0504 -development of a demand side response methodology...place your chosen image here. the four...

29
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 0504 -Development of a Demand Side Response Methodology 10 November 2014 Workgroup 6

Upload: others

Post on 01-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

0504 -Development of a Demand Side Response Methodology

10 November 2014

Workgroup 6

Page 2: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Agenda

¾ DSR Methodology and Consultation Document

¾ Survey feedback

¾ Next Steps

2

Page 3: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

DSR Methodology Consultation Process

10 November 2014

Workgroup 6

Page 4: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

DSR Methodology Consultation Appendices Supporting Documents

A1 DSR Methodology A2 DSR Consultation Questions A3 Survey and Volumetrics Analysis A4 NG Transporter Licence condition SC8I - Development and implementation

of a Demand Side Response methodology for use after a Gas Deficit Warning

A5 Shipper/Supplier and User DSR Agreement - Heads of Terms A5 DSR End to End Summary and process flow A6 Examples DSR Offer Options which meet End User Response needs A7 Timescales for the development of the DSR Methodology

Page 5: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

DSR Methodology Consultation process

¾ The DSR Methodology will be published and run through the Joint Office

¾ All responses and communications should be channelled through the Joint Office

¾ Should you wish to discuss any issues or queries regarding the consultation or the DSR Methodology please contact :

5

[email protected] Tel: 01926 656383: or [email protected] Tel: 01926 653493 [email protected] Tel: 01926 656397

Page 6: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

DSR Methodology Consultation Timescales

Dec 14 Jan 15 Feb 15

01/03/2015

19 Dec – 23 Jan

DSR

Methodology Consultation

Finalise

Methodology, Proposal &

Consultation Paper

24 Jan – 19 Feb

System Design, Build, Test

& Implementation

Seek agreement of

draft DSR Methodology

and draft Consultation

Proposal

Prepare Methodology

and consultation report

We are here

Nov 14

3rd Feb W

orkgroup meet to

discuss consultation report

Submit a draft proposed D

SR M

ethodology and consultation report to O

fgem

Workgroup to

prepare Workgroup

report Based on proposal

11 Nov W

G5

10 Dec W

G6

Page 7: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Next Steps Task Action Delivery date DSR Consultation Consultation Opens 19 Dec 14

Consultation Closes 23 Jan 15 Initial Consultation Responses issued to Workgroup

27 Jan 14

Next DSR Workgroup session

To discuss consultation responses and DSR Methodology report

03 Feb 15

DSR Methodology Consultation Report

Submitted to Ofgem 1 March 2015

DSR Trial

Internal preparation of options development and customer engagement plan

Nov 14 to Feb 15

Page 8: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

DSR Product - Offer Options

Workgroup 6

Page 9: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Features of the DSR Mechanism – Offer Volume

¾ Offers to be for a volume of energy

¾ End User may offer several tranches of volume

¾ For instance:

5% (plant can run between 100% and 95%)

10% (Minimum Operational Load = 85%)

@ 6 Hours notice

With high risk of tripping off costed in to offer

30% site minimum Gas required to protect plant load

55% (manufacturing shut down) 3 day Start up costs ~ £0.5M

Page 10: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Daily Product – Flat load - posted each day for the same volume and may be posted in ‘strips’ of 7 days or posted on a daily basis.

DSR Product Options for an eligible sites available DSR

30% of demand flexible flat load

same volume available every day

Recommended Product option

20% of Demand flexible demand able

to use on a peaky profile ?

e.g Weekdays only

40% of Demand Plant will be off for 7

days to re-commission

Final 10% of Demand Critical load

No available for DSR

Sites Available DSR tranches for

a day

Daily Product – Peaky load - Offer can be posted on a daily basis or posted in a 7 day ‘strip’ of offers with varying volumes offered depending on the offtake profile through the 7 days. Multiday Product - committed for posted durations. Max duration of contract 7 days (may be posted a via automatic rolling offer, or posted as a one off closer to the relevant 7 day contract) Required to reduce by the same volume for each day of the contract.

Both D

aily and Multiday D

SR O

ffers m

ay be posted with the posting

automatically replicating.

Page 11: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Demand Side Response Survey Results

10 December 2014

DSR WG6

Page 12: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

High Level Stats

¾ Total of 31 responses received

¾ 6 of these have attended one or more of the DSR development discussions held so far

¾ 26 respondents had heard of the DSR mechanism prior to the survey

¾ 22 respondents left their contact details and 14 were available for follow up phone calls / emails.

12

Page 13: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Would you be interested in participating in a DSR Mechanism?

13

0  

2  

4  

6  

8  

10  

12  

14  

Yes   Yes,  only  with  op5on  fee   No   Maybe  

Num

ber  o

f  respo

nden

ts  

Page 14: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

What sector are you in?

14

Ceramics  

construc5on  

chemicals  

heat  treatment  

Non-­‐Ferrous  Metals  (ie  aluminium,  copper,  nickel,  lead,  zinc,  etc)  Mining  &  minerals  

Electronics  

Semiconductor  manufacturing  

Iron  /  steel  

Paper  /  Prin5ng  

Food,  Beverages  etc  

Educa5on  

RAIL  

manufacturing  of  building  materials  

University  Educa5on  

Leisure  and  Events  

Glass  

u5lity  

Page 15: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Would you be willing to participate in an Expression of interest Trial?

15

Yes  

No  

Page 16: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Assumptions

16

§  Respondents who answered “no” to participating in the DSR

Mechanism are not included within the data analysis beyond this

slide. This is to ensure that the data shows an accurate picture with

regards to the potential volumes and length of time which DSR

Offers may be made available for.

§  Therefore, the data is based on 25 responses, which represents

approximately 6 % of the target market.

Page 17: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

What is your average daily gas demand?

17 0  -­‐  0.99  GWh   1  -­‐  2.99  GWh   3  -­‐  5.99  GWh   10+  GWh   Dont  Know  

Page 18: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Maximum and Minimum length of time DSR volume available

18

0  

5  

10  

15  

20  

25  

Maximum   Minimum  

More  than  a  week  

A  full  week  

A  number  of  days,  but  less  than  a  week  

A  full  day  

A  few  hours,  but  less  than  a  day  

Page 19: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Three scenarios to show the potential volume availability from the 25 participating responses

19

0.0  

5.0  

10.0  

15.0  

20.0  

25.0  

30.0  

Low  scenario   Average  scenario   High  scenario  

Volume  in  GWh  

Page 20: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Summary

§  Out of the 31 responses received 25 answered either yes or maybe to participating in DSR. This is approximately 80%. If we extrapolate this to cover the whole market (approximately 450 eligible sites) this could mean that potentially 360 sites would be willing to participate in DSR.

Any further questions?

20

Page 21: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Locational Market and DSR Offer

10 November 2014

Workgroup 6

Page 22: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Aims ¾ During the last workgroup the following questions were

posed:

¾ Are all Multiday offers facilitated within the OCM?

¾ What information is apparent on the Locational Market, are there confidentiality issues?

22

Page 23: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Multiday Offers

23

¾ Each Multi day option (2 day, 4 day, 7 day etc) has its own distinct market and is visible to all market participants should they wish to view it

Page 24: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Locational Market – what is visible? ¾ On the “Market View” screen no location is visible

¾ However on the “Market Depth” screen more information is available:

¾ For DSR, all sites are likely to have a location of either;

¾  ‘DMC’ or ‘VLDMC’

¾ Meter Number is shown, but is generally ATVLDMC0001 or ATRTS0001 for demand side – so relatively anonymous

24

Page 25: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Locational Market screenshot

25

Page 26: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Conclusion

¾ The locational market in the context of DSR should maintain a suitable level of anonymity

¾ Any other comments / questions / observations?

26

Page 27: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

0504 -Development of a Demand Side Response Methodology – Next Steps

10 November 2014

Workgroup 6

Page 28: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

DSR Methodology and Mechanism Timescales

SC8I draft published

12/02/2014

2014 2015 2016

Submit a draft M

ethodology to O

fgem

May 2014 – Jan 2015

Consultation closes

09/04/2014

01/03/2015

May – Jul

Run Trial

(subject to Authority Direction)

Sep - Dec

Final

Modification and consult

Implem

ent methodology

& m

echanism

01/10/2016

Submit report on trial to O

fgem

? ? ?

Ofgem

decision

?

Feb - Sep

System Design, Build, Test

& Implementation

? SC 8I

Licence changes Implemented

Nov 14

Industry Development

of a draft DSR Methodology &

DSR Mechanism

We are here and on track

Page 29: 0504 -Development of a Demand Side Response Methodology...Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the

Next Steps Task Action Delivery date DSR Consultation Consultation Opens 19 Dec 14

Consultation Closes 23 Jan 15 Initial Consultation Responses issued to Workgroup

27 Jan 14

Next DSR Workgroup session

To discuss consultation responses and DSR Methodology report

03 Feb 15

DSR Methodology Consultation Report

Submitted to Ofgem 1 March 2015

DSR Trial

Internal preparation of options development and customer engagement plan

Nov 14 to Feb 15

Should you have any questions please contact: [email protected] Tel: 01926 656383; [email protected] Tel: 01926 653493; or [email protected] Tel: 01926 656397