CopperString Supplementary Environmental Impact Statement PART B 43 Figure 1.13: Conductor transposition arrangement Source: Powerlink Queensland, 2008 The physical locations of the transpositions will be finalised with the tower locations as the detailed design of the Project progresses, with two transpositions anticipated between each substation site. The additional impact related to these sites has been taken into account with both the conservative estimation of construction disturbance and landholder compensation packages. 02 Substations The majority of substations that were detailed in the EIS for the Project remain in the same location with minor amendments proposed to either the physical land requirements or the high voltage equipment and support services. Revisions in land requirements and locations have occurred to the Hughenden, Mount Isa and Cannington Substations, while the Phosphate Hill Substation which, as described in Part B: Section 1.4 of the SEIS, will not be constructed at this time. One new substation site adjacent to the Woodstock Substation has also been added to the Project scope (Upper Haughton Substation) (refer to Part B: Section 2.2 of the SEIS). A more detailed description of the changes to substations planned as part of the Project is provided in the following sections. The construction requirements of the substation sites and an overview of the required workforce are provided in Part B: Section 6.2 of the SEIS. 2.1 General and technical substation description The locations of the Woodstock, Dajarra Road and Cannington Substations have not changed since the release of the EIS, though some land requirements have been modified. A summary of the land requirements of each supplementary substation site and amendments to the EIS location of the substation and the transmission line sections in the vicinity of the substation sites is illustrated in Figure 2.1 to 2.6 and the physical description of the substation sites are summarised below in Table 2.1.

Upload: nguyendat

Post on 22-May-2018

221 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

CopperString Supplementary Environmental Impact Statement PART B 43 CopperString Supplementary Environmental Impact Statement PART B

Figure 1.13: Conductor transposition arrangement

Source: Powerlink Queensland, 2008

ThephysicallocationsofthetranspositionswillbefinalisedwiththetowerlocationsasthedetaileddesignoftheProject progresses, with two transpositions anticipated between each substation site. The additional impact related to these sites has been taken into account with both the conservative estimation of construction disturbance and landholder compensation packages.

02 SubstationsThe majority of substations that were detailed in the EIS for the Project remain in the same location with minor amendments proposed to either the physical land requirements or the high voltage equipment and support services. Revisions in land requirements and locations have occurred to the Hughenden, Mount Isa and Cannington Substations, while the Phosphate Hill Substation which, as described in Part B: Section 1.4 of the SEIS, will not be constructed at this time. One new substation site adjacent to the Woodstock Substation has also been added to the Project scope (Upper Haughton Substation) (refer to Part B: Section 2.2 of the SEIS).

A more detailed description of the changes to substations planned as part of the Project is provided in the following sections. The construction requirements of the substation sites and an overview of the required workforce are provided in Part B: Section 6.2 of the SEIS.

2.1 General and technical substation descriptionThe locations of the Woodstock, Dajarra Road and Cannington Substations have not changed since the release oftheEIS,thoughsomelandrequirementshavebeenmodified.Asummaryofthelandrequirementsofeachsupplementary substation site and amendments to the EIS location of the substation and the transmission line sections in the vicinity of the substation sites is illustrated in Figure 2.1 to 2.6 and the physical description of the substation sites are summarised below in Table 2.1.

CopperString SEIS_Part B_cs55.indd 43 14/09/11 8:36 PM

Page 2: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

44 CopperString Supplementary Environmental Impact Statement PART B

Table 2.1: Physical description of the substation sites

Substation Lot / Plan Land Tenure Type Approximate Physical Land Requirements (fenced area)#

Total Land Area Acquired (ha)

WoodstockLot 3 on GS603 Freehold

8 ha(Irregular boundaries)

35

Upper Haughton17 ha

(Irregular boundaries)

Hughenden NA Road Reserve200 x 300 m

(4 ha)27

Dajarra Road Lot 521 on CP905413Lease Land

(Pastoral Holding)250 x 250 m

(6.25 ha)22

Mount Isa Lot 422 on SP128451 State Land250 x 250 m

(6.25 ha)62

Cannington Lot 1 on CP865897Lease Land

(Term Lease)0.6 ha

(Irregular boundaries)NA*

* The substation at Cannington will be constructed on the Cannington mining lease (ML 90059) and no land will be acquired for this site.# Note that there will be some infrastructure requirements outside of the fenced area of the substation (e.g. helicopter pad and where

appropriate operations and maintenance control centres).

Due to the progression of detailed design and the potential for additional connection applications from prospective networkusers,CopperStringhasamendedthespecificdesignparametersofeachofthesubstationstoaccountforfuture load growth, which accounts for the total land area required to be greater than the physical land area of the proposed substation infrastructure (refer to Table 2.1). The summary of major electrical equipment at each substation site is provided below in Table 2.2.

CopperString SEIS_Part B_cs55.indd 44 14/09/11 8:36 PM

Page 3: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

CopperString Supplem

entary Environmental Im

pact Statement PA

RT B

1280 m

1010

m

700 m

0 WD

3GS603(Freehold)

4GS926(Leasehold/Lands Lease)

2GS909(Leasehold/Lands Lease)

(Road)(Road)

Oak

y C

reek

146°59'E

146°59'E

146°58'30"E

146°58'30"E

146°58'E

146°58'E

146°57'30"E

146°57'30"E19

°51'

S

19°5

1'S

19°5

1'30

"S

19°5

1'30

"S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\EIS\Chapter2\Substation_Sites.mxdCreated on 27/09/2010 by KR

PROJECT

DATE

FIGURE 2.1

COPPERSTRING SEIS - PART B

°0 150 300 450 600

MetresDatum: GDA94

Projection: MGA94 Zone 55

AUGUST 2011

Easements, Cadastre: Dept of Natural Resources & Water, June 10Transmission Lines: RLMS databaseBase Data: Geoscience Australia, Geodata V3Imagery: Worldview 2, DigitalGlobe

Note: Measurements are approximate only WOODSTOCK AND UPPER HAUGHTON SITES

LEGEND

Kilometre Post

Woodstock to Dajarra Alignment(Supplementary)

EIS Alignment

Substation Site (Supplementary)

EIS Substation Site

Property Boundary

Registered Easement

Secondary Road

Minor Road

Access Track

Watercourse Line

")

")") ")

")

Mt IsaHughenden

Woodstock

Cannington

Dajarra Road

CopperString SEIS_Part B_cs55.indd 45

14/09/11 8:36 PM

Page 4: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 16/08/2011 by KR\Fig2-2_Substation Layout.mxd

146°58'30"E

146°58'30"E

146°58'20"E

146°58'20"E

146°58'10"E

146°58'10"E

146°58'0"E

146°58'0"E

19°5

0'50

"S

19°5

0'50

"S

19°5

1'0"

S

19°5

1'0"

S

19°5

1'10

"S

19°5

1'10

"S

19°5

1'20

"S

19°5

1'20

"S

°Datum: GDA94

Projection: MGA94 Zone 55Scale is approximate only

In preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

NOTES

DISCLAIMER

Substation Layout: Powerlink Preliminary Drawing PROJECT

FIGURE 2.2

DATE AUGUST 2011

UPPER HAUGHTON & WOODSTOCKSUBSTATION SITE

COPPERSTRING SEIS - PART B

Layout: A4 Portrait

0 50 100 150 200

Meters

LEGEND

Supplementary Alignment

Shared Access Road

Upper Haughton Substation Area

Woodstock Substation AreaTo Strathm

ore

To Ross

CopperString SEIS_Part B_cs55.indd 46 14/09/11 8:36 PM

Page 5: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

300 m

900 m

4DG48(Freehold)

2DG35(Leasehold/Lands Lease)

5DG248(Freehold)

(Road)

HU

GH

EN

DE

N M

UTT

AB

UR

RA

RO

AD

330 WD

329 WD

328 WD

327 WD

326 WD325 WD

144°13'E

144°13'E

144°12'30"E

144°12'30"E

144°12'E

144°12'E

144°11'30"E

144°11'30"E

144°11'E

144°11'E

144°10'30"E

144°10'30"E20

°53'

30"S

20°5

3'30

"S

20°5

4'S 20

°54'

S

20°5

4'30

"S

20°5

4'30

"S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\EIS\Chapter2\Substation_Sites.mxdCreated on 27/09/2010 by KR

PROJECT

DATE

FIGURE 2.3

COPPERSTRING SEIS - PART B

°0 190 380 570 760

MetresDatum: GDA94

Projection: MGA94 Zone 55

AUGUST 2011

Easements, Cadastre: Dept of Natural Resources & Water, June 10Transmission Lines: RLMS databaseBase Data: Geoscience Australia, Geodata V3Imagery: Worldview 2, DigitalGlobe

Note: Measurements are approximate only HUGHENDEN SUBSTATION SITE

LEGEND

Kilometre Post

Woodstock to Dajarra Alignment(Supplementary)

EIS Alignment

Substation Site (Supplementary)

EIS Substation Site

Property Boundary

Stock Route

Registered Easement

Secondary Road

Minor Road

Access Track

Watercourse Line

")

")") ")

")

Mt IsaHughenden

Woodstock

Cannington

Dajarra Road

CopperString SEIS_Part B_cs55.indd 47

14/09/11 8:36 PM

Page 6: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

500 m

500

m

1 DM

0 DM

0 DE 0 DH0 DG

0 DC

723 WD

CLONC

URR

Y DAJAR

RA RO

AD

521CP905413(Leasehold/Lands Lease)

521CP905413(Leasehold/Lands Lease)

2SW40(Leasehold/Lands Lease)

(Road)

140°25'E

140°25'E

140°24'30"E

140°24'30"E

140°24'E

140°24'E

20°4

5'S

20°4

5'S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\EIS\Chapter2\Substation_Sites.mxdCreated on 27/09/2010 by KR

PROJECT

DATE

FIGURE 2.4

COPPERSTRING SEIS - PART B

°0 100 200 300 400

MetresDatum: GDA94

Projection: MGA94 Zone 55

AUGUST 2011

Easements, Cadastre: Dept of Natural Resources & Water, June 10Transmission Lines: RLMS databaseBase Data: Geoscience Australia, Geodata V3Imagery: Worldview 2, DigitalGlobe

Note: Measurements are approximate only DAJARRA RD SUBSTATION SITE

LEGEND

Kilometre Post

CopperString Supplementary Alignments

Woodstock to Dajarra Rd

Dajarra Rd to Cannington

Dajarra Rd to Mount Isa

Dajarra Rd to Chumvale Substation

Dajarra Rd to Ernest Henry Transmission Line

Dajarra Rd to MMG Transmission Line

Substation Site (Supplementary)

EIS Alignments

EIS Substation Site

Property Boundary

Registered Easement

Secondary Road

Minor Road

Access Track

Watercourse Line

")

")") ")

")

PentlandMt Isa

Hughenden

Woodstock

Cannington

Dajarra Road

CopperString SEIS_Part B_cs55.indd 48

14/09/11 8:36 PM

Page 7: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

700 m

670 m920 m

250 m

422SP128451(State Land)

573SP110102(Leasehold/Lands Lease)

422SP128451(State Land)

10USL45826(State Land)

46USL45826(State Land)

14RD217(Leasehold/Lands Lease)

(Roa

d)

(Roa

d)

(Road)

DU

CH

ESS

MT

ISA

RO

AD

DIAMANTINA D

EVELOPMENTAL R

OAD

99 DM

98 DM 97 DM

96 DM

100 DM

Leichhardt River

Lena Creek

Mic

a C

reek

139°30'30"E

139°30'30"E

139°30'E

139°30'E

139°29'30"E

139°29'30"E

139°29'E

139°29'E

139°28'30"E

139°28'30"E20

°46'

S

20°4

6'S

20°4

6'30

"S

20°4

6'30

"S

20°4

7'S

20°4

7'S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\EIS\Chapter2\Substation_Sites.mxdCreated on 27/09/2010 by KR

PROJECT

DATE

FIGURE 2.5

COPPERSTRING SEIS - PART B

°0 180 360 540 720

MetresDatum: GDA94

Projection: MGA94 Zone 55

AUGUST 2011

Easements, Cadastre: Dept of Natural Resources & Water, June 10Transmission Lines: RLMS databaseBase Data: Geoscience Australia, Geodata V3Imagery: Worldview 2, DigitalGlobe

Note: Measurements are approximate only MOUNT ISA SUBSTATION SITE

LEGEND

Kilometre Post

Dajarra Rd to Mt Isa Alignment(Supplementary)

EIS Alignment

Substation Site (Supplementary)

Indicative Substation Disturbance Area

EIS Substation Site

Property Boundary

Registered Easement

Principal Road

Secondary Road

Minor Road

Access Track

Watercourse Line

")

")") ")

")

")Mt IsaHughenden

Woodstock

Cannington

Dajarra Road

CopperString SEIS_Part B_cs55.indd 49

14/09/11 8:36 PM

Page 8: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

1CP865897(Leasehold/Lands Lease)

140°55'10"E

140°55'10"E

140°55'E

140°55'E

140°54'50"E

140°54'50"E

21°5

1'30

"S

21°5

1'30

"S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\EIS\Chapter2\Substation_Sites.mxdCreated on 27/09/2010 by KR

PROJECT

DATE

FIGURE 2.6

COPPERSTRING SEIS - PART B

°0 30 60 90 120

Metres

Datum: GDA94Projection: MGA94 Zone 54

AUGUST 2011

Easements, Cadastre: Dept of Natural Resources & Water, June 10Transmission Lines: RLMS databaseBase Data: Geoscience Australia, Geodata V3Imagery: Worldview 2, DigitalGlobe

Note: Measurements are approximate only CANNINGTON SUBSTATION SITE

LEGEND

Kilometre Post

Dajarra Rd to Cannington Alignment(Supplementary)

EIS Alignment

Substation Site (Supplementary)

EIS Substation Site

Property Boundary

Registered Easement

Secondary Road

Minor Road

Access Track

Watercourse Line

")

")") ")

")")

Mt IsaHughenden

Woodstock

Cannington

Dajarra Road

75m

55m

CopperString SEIS_Part B_cs55.indd 50

14/09/11 8:36 PM

Page 9: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

CopperString Supplementary Environmental Impact Statement PART B 51

Table 2.2: Technical description of the substation sites

Substation Technical Description of Major Electrical Equipment

Woodstock

- 275/330 kV switchgear and general substation equipment - 2 x 275/330 kV transformers (600 MVA – 150 000 L oil volume each transformer) - 2 x shunt reactors may be required each containing up to 50 000 litres of oil (subject to further detailed design)

Upper Haughton

- 275 kV switchgear and general substation equipment - Several new 275 kV transmission line towers will be required to connect to the existing 275 kV Strathmore to Ross transmission line

- No large transformers will be required for this substation

Hughenden

- 330 kV switchgear and general substation equipment - 4 x 330/132 kV, approximately 375 MVA transformers and 132 kV switchyard and associated services for renewable energy connections (wind and solar).

- Transformers contain up to 125 000 L oil volume each. - 2 x 330/21 kV SVC transformers (250 MVA – 100 000 L oil volume each transformer) - 2 x 330/21 kV SVC transformers (250 MVA – 100 000 L oil volume each transformer) - 2 x 330 kV shunt reactors (50 MVAr – 50 000 L oil volume each reactor)

Dajarra Road

- 330/220 kV switchgear and general substation equipment - 2 x 330/220 kV transformers (600 MVA – 150 000 L oil volume each transformer) - 1 x 220/21 kV SVC transformer (250 MVA – 100 000 L oil volume each transformer) - 2 x 330 kV shunt reactors (50 MVAr – 50 000 L oil volume each reactor)

Mount Isa - 220/132 kV switchgear and general substation equipment - 2 x 220/132 kV transformers (350 MVA – 120 000 L oil volume each transformer) - 1 x 220/21 kV static var compensator Transformer (250 MVA - 100 000 L oil volume)

Cannington - 220 kV switchgear and general substation equipment - 1 or 2 x 220/11 kV transformers (60 MVA – 40 000 L oil volume each)

The design requirements and layout of the substation infrastructure remains as generally described in the EIS, though some amendment has been made to the internal design of the major electrical equipment in order to facilitate potential connectionsfromnewusersinthefuture.SincethereleaseoftheEISithasbeenidentifiedthatthesubstationsmayrequire connection to local council services such as water, electricity and telephone connections though each site is beingdesignedtobeself-sufficientandtheseconnectionswouldbeaprecautionarymeasure.

All CopperString-owned and operated substation sites will have an allowance for a maintenance depot that would consistofadust-freebuildingwithaninternalcubiclethatincludesamenities,anofficeandahardstandfortheloadingand unloading of storage, that would include a vehicle washdown area. Additional areas are required for hazardous substance enclosures and fuel storage tanks or areas.

The designs of the substation sites have also been amended to incorporate a helicopter pad, with the exception of the Cannington Substation. Access to the Cannington Substation by air would be reliant on the Trepell Aerodrome, which.is in close proximity to the substation site

This design and operation of the required helicopter pads will comply with the relevant Civil Aviation Safety Authority’s Guidelines for the establishment and use of helicopter landing sites (CAAP 92-2) and the Queensland Government’s Helicopter Landing Site Guidelines (Department of Public Works, 2006). The helicopter pads would be utilised during the operation of the substations and allow CopperString personnel to quickly reach the substation site for infrequent maintenance or emergency situations.

AnassessmentofthefloodimmunityofeachofthesubstationsitesisprovidedinPartC:Section3andaFloodStudyReport is presented in Appendix 5,whichdetailsthepotentialoffloodingatsitesofcriticalinfrastructure.

The following sections of the SEIS provide an overview of the new or amended substations that have been incorporated into the Project’s scope since the release of the EIS.

2.2 Upper haughton SubstationThe Upper Haughton Substation is proposed to be located on a portion of freehold land to be subdivided from the landparcelidentifiedfortheproposedWoodstockSubstationsite(Lot3onGS603).ThisPowerlinksubstationwouldfacilitate CopperString accessing electricity from the Powerlink operated 275 kV Strathmore to Ross Transmission Line. The substation would supply electricity to the Woodstock Substation via a short 275 kV transmission line connection between the two adjacent sites (refer to Figure 2.2).

CopperString SEIS_Part B_cs55.indd 51 14/09/11 8:36 PM

Page 10: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

52 CopperString Supplementary Environmental Impact Statement PART B

The Upper Haughton Substation is being proposed as part of the CopperString Project though the ownership of the substation assets and the operation of the substation will rest with Powerlink as it forms part of their electricity supply network. Approvals, including Ministerial designation of the Upper Haughton Substation as community infrastructure under the Sustainable Planning Act 2009 is being sought as part of the CopperString Project in order to facilitate the construction of the site in a timely manner, meeting the needs of the CopperString network users. The Upper Haughton Substation will also allow for future load growth within the Powerlink network.

TheUpperHaughtonSubstationisexpectedtobeconstructedabovetheQ500AnnualReturnIntervalfloodlevelplus300mmforfloodimmunityinaccordancewiththeState Planning Policy 1/03: Mitigating the Adverse Impacts of Flood, Bushfire and Landslide for major substation infrastructure. Powerlink will require a local electricity supply from the Ergon Energy network for substation auxiliary power. Powerlink may also require a local water supply pipe to back upthefireprotectionbulkwaterstoragetank.

A common access road is to be constructed for both the Upper Haughton and Woodstock substations. The road will be constructed to Powerlink substation standards, including the provision for transporting large transformers. The access road will provide permanent access to the substation sites and necessitate the construction of a number of waterway crossings, including crossing a SunWater water channel. The access road will be approximately 23 km in length, connecting to the Keith Venables Road with 10 km of the required access track being an already formed private road.

2.3 hughenden SubstationDiscussions held with DERM and the relevant landholder has resulted in the relocation of the Hughenden Substation, from Lot 4 on DG48 onto the State-controlled road reserve of the Hughenden Muttaburra Road (DTMR Category – 5701). This is a minor amendment to the substation location that has been amended in coordination with the landholder and DERM. The EIS and supplementary locations of the Hughenden Substation are highlighted in Figure 2.3.

Due to the relocation of this site and the requirement to limit potential impacts to the safety and amenity of the Hughenden Muttaburra Road, CopperString has amended the design of the substation site to accommodate a more rectangular area of 900 x 300 m (27 ha), with comparison to the EIS substation site that was 500 x 500 m (25 ha).

CopperString has applied to be a public utility provider under the Land Act 1994 and the Land Title Act 1994 (refer toPartC:Section1.4.3.3).Oncethestatushasbeenconfirmed,CopperStringproposestoapplyforapermanentroadclosureoftherequiredland.Itisnotedthattheroadreserveisclassifiedasaminorstockroute,thoughit is anticipated that CopperString will not impact on the continued use of the road reserve for travelling stock. CopperString has received support for the permanent road closure from the Flinders Shire Council, as the trustee of the stock route.

2.4 Mount isa SubstationThelocationoftheMountIsaSubstationhasbeenrevisedduetoconstraintsassociatedwiththelandidentifiedin the EIS, which limits the ability to expand the substation for future growth. In order to address these constraints CopperString has relocated the proposed substation within Lot 422 on SP128451, to a site approximately 1 km north of the proposed EIS substation site. Consultation has occurred with Mount Isa Mines Limited as the holder of the mining lease (ML 8058) that covers the previous EIS and current supplementary substation sites and they are supportive of the proposed supplementary location.

Thefinalsitingoftheinfrastructurewithinthislandparcelisdependentonfurtherdetaileddesignandgeotechnicalstudies, though CopperString will only impact on an area of approximately 500 x 500 m (25 ha). The site of the Mount Isa substation proposed in the SEIS is 62 ha, compared to the 6.25 ha in the EIS proposed site. This requirement foradditionalareahasbeenidentifiedontheunderstandingofthesubstationdesignandpotentialforfuturegrowthof the network. The substation disturbance area is now a similar size to the other substation sites proposed to be constructed as part of the Project. The EIS and supplementary locations of the Mount Isa Substation are illustrated in Figure 2.5.

2.5 cannington SubstationThe area proposed for the Cannington Substation has increased in size from approximately 0.3 ha to 0.6 ha. This increaseinlandisduetotherefinementofthesubstationdesignandtoaccommodatethenecessarysedimentbasininfrastructure. The location of the site within the Cannington Mine remains unchanged and consultation with BHP Billitonhasconfirmedthattheadditionalsiteareadoesnotconflictwiththecurrentorfutureusesofthesite.TheEISand supplementary boundaries of the Cannington Substation are illustrated in Figure 2.6.

CopperString SEIS_Part B_cs55.indd 52 14/09/11 8:36 PM

Page 11: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

CopperString Supplementary Environmental Impact Statement PART B 53 CopperString Supplementary Environmental Impact Statement PART B

2.6 Potential future substationsSection2.2.2oftheEISidentifiedtheprovisionoffuturesubstationsitesthatwouldallowCopperStringtofacilitateaccess to new network users. It was detailed that terminal towers would be incorporated into the Project’s design to allow future access in the vicinity of Julia Creek.

SincethereleaseoftheEISCopperStringhasfurtheridentifiedtheneedtoincorporateasubstationonthemainlinearound Pentland or Charters Towers to allow future connection from potential renewable energy projects in the region and to facilitate the potential connection of mining operations in the northern Galilee Basin.

Although preliminary analysis into potential locations of these sites have occurred and the site investigation will continue during the design stages of the Project, CopperString is not seeking to assess or approve these sites as part of the current Project. Any future substation site will be subject to a separate environmental assessment and approval process once greater information is known on the future connection requirements.

03 Transmission network communication and monitoringSubstation protection, control and communication systems need precise and high quality monitoring to ensure safety standards and security of electricity supply and transmission. Modern substation and transmission line protection, control and communication systems integrate control, protection and monitoring functions into the one coordinated network.

The NER require duplicate communications links to the network to ensure the dual redundancy of the transmission networks operation. The OPGW, located on the transmission towers, will form the primary communication infrastructure network connecting the supervisory system to the remote terminal units. The second communications network will be the Nextgen Networks Facility, which is currently being installed between Townsville and Mount Isa.

3.1 ceV hutsSection2.3.2.5oftheEISidentifiedthatCEVhutswillberequiredatsitesapproximately80-120kmapartalongthetransmission network in order to amplify the optical signal. These stations are used to extend the reach of optical communicationsbyovercominglossesassociatedwithattenuationoftheopticalfibre.Furtherinformationisnowavailable on the design and proposed locations of these sites.

The CEV huts will be located close to transmission towers and will be fenced with optional CCTV monitoring and intruder alarms. The CEV huts are unmanned, passively cooled equipment shelters, though they will be equipped with a single inverter type split air-conditioning unit. As the telecommunications equipment in the shelter will be capable of operating at up to 65oC, the air-conditioning units will only operate for staff comfort during infrequent maintenance visits.

The CEV huts will be a maximum of approximately 10 m long, 3.5 m wide and 3 m high, and mounted on concrete piers. Transmission and support equipment will be powered by main electricity where available or solar power. Solar power sites will have a solar array of around 3 kW to support a 300 watt equipment load or 4 solar array modules of 4 x 3 m (i.e. about 6 kW to support a load of around 530 watt). Valve regulated lead acid batteries will be used at all sites, will be contained within acid-resistant bunding and protected from the weather.

An indicative CEV hut layout is provided below in Figure 3.1.

CopperString SEIS_Part B_cs55.indd 53 14/09/11 8:36 PM

Page 12: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

54 CopperString Supplementary Environmental Impact Statement PART B

Figure 3.1: Indicative CEV hut Layout

The area around the CEV hut needs to be cleared of vegetation for a width of at least 20-25 m from the site to protect itfrompotentialbushfires.Anareaofapproximately15x16mwillbefencedfortheCEVhut,howevertoensurethatvegetationmanagementismaintainedanareaofapproximately60x65misrequiredtomaintainfiresecurity.Anindicative CEV hut design is shown in Figure 3.2.

CopperString SEIS_Part B_cs55.indd 54 14/09/11 8:36 PM

Page 13: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

CopperString Supplementary Environmental Impact Statement PART B 55 CopperString Supplementary Environmental Impact Statement PART B

Figure 3.2: Indicative CEV Hut location within the easement

TheCEVhutswillbeconstructedandfittedoutatthesupplier’spremisesandinstalledonpre-preparedconcretefootingsorraisedpiers,subjecttothefloodstudyassessmentofthesesites,withatransportablecrane.Siteworkswill comprise installation of an earth grid, conduits for power cables, a 2.2 m high cyclone mesh security fence, weed mats and a gravel surface. The earth grid will be constructed of driven copper rods, connected by copper or galvanised steel strap, trenched within the compound. The solar array frames will be mounted on strip footings, and be rated for local wind or cyclone conditions.

ThirteenCEVhutsarerequiredintotalfortheProject.FivewillbelocatedwithintheidentifiedCopperStringsubstation sites (Woodstock, Hughenden, Dajarra Road, Cannington and Mount Isa substations) and eight are stand alone. The property descriptions of the eight CEV huts (where not associated with a substation site), the tenure type and the approximate areas of land under investigation for the sites are provided in Table 3.1. These sites are shown in detail in Figure 3.3 to 3.10 and at a regional scale above in Figure 1.12.

CopperString SEIS_Part B_cs55.indd 55 14/09/11 8:36 PM

Page 14: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

65 m

120 m

Charters Towers South

1MPH13914(Freehold)

5260PH1598(Leasehold/Lands Lease)

1MPH13929(Freehold)

84 WD

83 WD

(Road)

146°20'30"E

146°20'30"E

146°20'E

146°20'E

20°1

3'30

"S

20°1

3'30

"S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR

PROJECT

DATE

COPPERSTRING SEIS - PART B

°0 50 100 150 200

MetresDatum: GDA94

Projection: MGA94 Zone 54

AUGUST 2011

Parcel Boundaries: DERM, June 10LEGEND

Kilometre Post

WoodStock to Dajarra RdAlignment (Supplementary)

Proposed CEV Hut Site

Principal Road

Secondary Road

Minor Road

Access Track

Property Boundary

CHARTERS TOWERS SOUTH CEV HUT SITE

!!! !

!

!

!

")

")

")")")")") ")

")Richmond

Woodstock

Mount Isa Cloncurry Hughenden

Cannington

Townsville

Charters Towers South

1MPH13914

FIGURE 3.3

5

CopperString SEIS_Part B_cs55.indd 56

14/09/11 8:36 PM

Page 15: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

Pentland South

61GF812272(Leasehold/Lands Lease)

174 WD

173 WD

145°36'E

145°36'E

145°35'30"E

145°35'30"E20

°37'

30"S

20°3

7'30

"S

20°3

8'S

20°3

8'S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR

PROJECT

DATE

COPPERSTRING SEIS - PART B

°0 50 100 150 200

MetresDatum: GDA94

Projection: MGA94 Zone 54

AUGUST 2011

Parcel Boundaries: DERM, June 10LEGEND

Kilometre Post

WoodStock to Dajarra RdAlignment (Supplementary)

Proposed CEV Hut Site

Principal Road

Secondary Road

Minor Road

Access Track

Property Boundary

PENTLAND SOUTH CEV HUT SITE

!!! !

!

!

!

")

")

")")")")") ")

")Richmond

Woodstock

Mount Isa Cloncurry Hughenden

Cannington

Townsville

Pentland South

61GF812272

FIGURE 3.4

65m

120m

CopperString SEIS_Part B_cs55.indd 57

14/09/11 8:36 PM

Page 16: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

65 m

123

m

Torrens Creek 25OL212(Leasehold/Lands Lease)

6SP118964(Leasehold/Lands Lease)

25OL212(Leasehold/Lands Lease)

4SP118964(Leasehold/Lands Lease)

25OL212(Leasehold/Lands Lease)

240 WD

239 WD

(Road)

(Road)

145°2'E

145°2'E

145°1'30"E

145°1'30"E

145°1'E

145°1'E

20°5

2'30

"S

20°5

2'30

"S

20°5

3'S

20°5

3'S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR

PROJECT

DATE

COPPERSTRING SEIS - PART B

°0 50 100 150 200

MetresDatum: GDA94

Projection: MGA94 Zone 54

AUGUST 2011

Parcel Boundaries: DERM, June 10LEGEND

Kilometre Post

WoodStock to Dajarra RdAlignment (Supplementary)

Proposed CEV Hut Site

Principal Road

Secondary Road

Minor Road

Access Track

Property Boundary

TORRENS CREEK CEV HUT SITE

!!! !

!

!

!

")

")

")")")")") ")

Richmond

Woodstock

Mount Isa Cloncurry Hughenden

Cannington

Townsville

Torrens Creek25OL212

FIGURE 3.5

CopperString SEIS_Part B_cs55.indd 58

14/09/11 8:36 PM

Page 17: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

120

m

60 m

Marathon

MA

RAT

HO

N S

TAM

FOR

D R

OA

D

13DG158(Leasehold/Lands Lease)

1PER6044(Leasehold/Lands Lease)

394 WD

393 WD(Road)

143°35'E

143°35'E

143°34'30"E

143°34'30"E

143°34'E

143°34'E20

°53'

S20

°53'

30"S 20°5

3'30

"S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR

PROJECT

DATE

COPPERSTRING SEIS - PART B

°0 50 100 150 200

MetresDatum: GDA94

Projection: MGA94 Zone 54

AUGUST 2011

Parcel Boundaries: DERM, June 10LEGEND

Kilometre Post

WoodStock to Dajarra RdAlignment (Supplementary)

Proposed CEV Hut Site

Principal Road

Secondary Road

Minor Road

Access Track

Property Boundary

MARATHON CEV HUT SITE

!!! !

!

!

!

")

")

")")")")") ") ")

Richmond

Woodstock

Mount Isa Cloncurry Hughenden

Cannington

TownsvilleMarathon

13DG158

FIGURE 3.6

CopperString SEIS_Part B_cs55.indd 59

14/09/11 8:36 PM

Page 18: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

60 m

120 m

7RT60(Leasehold/Lands Lease)

Maxwelton

478 WD477 WD

476 WD

142°47'E

142°47'E

142°46'30"E

142°46'30"E

142°46'E

142°46'E

20°5

0'S

20°5

0'S

20°5

0'30

"S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR

PROJECT

DATE

COPPERSTRING SEIS - PART B

°0 60 120 180 240

MetresDatum: GDA94

Projection: MGA94 Zone 54

AUGUST 2011

Parcel Boundaries: DERM, June 10LEGEND

Kilometre Post

WoodStock to Dajarra RdAlignment (Supplementary)

Proposed CEV Hut Site

Principal Road

Secondary Road

Minor Road

Access Track

Property Boundary

MAXWELTON CEV HUT SITE

!!! !

!

!

!

")

")

")")")")") ")")

Richmond

Woodstock

Mount Isa Cloncurry Hughenden

Cannington

Townsville

Maxwelton7RT60

FIGURE 3.7

CopperString SEIS_Part B_cs55.indd 60

14/09/11 8:36 PM

Page 19: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

60 m

120 m

Yorkshire Downs

1EN3(Leasehold/Lands Lease)

565 WD

564 WD

141°56'30"E

141°56'30"E

141°56'E

141°56'E

141°55'30"E

141°55'30"E20

°48'

S

20°4

8'S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR

PROJECT

DATE

COPPERSTRING SEIS - PART B

°0 50 100 150 200

MetresDatum: GDA94

Projection: MGA94 Zone 54

AUGUST 2011

Parcel Boundaries: DERM, June 10LEGEND

Kilometre Post

WoodStock to Dajarra RdAlignment (Supplementary)

Proposed CEV Hut Site

Principal Road

Secondary Road

Minor Road

Access Track

Property Boundary

YORKSHIRE DOWNS CEV HUT SITE

!!! !

!

!

!

")

")

")")")")") ")

Richmond

Woodstock

Mount Isa Cloncurry Hughenden

Cannington

Townsville

Yorkshire Downs

1EN3

FIGURE 3.8

5

CopperString SEIS_Part B_cs55.indd 61

14/09/11 8:36 PM

Page 20: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

OO

RIND

I MCK

INLA

Y RO

AD

Oorindi

1BD52(Freehold)

1BD2(Freehold)

656 WD 655 WD 654 WD

(Road)

141°4'30"E

141°4'30"E

141°4'E

141°4'E

141°3'30"E

141°3'30"E

20°4

6'S

20°4

6'S

20°4

6'30

"S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR

PROJECT

DATE

COPPERSTRING SEIS - PART B

°0 60 120 180 240

MetresDatum: GDA94

Projection: MGA94 Zone 54

AUGUST 2011

Parcel Boundaries: DERM, June 10LEGEND

Kilometre Post

WoodStock to Dajarra RdAlignment (Supplementary)

Proposed CEV Hut Site

Principal Road

Secondary Road

Minor Road

Access Track

Property Boundary

OORINDI CEV HUT SITE

!!! !

!

!

!

")

")

")")")")") ")")

Richmond

Woodstock

Mount Isa Cloncurry Hughenden

Cannington

Townsville

Oorindi1BD52

OO

RIN

DI M

CKI

NLA

Y R

OAD

FIGURE 3.9

65m

120m

CopperString SEIS_Part B_cs55.indd 62

14/09/11 8:36 PM

Page 21: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

Mt Elliott

13SP150177(Leasehold/Lands Lease)

5364PH1891(Leasehold/Lands Lease)

5364PH1891(Leasehold/Lands Lease)

13SP150177(Leasehold/Lands Lease)

93 DC

(Road)

(Road)

140°27'30"E

140°27'30"E

140°27'E

140°27'E

21°3

3'S

21°3

3'30

"S

21°3

3'30

"S

DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.

DATA SOURCE

WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR

PROJECT

DATE

COPPERSTRING SEIS - PART B

°0 50 100 150 200

MetresDatum: GDA94

Projection: MGA94 Zone 54

AUGUST 2011

Parcel Boundaries: DERM, June 10LEGEND

Kilometre Post

WoodStock to Dajarra RdAlignment (Supplementary)

Proposed CEV Hut Site

Principal Road

Secondary Road

Minor Road

Access Track

Property Boundary

MT ELLIOTT CEV HUT SITE

!!! !

!

!

!

")

")

")")")")") ")

")

Richmond

Woodstock

Mount Isa Cloncurry Hughenden

Cannington

Townsville

13SP150177

Mt Elliott

FIGURE 3.10

65m

120m

CopperString SEIS_Part B_cs55.indd 63

14/09/11 8:36 PM

Page 22: 02 Substations - PixelFrame B... · Source: Powerlink Queensland, 2008 ... 0 50 100 150 200 Meters LEGEND Supplementary Alignment Shared Access Road Upper Haughton Substation Area

64 CopperString Supplementary Environmental Impact Statement PART B

Table 3.1: Location and required land for CEV hut sites (where not associated with a substation)

CEV Hut Location Land Parcel (Lot/Plan) Tenure Type Approximate Land Area IdentifiedforSite

Charters Towers South Lot 1 on MPH13914 Freehold 7800 m2

Pentland South Lot 61 GF812272 Lease Land 7800 m2

Torrens Creek Lot 25 on OL212 Lease Land 7800 m2

Marathon Lot 13 on DG158 Lease Land 7800 m2

Maxwelton Lot 7 on RT60 Lease Land 7800 m2

Yorkshire Downs Lot 1 on EN13 Lease Land 7800 m2

Oorindi Lot 1 on BD52 Freehold 7800 m2

Mt Elliott Lot 13 on SP150177 Lease Land 8520 m2

TheareaoflandidentifiedateachCEVhutisgreaterthantheareaoflandtobeacquiredandusedforeachCEVhut(approximately 4000 m2).TheadditionallandareathathasbeenidentifiedwillallowCopperStringtositetheCEVhutsinrelationtothefinaltransmissionlinealignment.TheproposedlandareasoftheCEVhutsareidentifiedinFigure 3.3 to 3.10.Itisimportanttonotethatthefinallocationofthesesiteswillbedependentonthetransmissiontower siting as they are proposed to be co-located (refer to Figure 3.2).

04 Access tracksThe access tracks required for the Project’s construction and operational maintenance remain as generally described in the EIS for the Project. CopperString has a requirement to utilise access tracks to enter the transmission line easement and access tracks within the easement to access individual transmission tower locations. The inclusion of the access tracks in the Project’s scope causes impact to a further 26 land parcels, which were not detailed in the EIS. A listing of these additional land parcels is provided in Appendix 3.

The access tracks that CopperString will utilise to reach the easement from the State and local controlled road network are shown in Figure 1.12. The locations of the tracks required to access individual transmission tower locations are not able to be detailed until the tower spotting is complete as part of the Project’s detailed design.

In the EIS CopperString made a commitment to utilise existing tracks and avoid impact to the environment and the potential to establish land degradation by the creation of new tracks. This commitment has been realised with 88 percent of the access tracks (excluding principal and secondary roads) proposed to be used by CopperString being already formed. The distribution of formed and unformed access tracks is further detailed in Figure 1.12.