used to describe

unsaturated soil behaviour. The equation is in the form of an integrated frequency distribution

curve and is based on the assumption that the shape of the SWRC is based upon the pore size

distribution of the soil (Fredlund & Xing 1994). Best-fit parameters for experimental water

retention test data, such as pressure plate test data, can be determined through least-squares

computation (Fredlund & Xing 1994). In this project, this computation was performed using a

spreadsheet on Microsoft Excel.

The Fredlund-Xing SWRC model is based on several sub-equations combined to give the

following equation:

(2)

Where:

• ! is Volumetric water content (VWC)

• a5 is a curve-fitting parameter based on equations in Fredlund & Xing (1994)

• b5 is a curve-fitting parameter based on equations in Fredlund & Xing (1994)

• " is Applied pressure / matric suction (kPa)

• m is a curve-fitting parameter related to slope at inflection point

Page 27: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 27

2.15 Other Important Material Properties in Capillary Barrier Design

While this report focussed on the hydraulic properties of the materials used in capillary barrier

design, there are other material properties that can influence the performance of a barrier.

As is the case with all other sections of the tailings cover, stability is important to consider when

selecting materials to construct Toro’s capillary barrier. Both layers of the capillary barrier must

remain stable for more than 1000 years in order to ensure the long-term effectiveness of the

tailings cover (Toro Energy 2011).

Long-term stability of a material is complex and based on many variables. Nonetheless, stability

can be predicted through modelling based on several factors, including the following (Smithson

2008; Riley 2006; Goudie & Viles 1997):

• Soil erosion parameters based on the USDA’s Universal Soil Loss Equation

• Thresholds of rilling and gullying

• Insolation weathering

• Salt weathering (this is of particular concern due to the Wiluna TSF’s location in a saline

environment)

• Slaking

• Aggregate stability (for the top layer of the tailings cover)

Geochemical properties of materials used in a tailings cover can have an effect on its long-term

performance, due to the chemical processes of weathering. Weathering of all or part of a tailings

cover (including a capillary barrier) can cause major change in its stability or hydraulic

properties and thus negatively affect its performance (Yanful et al 1999). Weathering has been

responsible for the failure of many tailings covers throughout the world. The sulphide

weathering of tailings covers at the Banska Stiavnica and Smolnik mines in Slovakia resulted in

the release of Iron oxyhydroxides from the tailings into the surrounding environment (Lintnerova

et al 2007). In Australia, weathering has been identified as a potentially major risk in the storage

of uranium mill tailings in Alligator Rivers, Northern Territory (East 1986).

Page 28: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 28

Weathering is often exacerbated by the chemistry of the tailings themselves (Yanful et al 1999).

Thus, in sections of the tailings cover that may be in contact with tailings, it important to select

materials that will not react with the tailings. In Toro’s tailings cover design (Figure 4), it is

possible that the lower (coarse) layer of the capillary barrier will come into contact with tailings.

Therefore, it is important that the material geochemistry is considered when selecting adequate

materials for its construction (although this task falls outside the scope of this project).

3. Approach and Methodology

3.1 Sampling Three drill cores from Toro Energy’s September 2011 sonic drilling program were selected.

These cores were inspected at the Wiluna site on June 15th, 2012, and sent via courier to the

UWA Civil Engineering Workshop. The cores ranged from 5 to 9 metres in length, were 100mm

in diameter. Five smaller (approx. 1kg) samples were selected from these drill cores and used for

laboratory analysis.

The cores and samples were selected based on a variety of factors.

The samples:

• Included all major local soil types in various observed percentages (sand/clay ratio)

• Did not contain any mineralisation (radiation above 600ppm U3O8 equiv.)

• Were undamaged from any previous analysis by Toro

• Had similar observed properties to those used in permeability testing conducted by Knight

Piesold

These factors meant the choice of viable drill cores samples was limited to areas where little or

no uranium mineralisation was present, due to both transport restrictions and the requirement for

Page 29: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 29

non-mineralised waste samples in the capillary barrier construction. Since the sonic drilling

program was conducted in order to assess the uranium resource, most drill cores contained too

much mineralisation for use in this project and thus the range of viable sonic cores was limited to

a relatively small region of the Centipede deposit. However, the layered nature of the geological

formations around Centipede (Figure 2) meant that a variety of representative waste material

samples could still be collected from the three drill cores selected, despite the comparatively

short distances between them (200 – 500m).

Figure 5: Drill cores collected, Centipede site (Dunne 2012)

As part of the drill program, the Toro geologists recorded the observed properties of each drill

core. These observations included an observed clay/sand ratio, grain size, colour and a brief

Page 30: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 30

description of the material. The observed properties of the five samples used for this project

were:

Table 3: Sample locations and observed properties (Schneider/Toro Energy 2011)

Sample no. Drill core Depth of sample

% clay (observed)

% sand (observed)

Colour Description

1 CPS150 3 – 3.5m 40 60 red/brown Very fine to fine sand, secondary clay 2 CPS150 4.5 – 5m 100 0 red/brown Clay 3 CPS170 7 – 7.5m 80 20 grey/yellow Grey clay with secondary coarse sand 4 CPS153 4 – 5m 75 25 red/brown Red/brown clay with secondary

med/coarse sand 5 CPS170 3 – 3.5m 30 70 red/brown Medium grain sand with clay

3.2 Sample Preparation

Prior to testing, the five samples were kiln-dried, and their particles were separated using a

mortar and pestle. The prepared samples are shown in the photographs below.

Table 4: Prepared samples (Dunne 2012) Sample Photograph

Sample 1

Page 31: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 31

Sample 2

Sample 3

Page 32: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 32

Sample 4

Sample 5

Page 33: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 33

3.3 Grain Size Distribution Testing

The grain size distribution of the five samples was tested in order to ensure sample identification

was based on experimental rather than observed data, and to determine whether observed

sand/clay percentages are a useful predictor of actual grain size and hence a useful tool for the

identification and collection of non-mineralised mined waste materials.

A 300g segment of each sample was tested for grain size distribution using 4.75-0.075mm sieves

in the University of Western Australia’s Civil Engineering Workshop. The amount of material

remaining on each sieve was weighed and recorded. If more than 10% of a sample was found to

be of a grain size finer than 0.075mm (the smallest sieve size used), a hydrometer test was

conducted in order to find the size distribution of the fine particles.

The weights recorded from the sieving and the results from the hydrometer testing were used to

construct a grain size distribution curve for each sample. From these curves D10 and D60 values

were determined, as were the relative percentages of sand and silt/clay in each sample based on

the Australian geological definition (sand particles are 0.0625mm – 2mm in size, silt/clay

particles are smaller than 0.0625mm) (Pain 2008).

3.4 Pressure Plate Testing

Three of the five samples were tested for their water retention properties using a pressure plate

apparatus in the UWA Civil Engineering Workshop, with assistance from PhD student

Muhammad Suradi. A small amount of each sample was used to fill a 55mm diameter, 20mm

deep ring. Each sample ring was saturated, then placed on a porous ‘pressure plate’. This plate

was placed inside a pressurised apparatus, onto which pressures ranging from 5-200kPa were

applied. The apparatus, pressure plate and a sample inside a ring are shown in Table 5, below.

The system was allowed to reach equilibrium at each applied pressure (i.e. water level in the

column (Table 5) reached a constant level), at which point each sample was weighed.

Page 34: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 34

Table 5: Pressure plate testing apparatus: UWA Civil Engineering Workshop (Dunne 2012)

A portion of Sample 3 inside a 55mm

diameter, 20mm deep ring placed on

the pressure plate.

The UWA Civil Engineering

Workshop’s pressure plate apparatus;

as used in this project. The pressure

plate and samples were enclosed

inside the metal cylinder, onto which

various pressures were applied. The

system was said to reach equilibrium

when the water level inside the

column (attached to the stand behind

the cylinder) reached a constant level.

Page 35: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 35

After the pressure plate test was run, the samples were kiln-dried and weighed again in order to

determine their dry weight and density.

The pressure plate results were analysed using PC-Progress’ RTEC program, giving parameter

values for the van Genuchten model. In addition to this, water retention curves were created

using a similar water retention curve model developed by Fredlund & Xing (1994).

3.5 Determining Permeability Values

The Hydrus-2D capillary barrier simulation used in this project required permeability (Ks) values

for each material. Originally, known permeability values (determined by Knight Piesold) of

materials similar to those used in this project were to be input into the model. However,

discrepancy between observed and actual soil properties meant using these values would result in

a grossly inaccurate simulation (Chapter 4.2). Instead, permeability (Ks) values were estimated

using Hydrus-2D’s permeability estimation tool, which gives an approximate result based on

grain size and density (Radcliffe & Simunek 2010).

3.6 Capillary Barrier Modelling

The model parameter values obtained for each of the three tested samples were then input into a

simple capillary barrier simulation developed by Heiberger (1996) using Hydrus-2D. This model

space consisted of a soil block 402cm long and 250cm deep with a 5% slope (Figure 6). The

coarse material began at a depth of 65cm below the surface and was 80cm thick, extending about

% of the distance across the model space. The finite element mesh contained a dense grid at the

interface between the coarse and fine layers. The steady infiltration rate at the soil surface (as a

boundary condition) was 4mm/h; while there was free drainage at the base and no drainage along

the side walls of the model area. The simulation’s runtime was 15 hours. This was approximately

analogous to a 1-in-25-year storm event in Wiluna assuming 60% of rainfall infiltrates the soil,

or a 1-in-100-year storm event assuming 30% of rainfall infiltrates the soil (Knight Piesold 2010;

Gee et al 1994).

Page 36: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 36

Figure 6: Finite elements mesh for a capillary barrier model (Heiberger 1996)

When the simulation was run using materials stipulated by Heiberger (Table 7), water was

diverted downslope along the capillary barrier and around the end of the barrier, away from the

location where tailing would hypothetically be stored (Tables 8 and 9).

Sample 2, which was found to contain the finest particles (Table 6), was used as the upper (fine)

layer of the capillary barrier in this simulation, while Samples 3 and 4 were used alternatively as

the lower (coarse) layer.

Page 37: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 37

4. Results

4.1 Grain Size Distribution Results

Grain size distribution testing and analysis on the five samples yielded the following results.

Table 6 shows the measured D60, D10, sand and silt/clay percentages of the five samples;

compared with the observed sand and clay percentages from Toro’s September 2011 drill logs.

Grain size distribution curves for each sample are shown in Figure 7.

Table 6: Grain size distribution testing on Wiluna mined waste samples: key figures (Dunne 2012)

Sample No. % clay

formation (observed)

% sand formation (observed)

D60 (mm)

D10 (mm)

% silt/clay (particles <

0.0625mm)

% sand (particles >

0.0625mm) 1 40 60 0.7 0.14 <2.2 >97.8 2 100 0 0.098 0.0011 45 55 3 80 20 0.94 0.18 <3 >97 4 75 25 0.45 0.084 <8.4 >91.6 5 10 90 0.64 0.075 <10 >90

Figure 7: Grain size distribution curves; Wiluna mined waste samples (Dunne 2012)

Page 38: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 38

4.2 Pressure Plate Test Results

Van Genuchten model parameter values (Table 7) and Fredlund-Xing water retention curves

(Figure 8) for Samples 2-4 were determined through analysis of results from the pressure plate

tests. Dry density (&d) and permeability (Ks) values are also included in Table 7, as are the van

Genuchten parameter values and permeability values of the materials used in Heiberger’s

capillary barrier simulation.

Table 7: Van Genuchten parameter, dry density and permeability values; Wiluna waste

samples (Dunne 2012)

Material !s !r n " (cm-1) #d (g/m2) Ks (cm/d) Sample 2 0.766 0.255 1.99 0.117 1.163 86.8 Sample 3 0.566 0.148 2.13 0.106 1.603 904.3

Sample 4 0.659 0.16 2.02 0.114 1.414 606.6 Heiberger

fine 0.348 0.02 12.18 0.045 258 Heiberger

coarse 0.348 0.012 7.35 0.151 1811

Figure 8: Fredlund-Xing SWRCs for Wiluna waste samples (Dunne 2012)

Page 39: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 39

4.3 Modelling Results

Running the capillary barrier simulation using the van Genuchten equation values determined

experimentally (with Sample 2 as the fine layer and Samples 3 and 4 as the coarse layer) gave a

poor result, with the barrier unable to prevent water flow across the interface between the two

layers. This is evident in Tables 8 and 9, which illustrate the water content and water velocity

vectors respectively after 10.5 hours of constant 4mm/hr water flux from the model surface.

Water content and flow velocity results of Heiberger’s simulation are also included in Tables 8

and 9 in order to give an indication of what would be expected in a successful capillary barrier

simulation.

In all three simulations, initial water content for each material was defined as being equal to its

residual water content term (!r in Table 7) in its respective solution to the van Genuchten

equation. Both the fine and coarse materials in all three simulations remained unsaturated for the

entire model runtime.

Table 8: Capillary barrier simulations: water content after 10.5 hours runtime (Heiberger 1996; Dunne 2012)

Water content of Heiberger’s capillary barrier simulation after 10.5 hours runtime. Infiltrating water does not cross the interface between the fine and coarse layers. Instead, it is diverted downslope, away from where tailings would hypothetically be placed.

Page 40: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 40

Water content of the capillary barrier simulation using Sample 2 as the fine material and Sample 3 as the coarse material, after 10.5 hours model runtime. This barrier is not effective, as water is clearly infiltrating through the interface into the coarse layer.

Water content of the capillary barrier simulation using Sample 2 as the fine material and Sample 4 as the coarse material, after 10.5 hours model runtime. This barrier is also not effective, as water is clearly infiltrating through the interface into the coarse layer.

Page 41: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 41

Table 9: Capillary barrier simulations: Velocity vectors after 10.5 hours model runtime (Heiberger 1996; Dunne 2012)

Flow velocity vectors of Heiberger’s capillary barrier simulation after 10.5 hours runtime. Infiltrating water does not cross the interface between the fine and coarse layers. Instead, it is diverted downslope, away from where tailings would hypothetically be placed.

Water flow velocity vectors of the capillary barrier simulation using Sample 2 as the fine material and Sample 3 as the coarse material, after 10.5 hours model runtime. This barrier is not effective, as water is clearly infiltrating through the interface into the coarse layer.

Page 42: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 42

Water flow velocity vectors of the capillary barrier simulation using Sample 2 as the fine material and Sample 4 as the coarse material, after 10.5 hours runtime. This barrier is also not effective, as water is clearly infiltrating through the interface into the coarse layer.

5. Discussion

5.1 Sample Properties and Identification

The results of the grain size distribution analysis confirmed that the clay system (Sample 2)

contained finer particles overall than any of the clay/sand system blends, which contained

coarser particles on average (Table 6; Figure 7).

The sand/clay blended soils, despite having wide-ranging observed sand/clay percentages, were

found to have very similar grain size distribution curves (Figure 7). Furthermore, there was a

lack of correlation between observed and measured grain size distribution. For example, the

coarsest material (Sample 3) had an observed 20:80 sand to clay ratio, while Sample 5 (with an

observed 90:10 sand to clay ratio) contained finer particles on average (Table 6; Figure 7).

These results imply that the observed material properties from Toro’s September 2011 drilling

program are an inaccurate guide for identifying and collecting soils. Likewise, the discrepancy

between observed and actual soil properties meant that the results from permeability testing

conducted by Knight Piesold on Toro’s sonic drill core samples could not be used as inputs into

Page 43: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 43

the capillary barrier model.

From Table 6 it can also be noted that observed ‘clay’ and ‘sand’ percentages were based on

local soil formations rather than the geological definitions for ‘sand’ and ‘clay’. Using the

Australian geological definitions for sand (0.0625mm – 2mm), silt (0.002mm – 0.0625mm) and

clay (<0.002mm) (Pain 2008) it can be seen that all four of the sand/clay system blends (Samples

1,3,4 and 5) were technically defined as being predominantly sand, while the 100% clay system

sample (Sample 2) was roughly half sand, half silt/clay.

The pressure plate testing results implied that, despite the fact that the magnitude of volumetric

water content differs between the three samples tested, their water retention properties were not

significantly different. This is illustrated in Figure 8, which shows the Fredlund-Xing water

retention curves for Samples 2, 3 and 4. While it was clear that Sample 2 had higher all-round

volumetric water content than Samples 3 and 4, the similarity between the shapes of the curves

showed that the each sample had similar suction (Fredlund & Xing 1994). This was also the case

for the van Genuchten parameters determined through the pressure plate testing. It is clear that

the materials did not have significantly varied water retention properties, especially when

compared the materials used in Heiberger’s capillary barrier simulation (Table 7).

Despite the wide variety of ‘observed’ properties, and the fact the samples were taken from

different locations and soil systems, the clay/sand blended samples had very similar grain size

distributions; and all samples had similar water retention properties. The similarity between the

physical properties of these materials suggested that waste materials collected from Centipede

were not likely to be ideal for use in a capillary barrier, which relies on difference in capillary

forces between its two layers to limit flow. However, the similarity of the tested materials could

have positive implications- as it means a blended waste material with relatively uniform physical

properties could potentially be easily collected from the Centipede site.

5.2 Capillary Barrier Performance

The results from the pressure plate tests and modelling suggest that unsorted waste materials at

Page 44: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 44

Centipede do not have sufficiently different water retention properties for use in a capillary

barrier. This is illustrated in Tables 8 and 9, which show water passing through the interfaces of

the Sample 2/Sample 3 and Sample 2/Sample 4 capillary barrier simulations. The results from

these two simulations are in stark contrast to Heiberger’s simulation, which diverts water to the

edge of the barrier.

The relative lack of uniformity in the grain size of the tested samples could explain the result, as

many capillary barrier designs (including that of Heiberger (1996)) utilise more uniform

materials in the fine and coarse layers (Parent & Cabral 2006). Thus, if Toro Energy wishes to

use mined waste materials in its capillary barrier design, it is recommended that some kind of

material sorting process be examined for feasibility; and the water retention properties of these

sorted materials be tested.

5.3 Limitations

The need to select non-mineralised drill cores for use in this project meant that the sample size

was small and the samples were not significantly spatially distributed around the Centipede

deposit (Figure 5). Furthermore, accessibility issues in the drill program meant that drill cores

were only obtained from the lakebed system; no suitable samples from the nearby dune system

were obtained (Schneider 2011). While the results of this project showed that a range of

materials from Centipede are unsuitable for use in capillary barrier construction, it is not

inconceivable that materials from other parts of Centipede (such as the sand dune system) have

suitable hydraulic properties.

Page 45: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 45

6. Conclusions

The results from the laboratory analysis and modelling suggest that constructing a simple

capillary barrier using unsorted mined waste is not likely to be effective for Toro Energy’s

Centipede mine.

Designing and implementing a radioactive tailings cover system is a huge operation and

optimising its design relies on many factors. The results of this paper will be a valuable

contribution to the design of Toro’s tailings cover. The literature review confirms the fact that a

capillary barrier is a good idea for use in the tailings cover; while the results of the model

suggest that grain sorting will need to take place if Toro wishes to use mined waste material to

construct its barrier.

Additionally, as a result of this project Toro now has a record of the grain size distribution and

water retention properties of a range of waste materials- information that was previously

unknown. Data such as this is essential for the capillary barrier design to move beyond the

conceptual stage. The similarity in grain size and water retention properties of the samples could

also be a positive for Toro, as it suggests that a mixed waste material with relatively uniform

grain size and capillarity could likely be collected from the Centipede mine and used elsewhere

on site, such as in another section of the tailings cover or in dam construction.

7. Recommendations

Based on the findings of this project, it is strongly recommended that a capillary barrier be

included in the design of Toro Energy’s radioactive tailings storage facility in Wiluna. Including

a capillary barrier as planned will ensure that current best practice is incorporated in Toro’s

tailings cover design, limiting the risk of tailings release through groundwater or evaporative

forcing. However, the use of non-mineralised mined waste material from Toro’s Centipede mine

in the construction of this capillary barrier is not recommended unless the material is subject to

grain sorting, which may or may not be viable.

Page 46: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 46

This project can be seen as a first step of many in the fine-tuning of Toro’s capillary barrier

design and can thus be used as a basis for future studies. Some other issues that could be

considered are:

• The viability of using sorted mine waste material in the capillary barrier. A cost/benefit

analysis should be conducted, comparing grain sorting processes with collecting and

transporting material from elsewhere.

• Preferential flow pathways and their effect on the performance of the capillary barrier.

• Analysis of the stability and geochemistry of materials to be used in the tailings cover,

including the capillary barrier.

• Modelling the upwards transport of tailings through evaporative and capillary forces, rather

than just downwards water infiltration. Despite the fact that a review of the relevant

literature suggests that this is a problem that will not occur with a capillary barrier that

prevents infiltration (Tidwell et al 2003; Parent & Cabral 2006; Yanful et al 2006), it is

important to know for certain that tailings will not be transported upwards when designing

a radioactive tailings cover.

• Potential costs and benefits of using a more complex capillary barrier (such as the one

proposed by Mallants et al (1999)) in Toro’s tailings cover.

Studying any of these issues would build upon the work conducted in this project and bring Toro

Energy one step closer to completing the design of its radioactive tailings cover system.

Page 47: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 47

8. References

Australian Radiation Protection and Nuclear Safety Agency, 2012, Cradle-to-Grave Radioactive Waste Management, Australian Government, Canberra, Australia

Bowerman, A.G.; Redent, E.F., ‘Biointrustion of Protective Barriers at Hazardous Waste Sites’,

Journal of Environmental Quality, vol. 27 (3), pp. 625-632 Burdine, N.T., 1953, ‘Relative permeability calculations from pore-size distribution data’, Petr.

Trans. Am. Inst. Mining Metall., vol. 198, pp. 71-77 Bureau of Meteorology, 2012, ‘Climate Statistics for Wiluna, Western Australia’, BOM,

Australian Government, Canberra East, J., 2007, ‘Geomorphological assessment of sites and impoundments for the long term

containment of Uranium mill tailings in the Alligator Rivers region’, Australian Geographer, vol. 17 (1), pp. 16-21

Fala, O.; Molson, J.; Aubertin, M.; Bussiere, B., 2005, ‘Numerical Modelling of Flow and

Capillary Barrier Effects in Unsaturated Waste Rock Piles’, Mine Water and the Environment, vol. 24 (4), pp. 172-185

Fredlund, D.G.; Xing, A., 1994, ‘Equations for the soil-water characteristic curve’, Canadian

Geotech Journal, vol. 31, pp. 521-532 Gee, G.; Wierenga, P.; Andraski, B.; Young, M.; Fayer, M.; Rockhold, M., 1994, ‘Variations in

water balance and recharge potential at three western sites.’ Soil Science Society of America Journal, vol. 58, pp. 63–72

Goudie, A.; Viles, H., 1997, Salt Weathering Hazards, Wiley Publishing, New York City, NY,

USA Heiberger, T.S., 1996, ‘Simulating the effects of a capillary barrier using the two-dimensional

variably saturated flow model SWMS-2D/HYDRUS-2d’, PhD Thesis, Oregon State University, Corvallis, OR, USA

Kampf, M.; Montenegro, H., 1997, ‘On the performance of capillary barriers as landfill cover’,

Hydrology and Earth Systems Sciences Discussions, vol. 1 (4), pp. 925-930 Kazimoglu, Y.K.; McDougall, J.R.; Pyrah, I.C., 2005, ‘Moisture Retention and Movement in

Landfilled Waste’, Proceedings of the International Conference on Problematic Soils, Famagusta, Cyprus

Kean, A., 2012, ‘Toro Energy receives milestone approval for Wiluna uranium project’,

Proactive Investors News, Australia

Page 48: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 48

Khire, M.V.; Benson, C.H.; Bosscher, P.J., 2000, ‘Capillary Barriers: Design Variables and Water Balance’, Journal of Geotechnical and Geoenvironmental Engineering, August 2000, pp. 695-708

Knight Piesold Pty Ltd, 2010, Wiluna Uranium Project Tailings Management Strategy and

Conceptual Storage Design, Knight Piesold, West Perth, Australia Lintnerova, O.; Sottnik, P.; Soltes, S., 2007, ‘Abandoned Smolnik mine (Slovakia) – a catchment

area affected by mining activities’, Estonian Journal of Earth Sciences, vol. 57 (2), pp. 104-110

Lottermoser, B.G.; Ashley, P.M., 2005, ‘Tailings dam seepage at the rehabilitated Mary

Kathleen uranium mine, Australia’, Journal of Geochemical Exploration, vol. 85, pp. 119-137

Maeda, R.; Sheldrick, A., 2012, ‘Japan aims to abandon nuclear power by 2030s’, Reuters,

<http://www.reuters.com/article/2012/09/14/us-japan-nuclear-idUSBRE88D05520120914>

Mallants, D.; Volckaert, G.; Marivoet, J., 1999, ‘Sensitivity of protective barrier performance to

changes in rainfall rate’, Waste Management, vol. 19 (7-8), pp. 467-475 Moeller, K., 2011, ‘Waste Safety Standards Committee 27th to 30th June 2011’, Revision of

Current WS-G-2.7 Safety Guide, International Atomic Energy Agency Mualem, Y., 1976, ‘A new model for predicting the hydraulic conductivity of unsaturated porous

media’, Water Resources Res., vol. 12, pp. 513-522 Mudd, G.M.; Patterson, J., 2010, ‘Continuing pollution from the Rum Jungle U-Cu project: A

critical evaluation of environmental monitoring and rehabilitation’, Environmental Pollution, vo. 158, pp. 1252-1260

Nicholson, R.V.; Gillham, R.W.; Cherry, J.A.; Reardon, E.J., 1989, ‘Reduction of acid

generation in mine tailings through the use of moisture-retaining cover layers as oxygen barriers’, Canadian Geotechnical Journal, vol. 26 (1), pp. 1-8

Pain, C.F., 2008, ‘Field Guide for Describing Regolith and Landforms’, Cooperative Research

Centre for Landscape Environments and Mineral Exploration, CSIRO Exploration and Mining, Bentley, WA, Australia

Parent, S.E.; Cabral, A., 2006, ‘Design of inclined covers with capillary barrier effect’,

Geotechnical and Geological Engineering, vol. 24, pp. 689-710 Rabozzi, C., 2005, ‘Evaluation of mineral barriers water retention curves using the vapour

equilibrium method’, Post-doc, Dipartimento di Ingegneria del Territorio, dell’ Ambiente e delle Geotecnologie, Torino, Italy

Page 49: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 49

Radcliffe, D.E.; Simunek, J., 2010, Soil Physics with Hydrus: Modeling and Applications, CRC

Press, Taylor & Francis Group, Boca Raton, Florida, USA Riley, S.J., 2006, ‘Geomorphic estimates of the stability of a uranium mill tailings containment

cover: Naberlek, Northern Territory, Australia’, Land Degradation & Development, vol. 6 (1), pp. 1-16

Schneider, A., 2011, ‘Sonic Drilling report 2011’, Toro Energy Limited, West Perth, WA,

Australia Simunek, J.; Sejna, M.; Van Genuchten, M.T., 1999, ‘The Hydrus-2D software package for

simulating two-dimensional movement of water, heat and multiple solutes in variably saturated media. Version 2.0’, IGWMC – TPS – 53, International Ground Water Modelling Center, Colorado School of Mines, Golden, Colorado, pp. 251

Stolberg, D.J.; Williams, D.J., 2004, ‘Cover systems for hypersaline tailings in an arid climate’,

in Stolberg, D.J.; Williams, D.J., 2004, Tailings and Mine Waste ’04, Proceedings of the Eleventh Tailings and Mine Waste Conference, October 2004, Vail, Colorado, USA

Suter, G.W.; Luxmoore, R.J.; Smith, E.D., 1993, ‘Compacted Soil Barriers at Abandoned

Landfill Sites are Likely to Fail in the Long Term’, Journal of Environmental Quality, vol. 22 (2), pp. 217-226

Tidwell, V.C.; Glass, R.J.; Chocas, C.; Barker, G.; Orear, L., 2003, ‘Visualization experiment to

investigate capillary barrier performance in the context of a Yucca Mountain emplacement drift’, Journal of Contaminant Hydrology, vol. 17, pp. 342-355

Toro Energy Limited, 2011, ‘Environmental Review and Management Program (ERMP)’, EPA

Assessment No 1819, Toro Energy, Norwood, SA, Australia Toro Energy Limited, 2012, ‘Environmental Review and Management Program (ERMP):

Response to Submissions’, EPA Assessment No 1819, Toro Energy, Norwood, SA, Australia

Van Genuchten, M.T., 1980, ‘A closed form equation for predicting the hydraulic conductivity

of unsaturated soils’, Soil Sci. Soc. Am. J., vol. 44, pp. 689-710 Walter, M.T.; Kim, J.S.; Steenhuis, T.S.; Parlange, J.Y.; Heilig, A.; Braddock, R.D.; Selker, J.S.;

Boll, J., 2000, ‘Funneled flow mechanisms in a sloping layered soil: Laboratory investigation’, Water Resources Research, vol. 36 (4), pp. 841-849

Waugh, W.J., 2004, Design, Performance and Sustainability of Engineered Covers for Uranium

Mill Tailings, Environmental Sciences Laboratory, SM Stoller Corporation, Grand Junction, Colorado, USA

Page 50: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 50

Yanful, E.K.; Mousavi, S.M.; De Souza, L.P, 2006, ‘A numerical study of soil cover performance’, Journal of Environmental Management, vol. 81, pp. 72-92

Yanful, E.K.; Simms, P.H., Payant, S.C., 1998, ‘Soil Covers for Controlling Acid Generation in

Mine Tailings: A Laboratory Evaluation of the Physics and Geochemistry’, Water, Air and Soil Pollution, vol. 114, pp. 347-375

Yurisich, A., 2012, ‘Response to questions from Ray Claudius, OEPA, 22 December 2011 & 5

January 2012’, Toro Energy, West Perth, WA, Australia

Page 51: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 51

Appendices

Appendix A: Full Grain Size Distribution Results Sample 1 Sieve size (mm) soil W (g) W % sum W % % finer

4.75 0.6 0.2 0.2 99.8 2.36 3.6 1.2 1.4 98.6 1.18 42.5 14.0 15.4 84.6 0.6 93.2 30.8 46.2 53.8

0.425 38.5 12.7 59.0 41.0 0.3 34.6 11.4 70.4 29.6

0.212 29.8 9.9 80.3 19.7 0.15 24.4 8.1 88.3 11.7

0.106 18.3 6.0 94.4 5.6 0.075 10.2 3.4 97.8 2.2

0 6.8 2.2 100 0 total weight 302.5

Sample 2 Including hydrometer results Sieve size (mm) soil W (g) W % sum W % % finer

4.75 0 0 0 100 2.36 0.1 0.0 0.0 100.0 1.18 0.1 0.0 0.1 99.9 0.6 12.8 4.3 4.4 95.6

0.425 15.4 5.2 9.5 90.5 0.3 18.4 6.2 15.7 84.3

0.212 17.1 5.7 21.4 78.6 0.15 14.1 4.7 26.1 73.9

0.106 32.9 11.0 37.1 62.9 0.075 43 14.4 51.5 48.5 0.054 36.5 12.2 63.8 36.2 0.039 7.1 2.4 66.2 33.8 0.028 8.1 2.7 68.9 31.1 0.021 11.2 3.8 72.6 27.4 0.015 10.2 3.4 76.1 23.9 0.011 8.1 2.7 78.8 21.2

0.0081 8.1 2.7 81.5 18.5

Page 52: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 52

0.0058 6.1 2.0 83.6 16.4 0.0042 6.1 2.0 85.6 14.4 0.0030 3.1 1.0 86.6 13.4 0.0021 3.1 1.0 87.6 12.4 0.0012 4.1 1.4 89.0 11.0 0.0011 2.0 0.7 89.7 10.3 0.0009 0 0 89.7 10.3 0.0007 0 0 89.7 10.3

0 30.77 10.30 100.0 0.0 total weight 298.6

Sample 3 Sieve size (mm) soil W (g) W % sum W % % finer

4.75 9 2.9 2.9 97.1 2.36 18.2 6.0 8.9 91.1 1.18 67.4 22.1 31.0 69.0 0.6 88.3 28.9 59.8 40.2

0.425 37.6 12.3 72.2 27.8 0.3 29.2 9.6 81.7 18.3

0.212 19.7 6.4 88.2 11.8 0.15 13.7 4.5 92.6 7.4

0.106 8.8 2.9 95.5 4.5 0.075 4.5 1.5 97.0 3.0

0 9.2 3.0 100 0 total weight 305.6

Sample 4

Sieve size (mm) soil W (g) W % sum W % % finer 4.75 0 0 0 100 2.36 2.8 0.9 0.9 99.1 1.18 18.5 6.1 7.0 93.0 0.6 58.8 19.3 26.3 73.7

0.425 51 16.7 43.0 57.0 0.3 47.4 15.6 58.6 41.4

0.212 35.2 11.5 70.1 29.9 0.15 24 7.9 78.0 22.0

0.106 25.1 8.2 86.2 13.8 0.075 16.5 5.4 91.6 8.4

0 25.5 8.4 100 0 total weight 304.8

Page 53: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 53

Sample 5 Sieve size (mm) soil W (g) W % sum W % % finer

4.75 6.8 2.2 2.2 97.8 2.36 8.3 2.7 4.9 95.1 1.18 36.5 11.9 16.8 83.2 0.6 78.7 25.6 42.4 57.6

0.425 37.1 12.1 54.5 45.5 0.3 36.6 11.9 66.4 33.6

0.212 27 8.8 75.2 24.8 0.15 21.2 6.9 82.1 17.9

0.106 14.7 4.8 86.9 13.1 0.075 9.7 3.2 90.0 10.0

0 30.6 10.0 100 0 total weight 307.2

Appendix B: Full Pressure Plate Testing and Fredlund-Xing SWRC Results

!"#$%%&#$!"'()$!)$%)!*$+,-)%!.+/&%!0+%1!*$+,-)!234! !

5678!29:;<4!!:==>689!=?8<<@?8! <:7=>8!A!B863C5! <:7=>8!D!B863C5! <:7=>8!E!B863C5!

FG":! HI! JJ! JAKI! L!LMG":! NJKL! JDKI! HNKA! A!AMG":! NE! HHKA! HLKH! D!FMG":! NMKE! HFKA! NNKF! N!LMMG":! IJ! HEKI! NIKE! LF!AMMG":! INKL! HDKA! NEKH! AA!O6P:>!9?;!B863C5! FFKD! NIKA! INKA!

!

Water retention curves were created using this data; and equations as described in Fredlund &

Xing (1994). Key Fredlund-Xing Fitting Curve results are as follows, where:

Mr : Mass of sample ring (g) Mr+s : Mass of ring & sample (g) Ms : Mass of soil sample (g)

Page 54: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 54

Md : Mass of dry soil sample (g) w : Water content V : Volume of soil sample (cm3) 'd : Dry density of soil sample (g/cm3) " : Applied pressure / matric suction (kPa) ! : Volumetric water content (VWC) !s : Saturated VWC a : Curve-fitting parameter m : Curve-fitting parameter n : Curve-fitting parameter related to slope at inflection point

Initial Conditions: Sample 2

Mr Mr+s Ms Md w V 'd 30.53 92.90 62.37 55.27 0.128460286 47.515 1.163

$ Mr+s Ms w ! 1 122.2 91.67 0.658585128 0.765934503 5 116.5 85.97 0.555455039 0.64599421 10 109.6 79.07 0.430613353 0.500803329 20 104.5 73.97 0.338339063 0.39348833 50 100.9 70.37 0.27320427 0.317736566 100 99.5 68.97 0.247874073 0.288277547 200 97.6 67.07 0.213497377 0.248297449

!"#$%&'$()*+,-*)*, .&))&(/,0%12$334,5*'#+$,6,

572)&1(8,9,:;0*<,=>?8,@, @,A&))&(/, :@,B,@,A&))&(/<6, 0*%*'$)$%3, C(&)&*+,=*+7$,, D$37+),

L! MKFII! MKFII! !! Q<! MKFII! EFGHH,F! MKEHM! MKEHD! LKADIFJ$RMF! :! H! GFEHE,LM! MKDII! MKDFH! IKEMDEH$RMF! 7! LKLHD! EFGIJ,AM! MKAFD! MKAIL! NKHIEJN$RMF! P! MKNHH! 6FH6G,FM! MKLHJ! MKLJF! DKDIHDN$RMF! !! !! !!LMM! MKLNN! MKLIN! JKIML$RMF! !! !! !!AMM! MKLEN! MKLEH! EKHIDJF$RMH! !! !! !!%&.!

! !MKMMMAHENJD!

! ! !

Page 55: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 55

Initial Conditions : Sample 3

Mr Mr+s Ms Md w V 'd 30.33 111.70 81.37 76.17 0.068268347 47.515 1.603

$ Mr+s Ms w ! 1 133.4 103.07 0.353157411 0.56611133 5 129.3 98.97 0.299330445 0.479826703 10 123.9 93.57 0.228436392 0.366183537 20 118.5 88.17 0.15754234 0.25254037 50 115.5 85.17 0.118156755 0.189405278 100 114.9 84.57 0.110279638 0.176778259 200 113.5 83.17 0.091899698 0.147315216

!"#$%&'$()*+,-*)*, .&))&(/,0%12$334,5*'#+$,J,

572)&1(8,9,:;0*<,=>?8,@, @,A&))&(/, :@,B,@,A&))&(/<6, 0*%*'$)$%3, C(&)&*+,=*+7$,, D$37+),

L! MKFII! MKFII! !! Q<! MKFII! EFGHH,F! MKEHM! MKEHD! LKADIFJ$RMF! :! H! GFEHE,LM! MKDII! MKDFH! IKEMDEH$RMF! 7! LKLHD! EFGIJ,AM! MKAFD! MKAIL! NKHIEJN$RMF! P! MKNHH! 6FH6G,FM! MKLHJ! MKLJF! DKDIHDN$RMF! !! !! !!LMM! MKLNN! MKLIN! JKIML$RMF! !! !! !!AMM! MKLEN! MKLEH! EKHIDJF$RMH! !! !! !!%&.!

! !MKMMMAHENJD!

! ! ! Initial Condition : Sample 4

Mr Mr+s Ms Md w V 'd 30.3 102.00 71.7 67.2 0.066964286 47.515 1.414

$ Mr+s Ms w ! 1 128.8 98.5 0.46577381 0.658604167 5 122.9 92.6 0.37797619 0.534458333 10 117.5 87.2 0.297619048 0.420833333 20 112.1 81.8 0.217261905 0.307208333 50 107.8 77.5 0.15327381 0.216729167

Page 56: 012)3'$+1)/'+14%'($)01'4) !#$%&'(!)*+),%(-$*+,&&( · 2.2 Wiluna Uranium Project Toro’s Wiluna project is centred around two uranium deposits, Centipede and Lake Way, both located

Patrick Dunne

Page | 56

100 106.7 76.4 0.136904762 0.193583333 200 105.1 74.8 0.113095238 0.159916667

Experimental Data Fitting Process: Sample 4

Suction, $ (kPa) VWC, !

! fitting (! - ! fitting)2 Parameters Initial Value Result

1 0.659 0.659 !s 0.659 0.659 5 0.534 0.537 6.22134E-06 a 7.000 4.885 10 0.421 0.416 2.27423E-05 m 1.087 0.727 20 0.307 0.310 5.27353E-06 n 0.338 1.881 50 0.217 0.224 5.33418E-05 100 0.194 0.186 5.54472E-05 200 0.160 0.160 1.52163E-07

SUM

0.000143178