02-b difference between phase1- phase2- phase2+
DESCRIPTION
GSM Phase 1 -2TRANSCRIPT
-
M900/M1800 Base Station Subsystem Signaling Analysis Manual Contents
Issue 01 (2007-03-15) Huawei Technologies Proprietary i
Contents
B Difference between Phase1- Phase2- Phase2+....................................................................B-1 B.1 Difference between Messages o the A Interface in Different Phases ............................................................ B-2 B.2 Difference Analysis......................................................................................................................................... B-2
-
Tables M900/M1800 Base Station Subsystem
Signaling Analysis Manual
ii Huawei Technologies Proprietary Issue 01 (2007-03-15)
Tables
Table B-1 message differences in Phase1/Phase2/Phase2+................................................................................. B-2
Table B-2 message IE difference in Phase1-Phase2-Phase2+Phase1Phase2Phase2........................................... B-9
-
M900/M1800 Base Station Subsystem Signaling Analysis Manual B Difference between Phase1- Phase2- Phase2+
Issue 01 (2007-03-15) Huawei Technologies Proprietary B-1
B Difference between Phase1- Phase2- Phase2+
About This Chapter
The following table lists the contents of this chapter.
Title Description
B.1 Difference between Messages on the A Interface in Different Phases
Introduces the differences between the A interface messages in PHASE 1, PHASE 2, and PHASE 2+.
B.2 Difference Analysis Analyses the differences in the IEs of the A interface messages in PHASE 1, PHASE 2, and PHASE 2+.
-
B Difference between Phase1- Phase2- Phase2+ M900/M1800 Base Station Subsystem
Signaling Analysis Manual
B-2 Huawei Technologies Proprietary Issue 01 (2007-03-15)
B.1 Difference between Messages on the A Interface in Different Phases
The GSM technical specification is a standard constantly improved and perfected. With the introduction of Phase1, Phase2 and Phase2+, GSM provides different new services for user to satisfy the requirements from the market. Phase1 of the GSM technical specification includes 3.x.x series standard; Phase2 includes 4.x.x series standard, and the subsequent series standards 5.x.x, 6.x.x and 7.x.x belong to Phase2+. This technical specification provides good compatibility in the development.
This section gives the development of the A-interface L3 protocol (GSM 08.08) in each phase. To facilitate description, take the typical protocol in each phase for analysis: GSM08.08 version 3.10.1 is for Phase1, GSM08.08 version 4.7.1 for Phase2, and GSM08.08 version 7.6.1 for Phase2+.
B.2 Difference Analysis
Message Differences in Phase1-Phase2-Phase2+ Table B-1 illustrates the message differences in Phase1/Phase2/Phase2+.
Table B-1 message differences in Phase1/Phase2/Phase2+
Message Phase1 Phase2 Phase2+
Assignment Request
Supported Layer 3 header information changed as optional IE RADIO CHANNEL IDENTITY cancelled, optional IE CLASSMARK INFORMATION 2Reference newly added, optional IE
Group Call Reference newly added, optional IE Talker Flag newly added, optional IE LSA Access Control Suppression newly added, optional IE
Assignment Complete
Supported Radio channel identity cancelled, Chosen channel Reference newly added, optional IE Chosen encryption algorithm Reference newly added, optional IE
Circuit Identity Code newly added, optional IE Circuit Pool newly added, optional IE Speech Version (Chosen) newly added, optional IE LSA Identifier newly added, optional IE
-
M900/M1800 Base Station Subsystem Signaling Analysis Manual B Difference between Phase1- Phase2- Phase2+
Issue 01 (2007-03-15) Huawei Technologies Proprietary B-3
Message Phase1 Phase2 Phase2+
Assignment Failure
Supported Basically consistent, with cause value adjusted
Circuit Pool newly added, optional IE Circuit Pool List newly added, optional IE Some cause values added
Block (BSC to MSC) supported
(BSC to MSC) supported Changed as bi-directional (MSC-BSC) messages:(MSC to BSC) Connection Release Requested Reference newly added, optional IE
Blocking Acknowledge
Supported Supported Changed to bi-directional
Unblock (BSC to MSC) supported
(BSC to MSC) supported Changed to bi-directional
Unblocking Acknowledge
Supported Supported Changed to bi-directional
-
B Difference between Phase1- Phase2- Phase2+ M900/M1800 Base Station Subsystem
Signaling Analysis Manual
B-4 Huawei Technologies Proprietary Issue 01 (2007-03-15)
Message Phase1 Phase2 Phase2+
Handover Request
Supported Radio channel identity cancelled, Cause Reference newly added, optional IE Classmark information Reference newly added, optional IE
Current Channel type 1 newly added, optional IE Speech Version (Used) newly added, optional IE Group Call Reference newly added, optional IE Talker Flag newly added, optional IE Configuration Evolution Indication newly added, optional IE Chosen Encryption Algorithm (Serving) newly added, optional IE Old BSS to New BSS Information newly added, optional IE LSA Information newly added, optional IE LSA Access Control Suppression newly added, optional IE
Handover Required
Supported Optional IE Cell identifier list (preferred) modified as mandatory Current radio environment cancelled, optional IE Environment of BS "n" cancelled, optional IE
Circuit Pool List newly added, optional IE Current Channel Type 1 newly added, optional IE Speech Version (Used) newly added, optional IE Queuing Indicator newly added, optional IE Old BSS to New BSS Information newly added, optional IE
-
M900/M1800 Base Station Subsystem Signaling Analysis Manual B Difference between Phase1- Phase2- Phase2+
Issue 01 (2007-03-15) Huawei Technologies Proprietary B-5
Message Phase1 Phase2 Phase2+
Handover Request Acknowledge
Supported Layer 3 Information modified in code Chosen channel Reference newly added, optional IE Chosen encryption algorithm Reference newly added, optional IE
Circuit Pool newly added, optional IE Speech Version (Chosen) newly added, optional IE Circuit Identity Code newly added, optional IE LSA Identifier newly added, optional IE
Handover Command
Supported Layer 3 Information modified in code
Cell Identifier newly added, optional IE
Handover Complete
Supported Supported Supported
Handoer Succeeded
Not supported Not supported Newly added
Handover Candidate Enquire
Supported Optional IE Cell identifier modified as mandatory
Supported
Handover Canidate Response
Supported Optional IE Cell identifier modified as mandatory
Supported
Handover Failure Supported Supported Circuit Pool newly added, optional IE Circuit Pool List newly added, optional IE
Resource Request
Supported Optional IE Cell identifier modified as mandatory Extended Resource Indicator Reference newly added, optional IE
Supported
Resource Indication
Supported Resource Indication Method newly added, Mandatory IEMandatory IE Resource available modified as optional Total Resource accessible newly added, optional IE
Supported
Paging Supported TMSI code changed Channel Needed newly added, optional IE
eMLPP Priority newly added, optional IE
Clear Request Supported Supported Supported
-
B Difference between Phase1- Phase2- Phase2+ M900/M1800 Base Station Subsystem
Signaling Analysis Manual
B-6 Huawei Technologies Proprietary Issue 01 (2007-03-15)
Message Phase1 Phase2 Phase2+
Clear Command Supported Mandatory IE Layer 3 header information modified as optional
Supported
Clear Complete Supported Supported Supported
Reset Supported Supported Supported
Reset Acknowledge
supported Supported Supported
handover Performed
Supported Optional IE Cell identifier modified as mandatory Optional IE Radio channel identity deleted Chosen channel newly added, optional IE Chosen encryption algorithm newly added, optional IE
Speech Version (Chosen), optional IE LSA Identifier newly added
Overload Supported Supported Supported
Trace Invocation Supported Modified as 2 messages: MSC INVOKE TRACE ; BSS INVOKE TRACE
Modified as 2 messages: MSC INVOKE TRACE ; BSS INVOKE TRACE
MSC Invoke Trace
Not supported Newly added Supported
BSS Invoke Trace
Not supported Newly added Supported
Classmark Update
From BSC to MSC
Modified as bi-directional Change to the optional IE Classmark information type 2 Classmark information type 3 newly added, optional IE
Supported
Cipher Mode Command
Supported Mandatory IE Layer 3 header information modified as optional Cipher response mode newly added, optional IE
Supported
-
M900/M1800 Base Station Subsystem Signaling Analysis Manual B Difference between Phase1- Phase2- Phase2+
Issue 01 (2007-03-15) Huawei Technologies Proprietary B-7
Message Phase1 Phase2 Phase2+
Cipher Mode Complete
Supported Layer 3 message contents newly added, optional IE Chosen encryption algorithm newly added, optional IE
Supported
Complete Layer3 Information
Supported Chosen channel newly added, optional IE
LSA Identifier List newly added, optional IE APDU newly added, optional IE
Queuing Indication
Supported Supported Supported
SAPI "n" Reject Supported Supported Supported
SAPI "n" Clear Command
Supported Not supported Not supported
SAPI "n" Clear Complete
Supported Not supported Not supported
handover Required Reject
Supported Supported Supported
Reset Circuit Supported Supported Supported
Reset Circuit Acknowledge
Supported Supported Supported
Handover Detect Supported Supported Supported
Circuit Group Block
Not supported Newly added (from BSC to MSC)
Supported(bi-directional)
Circuit Group Blocking Acknowledge
Not supported Newly added (from MSC to BSC)
Supported (bi-directional)
Circuit Group Unblock
Not supported Newly added (from BSC to MSC)
Supported (bi-directional)
Circuit Group Unblock Acknowledge
Not supported Newly added (from MSC to BSC)
Supported (bi-directional)
Confusion Not supported Newly added Supported
Classmark Request
Not supported Newly added Supported
Unequipped Circuit
Not supported Newly added Supported
Cipher Mode Reject
Not supported Newly added Supported
-
B Difference between Phase1- Phase2- Phase2+ M900/M1800 Base Station Subsystem
Signaling Analysis Manual
B-8 Huawei Technologies Proprietary Issue 01 (2007-03-15)
Message Phase1 Phase2 Phase2+
Load Indication Not supported Not supported Newly added
VGCS.CBS Setup
Not supported Not supported Newly added
VGVS/VBS Setup ACK
Not supported Not supported Newly added
VGCS/VBS Assignment Request
Not supported Not supported Newly added
VGCS/VBS Assignment Result
Not supported Not supported Newly added
VGCS/VBS Assignment Failure
Not supported Not supported Newly added
VGCS/VBS Assignment Indication
Not supported Not supported Newly added
Uplink Request Not supported Not supported Newly added
Uplink Request Acknowledge
Not supported Not supported Newly added
Uplink Request Confirmation
Not supported Not supported Newly added
Uplink Release Indication
Not supported Not supported Newly added
Uplink Reject Command
Not supported Not supported Newly added
Uplink Release Command
Not supported Not supported Newly added
Uplink Seized Command
Not supported Not supported Newly added
Suspend Not supported Not supported Newly added
Resume Not supported Not supported Newly added
Change Circuit Not supported Not supported Newly added
Change Circuit Acknowledge
Not supported Not supported Newly added
LSA Information Not supported Not supported Newly added
Location Information Command
Not supported Not supported Newly added
-
M900/M1800 Base Station Subsystem Signaling Analysis Manual B Difference between Phase1- Phase2- Phase2+
Issue 01 (2007-03-15) Huawei Technologies Proprietary B-9
Message Phase1 Phase2 Phase2+
Location Information Report
Not supported Not supported Newly added
message IE difference in Phase1-Phase2-Phase2+Phase1Phase2Phase2 Table B-2 illustrates the IE differences of messages in Phase1/Phase2/Phase2+.
Table B-2 message IE difference in Phase1-Phase2-Phase2+Phase1Phase2Phase2
ELEMENT Phase1 Phase2 Phase2+
Circuit identity code Supported Supported 1544k/s supported
Radio channel identity Supported Deleted Deleted
Resource available Supported Supported Supported
Cause Supported Directed Retry added Invalid cell addedInvalid message contents added Information element or field missing added Incorrect value added Unknown Message type added Unknown Information Element added
Joined group call channel added Traffic added Traffic Load added Preemption added Circuit pool mismatch added Switch Circuit pool added Requested speech version unavailable added LSA not allowed addedVGCS/VBS call non existent added
Cell identifier Supported Supported Support for PCS1900 newly added
Priority Supported PCI domain added Supported
Layer 3 header information
Supported Supported Supported
IMSI Supported Supported Supported
TMSI Supported Supported Supported
Encryption information Supported (only A5/1 not encrypted)
Supported (A5/1 A5/2 A5/3 A5/4 A5/5 A5/6 A5/7 not encrypted)
Supported A5/1 A5/2 A5/3 A5/4 A5/5 A5/6 A5/7 not encrypted)
-
B Difference between Phase1- Phase2- Phase2+ M900/M1800 Base Station Subsystem
Signaling Analysis Manual
B-10 Huawei Technologies Proprietary Issue 01 (2007-03-15)
ELEMENT Phase1 Phase2 Phase2+
Channel type Supported Channel rate type newly added Full/half rate preferred, optional Speech version 1 supported Data service rate improved
multi-timeslot assignment supported Multi-speech version like EFR,AMR supported
Periodicity Supported Parameter strictly defined
Parameter strictly defined
Extended resource indicator
Not supported Newly added SM domain newly added
Number of MSs Supported Supported Supported
Current radio environment
Supported Deleted Deleted
Environment of BS "n" Supported Deleted Deleted
Classmark information type 2
Supported Code of CLASSMARK 2 modified
Supported
Classmark information type 3
Not supported Newly added Supported
Interference band to be used
Supported Supported Supported
RR Cause Supported Supported Supported
Trace number Supported Deleted Deleted
Layer 3 information Supported Supported Supported
DLCI Supported Supported Supported
Downlink DTX flag Supported Supported Supported
Cell identifier list Supported Supported Newly addedPCS1900 supported
Response Request Supported Supported Supported
Resource Indication Method
Supported Supported Supported
Classmark information type 1
Supported Supported Supported
Circuit identity code list Not supported Newly added Supported
Diagnostic Not supported Newly added Supported
-
M900/M1800 Base Station Subsystem Signaling Analysis Manual B Difference between Phase1- Phase2- Phase2+
Issue 01 (2007-03-15) Huawei Technologies Proprietary B-11
ELEMENT Phase1 Phase2 Phase2+
Layer 3 message contents
Not supported Newly added Supported
Chosen channel Not supported Newly added channel mode domain added Newly added multi-channel supported
Total resource accessible Not supported Newly added Supported
Cipher response mode Not supported Newly added Supported
Channel needed Not supported Newly added Understanding of 11 modified, half/full rate supported
Trace type Not supported Newly added Supported
Trigger Id Not supported Newly added Supported
Trace reference Not supported Newly added Supported
Transaction Id Not supported Newly added Supported
Mobile identity Not supported Newly added Supported
OMC Id Not supported Newly added Supported
Forward indicator Not supported Newly added Supported
Chosen encryption algorithm
Not supported Newly added Supported
Circuit Pool Not supported Not supported Newly added
Circuit Pool List Not supported Not supported Newly added
Time Indication Not supported Not supported Newly added
Resource Situation Not supported Not supported Newly added
Current Channel type 1 Not supported Not supported Newly added
Queuing Indicator Not supported Not supported Newly added
Speech Version Not supported Not supported Newly added
Assignment Requirement
Not supported Not supported Newly added
Talker Flag Not supported Not supported Newly added
Connection Release Requested
Not supported Not supported Newly added
Group Call Reference Not supported Not supported Newly added
EMLPP Priority Not supported Not supported Newly added
-
B Difference between Phase1- Phase2- Phase2+ M900/M1800 Base Station Subsystem
Signaling Analysis Manual
B-12 Huawei Technologies Proprietary Issue 01 (2007-03-15)
ELEMENT Phase1 Phase2 Phase2+
Configuration Evolution Indication
Not supported Not supported Newly added
Old BSS to New BSS Information
Not supported Not supported Newly added
LSA Identifier Not supported Not supported Newly added
LSA Identifier List Not supported Not supported Newly added
LSA Information Not supported Not supported Newly added
LCS QoS Not supported Not supported Newly added
LSA access control suppression
Not supported Not supported Newly added
LCS Priority Not supported Not supported Newly added
Location Type Not supported Not supported Newly added
Location Estimate Not supported Not supported Newly added
Positioning Data Not supported Not supported Newly added
LCS Cause Not supported Not supported Newly added
LCS Client Type Not supported Not supported Newly added
APDU Not supported Not supported Newly added
Network Element Identity
Not supported Not supported Newly added
GPS Assistance Data Not supported Not supported Newly added
Deciphering Keys Not supported Not supported Newly added
Return Error Request Not supported Not supported Newly added
Return Error Cause Not supported Not supported Newly added
Segmentation Not supported Not supported Newly added
ContentsTablesB Difference between Phase1- Phase2- Phase2+About This ChapterB.1 Difference between Messages on the A Interface in Different PhasesB.2 Difference Analysis