1 epp2010 050516 international cooperation and coordination: kek introduction of kek how a new hep...

29
1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities Toward ILC EPP 2010 050516 Y. Totsuka

Upload: theresa-tyler

Post on 25-Dec-2015

216 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

1

EPP2010 050516

International Cooperation and Coordination: KEK

Introduction of KEK How a new HEP project is undertaken in

Japan Current HEP priorities Toward ILC

EPP 2010050516Y. Totsuka

Page 2: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

2

EPP2010 050516

Inter-University Research Corporation High Energy Accelerator Research Organization, KEK

Staff (2004) Trustees 7 Researchers 373 Technical staff 161 Administrators 158 Total 699

Budget (2005) 417 (oku-yen) Visitors (2004) 3985 (784 foreigners)

GD Selection CommitteeDirector-General

Accelerator Research Laboratory

Applied Research Laboratory

J-PARC Project Office

Institu

te of P

article an

d N

uclear S

tud

y

Institu

te of M

aterials S

tructu

re Scien

ce

RadiationLow TemperatureComputerEngineering

Management CouncilEducation & Research Council

ILC Project Office

Page 3: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

3

EPP2010 050516

KEKB (8GeVe-x3.5GeVe+)

12GeV PSTerminated in Dec 2005

e+ & e- LINAC

2.5GeV PF

6.5GeV PF-AR

K2K beamlineTerminated

BELLETsukuba Campus:153 ha

Spallation neutron sourceLE muon sourceTerminated in March 2006

ATF (Accelerator Test Facility)

STF

Page 4: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

4

EPP2010 050516

J-PARC jointly with JAERI

LIN

AC

3GeV PS

50 GeV PS

Neutrino beamline

K-arena

Page 5: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

5

EPP2010 050516

How a new HEP project is undertaken in Japan

Japanese HEP community discusses and recommends a few prioritized projects to KEK.

KEK and MEXT (funding agency) discuss budgetary constraints. KEK submits a formal proposal to MEXT by picking up a realistic

one among the projects recommended by the community MEXT asks a standing committee to review and approve it

Sub-committee for Basic Science under Committee for Science and Technology, MEXT

Approval from other committees is necessary, if the project is conducted jointly with other institute J-PARC.

Final approval by CSTP, Cabinet Office (~ OSTP in the US)

Page 6: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

6

EPP2010 050516

CSTP (Committee for Science and Technology Policy): Members

Prime minister, 6 ST-related ministers, 4 full-time science/engineers, and 3 part-time scientists/engineers

CSTP

Page 7: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

7

EPP2010 050516

Mission Policy to promote ST in a general and organized way Policy on budget and personnel for ST To review big projects

According to the 2nd ST 5-year basic plan (2001 – 2005) made by CSTP the government is expected to spend 20.7 Trillion \ (~ 200 B$), though 24 T\ was planned. Fraction of basic researches ~ 40%

CSTP’s 3rd 5-year basic plan (2006 – 2010) is under discussion and will be ready in February 2006.

Large-scale ST proposals are reviewed, considering whether they are consistent with the ST basic plan. ILC would be the case like ITER.

CSTP - 2

Page 8: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

8

EPP2010 050516

MEXT negotiates the budget with Ministry of Finance Examples:

12 GeV PS TRISTAN (e+e- collider) KEKB (e+e- collider) Super-Kamiokande K2K (neutrino beam line) J-PARC (3 and 50 GeV PS, under construction)

T2K (neutrino beam line)

Cont.

Page 9: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

9

EPP2010 050516

1960

1970

1980

1990

2000

2010

Photon factory (2.5 GeV)(1982)

TRISTAN (30GeV e+ 30GeV e -)(1986) (1994)

KEKB (8GeV e- 3.5GeV e+)(1999)

J-PARC50GeV p, 3 GeV p

(2009)

(1999)Electron synchrotron (1.3 GeV)(1961)

Univ. TokyoTanashi Campus

Proton synchrotron (12 GeV)(1976-2005)

Page 10: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

10

EPP2010 050516

KEK’s current priorities for HEP -1 Running the KEKB collider and the BELLE experiment

Up to luminosity of 1000 fb-1 secured by CSTP 430 fb-1 so far Could be achieved in 2008

BELLE is truly international.

Page 11: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

11

EPP2010 050516

-2

Construction and commissioning of J-PARC as scheduled Total construction cost (phase 1) ~ 1500 oku-yen Cost for operation, maintenance and experiments ~ 170 – 200 oku-yen / year, h

alf supported by KEK T2K start in 2009 T2K will be international.

Decay volume of the neutrino beamline Super-Kamiokande

295km

Page 12: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

12

EPP2010 050516

-3

Active participation in ILC GDE and R&D Full use of ATF and STF (superconducting RF test facility under

construction)

ATF

Page 13: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

13

EPP2010 050516

Salaries: ……………………………………….. 72 72 J-PARC construction: ………………………. 83 110 Computers: ……………………………………. 21 21 Operations, R&Ds and others:

Electricity etc.: …………………………………. 53 50 KEKB:

Operation and maintenance: …………….. 18 16 R&D (crab cavities): ………………………. 5 7

LINAC: …………………………………………….. 5 5 BELLE maintenance etc.: ………………………. 7 7 LC R&D

ATF and STF: ...………………………………. 4 5 Japan-US collaboration: ……..…………….. 3 5

PS: ………………………………………………….. 7 7 K2K, etc.: ………………………………………….. 3 1 LHC-ATLAS: ………………………………………. 2 4 J-PARC related: …………………………………..~ 9 12

KEK’s budget for FY05: 417 oku-yen

2004 2005HEP-related main items

Page 14: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

14

EPP2010 050516

Current discussion in Japanese HEP community

ILC (energy-frontier e+e- collider) Highest priority

To be discussed Super-KEKB (luminosity-frontier e+e- collider) Upgrade of J-PARC (4 MW PS) for neutrino physics

Page 15: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

15

EPP2010 050516

Toward ILC

Page 16: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

16

EPP2010 050516

2004 Statement from JHEPC (Japanese HEP Committee)

Upon the ITRP's technology choice, the JHEPC, after leading the discussion in Japanese community as to how Japan should proceed to the new stage of the ILC researches after the decision, confirms as the consensus of the high energy physics community in Japan that scientists and engineers in Japan should cooperate to realize the ILC by actively participating in the activities of the Global Design Initiative (GDI) of the ILC.

The JHEPC therefore urges that more scientists and engineers work on their own initiative in closer cooperation with industry for the ILC and play the leading role in the GDI. The JHEPC also supports KEK's proposal to host the Central Team of the GDI.

Page 17: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

17

EPP2010 050516

LC Forum: Cooperation with industry

Objective Establish international and industrial collaboration scheme, Develop strategic scenario for technological R&D, Assess associated infrastructure and economic effects.

Founded in 2002 Members

JHEPC 63 industrial companies researchers from universities / institutes

3 working groups International collaboration Technology development Associated infrastructure

Page 18: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

18

EPP2010 050516

KEK

KEK

As of 2002

Page 19: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

19

EPP2010 050516

1997, 2001, and 2004 statements from ACFA (Asian committee for future accelerators)

Excerpt from 2004 statement: ACFA reaffirms that the ILC, the next major high-energy physics

project, should be realized by world-wide efforts. In such International collaboration ACFA and scientists in ACFA countries should play crucial and leading roles.

ACFA reconfirms the importance of hosting ILC in Asia, which will make high energy physics and accelerator science truly global.

ACFA urges Japanese Government to fully support the efforts of KEK and Japanese scientists to host the ILC in Japan.

ACFA urges KEK to establish the Asian Regional Center for R&D in GDI and encourages other Asian countries to actively participate in GDI.

With ILC entering this important phase, ACFA urges Governments of Asian countries to support participation of their scientists in GDI.

Page 20: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

20

EPP2010 050516

2004 ICFA statement (excerpt)

ICFA welcomes the January 2004 OECD Ministerial Statement on International Cooperation on Large Accelerator-based Projects in High-Energy Physics, which “acknowledged the importance of ensuring access to large-scale research infrastructure and the importance of the long-term vitality of high-energy physics. They noted the worldwide consensus of the scientific community, which has chosen an electron-positron linear collider as the next accelerator-based facility to complement and expand on the discoveries that are likely to emerge from the Large Hadron Collider currently being built at CERN. They agreed that the planning and implementation of such a large, multi-year project should be carried out on a global basis, and should involve consultations among not just scientists, but also representatives of science funding agencies from interested countries. Accordingly, Ministers endorsed the statement prepared by the OECD Global Science Forum Consultative Group on High-Energy Physics (see Appendix).”

ICFA reaffirms its conviction that the highest priority for a new machine for particle physics is a linear electron-positron collider with an initial energy of 500 GeV, extendible up to about 1 TeV, with a significant period of concurrent running with the LHC.

Page 21: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

21

EPP2010 050516

Following the statements from JHEPC, ACFA and ICFA, KEK will actively participate in GDE design work and R&D to realize ILC, and strengthen joint work among Asian institutes.

KEK signed for GDE-MOU. Asian MOU for R&D efforts toward the Realization of the ILC is under discussion.

Page 22: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

22

EPP2010 050516

QD31T

ML5TBPM.2

BH1R

BH1R.36BH1R.19

BH1R.18

BPM.1

ZV51RZH48RBPM.48

BPM.49

QF1R.14 ZV24R ZH23R

QF2R.14 QF2R

QF1R.28

QF31T

ZH30T

ZV30T

Beam Dump

MW1XMW1X

MW2XMW3X

MW4X

  ATF  Damping Ring

Electoron Linac

BT( Beam Transport Line )

Extraction Line

SR Monitor

RF Cavity

Wiggler

Injection Kicker

Seputum Magnets

Extraction KickerWiggler

East Arc

North Straight

South Straight

West Arc

Wire scanner

KEK R&D effort - 1; ATF

  To produce the electron beams with the quality required for ILC

1.28 GeV

Page 23: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

23

EPP2010 050516

to demonstrate the beam focusing technologies that are consistent with ILC requirements to focus the beam down to a few tens of nm (rms) with a beam centroid stability within a few nm for a prolonged period of time AFT2-MOU is under discussion internationally

Page 24: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

24

EPP2010 050516

KEK R&D effort - 2; STF (Superconducting RF Test Facility)

Page 25: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

25

EPP2010 050516

; 35MV/m

; 45MV/m

Page 26: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

26

EPP2010 050516

Conclusion

KEK is the central institute for HEP in Japan currently running the KEKB collider and the BELLE experiment. (The T2K n

eutrino experiment is over.) building 3 and 50 GeV proton accelerators, J-PARC, jointly with JAERI.

The T2K neutrino experiment will start in 2009. KEK will further promote international cooperation.

will strengthen ties with Asian institutes. actively participate in the world-wide endeavor of the ILC project, following

the statements given by JHEPC, ACFA and ICFA.

Page 27: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

27

EPP2010 050516

Both LHC and ILC are necessary

Page 28: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

28

EPP2010 050516

Rea

ctio

n E

ner

gy  

Year

p-p(bar) collider   e+e- collider

Tevatron(2TeV)

2000198019601940

LHC (14TeV)

4.5TeV

43GeV

140GeV

12GeV

50MeV

 

0.5MeV

2.9GeV

450GeV

14TeV

LEP (120 200GeV)

TRISTAN(JPN)PETRA/PEP

SPEAR

KEK PS

SppS(540GeV) ILC

(500 1000GeV)

1.4TeV

Reaction energy = 2E* - 2mp, e

AGS KEKB/PEP2

Page 29: 1 EPP2010 050516 International Cooperation and Coordination: KEK Introduction of KEK How a new HEP project is undertaken in Japan Current HEP priorities

29

EPP2010 050516

SPEAR KEKB/PEP2

Rea

ctri

on

En

erg

y 

 

Year

p-p(bar) collider   e+e- collider

Tevatron(2TeV)

2000198019601940

LHC (14TeV)

4.5TeV

43GeV

140GeV

12GeV

50MeV

 

0.5MeV

2.9GeV

450GeV

14TeV

LEP (120 200GeV)

TRISTAN(JPN)PETRA/PEP

ILC (500 1000GeV)

KEK PS

SppS(540GeV)

1.4TeV

Reaction energy = 2E* - 2mp, e

7L

i+p

2

m

eso

n p

rod

anti

pro

ton

Exc

ite

d s

tate

s

2 n

eu

trin

os

Dee

p i

ne

last

ic(e

xist

of

qu

arks

)

Tau

lep

ton

Neu

trin

o o

sc

Tau neutrino

Glu

on

s

Ch

arm

qu

ark

Hig

gs

S

US

Y・・・・

CP

vio

lati

on

W,

Z

Bo

tto

m q

uar

k

Sta

nd

M.

Top quark