08/04/05 Erika Garutti 1
Status of Detector R&D
March 18-22: in LCWS05 Latest news on:
- detector concept- detector R&D- dead lines and schedules- test beam activities and plans
http://www-conf.slac.stanford.edu/lcws05/default.htm
A brief summary of the hottest news
08/04/05 Erika Garutti 2
Three Detector ConceptsSiD: Silicon based LDC: large detector GLD: even larger detector
Silicon tracker Gaseous tracker
B = 5TB = 4T
B = 3T
IFAE Catania - E. Garutti 3
Detector ConceptsConcepts currently studies differ mainly in SIZE and aspect ratio
Relevant: inner radius of ECAL: defines the overall scale
LDC
SiDGLD
ECAL end-view
Tracker
SiD
LDC
GLD
B = 5T
B = 4TB = 3T
Figure of merit (ECAL):Barrel: B Rin
2/ Rmeffective
Endcap: "B" Z2/ Rmeffective
Rin : Inner radius of Barrel ECAL
Z : Z of EC ECAL front face
Different approaches
SiD: B Rin2
LDC: B Rin2
GLD: B Rin2
Inner Tracking/Vertex DetectionDetector RequirementsDetector Requirements
Excellent space point precision ( < 4 s )
Superb impact parameter resolution ( 5µm 10µm/(p sin3/2) )
Transparency ( ~0.1% X0 per layer / 4-5 layers)
Track reconstruction ( find tracks in VXD alone )
commonly agreed: Pixel Detectorcommonly agreed: Pixel Detectorkeep occupancy below 1% given the bunch structure:
with pixels ~ 20 x 20 μm2: 1) readout ~20 times during bunch trainCCD: Charge-Coupled Devices DEPFET: DEpleted P-channel Field Effect Transistor MAPS: Monolithic Active Pixels SoI: Silicon on Insulator2) store ~20 signals during bunch train ISIS: Imagine Sensor with In-Situ StorageHAPS: Hybrid Pixel SensorsOR 3) make pixels 20 times smaller FPCCD: Fine Pixel CCD (5x5 μm2)
before LCWS0511 technologies26 groups
12 / /30 / /
after
08/04/05 Erika Garutti 5
1
Storage gate 2
45
6
20
19
1817
7
8
RSEL OD RD RG
OSto column load
Storage gate 3
Transfer gate 8Output gate
Output node
Photogate
Charge generationTransfer Storage
Readback from gate 6Idea by D. Burt and R. Bell (E2V)
2) Revolver ISIS
08/04/05 Erika Garutti 6
Tracking Detector: TPCsCarleton, Aachen, Desy(not shown) for B=0 studies with laser or cosmics
Desy, Victoria, Saclay (fit in 2-5T magnets)
08/04/05 Erika Garutti 7
TPC: status and next steps
• A large international Community is engaged in TPC R&D• Both GEMs and MICROMEGAS seem to work• Construction of a ‘Large Prototype’ • Full System Test with the ‘Large Prototype’ in a beam
A Collection of ongoing R&D topics:• Choice of gas mixture (Diffusion, D-velocity)• Ion feedback• Readout electronics (pad density)• Neutron background
R.K.Carnegie et.al.,
to be publishedFirst results
Micromegas with charge
dispersion readout GEM with charge
dispersion
readout
08/04/05 Erika Garutti 8
Tracking detector: Silicon Strip
H. Park (BAERI, KNU)On behalf of Korean Silicon Group
Double sided silicon strips
Fabrication “in house”Sensor size: 55.6x29 mm512 strips, 50 um pitch5” wafers, 380 um thickQuality control test performed:Electronic, Source, Radiation damage
Digital Active Pixel Array
Position memoryTime memory
Position memoryTime memory
Position memoryTime memory
Position memoryTime memory
Position memoryTime memory
Position memoryTime memory
DAP Strip 1 DAP Strip 2
G.BashindzhagyanN.Sinev LCWS 2005
1 strip = 2000 pixels of 25x25 μm2
25 μm pitch
digital readout
08/04/05 Erika Garutti 9
ECAL designsSi-W
CALICE 30% of layers tested @ DESY SLAC-Oregon under production
Scintillator-W
Korea tested @ CERN
29%/E (vs. 18%/E for GEANT4)
Colorado under production
Scintillator-Pb
Japan-Korea-Russia tested @ DESY & KEK
Hybrid Scintillator/Si-W
INFN Padova tested @ CERN
E/E ~11.-11.5% /E, pos ~2 mm (@ 30 GeV)
08/04/05 Erika Garutti 10
Move (completed) module to Fermilab test beam late 2005
CALICE ECAL @ DESY testbeam
Detector slab
08/04/05 Erika Garutti 11
HCAL and Tail catcher designs
HCAL: Scintillator + Analog readoutJapan tested @ KEK & FNAL CALICE 100 ch. prototype tested @ DESY
8000 ch. prototype under constructionHCAL: Digital readoutCALICE GEM plates, under constructionCALICE RPC plates, under construction
Tail catcher / Muon detector:US Collaboration Scintillator stripCALICE / NIU Scintillator stripCaPiRe (European) RPC plate, tested @ Frascati
30 March 2005 12
100 channels prototypetested at DESY testbeam in 2004
Excellent results obtained!
Prototype under construction: 1m3
8000 cells, from 3x3cm2
CALICE A-HCALLateral shower shape Longitudinal shower shape
5x5cm2 tile
08/04/05 Erika Garutti 13
Next Test Beam Activities
CALICE SiW ECAL
CALICE TILE AHCAL+TCMT
OTHER ECALs
CALICE DHCALs
Combined Calorimeters
20082007 2006 2005 2009 >2009
PFA and shower library Related Data Taking
ILCD R&D, calibration
Phase I: Detector R&D, PFA Phase I: Detector R&D, PFA development, Tech. Choicedevelopment, Tech. Choice
Phase IIPhase IIPhase 0: Prep.Phase 0: Prep.
Timeline of Beam Tests
MDI, , tracking, etc
• Mainly driven by calorimeter activities• From 2006 only FNAL / Protvino available with low-high E hadrons
08/04/05 Erika Garutti 14
Calorimeter Project Lead institution
ECAL Silicon-Tungsten (CALICE) LLR
Silicon-Tungsten (US) SLAC, Oregon
Scintillator-Tungsten Shinshu
Scintillator-Tungsten Colorado
Scintillator-Silicon-Tungsten Kansas
Scintillator-Silicon-Lead Padova
HCAL Scintillator-Steel DESY
RPC-Steel ITEP, ANL
GEM-Steel UTA
Muon-detectors/tail catcher Scintillator-Steel DESY/FNAL/NIU
RPC-Steel Frascati
An ILC planning document submitted to Fermilab (FNAL–TM–2291) 11 projects proposed by 28 institutions from 3 regions
Planning Document for FNAL
J. Repond
08/04/05 Erika Garutti 15
Tail Catcher
ECALECAL
HCALHCAL
Electronic Racks
Beam
CALICE Setup V-Trial at FNAL MTBF
K. Gadow (DESY)
08/04/05 Erika Garutti 16
Test beam for VTX & Tracking
• VTX and Tracking group plans to put down requirements for beam tests– Less stringent beam requirement compared to CAL
• Broader facility options• But still need to specify requirements
– First requirements to be presented in Snowmass
D. Bailey, H.E.Fisk
08/04/05 Erika Garutti 17
ConclusionWolfgang Lohmann (review of detector R&D):• Its time to organize our community world wide to strengthen and structure
the efforts in ILC Detector R&D
Andy White (summary talk on Calorimetry): • A vigorous program of LC calorimetry […] development is underway • Many results from prototypes – but we should avoid too much duplication• It is critical to carry out an R&D survey and ensure that Detector R&D
proceeds in a timely manner alongside Accelerator R&D.
Ji Yu (summary talk on Test Beams):• Tremendous amount of activities• Limited number of facilities for a combined calorimeter beam tests• Fermilab is working closely with LC TB community • WW coordination effort to pick up momentum
Outlook: see you at LCWS06 !!!