031512 we ppt.pdf

68
Water Efficiency LEED® Leadership in Energy and Environmental Design

Upload: iman-satria

Post on 07-Nov-2015

233 views

Category:

Documents


1 download

TRANSCRIPT

  • Water Efficiency

    LEED Leadership in Energy and Environmental Design

  • Goals:Reduce the quantity of the water needed for the building.

    Reduce municipal water supply and treatment burden.

    Water Efficiency

  • Water EfficiencyCredits

  • WE Prerequisite 1Water Use Reduction

    IntentTo increase water efficiency within buildings to reduce the burden on municipal water supply and wastewater systems.

    NC: REQSCHOOLS: REQCS: REQ

    WE Credit 3Water Use Reduction

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • RequirementsNC, SCHOOLS & CSReduce building potable water use from the baseline.

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • RequirementsThe following fixtures, fittings and appliances are outside the scope of the water use reduction calculation: Commercial Steam Cookers Commercial Dishwashers Automatic Commercial Ice Makers Commercial (family-sized) Clothes Washers Residential Clothes Washers Standard and Compact Residential Dishwashers

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • Implementation Install flow restrictors and/or reduced flow aerators Install and maintain automatic faucet sensors and

    metering controls Install low-flow and low-flush fixtures Install non-water fixtures

    Harvest / Collect rainwater

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • Documentation and CalculationsDetermine the type and number of occupants.

    Retain manufacturers data showing the water consumption rates, manufacturer, and model of each fixture and fitting.

    List plumbing fixtures by usage group, if applicable.Define any usage groups.

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • Documentation and CalculationsThe calculated water use reduction for the project is the difference between the calculated design case and a baseline case.

    Water use calculation is based on fixture and fitting water consumption rates and estimated use by the occupants

    Occupants estimated use is determined by calculating full-time equivalent (FTE) and transient occupants and applying appropriate fixture use rates to each.

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • Documentation and CalculationsFixture Usage GroupsFixture usage groups are subsets of washroom facilities used by different types of occupants.

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • Documentation and CalculationsCalculating OccupancyNC & CSIdentify the number of building occupants by occupancy type. In buildings with multiple shifts, use the number of FTEs from all shifts. Include the followinga. Full-time staffb. Part-time staffc. Transients (students, visitors, retail customers)d. Residents

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • Documentation and CalculationsSCHOOLSIdentify the total number of building occupants for each occupancy type. In buildings with multiple shifts, use the number of full-time equivalents (FTEs) from all shifts.a. Full-time staffb. Part-time staffc. Studentsd. Transients (volunteers, visitors, etc.)

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • Documentation and CalculationsNC, SCHOOLS & CSAssume a 1-to-1 gender ratio

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • Timeline and TeamPredesignDesign Architect / Mechanical EngineerConstructionOccupancy

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • Referenced StandardsThe Energy Policy Act (EPAct) of 1992 (and as amended)The Energy Policy Act (EPAct) of 2005

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • Exemplary PerformancePrerequisite NoneWE Credit 3 45%

    WE Prerequisite 1 & WE Credit 3Water Use Reduction

  • IntentTo limit or eliminate the use of potable water or other natural surface or subsurface water resources available on or near the project site for landscape irrigation.

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • RequirementsNC, SCHOOLS & CSOPTION 1Reduce potable water consumption for irrigation by 50% from a calculated midsummer baseline case.

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • RequirementsReductions shall be attributed to any combination of the following items: Plant species factor Irrigation efficiency Use of captured rainwater Use of recycled wastewater Use of water treated and conveyed by a public

    agency specifically for non-potable uses

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • RequirementsNC, SCHOOLS & CSOPTION 2Do not use potable water for irrigation

    ANDPATH 1Use only captured rainwater, recycled wastewater, recycled graywater or water treated and conveyed by a public agency specifically for nonpotableuses for irrigation.

    ORPATH 2Install landscaping that does not require permanent irrigation systems. Temporary irrigation systems used for plant establishment are allowed only if removed within 1 year of installation

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • ImplementationUse native and drought-tolerant plants that can survive on natural rainfall.

    Climate Tolerate PlantsMinimize Turf

    Utilize Techniques such as:MulchingAlternative MowingComposting

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • ImplementationCapture rainwater on-site for irrigation purposes.

    Consider using for Irrigation: Stormwater Graywater Condensate Water

    Minimize the amount of turf and use only where needed for recreational or pedestrian use. Turf typically requires irrigation and creates a monoculture that does not encourage biodiversity.

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • ImplementationSpecify high-efficiency irrigation systems, such as, drip irrigation which delivers water to plant roots so less water is lost to evaporation.

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • ImplementationRegularly monitor irrigation systems to ensure that they are watering on desired schedules.

    Do not irrigate plants during winter months.

    Mulch landscaped areas to assist with water retention.

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • ImplementationGood Approaches:

    High-Efficiency Irrigation StrategiesMicro-irrigation systemsMoisture sensorsRain shut-offsWeather-based evapotranspiration controllersDrip systems use 30% - 50% less water than sprinklers

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • ImplementationGood Approaches:

    Rainwater CollectionCisternsUnderground TanksPondsRain Barrels

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • ImplementationGood Approaches:

    Rainwater CollectionRoofsPlazasPaved Areas

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • ImplementationGood Approaches:

    Wastewater RecoveryOn-siteMunicipal

    On-Site:GraywaterWastewater Treatment

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • ImplementationGood Approaches:

    Wastewater RecoveryOn-siteMunicipal

    On-Site:GraywaterWastewater Treatment

    WE Credit 1Water Efficient Landscaping

    Graywater:Wastewater from:SinksShowersWashing MachinesCooling TowerCondensation from AC Systems

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • ImplementationGood Approaches:

    Wastewater RecoveryOn-siteMunicipal

    On-Site:GraywaterWastewater Treatment

    WE Credit 1Water Efficient Landscaping

    Graywater:Wastewater from:SinksShowersWashing MachinesCooling TowerCondensation from AC Systems

    No Human Waste or Food Processing

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • Documentation and CalculationsPerform calculations of the baseline and design case to show the percentage reduction in water demand, and report what portion of irrigation will come from each nonpotable source (if any).

    Prepare a landscape plan showing a planting schedule and irrigation system.

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • Documentation and CalculationsBaseline Case vs Design CaseFor each Landscape Area:Calculate KL KL = Ks x Kd x KmcDetermine ET0 for your region (July)

    Calculate ETL ETL [in] = ET0 x KLKL Landscape CoefficientKs Species FactorKd Density FactorKmc Microclimate Factor

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • WE Credit 1Water Efficient Landscaping

    KL = Ks x Kd x KmcETL = ET0 X KL

    KL = Ks x Kd x KmcETL = ET0 X KL

    BLDG

    Which two variables remain constant when calculating the design and baseline cases?

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • WE Credit 1Water Efficient Landscaping

    KL = Ks x Kd x KmcETL = ET0 X KL

    KL = Ks x Kd x KmcETL = ET0 X KL

    BLDG

    Which two variables remain constant when calculating the design and baseline cases?

    Kmc & ET0

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • WE Credit 1Water Efficient Landscaping

    Baseline Case TWA [gal]Design Case TWA [gal]

    Percent Reduction of Potable Water

    Baseline H20% Reduction

    % Reduction = 100 x [1 Design H20 /Baseline H20]

    Design H20

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • Timeline and TeamPredesignDesign Architect / Mechanical Engineer / Civil EngineerConstructionOccupancy

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • Referenced StandardsNone

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • Exemplary PerformanceNone

    WE Credit 1Water Efficient Landscaping

    NC: 2-4 ptsSCHOOLS: 2-4 ptsCS: 2-4 pts

  • IntentTo reduce wastewater generation and potable water demand while increasing the local aquiferrecharge.

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • RequirementsOPTION 1Reduce potable water use for sewage conveyance by 50%through water conserving fixtures (water closets, urinals) or non-potable water (captured rainwater, recycled graywater, and on-site or municipally treated wastewater).

    OR

    OPTION 2Treat 50% of wastewater on-site to tertiary standards. Treated water must be used on-site or infiltrated.

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • ImplementationSpecify:

    High Efficiency Fixtureslow flowdual flush

    Dry Fixturescomposting toiletsnon-water urinals

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • ImplementationReuse for sewage conveyance:StormwaterGraywater

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • ImplementationConsider:On-site wastewater treatment

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • ImplementationConsider:Constructed Wetlands

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • ImplementationConsider:High-efficiency Filtration Systems

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Documentation and CalculationsOption 1:Using the WE Prerequisite 1 calculations, determine the baseline and design case of only the flush fixtures, to determine whether potable water consumption is reduced by 50%.

    Option 2:Determine the amount of wastewater compared with the capacity of the wastewater treatment system available.

    Compile information about system schematics and the capacity of any rainwater of graywater systems.

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Documentation and CalculationsPlumbing Drawings of on-site wastewater treatment facilities Calculated occupants [ Default 1 to 1] Calculated Baseline Water usage Calculated Design Water Usage

    Provide:Fixture ManufacturerFixture ModelFlush Rate in gallons per flush [GPF]

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Documentation and CalculationsTotal non-potable water for sewage conveyance [gal] (if using)

    If treating wastewater provide the annual quantity (gal) of:Water treatedTreated water infiltratedTreated water that is re-used on site

    Narrative describing potable water reduction strategies employed by the project.

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Documentation and CalculationsOPTION 1Full Time Equivalent - FTETransient Building Occupants daily average

    Baseline CaseUse Energy Policy Act of 1992 for Fixture Flush Rates

    Design CaseActual WC & Urinals Specified

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Documentation and CalculationsAssumptions50% males & 50% females

    Daily Uses:MalesWC 1 useUrinal 2 uses

    FemalesWC 3 uses

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Documentation and CalculationsEnergy Policy Act of 1992

    Flush Rate for Fixtures:Conventional Water Closet 1.6 GPFConventional Urinal 1.0 GPF

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Documentation and CalculationsCommercial Building - 14 FTEBaselineWC, Women 3 x 1.6 GPF x 7 = 33.6 galWC, Men 1 x 1.6 GPF x 7 = 11.2 galUrinal, Men 2 x 1.0 GPF x 7 = 14.0 gal

    TPW daily = 58.8 galDesignWC, Women 3 x 1.1 GPF x 7 = 23.1 galWC, Men 1 x 1.1 GPF x 7 = 7.7 galUrinal, Men 2 x 0.0 GPF x 7 = 0.0 gal

    TPW daily = 30.8 gal

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Documentation and CalculationsCommercial Building - 14 FTEBaselineWC, Women 3 x 1.6 GPF x 7 = 33.6 galWC, Men 1 x 1.6 GPF x 7 = 11.2 galUrinal, Men 2 x 1.0 GPF x 7 = 14.0 gal

    TPW daily = 58.8 galDesignWC, Women 3 x 1.1 GPF x 7 = 23.1 galWC, Men 1 x 1.1 GPF x 7 = 7.7 galUrinal, Men 2 x 0.0 GPF x 7 = 0.0 gal

    TPW daily = 30.8 gal

    WE Credit 2Innovative Wastewater Technologies

    % Reduction

    = 100 x (1 30.8/58.8)

    = 47.6%

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Documentation and CalculationsOPTION 2

    Annual Volume of Sewage GeneratedAnnual Volume of Wastewater Treated and Reused and/or infiltrated On-Site

    Calculate the percent reduction of wastewater that is released into the municipal sewer system.

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Timeline and TeamPredesignDesign Architect /Mechanical Engineer / Civil EngineerConstructionOccupancy

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Referenced StandardsThe Energy Policy Act (EPAct) of 1992 (and as amended)

    The Energy Policy Act (EPAct) of 2005

    The 2006 editions of the Uniform Plumbing Code or International Plumbing Code

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • Exemplary Performance100% reduction in potable water use for sewage conveyance

    OR

    On-site treatment and re-use/infiltration of 100% of generated wastewater

    WE Credit 2Innovative Wastewater Technologies

    NC: 2 pointsSCHOOLS: 2 pointsCS: 2 points

  • IntentTo maximize water efficiency within buildings to reduce the burden on municipal water supplyand wastewater systems.

    WE Credit 4Process Water Use Reduction

    NC: NASCHOOLS: 1 pointCS: NA

  • RequirementsSCHOOLSTo receive this credit, buildings must have the following:

    No refrigeration equipment using once-through cooling with potable water

    No garbage disposals

    WE Credit 4Process Water Use Reduction

    X

    NC: NASCHOOLS: 1 pointCS: NA

  • RequirementsAt least 4 process items where water use is at or below the levels shown in the table below. Inclusion of any equipment not listed in the table below must be supported by documentation showing a 20% reduction in water use from a benchmark or industry standard.

    WE Credit 4Process Water Use Reduction

    NC: NASCHOOLS: 1 pointCS: NA

  • ImplementationAssess all water-using process equipment within the school and select water-efficient options.

    WE Credit 4Process Water Use Reduction

    NC: NASCHOOLS: 1 pointCS: NA

  • Documentation and CalculationsRetain manufacturers' data showing the water consumption rates, manufacturer, and model of each appliance.

    Assemble information about the baseline water use based on industry standards for any equipment that is not listed in the credit requirements.

    WE Credit 4Process Water Use Reduction

    NC: NASCHOOLS: 1 pointCS: NA

  • Timeline and TeamPredesignDesign Architect /Mechanical Engineer / Project OwnerConstructionOccupancy

    WE Credit 4Process Water Use Reduction

    NC: NASCHOOLS: 1 pointCS: NA

  • Referenced StandardsNone

    WE Credit 4Process Water Use Reduction

    NC: NASCHOOLS: 1 pointCS: NA

  • Exemplary PerformanceProjects may earn an innovation credit for exemplary performance by demonstrating a projected process water saving of 40%.

    WE Credit 4Process Water Use Reduction

    NC: NASCHOOLS: 1 pointCS: NA

    Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28Slide Number 29Slide Number 30Slide Number 31Slide Number 32Slide Number 33Slide Number 34Slide Number 35Slide Number 36Slide Number 37Slide Number 38Slide Number 39Slide Number 40Slide Number 41Slide Number 42Slide Number 43Slide Number 44Slide Number 45Slide Number 46Slide Number 47Slide Number 48Slide Number 49Slide Number 50Slide Number 51Slide Number 52Slide Number 53Slide Number 54Slide Number 55Slide Number 56Slide Number 57Slide Number 58Slide Number 59Slide Number 60Slide Number 61Slide Number 62Slide Number 63Slide Number 64Slide Number 65Slide Number 66Slide Number 67Slide Number 68