4POWER KICK-OFF MEETINGRostock 30-31 May - 2012
Stefania Sabba (Councillor of the Environment) Alberto Rossini, Claudia Ozzi, Claudia BerrettaProvince of RiminiMobility and “Wide Areas projects” Department
Ufficio Energia - Servizio Progetti di area vasta e mobilità di sistema 2
Off-Shore Wind Experience level
In 2008 the Province of Rimini started a monitoring project of the anemometric conditions for collecting data in order to assess the energy potential of the OFW in the Adriatic Sea
In 2008 the Province of Rimini started a monitoring project of the anemometric conditions for collecting data in order to assess the energy potential of the OFW in the Adriatic Sea
OFF-SHORE OFF-SHORE ITALIAN potential ITALIAN potential
sitessites
Ufficio Energia - Servizio Progetti di area vasta e mobilità di sistema 3
Off-Shore Wind Experience levelThe Province of Rimini has set up a cooperation with
ENI (Hydrocarbon National Body) placing the anemometers and supporting computer technologies on the off-shore ENI Azalea B platform.
The Province of Rimini has set up a cooperation with ENI (Hydrocarbon National Body) placing the anemometers and supporting computer technologies on the off-shore ENI Azalea B platform.Since 14/01/2011 “Energia 2020 s.r.l.” Company has cooperated with the Province of Rimini for the assignment to the Province of wind monitoring electronics equipment (LIDAR Zephir 300) in free- use commodatum.
Since 14/01/2011 “Energia 2020 s.r.l.” Company has cooperated with the Province of Rimini for the assignment to the Province of wind monitoring electronics equipment (LIDAR Zephir 300) in free- use commodatum.The initial steps of the project are:
• Wind average speed measurement at different heights; • Distribution of the wind rose at different heights; • Analysis of turbulences of the vertical profile.
The initial steps of the project are: • Wind average speed measurement at different heights; • Distribution of the wind rose at different heights; • Analysis of turbulences of the vertical profile.
The aim is to survey the opportunity of realising a Off-Shore Wind farm in the area facing the Rimini coast.
The aim is to survey the opportunity of realising a Off-Shore Wind farm in the area facing the Rimini coast.
Ufficio Energia - Servizio Progetti di area vasta e mobilità di sistema 4
Off-Shore Wind Experience level
Azalea Platform
To be placed in Summer 2012
Operating