Asphalt Quality Assurance Program
& Construction Inspection
2015 Asphalt Regional Seminars
Rob Crandol, P.E.
VDOT – Materials Division
Assistant State Materials Engineer
Trenton Clark, P.E.
Virginia Asphalt Association
Director of Engineering
![Page 2: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/2.jpg)
![Page 3: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/3.jpg)
3
QUALITY ASSURANCE
QUALITY CONTROL (QC)
and ACCEPTANCE
INDEPENDENT ASSURANCE (IA)
VERIFICATION SAMPLING AND TESTING (VST)
![Page 4: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/4.jpg)
Are these Actually Different?
QA or Quality Assurance is the overall program required by the owner.
1. QC or Quality Control is the processes*/procedures used by the contractor.
* These processes are beyond the minimum requirements of acceptance testing - such as additional sampling
Acceptance is the procedure for which a product is measured for adherence to specification such as mat density. In Virginia, this procedure is performed by the contractor for asphalt
![Page 5: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/5.jpg)
Are these Actually Different?
2. Independent Assurance is a procedure/process used by the owner.
The purpose is to ensure the people, equipment, and procedures used by the Contractor are compliant to specification
3. Verification, Sampling and Testing is a procedure / process used by the owner.
The purpose is to check the acceptance decision by the Contractor such as verification cores
![Page 6: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/6.jpg)
VDOT Uses System & Project Approach to QA
System Approach at the Plant (Contractor)
• Certified technicians
• QC on mixes during production
• Sampling for acceptance on AC Content and Gradation; Pass/Fail on Volumetrics
• All mixes going to VDOT projects tested, but not specific to a project
• Test data entered into PLAID
![Page 7: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/7.jpg)
VDOT Uses System & Project Approach to QA
System Approach at the Plant (VDOT)• Certified technicians
• Mix samples collected for statistical comparisons on AC Content and Gradation
• Mix samples collected with contractor acceptance samples for IA (matched samples)
• VDOT samples compared to other contractor acceptance samples for VST (unmatched samples)
• VDOT volumetric samples collected for Pass/Fail only and compared to contractor results
![Page 8: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/8.jpg)
Asphalt Plant Quality Control
![Page 9: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/9.jpg)
![Page 10: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/10.jpg)
10
![Page 11: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/11.jpg)
11
![Page 12: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/12.jpg)
VDOT Uses System & Project Approach to QA
Project Approach in the Field (Contractor)
• Asphalt Field Level 2 Technician
• Certified density technicians
• Establish roller pattern and control strip
• QC on density during compaction of Lots
• Acceptance on Lot mat density
• Monitoring of longitudinal joint density
• All data recorded on TL forms and provided to VDOT
![Page 13: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/13.jpg)
VDOT Uses System & Project Approach to QA
Project Approach in the Field (VDOT)• Asphalt Field Level 2 technicians
• Monitor construction of roller pattern
• Monitor compacting, nuclear density testing, coring/plug and calculation of average control strip density
• Randomly tests cores from control strip (IA)
• Provides random numbers to contractor
• Monitors nuclear density testing in Lot
• Identifies and retrieves cores for VDOT acceptance testing (VST)
![Page 14: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/14.jpg)
![Page 15: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/15.jpg)
![Page 16: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/16.jpg)
VDOT Project Staff Responsibilities IA
• Verifies paving equipment meets specifications
• Verifies materials being used are from approved sources
• Take temperature measurements of AC at least every hour
• Verifies that contractor personnel are performing QC operations correctly
• Verifies density testing being performed• Joint Density
16
![Page 17: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/17.jpg)
![Page 18: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/18.jpg)
VDOT/Materials VST and IA
• Perform VST testing on plugs
• IA testing• Verify method of random selection• Marking of test locations• Observe QC testing at control strip• Observe test sections.• Obtain samples of cores from control strip to reweigh in
laboratory.
• Depth Control tests
18
![Page 19: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/19.jpg)
19
So where does construction inspection
fit into VDOT’s QA Program ?
QUALITY ASSURANCE
QUALITY CONTROL (QC)
and ACCEPTANCE
INDEPENDENT ASSURANCE (IA) VERIFICATION
SAMPLING AND TESTING (VST)
![Page 20: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/20.jpg)
20
Construction Inspection
VDOT Representatives (consultant or VDOT employee) provides the construction oversight & inspection
Representatives must be familiar with the VDOT Road and Bridge Specifications as well as Special Provisions that are found in the contract.
![Page 21: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/21.jpg)
Document HierarchySection 105.12
21
Standard Drawings
Standard Specifications
Supplemental Specifications Plans Special
Provisions
Special Provisions
Copied Notes
General notes and other written information not in a SP or SPCN in No Plan and Minimum Plan Concept contracts carry the same weight as plans
![Page 22: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/22.jpg)
Key Inspection Points
Prior to Density AcceptanceSite preparation
Milling
Tacking
Equipment
Placement
Compaction
Density AcceptanceGeneral requirements
Small quantity applications
VTM-76
QC test sections
Independent assurance
Verification testing and sampling
Referee procedure
22
![Page 23: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/23.jpg)
Site Preparation
Areas of particular concern/focus:
• Repairing failed areas• Cleaning the surface• Tack-achieve bonding of layers
23
![Page 24: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/24.jpg)
Site Preparation – Failed areas
Not addressing failed areas leads to premature failure of our overlays & resurfacing
Approaches to correct failures can include:• Milling
• Patching prior to the contract for resurfacing
• Specify patching type, material and locations in the contract• Use Special Provision (SP) for Surface Preparation and
Restoration Prior to Plant Mix Overlay (Volume 2)
24
![Page 25: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/25.jpg)
Milling
Why mill a road?• Remove material distress• Maintain surface elevation• Improve cross-section
What things must be inspected?• Presence of scabbing• Positive drainage• Cleanliness• Performance milling• Time frames• Run-on conditions
25
![Page 26: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/26.jpg)
What Happens with No Bonding
![Page 27: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/27.jpg)
½” Deflection,60# Load
¼” Deflection, 160# Load
Fully BondedUnbonded
Bonded Demonstration
![Page 28: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/28.jpg)
Cores Showing Debonding
Bonding Failures
![Page 29: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/29.jpg)
Days later!
Courtesy of Road Science
![Page 30: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/30.jpg)
Tacking – Proper Mainline
30
![Page 31: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/31.jpg)
Tacking – Mainline and Joints
What two categories of tack coat materials are approved by VDOT?
• Conventional Tack – Section 310
• Non-Tracking Tack Coat –Volume 2
31
![Page 32: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/32.jpg)
Tacking – Mainline and Joints
What is the specified application rate for conventional tack on mainline? Where is it found?• 0.05 – 0.10 gal/sy for undiluted
Section 310.03
What is the specified application rate for non-tracking tack coat on mainline?• Rate recommended by the manufacturer
32
![Page 33: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/33.jpg)
Tacking – Longitudinal Joints
Proper application to result in joint density
Width of application for first paving pass?• 2 feet – 18 to 20 inches under first pass, 4 to 6
inches protruding beyond first pass
• For second pass, vertical face of first pass and approximately 1 foot into lane to be paved
33
![Page 34: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/34.jpg)
Equipment
Material Transfer Vehicle • Required for interstate surface paving in 2015• Required for SMA and other specialty mixes• Minimum 15 ton combined capacity between
device and paver paver hopper
34
![Page 35: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/35.jpg)
Placement
Temperatures
Base• WMA: 40F minimum• HMA: 40F for “A” mixes and less 25% RAP; 50F for “A” mixes
and 25% or more RAP, “D” and “E”
Mix• Maximum is 350F or specified by liquid supplier• New for 2015: WMA minimum is 200F
35
![Page 36: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/36.jpg)
Placement
36
Paver Items
Longitudinal joints must be offset 6” from underlying joint
Surface longitudinal joint must be 6” – 12” from centerline marking; 6” offset from between lane markings
Continuous line for steering the paver
Grade control with ski, joint shoe
![Page 37: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/37.jpg)
Density (Compaction)
CRITICAL to pavement durability & performance !
No significant changes to procedures from 2014
SMA changes:
Allow more than 3 vibratory passes, caution not to crush the stone
37
![Page 38: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/38.jpg)
Roller pattern
1
2
3
50 FEET
75 FEET
MARK TEST LOCATIONS
ORIENT GAUGE IN SAME DIRECTION
![Page 39: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/39.jpg)
Thin Lift Roller Pattern Graph TL-57
2 3 4 5 6 7 8
143
142
141
140
139
138
137
136
135
Densitylbs/ft3
Roller Passes
Maximum Density = 142.5 lb/ft3
Roller Pattern = 5 passes
3 Vibratory
2 Static
![Page 40: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/40.jpg)
Control Strip Construction
40
Establishes an average nuclear density reading (10 locations)
Verifies nuclear density reading using asphalt cores
Determines the Target Density Value for subsequent acceptance testing
![Page 41: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/41.jpg)
41
When do you have to construct a Control Strip?
VDOT specifications require that one control strip be
constructed at the beginning of work on each roadway and
shoulder course and on each lift of each course.
Control Strip Construction
![Page 42: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/42.jpg)
Locations of nuclear readings are marked by contractor.
![Page 43: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/43.jpg)
Core locations are marked for cutting.
![Page 44: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/44.jpg)
![Page 45: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/45.jpg)
![Page 46: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/46.jpg)
46
Verification of Target Density
Mix Type Min.Control Strip Density%
SM-9.5A, SM-12.5A 92.5
SM-9.5D SM-12.5D 92.2
SM-9.5E, SM-12.5E 92.2
IM-19.0A, IM-19.0D, IM-19.0E 92.2
BM-25.0A, BM-25.0D 92.2
Table III-3
![Page 47: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/47.jpg)
47
Control Strip Construction
An additional control strip is required when:
- There is a change in type or source of materials.
- There is a significant change in the composition of the material being placed from the same source.
- There is a control strip failure (consecutive failures?)
Construction must cease if new control strip is required
![Page 48: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/48.jpg)
48
Test Sections
Table III-4Payment Schedule for Lot Densities
% of Target Control Strip Density Percent of Payment
Greater than 102.0% 95
98.0 to 102% 100
97.0 to less than 98.0% 95
96.0 to less than 97.0 90
Less than 96.0% 75
![Page 49: 1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State](https://reader035.vdocument.in/reader035/viewer/2022062313/56649d355503460f94a0c6ef/html5/thumbnails/49.jpg)
SM-4.75 is Slightly Different
Mix monitored at plant through permeability testing as well as standard tests
In the field:
Roller pattern established (same as other dense graded mixes)
Control strip constructed
• BUT NO CORES
• Average nuclear density from 10 readings is target
Lot testing and payment follows Table III-4