BU-18 Slickline PVT Sampling
Operation Design
Prepared by:
Reviewed by:
Reviewed by:
Reviewed by:
Approved by:
Well-tech of China Oilfield Services Limited
Nov 232013
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
2/18
Contents
1 Basic Data ................................................................................................................................ 1
1.1 Basic data of well drilling and completion ........................................................................... 11.2 Perforation data sheet ........................................................................................................... 12 The Purpose and work scope for well test ............................................................................... 13 Construction geological conditions ......................................................................................... 14 Operation program and time limit ........................................................................................... 15 Job preparation ........................................................................................................................ 15.1 Operator and service content ................................................................................................ 15.2 Job preparation ..................................................................................................................... 25.3 Onsite preparation ................................................................................................................ 26 Operation interface .................................................................................................................. 27 Operation steps ........................................................................................................................ 37.1 Fix the wellhead ................................................................................................................... 37.2 Wiper trip .............................................................................................................................. 37.3 RIH the PDS sampler ........................................................................................................... 47.4 Pull the PDS sampler and measure flowing pressure gradient ............................................. 4
7.5 Sample transferring6
8 Notice ...................................................................................................................................... 69 Safety measures ....................................................................................................................... 59.1 Safety requirements of slick line operation .......................................................................... 59.2 Safety measures in exceptional circumstances ..................................................................... 69.3 Emergency measures of hydrocarbon releasing ................................................................... 79.4 Potential risk and methods ................................................................................................... 710 Appendix ............................................................................................................................... 8Appendix1: Device listing .......................................................................................................... 8Appendix2: Wiper trip tool string .............................................................................................. 8Appendix3: PVT sampling tool string ........................................................................................ 9Appendix4: Production pipe schematic .................................................................................... 10Appendix5: BU-18 well test JSA ............................................................................................. 10
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
3/18
BU-18 Slickline PVT Sampling Operation Design
Page 1 of 17
1 Basic Data
1.1Basic data of well drilling and completion(1) Well No.:BU-18
(2) Well type: natural flow oil well
(3) Test interval: 3830m
(4) Target formation: Mishrif
(5) Current producing horizon: Mishrif reservoir
(6) Completion: case hole perforated completion
(7) Inclination data: the well is vertical well
1.2Perforation data sheetWell No. Perforation depth (m) Unit Reservoir
BU-18 3825-3833 MB21 Mishrif
2 The Purpose and work scope for PVT sampling
1) Run the PDS sampler down into nearly the mid-depth of Mishrif reservoir when the oil wellproduce normally, take two PVT sample of reservoir fluid.
2) Take the flowing pressure gradient.
3 Construction geological conditions
AppendixReservoir Design of Well BU-18
4 Operation program and time limit
NO. working programplan time
h
Time
h
Total time
h
1 Wiper trip 3
2 RIH the PDS sampler 3
3Pull the PDS sampler and measure flowingpressure gradient
3
5 Job preparation
5.1 Operator and service content
1) One job supervisor :control the onsite job
2) Each one person for crane and rigger of Well-tech: provide crane operation service. Four slick line
operators of well-tech, one windlass, and one tool case: provide slick line job service.
3) person of Well-tech slick line department, 1 slick line winch, 1 tool box, 2 Pressure gauge, provide
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
4/18
BU-18 Slickline PVT Sampling Operation Design
Page 2 of 17
slick line service.( Appendix 1Device listing )
5.2 Job preparation
1) Edit, verify and confirm the job design.
2) Job mobilization according the job time demand,Do this operation mobilization.
3) Slick line equipment preparation of well-tech.
Take all the equipments and accessories relate with slick line job for BU-18 well.
Check slick line windlass carefully, and test it, the depth reading of slick line should beaccurate.
4) All the down hole tools and surface equipments should be checked by job supervisor before go tothe onsite, detailing content as follows:
The qualification of equipment.
The certification of proof before job.
All the pressure and functional tests of the equipments should check-out and be recorded.
All the measuring instruments should check-out.
Pressure testing for the lubricator is 3000psi/10min.
Call all related responsible official together to introduce the detailing of the job design.
5.3 Onsite preparation
1) Check the situation and number of all tools and equipments reached the well-site.
2) Hold a meeting to study the safety regulation and operation procedure and let all the people knowthe procedure, emergency program and escape line.
3) Make sure the responsible of every position when there is emergency situation.
4) The job responsible official need communicate with the chief of well-site for the fixing and layingof equipment.
6 Operation interface
1) The supervisor is responsible for the coordination and management during the job, make sure theworking go smoothly.
2) The slick line team of well-tech is responsible for the pressure test, combine and optimize toolstring to satisfy meet the job goal.
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
5/18
BU-18 Slickline PVT Sampling Operation Design
Page 3 of 17
7 Operation steps
7.1 Fix the wellhead
1) Company man gives the order to all the contractors and organizes the conducting.
2) After the approval of the onsite director, under the guiding of the oilfield production supervisor orattendant, Make sure the swab valve of X-tree is closing, Keep the main valve and production wingvalve opening, then hang the sign of slick line.
3) Close pressure gauges needle valve to take off the pressure gauge,and then leak off the pressurebetween swab valve and x-tree head.
4) Position the slick line equipments; Make up BOP and lubricator, and do the functional testing of
BOP at 3000psi, keeping it stable for 10 minutes. The length of lubricator should long enough tomeet the job situation.
7.2Wiper trip
1) Inform job supervisor all the slick line things have prepared, it needs the surface safe valve positionat open situation, the main valve position kept at open situation, production wing valve position
kept at open situation, the well reach at working situation.
2) Connect suitable size(58 mm)of gauge cutter, check zero of depth at surface ground.
3) Open the swab valve 1 to 2 circles slowly, the down hole pressure go into lubricator grandly andobserve it for 10 minutes, and check if there is leaking from wellhead and lubricator. If the leakingis happen, close swab valve immediately, blow down the pressure and processing it; otherwise
continue open it totally, record the turn number, observing it for 10 minutes.
4) Slick line tools should down hole slowly and smoothly, after wiper trip to about 3850m, take outslick tools, wiper hole job needs:
Assemble tool string simulate well test. (Appendix 2Wiper trip tool string)
Up and down tool string test every 500 meters.
Notice the down speed and record it.
The maximum up and speed shall not faster than 80 m/min. if pull weight is abnormal, stopwinch immediately and analyze the reason.
5) Take out wiper tools to lubricator and confirm it, then close swab valve, leak the pressure in thelubricator, take off lubricator, disconnect wiper tool string.
6) If we select normal sequence from big to small gauge cutter(70 mm , 65 mm ) to wiper trip,operating procedures as the same; if successful, report to the supervisor, continue the next step work,if fail, communicate with supervisor and talk about resolve method.
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
6/18
BU-18 Slickline PVT Sampling Operation Design
Page 4 of 17
7.3 RIH the PDS sampler
1) Change the oil choke to 24/64 24hours before the job start, and keep the fluid production stableuntil the job finish.
2) Prepare two PDS sampler;
3) Assemble PDS sampling tools string (Appendix 3: RIH the PDS sampling tool string);
4) Open the swab valve 1 to 2 circles slowly, the down hole pressure go into lubricator grandly andobserve it for 10 minutes, and check if there is leaking from wellhead and lubricator. If the leakingis happen, close swab valve immediately, blow down the pressure and processing it; otherwise
continue open it totally, record the turn number, observing it for 10 minutes.
5) Slick line tools should down hole slowly and smoothly, the maximum up and speed shall not fasterthan 60 m/min;
6) Up and down tool string test every 500 meters, record the weight detailed;
7) When tool strings reach to 3830m, move up and down PDS sampling tool strings for three times,then wait to the PDS sampler to take sample. Leave it inside the well for at least one hour after theset clock time is over;
7.4 Pull the PDS sampler and measure flowing pressure gradient
1) Pull the tool strings up and stop at 3830m, 3780m, 3730m, 3500m, 3000m, 2500m, 2000m,2000m, 1500m, 1000m, 500m for 5 minutes to measure flowing pressure ;
NO. Stop depth Stop time Point interval
1 3830m 5min 10s
2 3780m 5min 10s
3 3730m 5min 10s4 3500m 5min 10s5 3000m 5min 10s
6 2500m 5min 10s
7 2000m 5min 10s
8 1500m 5min 10s
9 1000m 5min 10s10 500m 5min 10s
11 0m 5min 10s
2) Pull the strings out of hole;
8 Notice
1) It needs to check if the pipe string depth has something wrong to make sure the operation successratio.
2) In case the leaking of main valve and surface safety valve to avoid the failing of lubricator systempressure testing, operator should check carefully, maintenance and make necessary exchangingfor sealing before fixing lubricator system.
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
7/18
BU-18 Slickline PVT Sampling Operation Design
Page 5 of 17
3) It should know clearly blow down procedure before blow down every time.
4) Someone should on duty on well-site to check the wellhead all day during slick line job.
5) It should have warning belt around slick line equipments.
6) Forbidden hoisting goods above slick line area during working period.
9 Safety measures
9.1 Safety requirements of slick line operation
1) The linking of the above tools and operation must under the present direction of team header.
2) Slick line winch and other devices should be holding well, layout reasonably, and operate easily andsafety.
3) The lubricator must have pressure gauge and relief valve, the length of lubricator should be greaterthan the length of tool string.
4) Strictly control the slick line actual tension is not exceeding the limitation range.
5) After X-tree operation, open swab valve and master valve, it should be list slick line operationand other words.
6) When connecting slick line tools and pulling out or exchanging device every time, before running
in, the place of threaded connection should be fastened again.
7) During operation processing, if blocking is happen, it should up and down tools slowly, dontrunning in being forced.
8) If doing many times slick line job continuously, cutting off a short part of slick line and makingrope socket again to keep the device in a good working condition.
9) If do slick line fishing job, the running tools should be considerate it can be released.
10) All the running tools must be measured length, outside diameter, internal diameter before runningin.
11) When cutting off slick line on the ground, it should hold slick line with two hands to prevent slickline head from jumping up to hurt yourself and others.
12) The end portion of slick line unit must be firmly fixed.
13) During slick line job, irrelevant personnel should stay away wellhead, operator also pay attention tothe wellhead safety. If found abnormal circumstances, operator should immediately stop slick line
job and deal with it.
14) The lubricator and winch should fixing reliable, binding tightly and holding well by iron link orslick line; if blocking is happen, after the approval of supervisor and the direction of first party,
processing it by taking short distance moving, and taking relevant measurements to avoid hurting
incident because of slick line snapping.
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
8/18
BU-18 Slickline PVT Sampling Operation Design
Page 6 of 17
15) If there is overlapping job, safety measures and techniques must be in place. It should takefeasibility analysis at first to confirm the scientific and feasible before carry out.
16) We must know enough about the condition of well. it should know the pipe string, well deviation, minimum inside diameter and so on.
17) Set the implementation procedures according to first partys construction requirements. Beforeoperation, holding safety meeting to make operator know the risk in every operations.
18) Make full analysis for potential problems of operation equipment, tools, material. It should knowservice condition of semi-fragile component and the number of accessory.
9.2 Safety measures in exceptional circumstances
1) When there is slick line tools down hole emergency, it should report to field supervisor, oilfielddirector, branch office, Well-tech department at first.
2) Stop operation firstly, analyzing and finding reason right away and determine the type of accident.
3) Making relevant dealing measures according to accident type.
4) If tools couldnt be pulled out, tools could move down but not go up, we should try to change theplace of tools or the condition of stuck point to find opportunities in the process of trying. Dont
pull out by force to avoid entire tool string being stuck.
5) If tools get stuck in down hole, dont go up and down, it should make sure jar if in normal condition.If jar work well, it should consider which is the major way between upward jarring and downward
jarring. In general, upward jarring is the major way, but downward jarring is also important,Velocity is the key.
6) If tools get stuck in down hole, dont go up and down, and the jar cant work. It is very probablytool string get stuck with tubing wall. The reason is tha t the tubing is in the shape of S. The basicapproach is to open or close the well to change the temperature in down hole. Temperaturechanging will cause the changing of tubing shape of tube, which is in favor of unfreezing.
7) If all three or more ways have failed to resolve, it should consider cut off slick line in down hole (atbullhead) purposely for recovering whole slick line. Then run in suitable tools and tool string to
deal with the problem.
8) Operation method: close slick line BOP on ground, release the pressure of lubricator above the BOP,pull up lubricator, assemble cut rod onto the slick line. Connect lubricator well, open BOP, let cutrod sliding down to the top position of bullhead and cut off slick line suddenly.
9) Shear method: After open BOP, slotted bar slide down along slick line, make use of the impactforce to cut off the slick line from rope cap by inclined force which produced from slotted bar and
bullhead. After slick line being cut off, it can recover entire slick line to ground. Reassemble toolstring to do next work.
10) To avoid cutting tool not being in place or not cutting off at the right position, it should have donethe following works well in advance.
Think over all the preparatory work. For example, what about the ability of BOP? Theperformance of BV and related tool, hand pump, pipelines and so on.
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
9/18
BU-18 Slickline PVT Sampling Operation Design
Page 7 of 17
Tools selection: There are several kinds of cutting tools, such as impact bar that play asupporting role. In order to prevent cutting tool get stuck in the middle road, it can use1-1/2cut rod or increase the numbers of impact bar to strengthen the down force. Even use
1-1/2 ,x 3or 5impact bar.
Tighten the slick line when cutting bar slide down, pull to 800 LBS.
In normal circumstances, the slick line will loosing after 20 minutes, which indicate the slickline have been cut off. Otherwise it means the slick line hasnt been cut off. Put into anotherimpact bar to impact cut rod down or increase shear force to cut off slick line from the position
of rope socket.
If specific implementation measures crash with processing method, please shutdown operation,waiting for the order from leaders. Same problem have different phenomena in different well,
solving measures and parameters are not the same too. The above measures and parameters are
reference only, dont apply mechanically, or get the differently results.
9.3 Emergency measures of hydrocarbon releasing
1) The slick line operator should find out the point of hydrocarbon releasingat first time.
2) If processing measures failure, on site supervisor and slick line captain have right to close all thevalves of x-tree.
3) If there is hydrocarbon releasing occur during normal operation processing, all the people inwell-site should stop hot working at once.
4) When there is hydrocarbon release occur during normal operation processing, notice slick linecaptain and site supervisor ; If hydrocarbon release is out of control, it should notice all the workers
to keep in emergency situation on well site by broadcast at once.
5) In operation processing, slick line operator must equip work interphone.
9.4 Potential risk and methods
1) Wellhead X-tree cannot be removed or some accessories damaged and so on. Equipped allremoving tools and special tools, when the accessories damaged or cannot be used, it should
communicate with onsite supervisor to provide appropriate accessories by first party
2) The X-tree flange or valve have leakage, it should communicate with jobsite supervisor to repair itbefore working
3) If wiper trip working cannot go smoothly during operation, slick line operator should make sure thesituation of tubing, there are several methods:
Exchanging smaller gauge ring to wiper trip, exchanged the size by followed, every time 4mmsmaller than last one to confirm, and it cannot exceed than 3 times to watch which time will be
ok. If go through, then go to the goal depth, and go through many times at the last blocking
position, until it can running tool string smoothly, then exchange gauge ring from smaller tobigger to wiper hole, till the designing gauge ring can wiper hole smoothly.
If wiper trip cannot go smoothly, selecting suitable font to confirm the blocking situation towatch if there are tubing distorted, hard objects, sand and so on. If it still cannot be confirmed
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
10/18
BU-18 Slickline PVT Sampling Operation Design
Page 8 of 17
by font, first party should provide coiled tubing or pump car to flush the tubing, and then wiper
hole again to confirm.
4) It is possible there is no marking on the font in mark font job, so that the down hole situation will benot clearly. Method: first party provides coiled tubing to flush the wellbore, and then do impression
tool job. If the font marking is clearly, then do the next job, otherwise communicate with first partysupervisor again or do long time flushing job or fish the down hole crud.
5) During operation processing, in order to avoid possible fire hazard, it should take appropriatemeasures: ensure the performance of the riot, the personnel onsite safety education, not allow to use
non- explosion-proof equipment in safe area, not permitted with a fire source, having appropriate
fire fighting equipments, there are portable fire extinguisher near the X-tree and the equipments.
10 Appendix
Appendix1: Device listing
Appendix2: Wiper trip tool string
Name length in.) OD in. )Rope socket 6.1 1.875
Swivel joint 11.0 1.875
Weight bar 59.8 1.875
Knuckle joint 9.8 1.875
Quick release joint 13.8 1.875
Weight bar 35.8 1.875
Quick release joint 13.8 1.875
Mechanical jar 81.151.2 1.875
Crossover 3.9 1.875
Gauge cutter 8.7 2.28
total 162.7
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
11/18
BU-18 Slickline PVT Sampling Operation Design
Page 9 of 17
Appendix3: PVT sampling tool string
Namelengthin.)
ODin. )
Weightlbs)
Rope socket 6.0 1.875 3.08
Swivel joint 7.0 1.875 6.6
Weight bar 24 1.875 29
Quick release joint 13.8 1.875 8.58
Crossover 3.9 1.875 2.42
PVT 137.8 1.7 25
Crossover 1.9 1.7 0.5
Crossover 3.9 1.875 2.42
Knuckle joint 9.8 1.875 5.5
Quick release joint 13.8 1.875 8.58
Crossover 3.9 1.875 2.42
PVT 137.8 1.7 25
Crossover 1.9 1.7 0.5
Shock absorber 21.0 1.875 13.2
Crossover 3.9 1.5 1.5
Pressure gauge 9.5 1.25 2
Total 399.9 136.3
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
12/18
BU-18 Slickline PVT Sampling Operation Design
Page 10 of 17
Appendix4: Production pipe schematic
Appendix6: BU-18 well test JSA
BU-18 slick line well test JSA
BU-18 JSA Table Complete date
Fauqioil field
The member of JSA team
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
13/18
BU-18 Slickline PVT Sampling Operation Design
Page 11 of 17
Step Job ProcedurePotential
HazardsRisk Control Measures
Resp
onsibl
e
official
Remark
1
Work
environment
and geography
factor
person hurt
and equipment
losing
1. Before working,know nearby society and
culture situation;
2. Be careful the sunny
and high temperature;
3. Prepare first aid box
in case of emergency
accidents;
4. Prepare some
medicine to resist
mosquito and snake ants
etc;5. Know the roads,
6. Equipped with
security protection
equipment and personnel
security.
7.According to thenumber of vehicles with
homework on duty on duty
and prevent of emergency
2
Equipments
hanging on
base
Personnel Hurt
and equipment
damage
1. Check the equipments
carefully according to the
driving requirements;
2. Make sure the cranein the hanging situation;
3.Tell the true weight of
equipment to crane driver;
4.It needs professional
person direct the crane and
forbidden unrelated
persons
Equipment
transporting
Equipment
damage
1.Ready-made the
position and fixing of
equipments with driver;
2. If it is possible, let the
engineer take part in the
transporting to monitor thewhole processing.
Equipment
position onsite
Personnel Hurt
and equipment
damage
1.Related person take
enough protective
inventory;
2. Position the
equipments after them
arrived at the onsite as
soon as possible;
3. Pay attention to the
stability and safety during
hanging;
4. Check the equipment
in time, discover theproblem and deal
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
14/18
BU-18 Slickline PVT Sampling Operation Design
Page 12 of 17
3 Handover well
Handover not
clearly;
operationwrong; person
and well
accidents
1. Confirm the working
status of each valve and
make sure the situation of
the well;2. When transfer wells,
unrelated personnel do not
operate valves without
permission.
4
take off
wellhead
devices
Environment
pollution at
the wellhead;
wellhead
pressure gauge
damage;
Personnel
hurt(Falling,
bruising,
crushing,
pummeling,high
pressure) ;
blowout; sling
breaking
1. Blowout according to
nation or customers
requirements, otherwise
obey rule of operator ;
2. Stop all the hot work,
oil spill should use the
hosepipe to designate
emission;
3. In case of presence ofH2S the release will be
made according to the
procedures given by the
Company and issued on
the operating program.
4. For H2S Wells aInjection Nipple shall be
installed between the
Stuffing Box and the
Lubricator and shall have a
pipe, cock valve and a
flexible to flush the
lubricator with water afterbleeding off the lubricator
pressure. The
hydrocarbons liquid and
water shall be recovered in
the Flow Line and Sump
Tank.
5. In the presence
of H2S, always carry
escape masque during
the job.
A self-breathingapparatus must be used by
the operator for bleeding
off lubricator.
5
surfacepreparation
before BOP
system fixing
person hurt;
packing partsand packing
position of
BOP system
damage
1. Take on enough
protective inventories;2. Checking carefully;
3. Be ready related
packing parts.
fixing BOP
system
Blowout;
device
damage;
person hurt;danger during
tools hanging
1. Forbidden random
operation of wellhead
valve during operation;
hang forbidden label,operate the valves by
slickline operator;
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
15/18
BU-18 Slickline PVT Sampling Operation Design
Page 13 of 17
and wrong
direction; slick
line damage;
deviceaccident
because of
corrosion.
2. It needs professional
person direct the crane, the
crane driver should work
with certification, and thecrane should work v
6Power on the
equipment
Personnel
Hurt; devices
damage
1. Operators should
wear necessary inventory,
including protective glass
and so on;
2.Stay in the safety field
to avoid personnel hurt
because of the elasticity of
the slick line;
3. Before power on the
equipments, check allkinds of fluid level and
pipe
7pressure test
of BOP
system
Personnel hurt
( line break,
crushed by
shaking
booboo,
bruise )
1. Personnel must wear
the qualified protection
supplies, including
protective glasses;
2. Through radio,warning tape for isolation;
3. Special person check
it in a safe location,
prohibit irrelevant
personnel enters a high
pressure area.
BOP
installation
failed
1. Check the ring and
the ring groove;
2. Ensure locate the
BOP correct, on the
balance of the diagonal.
Equipment
damage
( pressure
build)
1.Check the diesel oil,
cooling water before
starting the diesel engine;2. Check the safety
valve set pressure is up to
the standard before starting
the mud pump;
3. Operating the pumpshould be smoothly and
slowing.
8 check slick
line situationperson hurting
1. Take necessary
protective inventories in
case of accidents in
checking processing;
2. Pay attention the
standing position prevent
the damage from elastic
slick line;
3. Drag slick line stable
out of roller when the
windlass in neutralposition.
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
16/18
BU-18 Slickline PVT Sampling Operation Design
Page 14 of 17
make slickline cap
1.The major operator
need pay attention safety
during making slick line
knot;2.Unrelated person not
allow to stay near in case
of damaging;
3. The operator pay
attention to protect the
wellhead.
9
confirm and
prepare for
running down
hole
person
hurting; slick
line and knot
cap damaging;
wellbore junk
1. Operator pay
attention safety;
2. Check the quality of
screw thread, connection
order; make sure the tool
string meet the
requirement.
design tool
string
Mismatch job
design, cannot
finish the job;
do not know
the well
situation andcannot reach
job goal, even
have accident
happen.
1. Understanding the job
requirements which is
based on the design;
2. Know whole working
situation and well history;
3.The final and best
design should beenapproved by onsite
supervisor;
4. All the tools must H2S
resisting in case of
accidence.
10
preparation
and check
person hurting
and tools
damage
1. take on enough andsuitable protective
inventory;
2. Preparation and
checking according to the
slick line wellhead
preparation procedure and
requirement.
wellhead
fixing
person
hurting; slick
line and downhole tools,
BOP system
damaging;
wellbore junk
1. Take on enough andsuitable protective
inventory;
2. Fix wellhead system
according to the slick line
wellhead preparationprocedure and
requirement;
3.Related persons need
pay attention the
coordinate between each
other during fixing, to
avoid the drama
11open x-tree
valves
high pressure,
oil and gas
leakage,
danger caused
by poison gas;
the dangercaused by the
1. Open the valves
according to slick line
processing procedure,
oilfield and related
technique requirements, it
needs two personscooperate each other to
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
17/18
BU-18 Slickline PVT Sampling Operation Design
Page 15 of 17
up rush of
slick line; the
danger caused
by semi-openvalves
operate, and take on
breather if it is necessary;
2. Wellhead valves
operator ensure if thevalves is
close x-tree
valves
valves uptight;accidents
caused by
slick line and
tool string
broken
1. Inform valve operator
after the major slick lineoperator ensures slick line
and tool string inside the
BOP system totally;
2. Wellhead valves
operator ensure if the
valves is opening totally.
12
combine tool
string and
select thegauge ring
cannot finish
job; tools drop
out and lost
down hole;person
hurting
1. Select suitable the
size of tools according to
schematic, check fishingtools carefully, select
suitable gauge ring;
2. When exchange thetool string, tight threading
for tools in case of losing;
3. Worker should take
on quantified protective
inventory
wiper trip
processing
tool string
blocking orsticking,
cannot finish
the job; slickline snap
because of
oversized
pulling power;
person
hurting; close
valve wrong to
cause slickline cut off;
depth wrong,
tools losing;
saver leakage
1. Before working,
know the well situation, becare for wrong depths
interval, sometime it is
necessary to get approve of
supervisor to start the job;
2. Forbidden mark font
two times;
3. When pulling power
greater than normal, reportit to supervisor, co
13Well test
process
Due to thepressure gauge
fault, cause thetest failed; The
necessary data
forget to
record, cause
test results
cannot be
calculated;
Personal
injury;
Shut off
wrong valve,Cut wire;
1.Make carefulexamination to pressure
gauge and relatedequipment before test,
make careful records;
2. Pressure gauge
Engineer check on the data
carefully;
3.Personnel must wear
an approved protective
equipment, enhance
self-protect consciousness;
4.Irrelevant personnel
should be away from thework area; Winding
-
8/12/2019 1- BU-18 PVT Sampling Operation Design2013.11.23
18/18
BU-18 Slickline PVT Sampling Operation Design
Page 16 of 17
Pressure gauge
damage;
operation area with yellow
caution tape in, lock valve,
and hanging operation is
prohibited sign;5.When replace pressure
gauge, be circumspect,
RIH AND POOH speed
should not exceed the rated
speed;
14
rig out
wellhead BOP
system
Blowout;
device
damage;
person hurt;
danger duringtools hanging
and wrong
direction; slickline damage;
device
accident
because of
corrosion.
1. Forbidden random
operation of wellhead
valve during operation;
hang forbidden label,operate the valves by slick
line operator;
2. It needs professionalperson direct the crane, the
crane driver should work
with certification, and the
crane should work
15
recover
wellhead
devices
Environment
pollution at
the wellhead;
Personnel
hurt(Falling,
bruising,
crushing,pummeling,
highpressure) ;
blowout
1. Worker should take
on qualified protective
inventory, operator should
equip with safe-belt whenthe x-tree is high,
forbidden operating with
pressure;
2. The threading shouldin position well by
operator, and smearcompound and twist crude
material
The member of JSA team signature