    1/82

    111/29/2013

    Describe the Procedure to Build Control

    Modules

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    2/82

    Honeywell

    2

    11/29/2013

    Introduction

    In this lesson you will learn aboutExperion control modules

    At the conclusion of this lesson,you will be able to:

    Build and edit control modules

    Load, activate and monitorcontrol modules

    Insert an OLE object in a controlmodule

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    3/82

    Honeywell

    3

    11/29/2013

    Topics

    Building and Editing Control Modules

    Loading, Activating, and Monitoring Control Modules

    Inserting an OLE Object in a Control Module

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    4/82

    Honeywell

    4

    11/29/2013

    Creating a Control Module (CM)

    Sequentially numbered namegiven by Control Builder

    Blank CM

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    5/82

    Honeywell

    5

    11/29/2013

    Building a CMAssigning CMs to the CEE

    1

    2

    3

    5

    6

    4

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    6/82

    Honeywell

    6

    11/29/2013

    Creating a CMDrag and Drop

    Drag and

    Drop

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    7/82

    Honeywell

    7

    11/29/2013

    Configuring a CM

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    8/82

    Honeywell

    8

    11/29/2013

    Configuring a CMMain Tab

    Name and itemname

    Parent asset

    Execution period

    Execution order inCEE and ExecutionPhase

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    9/82

    Honeywell

    9

    11/29/2013

    Configuring a CMExecution Cycle

    Execution period and phase = execution cycle

    Examples:

    A CM with a one second execution period (1000 ms) and a phase of0 would execute at phase 0 and again at phase 20

    A CM with an execution period of 200 milliseconds and a phase of 1will execute in cycles1, 5, 9, ... 37

    8

    PHASE

    7654321

    0

    0

    109

    03938371211

    50100 500450400350300250200150 2000

    1850600550 1900

    1950

    TIME (ms)

    This execution cyclehas 40 timing phases of

    50 ms each

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    10/82

    Honeywell

    10

    11/29/2013

    CPU Loading

    CEEdetail

    display

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    11/82

    Honeywell

    11

    11/29/2013

    Together, the CM execution periodand phase define the:

    Question 1: CM Period and Phase

    Yes! The execution period and phase of a CMdefine the execution cycle.

    Click anywhere to continue

    No. The execution period and phase of a CMdefine the execution cycle.

    Click anywhere to continue.

    No. The execution period and phase of a CMdefine the execution cycle.

    Click anywhere to continue.

    No. The execution period and phase of a CMdefine the execution cycle.

    Click anywhere to continue.

    Correct - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!

    Your answer:The correct answer is:

    You did not answer this question completelyYou must answer the question before

    continuing

    Submit Clear

    A) Execution cycle

    B) Execution phase hour

    C) Execution phase minute

    D) Execution order

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    12/82

    Honeywell

    12

    11/29/2013

    Building a CMInserting Function Blocks

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    13/82

    Honeywell

    13

    11/29/2013

    Function Block Execution Order in the CM

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    14/82

    Honeywell

    14

    11/29/2013

    Connecting Function Blocks with the Wiring Tool

    Not yet

    connected

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    15/82

    Honeywell

    15

    11/29/2013

    Analog loop CM

    Building CMs

    1

    2

    3

    4

    3

    3

    5

    5

    3

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    16/82

    Honeywell

    16

    11/29/2013

    Building CMs, contd.

    Device control CM

    Expandedto showfunctionblocks

    Logic/interlocks

    Inputs

    Outputs

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    17/82

    Honeywell

    17

    11/29/2013

    Permissive/Interlocks

    Device control detail display

    2-state

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    18/82

    Honeywell

    18

    11/29/2013

    Which of these is a definition ofthe Execution Orderin CM?

    Question 2: Execution Order in a CM

    No. "Execution Order in a CM" is the sequentialexecution order of function blocks in a CM.

    Click anywhere to continue.

    No. "Execution Order in a CM" is the sequentialexecution order of function blocks in a CM.

    Click anywhere to continue.

    Yes! "Execution Order in a CM" is the sequentialexecution order of function blocks in a CM.

    Click anywhere to continue.

    Correct - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!

    Your answer:The correct answer is:

    You did not answer this question completelyYou must answer the question before

    continuing

    Submit Clear

    No. "Execution Order in a CM" is the sequentialexecution order of function blocks in a CM.

    Click anywhere to continue.

    A) All function blocks with the sameexecution order in multiple CMsare executed in parallel

    B) The execution cycle of the CMin the CEE

    C) The execution phase of thefunction block in the CEE

    D) The sequential execution orderof function blocks in a CM

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    19/82

    Honeywell

    19

    11/29/2013

    Topics

    Building and Editing Control Modules

    Loading, Activating, and Monitoring Control Modules

    Inserting an OLE Object in a Control Module

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    20/82

    Honeywell

    20

    11/29/2013

    Loading CMs

    1

    3

    2

    Right-click

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    21/82

    Honeywell

    21

    11/29/2013

    Loading CMs, contd.

    Check the

    appropriate boxes

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    22/82

    Honeywell

    22

    11/29/2013

    Activating/Inactivating CMs

    Right-click

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    23/82

    Honeywell

    23

    11/29/2013

    Monitoring/Chart Visualization

    Monitoring CMsScale Factor

    Scale Factor

    Icon

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    24/82

    Honeywell

    24

    11/29/2013

    Topics

    Building and Editing Control Modules

    Loading, Activating, and Monitoring Control Modules

    Inserting an OLE Object in a Control Module

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    25/82

    Honeywell

    25

    11/29/2013

    Inserting a Video Clip in a CM

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    26/82

    Honeywell

    26

    11/29/2013

    Question 3: Loading Control Modules

    Incorrect. "Left-click the CPM in the Project tab andselect Load" is the wrong answer. You must RIGHT-click the CPM in the Project tab to select the Load

    option.

    Click anywhere to continue.

    Incorrect. "Left-click the CPM in the Project tab andselect Load" is the wrong answer. You must RIGHT-click the CPM in the Project tab to select the Load

    option.Click anywhere to continue.

    Incorrect. "Left-click the CPM in the Project tab andselect Load" is the wrong answer. You must RIGHT-click the CPM in the Project tab to select the Load

    option.

    Click anywhere to continue.

    Correct! "Left-click the CPM in the Project tab andselect Load" is the wrong answer. You must RIGHT-click the CPM in the Project tab to select the Load

    option.

    Click anywhere to continue.

    Correct - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!

    Your answer:The correct answer is:

    You did not answer this question completelyYou must answer the question before

    continuing

    Submit Clear

    Which of the following is not a way to load a control module?

    A) Select the corresponding CM in the

    Project tab and then selectController > Load

    B) Select the CM or IOM in the Projecttab and select the down arrow

    C) Select the CM or IOM in the

    Monitoring tab and select thedown arrow

    D) Left-click the CM in theProject tab and select Load

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    27/82

    Honeywell

    27

    11/29/2013

    Playing the Video

    Right-click video clip

    Select Play

    Works the same in Station

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    28/82

    Honeywell

    28

    11/29/2013

    Summary

    When building, loading, activating, and monitoring a CM in ControlBuilder, remember:

    A new CM is automatically assigned a unique, sequential name

    The execution phase and period of the CM defines the execution cycle

    Cycle overruns can occur when the scheduled processing for a cycle does

    not finish by the start of the next cycle

    Function blocks execute in ascending order beginning with the block havingthe lowest execution order value

    You can load a CM from the Project tree using the Control Builder Controller

    menu

    You can view an activated CM in the Monitoring tree of Control Builder or inthe associated detail display in Station

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    29/82

    Honeywell

    29

    11/29/2013

    Conclusion

    Describe the Procedure to Build Control Modules

    Complet ion

    Cert i f icate

    Proceed to the next lesson in your course material

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    30/82

    Honeywell

    30

    11/29/2013

    This page intentionally left blank

    Data Acquisition Control Module

    Describe the Procedure to Build Control Modules

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    31/82

    3111/29/2013

    Describe Bulk Build Functionality

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    32/82

    Honeywell

    32

    11/29/2013

    Introduction

    In this lesson you will learn to use the Bulk Build tool inControl Builder

    At the conclusion of this lesson, you will be able to describe how toquickly build multiple control modules of the same type using theBulk Build tool

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    33/82

    Honeywell

    33

    11/29/2013

    Topics

    Bulk Build Procedure Overview

    Bulk Build Procedure

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    34/82

    Honeywell

    34

    11/29/2013

    Features of the Bulk Build Tool

    Bulk Build:

    Productivity tool used to generate large quantities of control strategiesoutside of Control Builder

    Principle is very similar to bulk edit function parameters in Excel

    Licensed tool option

    Bulk Build supports the following components:

    Control modules

    Sequential control modules

    Fieldbus devices

    I/O modules

    User templates (instances of templates and templates themselves)

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    35/82

    Honeywell

    35

    11/29/2013

    Bulk Build Procedure Overview

    Create a typical (standard) control strategy

    Create copies of the typical using the bulkbuild tool

    Export the copies of the typical to an Excelspreadsheet or other qualified media

    Manipulate the Excel spreadsheet(multiplies the typical control strategy andchanges the required parameters)

    Read the Excel spreadsheet back intoControl Builder, which creates theindividual control strategies (uses normalconfiguration checks)

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    36/82

    Honeywell

    36

    11/29/2013

    Topics

    Bulk Build Procedure Overview

    Bulk Build Procedure

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    37/82

    Honeywell

    37

    11/29/2013

    Create the Bulk Build List

    Tools > Bulk Build > Create Bulk Build List

    Invoke CreateBulk Build List

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    38/82

    Honeywell

    38

    11/29/2013

    Select a Typical Control Strategy

    Select a typicalcontrol strategy

    Set copy name

    and count

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    39/82

    Honeywell

    39

    11/29/2013

    Configure Prefix and Suffix

    Number of copies to createSelected Typical

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    40/82

    Honeywell

    40

    11/29/2013

    Configure Tag Names

    Add Leading Zeros

    Ex: 00PIC0102

    Use Alpha SequenceAdd letter to eachblock nameEx: PIC0102A, B

    Add UnderscoreSeparator Ex: PIC0102_X

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    41/82

    Honeywell

    41

    11/29/2013

    Configure Prefix and Suffix

    Add prefix or suffix

    Add prefix or suffix,then start number and

    increment amount

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    42/82

    Honeywell

    42

    11/29/2013

    Select Parameters

    Result is updated

    Select blockparameter forBulk Build list

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    43/82

    Honeywell

    43

    11/29/2013

    Select Parameters, contd.

    Select block

    Parameters of

    selected block

    Parameter selected

    for typical control

    strategy

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    44/82

    Honeywell

    44

    11/29/2013

    Select Parameters, contd.

    Result is updated

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    45/82

    Honeywell

    45

    11/29/2013

    Select Path

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    46/82

    Honeywell

    46

    11/29/2013

    Modify Parameters in Excel

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    47/82

    Honeywell

    47

    11/29/2013

    Modify Parameters in Excel, contd.

    Make modificationsas desired in therequired CM

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    48/82

    Honeywell

    48

    11/29/2013

    Read Excel File

    Tools > Bulk Build > Read Bulk Build List

    Invoke ReadBulk Build List

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    49/82

    Honeywell

    49

    11/29/2013

    Validate and Build Control Strategies

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    50/82

    Honeywell

    50

    11/29/2013

    Validate and Build Control Strategies, contd.

    Select to replaceexisting, when desired

    Select Validate

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    51/82

    Honeywell

    51

    11/29/2013

    Validation Report

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    52/82

    Honeywell

    52

    11/29/2013

    Validate and Build Control Strategies, contd.

    Select Build

    Ordering Build.

    Building blocks.

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    53/82

    Honeywell

    53

    11/29/2013

    Build Report

    View reportafter bulk build

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    H llC

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    54/82

    Honeywell

    54

    11/29/2013

    New CMs

    New CMs availablein the Project

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    H llQ ti 1 B lk B ild T l

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    55/82

    Honeywell

    55

    11/29/2013

    Question 1: Bulk Build Tool

    Incorrect. The Bulk Build tool is used to generatemultiple control strategies outside Control Builder.

    Click anywhere to continue.

    Correct! The Bulk Build tool is used to generatemultiple control strategies outside Control Builder.

    Click anywhere to continue.

    Incorrect. The Bulk Build tool is used to generatemultiple control strategies outside Control Builder.

    Click anywhere to continue.

    Incorrect. The Bulk Build tool is used to generatemultiple control strategies outside Control Builder.

    Click anywhere to continue.

    Correct - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!

    Your answer:The correct answer is:

    You did not answer this question completelyYou must answer the question beforecontinuing

    Submit Clear

    The Bulk Build tool is used to:

    A) Create EB files for C200/C300

    control modules

    B) Generate large quantities ofcontrol strategies outside ControlBuilder

    C) Export control modules to otherERDBs

    D) All of the above

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    H llS

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    56/82

    Honeywell

    56

    11/29/2013

    Summary

    The Bulk Build tool:

    Exports multiple copies of a typical control strategy to an Excel spreadsheet

    where each copy can be modified

    Imports the edited Excel spreadsheet back into Control Builder which appliesthe normal configuration checks and creates the individual control strategies

    Supports the following components

    Control modules

    Sequential control modules

    Fieldbus devices

    I/O modules

    User templates (instances of templates and templates themselves)

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    H llC l i

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    57/82

    Honeywell

    57

    11/29/2013

    Conclusion

    Describe Bulk Build Functionality

    Complet ion

    Cert i f icate

    Proceed to the next lesson in your course material

    Data Acquisition Control Module

    Describe Bulk Build Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    H ll

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    58/82

    Honeywell

    58

    11/29/2013

    This page intentionally left blank

    Data Acquisition Control Module

    Describe Bulk Build Functionality

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    59/82

    5911/29/2013

    Describe Bulk Edit Parameters Functionality

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellIntroduction

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    60/82

    Honeywell

    60

    11/29/2013

    Introduction

    In this lesson you will learn how to use the bulk edit parameters tool inControl Builder

    At the conclusion of this lesson,you will know how touse the tool to:

    Export tags and parameters from

    a Control Builder project to anExcel spreadsheet

    Modify the parameters in anExcel spreadsheet

    Read the parameters into aControl Builder project

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellCreate Bulk Edit List

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    61/82

    Honeywell

    61

    11/29/2013

    Create Bulk Edit List

    Bulk Edit Parameters

    Utility which allows you to change the value of multiple parameters in asingle operation by importing a prepared list of edits

    Tools > Bulk Edit Parameters > Create Bulk Edit List

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellCreate Bulk Edit List contd

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    62/82

    Honeywell

    6211/29/2013

    Create Bulk Edit List, contd.

    The Show All Points button is used to populate the "Available Points"selection list with the names of all points in the database

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellCreate Bulk Edit List contd

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    63/82

    Honeywell

    6311/29/2013

    Create Bulk Edit List , contd.

    Select the points and parameters

    The selected points

    The parameter(s)

    to be modified

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellCreate Bulk Edit List contd

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    64/82

    Honeywell

    6411/29/2013

    Create Bulk Edit List , contd.

    Build the Excel file

    Browse todesiredoutput path

    Name theoutput file

    Select theoutputfile type

    Save

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellEdit Parameters

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    65/82

    Honeywell

    6511/29/2013

    Edit Parameters

    Open the created BulkEdit.xls file in Excel

    Use the single quotebefore numbers 100Do not change oradd tag names.Keep columns in order.

    Edit the parametersas necessary

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellRead Bulk Edit List

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    66/82

    Honeywell

    6611/29/2013

    Read Bulk Edit List

    Select Start

    Select UpdateMonitor or Project

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellQuestion 1: Bulk Edit Parameters Tool

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    67/82

    Honeywell

    6711/29/2013

    Question 1: Bulk Edit Parameters Tool

    Incorrect. The Bulk Edit Parameters tool is used to changeselected parameters in selected control modules.

    Click anywhere to continue.

    Incorrect. The Bulk Edit Parameters tool is used to changeselected parameters in selected control modules.

    Click anywhere to continue.

    Incorrect. The Bulk Edit Parameters tool is used to changeselected parameters in selected control modules.

    Click anywhere to continue.

    Correct! The Bulk Edit Parameters tool is used to changeselected parameters in selected control modules.

    Click anywhere to continue.

    Correct - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!Your answer:The correct answer is:You did not answer this question completely

    You must answer the question beforecontinuing

    Submit Clear

    The bulk edit parameters tool is used to:

    A) As an online tool to activate or inactivate multiplecontrol modules at once

    B) To copy the control module to the monitoring tab

    C) To export selected control modules

    D) To change selected parameters in selected controlmodules

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellSummary

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    68/82

    Honeywell

    6811/29/2013

    Summary

    You can use the Bulk Edit Parameters tool to:

    Export tags and parameters from a Control Builder project to an Excelspreadsheet

    Modify the parameters in an Excel spreadsheet

    Do not change or add tag names

    Keep columns in order

    Use the single quote before numbers 100

    Read the parameters into a Control Builder project

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellConclusion

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    69/82

    Honeywell

    6911/29/2013

    Conclusion

    Describe Bulk Edit Parameters Functionality

    Complet ion

    Cert i f icate

    Proceed to the Configu re the Data Acqu is i t ion Contro l Module

    lab exercise and the sixlab exercises that follow it

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

    Honeywell

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    70/82

    Honeywell

    7011/29/2013

    This page intentionally left blank

    Data Acquisition Control Module

    Describe Bulk Edit Parameters Functionality

    EXP20R300 - EPKS CEE C200/C300/ACE

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    71/82

    7111/29/2013

    Describe the Block Name References in CMand SCM

    Data Acquisition Control Module

    Describe the Block Name References in CM and SCM

    Data Acquisition Control Module

    Describe the Block Name References in CM and SCM

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellIntroduction

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    72/82

    Honeywell

    7211/29/2013

    Introduction

    In this lesson you will learn about:

    Block name references in CM and SCM

    At the conclusion of this lesson, you will be able to:

    Reference a parameter in CM

    Reference a parameter in SCM

    Data Acquisition Control Module

    Describe the Block Name References in CM and SCM

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellApplication

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    73/82

    Honeywell

    7311/29/2013

    Application

    Applies to parameter connector and parameter references

    Applies to expression used in SCM and all Calc Blocks

    Provides a simpler input mechanism for expression references

    The user does not have to enter more information than required

    Shorten the string for references within a container, or within a basic block,

    so a tag name does not take up more of the viewing area provided thannecessary

    Shorten the number of characters used in an expression

    Data Acquisition Control Module

    Describe the Block Name References in CM and SCM

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellRelative Reference Display Option

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    74/82

    Honeywell

    7411/29/2013

    Relative Reference Display Option

    Select the Short Name Option

    Data Acquisition Control Module

    Describe the Block Name References in CM and SCM

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellDisplay Option for Expression in Parameter Reference

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    75/82

    y

    7511/29/2013

    Display Option for Expression in Parameter Reference

    Reference to a container parameter will be displayed as $.parameter in

    the expression present in the step of an SCM

    Reference to a parameter which is present on the same block will be

    displayed as parameter name in the expression of the Auxiliary block

    Reference to a parameter on other basic block will be displayed as

    Blockname.parameter

    Short Name is applicable to reference within the same CM

    Data Acquisition Control ModuleDescribe the Block Name References in CM and SCM

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellExpression ExampleSCM

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    76/82

    y

    7611/29/2013

    p p

    Data Acquisition Control ModuleDescribe the Block Name References in CM and SCM

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellExpression ExampleCM

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    77/82

    y

    7711/29/2013

    p p

    Data Acquisition Control ModuleDescribe the Block Name References in CM and SCM

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellExpression ExampleCM

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    78/82

    y

    7811/29/2013

    p p

    Data Acquisition Control ModuleDescribe the Block Name References in CM and SCM

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellQuestion 1: Short Names

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    79/82

    y

    7911/29/2013

    Correct - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!

    Your answer:The correct answer is:

    You did not answer this question completelyYou must answer the question before

    continuing

    Submit Clear

    No. The correct answer is "All of the above". Allof these statements are correct about Short

    Names.

    Click anywhere to continue.

    No. The correct answer is "All of the above". Allof these statements are correct about Short

    Names.

    Click anywhere to continue.

    No. The correct answer is "All of the above". Allof these statements are correct about Short

    Names.

    Click anywhere to continue.

    No. The correct answer is "All of the above". Allof these statements are correct about Short

    Names.

    Click anywhere to continue.

    Yes! The correct answer is "All of the above". Allof these statements are correct about Short

    Names.

    Click anywhere to continue.

    Which of the following statements is true about Short Names?

    A) Optional setting

    B) Applies to parameter connector and parameterreferences

    C) Applies to expression used in SCM and all CalcBlocks

    D) Reference to a container parameter will be displayedas "$.parameter" in the expression present in thestep of a SCM

    E) All of the above

    Data Acquisition Control ModuleDescribe the Block Name References in CM and SCM

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellSummary

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    80/82

    y

    8011/29/2013

    y

    The block name references in CM and SCM function allows you to:

    Do parameter reference in CM

    Do parameter reference in SCM

    Data Acquisition Control ModuleDescribe the Block Name References in CM and SCM

    EXP20R300 - EPKS CEE C200/C300/ACE

    HoneywellConclusion

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    81/82

    8111/29/2013

    Describe the Block Name References in CM and SCM

    Complet ion

    Cert i f icate

    Proceed to the next lesson in your course material

    Data Acquisition Control ModuleDescribe the Block Name References in CM and SCM

    EXP20R300 - EPKS CEE C200/C300/ACE

    Honeywell

  • 7/27/2019 09 20R300 1 Data Acquisition Control Module

    82/82

    This page intentionally left blank