Doc. No.: 02-D-110-A4REVISION: P4PAGE 1 OF 7__________________________________________________________________
Sigma Aldrich Israel Ltd
New API Production Facility
LUDAN Project No. 134457FWSTERIL Contract no. 1.BJ.3631A
Mobile CIP SystemPG-3801
Data Sheet
02-D-110-A4-P4 PG-3801 CIP System
![Page 2: 02-D-110-A4-P4 PG-3801 CIP System](https://reader036.vdocument.in/reader036/viewer/2022073120/563db986550346aa9a9e2966/html5/thumbnails/2.jpg)
02-D-110-A4-P4 PG-3801 CIP System
![Page 3: 02-D-110-A4-P4 PG-3801 CIP System](https://reader036.vdocument.in/reader036/viewer/2022073120/563db986550346aa9a9e2966/html5/thumbnails/3.jpg)
Doc. No.: 02-D-110-A4REVISION: P4PAGE 2 OF 7_____________________________________________________________________APPROVAL PAGE
Name Function DateAuthor: Giorgio Urbano FW Process LeaderApproved by: Giuseppe Abbate FW Project ManagerApproved by: Moshe Avron LUD Project EngineerApproved by: Yoel Ben-Tolila LUD Project ManagerApproved by: Avi Katz SAI Proj. Eng.Approved by: Yael Asscher SAI Project ManagerApproved by: Theo Ackermann SAI Q.A
REVISION HISTORY
Revision No Date DescriptionP0 07/04/2006 1st issueP1 02/08/2006 2nd issueP2 01/09/2006 3rd issueP3 17/09/2007 4th issueP4 31/11/2008 UPDATE
Signature
02-D-110-A4-P4 PG-3801 CIP System
![Page 4: 02-D-110-A4-P4 PG-3801 CIP System](https://reader036.vdocument.in/reader036/viewer/2022073120/563db986550346aa9a9e2966/html5/thumbnails/4.jpg)
Doc. No.: 02-D-110-A4REVISION: P4PAGE 3 OF 7____________________________________________________________________ATTACHED DOCUMENTS
P4 P&ID
Revision Description
P402-D-003-FLL Fluid List
Number
02-D-058-A1
02-D-110-A4-P4 PG-3801 CIP System
![Page 5: 02-D-110-A4-P4 PG-3801 CIP System](https://reader036.vdocument.in/reader036/viewer/2022073120/563db986550346aa9a9e2966/html5/thumbnails/5.jpg)
CLIENT: UNIT:PROJECT: ITEMS:CONTRACT No: P&ID's:SERVICE: No. REQD.:
DateAuthorReviewer
SCOPEScope of this specification is to give the minimum requirements for the design, supply, install, start up and validate the mobile CIP System skidsfor the pharmaceutical plant of SIGMA ALDRICH ISRAEL located in Jerusalem (Israel).The skids will be installed in a class "ISO 8 at rest" area.
TECHNICAL REQUIREMENTSVendor must consider as essential conditions that:- design, construction, materials of construction, components of supply shall be in accordance with the latest US and
European pharmaceutical standards, as well as recommendations of ISPE Baseline - the equipment will be part of a system that must be fully validated to be in compliance with FDA codes and
European GMP rulesIn case of non-compliance with EU GMP rules or FDA regulations, the Vendor shall have to take all required correctiveactions until the supply would meet the above requirements.
Weldings shall be inspected and shall be complete with documentation for validation.
Materials employed for pressure parts shall be certified by 3.1.B EN 10204 certificates.
Equipment must be designed, constructed and tested according to current European and Israelian Law requirementsconcerning mechanical safety.Vendor shall comply with standards, codes and specifications of qualified Israel and international Institutions (EN, DIN,IEC, etc.; see in particular PED, DIN 24255 and IEC 34 norms).Compliance with the listed codes and standards is Vendor responsibility.Instruments and safety devices will be supplied calibrated by Vendor (with calibration certificate)
The equipment will be cleanable, drainable, easy access for maintenance and inspection.The equipment will be designed and built according to EU standards: 97/23/CE-PED, 98/37/CE (DM) and 94/9/CE-ATEXPressure Vessel are according ASME VIII div.1Piping will be designed and built according to BPE-2005 and the attached piping specification.
ATEX (PRELIMINARY INFORMATION)The equipment will not be internally classified (N2 blanketing) (to be confirmed after risk analysis)ATEX external classification is: II 3 G-D IIB < 135°C; top of the tank and areas close to sampling valve are Zone 1.
Solvent utilized are: Ethanol ATEX IIA < 300°CEthyl Acetate IIA < 450°CDichloromethane D Class I according to NFPA
INSTALLATIONThe equipment will be installed in pharmaceutical area, hence all external finishes must be realized to minimizeretention of dust / microbial growth, and shall minimize disruption of air flow
DOCUMENTATION:Vendor will supply a full set of documents (4 copies), in English. Documents supplied will be described in the budget quotation.
CERTIFICATESVendor will issue PED certificatesFAT includedSAT to be quoted separately on a man-daily basisIQ, OQ protocol (blank) to be quoted separatelyIQ, OQ protocol execution to be quoted separately on a man-daily basisEU 98/37 CE marking
GUARANTEESThe equipment is fully drainable; all nozzle are at minimum length.The equipment performs according to this specification and other figures, if any.Noise level is less than 65 dB(A) , measured at 1 meter all around the installed equipment.
DOCUMENT No.: 02-D-110-A43631 1396J_01FW PROCESS SPEC. No.:GU GU
PROCESS SPECIFICATION FORMOBILE CIP SYSTEM
Sigma Aldrich Israel Ltd 38New API Production Facility PG-3801 FWSTERIL Contract no. 1.BJ.3631A 02-D-058-A1CIP System 1
P0 P1 P2 P3
FDN CC07-04-06 02-08-06 01-09-06 17-09-07
GU GUFDN FDN
P3
02-D-110-A4-P4 PG-3801 CIP System 5 of 8
![Page 6: 02-D-110-A4-P4 PG-3801 CIP System](https://reader036.vdocument.in/reader036/viewer/2022073120/563db986550346aa9a9e2966/html5/thumbnails/6.jpg)
CLIENT: UNIT:PROJECT: ITEMS:CONTRACT No: P&ID's:SERVICE: No. REQD.:
DateAuthorReviewer
- PLC- Piping, valves, fittings- Spare parts- Documentation
Pharmaceutical standard Mechanical code / stampStamp
Location Material in contact withLayout cleaning fluidsPiping layout
Finishing internalSkid frame material external
GasketsInstalled power Piping
InsulationElectr.area classification WeldingElectrical protection ElectricalWeight Automation / Instrumentation
Test(s)
ITEM Design pressureType Design temperatureVolume nominal/geometr. Operating pressureDimensions Operating temperature
Nozzles
Spray-ball(s)
Vent filter Weight (empty/filled)Type
- a detergent mobile vessel for concentrated base or NaClO
- wheels in white Teflon
indoor AISI 316L,ferrite content < 0.5%
yes
DOCUMENT No.: 02-D-110-A4
Ra < 0.5 μm
FOR THE SKIDS
- Heat Exchanger- 2 detergent pump
by Vendor
Ra <1.2 μmPTFE
- a detergent mobile vessel for concentrated acid or soap detergent - Instrumentation
-1 Delivery pump
not applicable
SS AISI 304
/
not applicableIP 55by Vendor
PED, categ. IV, module GCE marking
- Fluid filter - Electrical switchboard and transformers
FDN FDN FDN CC07-04-06 02-08-06 01-09-06 17-09-07
CIP System 1P0 P1 P2 P3
New API Production Facility PG-3801 FWSTERIL Contract no. 1.BJ.3631A 02-D-058-A1
PROCESS SPECIFICATION FORMOBILE CIP SYSTEM
Sigma Aldrich Israel Ltd 38
GU GU GU GUDESCRIPTION OF THE SUPPLY
The mobile Cleaning Packages prepare, hold and distribute the solutions needed to clean the process equipment.
3631 1396J_01FW PROCESS SPEC. No.:
GENERAL FEATURES
The package will be provided with:
TANK
02-D-110-A4-P4 PG-3801 CIP System 6 of 8
![Page 7: 02-D-110-A4-P4 PG-3801 CIP System](https://reader036.vdocument.in/reader036/viewer/2022073120/563db986550346aa9a9e2966/html5/thumbnails/7.jpg)
CLIENT: UNIT:PROJECT: ITEMS:CONTRACT No: P&ID's:SERVICE: No. REQD.:
DateAuthorReviewer
ITEM ITEMType Type
Service ServiceFlow rate Flow rate
Head Head
NPSH req'd/availab. NPSH req'd/availab.Operating temperature Operating temperatureManufacturer / Model Manufacturer / ModelRotation speed Rotation speedNozzles inlet/outlet Nozzles inlet/outlet
vent/drain vent/drainEfficiency EfficiencySeal Seal
Power inst. / absorbed Power inst. / absorbed
Type Type
Service ServiceFlow rate Flow rate
Head Head
NPSH req'd/availab. NPSH req'd/availab.Operating temperature Operating temperatureManufacturer / Model Manufacturer / ModelRotation speed Rotation speedNozzles inlet/outlet Nozzles inlet/outlet
vent/drain vent/drainEfficiency EfficiencySeal Seal
Power inst. / absorbed Power inst. / absorbed
Fluid filter SERVICE
(note 1)ITEMControl board
ITEMpressure drop
TypePower board
Heat-transfer surfaceOverall dimensionsWeight
NOTES:
to heat chemical solutions and to adjust the
max 0.1 bar
Duty: as a minimum 10 KW
temperature of the fluid to be distributedhousing SS AISI 316L
-
1) The heat exchanger shall be designed as able to heat up the CIP fluid from 15 °C to 60 °Cin less than 15 minutes (to be guaranteed by Vendor)
by Vendor
ACCESSORIES
by Vendorsanitary double tube sheet
N / A
Electrical heat-exchanger Shell & Tubes
by VendorN / A
/ by Vendor
E-3801
/ -
DOCUMENT No.: 02-D-110-A4
Related to P-3803
P-3801 Not Required
DETERGENT # 2 PUMP
by Vendor
HEAT-EXCHANGER
in-line, 0.22 μm, PTFE
by Vendor
N / A N / A
30 Nm3/h (compr. air @ 7 barg)
F-3801
N / A
/
P-3802
DETERGENT # 1 PUMP
by VendorN / Aby Vendor
- / -
1.5 bar (Vendor to confirm)
by Vendor by Vendor
by Vendor
ambient ambientby Vendorby Vendor / > 7 m / > 7 m
1.5 bar (Vendor to confirm)
200 l/h 200 l/hto dose acid detergents to dose caustic detergents
Dosing, diaphragm Dosing, diaphragmRelated to
by Vendor
/by Vendor / by Vendorby Vendorby Vendor
/60°Cby Vendorvariable (VFD shall be included)
DN 50 / by Vendor
operating 5 bar
by Vendor / 0.7 bar(a)
3631 1396J_01FW PROCESS SPEC. No.:
/
to distribute CIP to all usersoperating max 6 m3/hdesign 8 m3/h
GURECIRCULATING PUMP
PROCESS SPECIFICATION FORMOBILE CIP SYSTEM
Sigma Aldrich Israel Ltd 38New API Production Facility PG-3801 FWSTERIL Contract no. 1.BJ.3631A 02-D-058-A1CIP System 1
P0 P1 P2 P307-04-06 02-08-06 01-09-06 17-09-07
FDN FDN FDN CCGU GU
DELIVERY PUMP
centrifugal, sanitaryopen impeller self-drainable
GU
02-D-110-A4-P4 PG-3801 CIP System 7 of 8
![Page 8: 02-D-110-A4-P4 PG-3801 CIP System](https://reader036.vdocument.in/reader036/viewer/2022073120/563db986550346aa9a9e2966/html5/thumbnails/8.jpg)
CLIENT: UNIT:PROJECT: ITEMS:CONTRACT No: P&ID's:SERVICE: No. REQD.:
DateAuthorReviewer
TYPE FEED (V/Ph/Hz) 400 / 3 / 50 3PH + N + GBradley or approved equivalent POWER (kW) installed by vendor
SOFTWARE DEVELOP. absorbed by vendor
PROTECTION CLASS ATEX / IP 55
INTEGRATION DESIGN CODE CE /CENELEC EN60079-10CLASSIFICATION
ACQUIRING DATA SYST. NOTE: MCC supplied by Vendorfrequency converter supplied by Vendor
OPERAT. INTERFACE
CONNECTION TO AMS hardwired general alarm
CONN. TO OTHER EQUIPMENTS
DOCUMENT No.: 02-D-110-A4
PLC Siemens serie S7/Allen
PLC
software specification and development by vendor according to specification."Automation Physical, Procedural and Process model" ISA S88 and Automation S88 Description 02-I-005-APPEthernet (for FUTURE connection with PAS)
vendor std + local paper recorder
signal to AMS (free contact)
1 Local Panel (HMI or SCADA )
New API Production Facility PG-3801FWSTERIL Contract no. 1.BJ.3631A 02-D-058-A1
PROCESS SPECIFICATION FORMOBILE CIP SYSTEM
Sigma Aldrich Israel Ltd 38
CIP System 1P0 P1 P2 P3
02-08-06 01-09-06 17-09-0707-04-06FDN FDN CCFDN
GU GUCONTROL UNIT
GU GUELECTRICAL
3631 1396J_01FW PROCESS SPECIFICATION No
02-D-110-A4-P4 PG-3801 CIP System 8 of 8