1- introduction 2- company licenses 3- organizational … · 2020-02-17 · 1- introduction. 2-...

63

Upload: others

Post on 10-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list
Page 2: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL CHART

4- LIST OF STAFF 5- LIST OF TOOLS

6- LIST OF PROJECTS

7- CONSULTANT AND CONTRACTOR

APPROVAL 8- COMPLETION CERTIFICATE

9- MAJOR PROJECTS

Page 3: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

INTRODUCTION of the leading Electrical Contracting and General Maintenance Companies operating in Abu Dhabi.

We are pleased to introduce OHM ELECTROMECHANICAL CONTRACTING as an establishment serving since 2014 in the field of Electrical Works (Low Voltage and High Voltage).

We are working with most of the Major Establishments in the country including Government Departments, Directorate of Military Works, WRM, Abu Dhabi Falcon Hospital, Abu Dhabi Judicial Department, Ministry of Interior, ADWEA, ADNOC, and ADMA & Etisalat.

o Design, Supply, Install, Testing & Commissioning of LV & HV Cables.

o Faults Locating and Repairing LV & HV Underground Cables.

o Design, Supply, Install, Testing & Commissioning of HV & LV Panels.

o Design, Supply, Install, Testing & Commissioning of Package Substations,

Transformers, RMUs (TRM, QRM) & Feeder Pillars etc.…

o Design, Supply, Install, Testing & Commissioning of Bus bar Risers.

o Design, Supply, Install, Testing & Commissioning of Street Lighting (Light Poles, Flood

Lights, etc.…).

o Supply, Install, Testing & Commissioning of Energy Meters.

o Design, Supply, Install, Testing & Commissioning of Switch Gears of all kinds of

buildings (i.e. Commercial, industrial, Sports Building etc...).

o Design, Supply, Install, Testing & Commissioning of Standby Generators.

o Supply, Install, Testing & Commissioning of ATS Panels.

o Design, Supply, Install, Testing & Commissioning of Fire Alarm Systems (Conventional

& Addressable)

o Design, Supply, Install, Testing & Commissioning of MATV / Satellite TV System.

o Design, Supply, Install, Testing & Commissioning of Audio / Video Intercom Systems.

o Design, Supply, Install, Testing & Commissioning of Public Address System (P.A.S.).

o Design, Supply, Install, Testing & Commissioning of Closed Circuit TV System

(C.C.T.V.S.).

o Designing of Electrical & Telephone Shop Drawings.

o Designing of Telephone Wiring Diagrams.

o Power, Control and Fiber Optic Cable Laying and Termination.

Page 4: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

We wish to register our Company as one of your approved contractors and for this purpose please find attached some of our works. Company Management

OHM ELECTROMECHANICAL CONTRACTING is gradually growing company with

annual turnover crossing 3 Million since last three years. The team comprises 30 personals including:

o Managerial staff o Engineers o Drafting and Administration Staff o Accountant o Forman’s and Electricians

o Outstanding reputation. o Ambitious management and its design and engineering experts. o High Quality Workmanship and site equipment. o Large Inventory and warehousing facilities. o Strong financial base. o Commitment to quality.

Working relationship OHM ELECTROMECHANICAL CONTRACTING has very fine business relations with

many trading companies of well repute such as…….

DORMAN SMITH U.A.E Power Distribution, Switchgear and Switchboard apparatus manufacturing.

OMAN CABLES U.A.E Medium voltage power cables, Low voltage power & Control cables,

Instrumentation cables, Pilot cables, Overhead power transmission line conductors and Building wires

ABU DHABI Cables U.A.E

Low voltage power & Control cables, Instrumentation cables, Pilot cables, Overhead power transmission line conductors and Building wires

EMICON U.A.E Close control Unit (CCU) also commonly known as computer Room Air

Conditioner (CRAC) or Precision Air Conditioner (PAC) use for precise control of Temperature along with Humidity in Server room, Datacenter, Laboratory and various Industrial applications.

Page 5: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

O GENERAL U.A.E Air conditioners, condenser coils, chillers & heat exchangers AL HAMAD U.A.E

Manufactures and supplies advanced Switch gear system including AHII fully type tested solutions, customs switchboards and ABB type designs for the utility, industrial, commercial and residential sectors. OSRAM GERMANY Manufactures and markets a wide range of lighting products for homes, and Business.

ELSEWEDY CABLE UAE Medium voltage power cables, Low voltage power & Control cables, Instrumentation cables, Pilot cables, Overhead power transmission line Conductors and Building wires FURSE Earthing & Lightning Protection, SCHNIEDER ELECTRIC UK Automation & Control, Electrical Distribution, Installation System & Control, Low Voltage Switchgear Products, Low Voltage Metering Panels, Low Voltage Fuse Distribution Box. ELECTRICAL CURRENT U.A.E Low Voltage Switchgear Products, Low Voltage Metering Panels, Low Voltage Fuse Distribution Box, Power Transformer, Distribution Transformer... Electric current meter, electric current resistance, electrical current transformer, electric current used, motor electric, cooker electric, electric Less.

Page 6: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Company Structure

:

Design, Supply, Install, testing, commission and maintenance for Packages substation, HV panels - RMU –Transformers- LV panels- cables – OHL up to 33KV.

• HV and LV cables laying. • Design, Supply, Install, testing, commission and maintenance for HV and

switchgear up to 33KV. • Design, Supply, Install, testing, commission and maintenance for LV internal

electrical works- Telephone system- TV system- Security system. • Design, Supply, Install, testing, commission and maintenance for Infrastructure

works (new/ shifting). Power, Control and Fiber Optic Cable Laying and Termination.

o Supply and Installation all type of AC/DC Distribution Panels. o Installation of Package Substations, Transformers, RMUs (TRM, QRM)

& Feeder Pillars etc. o Supply and installation of ATS Panels o Electrical and Mechanical Maintenance yearly contract basis o Electrification of all types of Domestic and Commercial Buildings. o Bus bar System and Bus Bar Riser. o Installation and Repairing / Maintenance of all type of control Panels. o Motor Control and Rewinding. o Street Lighting. o Central Air-condition installation and Maintenance work at yearly contract

basis. o Installation, Testing and Commissioning of Genset of different Ratings

complete with Control System, Power System, Fuel System and Protection Scheme.

o Maintenance, Repairing of Power Generators and their control system on yearly contract bases and look after Generator for smooth and trouble free Running

OHM ELECTROMECHANICAL CONTRACTING for Electrical Contracting

Establishment is dealing with the following trading companies of well repute such as….. o Dorman Smith U.K o Oman Cables Oman o Abu Dhabi Cables U.A.E o EMICON U.K o O General U.A.E

Page 7: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

o Al Hamad U.A.E o Skyway U.A.E o Osram Germany o Sartra Electromechanical U.K

OHM ELECTROMECHANICAL CONTRACTING has a very efficient sales staff, and it

supplies to all type Of Government Departments, Semi Government Departments and private Sector. OHM ELECTROMECHANICAL CONTRACTING is registered Electrical contractor and supplier for ADDC, AADC, ADNOC, ADCE, ADP, FEWA, DEWA, CMW, ADPOLICE, MUSANADA, WRM and ADWEA.

In order to optimize the efficiency and to prolong the life of building services Installations, OHM ELECTROMECHANICAL CONTRACTING has established a dedicated maintenance division which caters to the Maintenance of Electrical, Mechanical and Plumbing works that have been completed and successfully handed over to the Client.

The Maintenance Division is committed to quality work and rapid response service.

Operating with fully equipped service vans and qualified teams of technicians, the division is Capable of supplying and installing, all replacement parts as necessary. Maintenance team is also supported by a workshop which is Capable of Repairing and rewinding motors, repairing Air Handling Units, Fan coil Units, Replacing Coils, Compressors and components of electrical panels and switchgear.

OHM ELECTROMECHANICAL CONTRACTING in-house Design and technical office,

reviews and verifies the building services design and furnish the actual requirements of the project as per contract specifications, drawings and budget. We ensure that the specification and schedule of work for each project is Feasible to construct as per the local Authority regulations and standards. We also ensure compliance with the standards of highly recognized electromechanical Institutions and more importantly coordinate the MEP services with the buildings Structural elements, architectural and interior design. Thus shop drawings are produced and forwarded to the construction team who In turn execute the installations accordingly. As built drawings are then produced and handed over to the client along with Comprehensive operations and maintenance manuals covering all the equipment, all the Stages are developed, prepared, submitted and approved by the Engineer, construction Manager and Owner and the related local authorities.

Page 8: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

OHM ELECTROMECHANICAL CONTRACTING implements advanced project control and documentation in line to achieve the ISO certification.

The Activities of Divisions includes:

o Transformers – Single Phase, Three Phase, Auto Transformers (SP & TP) Mono

Phase Auto Transformer.

o Switchgear Component.

o A/C Distribution Boards & D/C Distribution Boards.

o Automatic Controllers, Automatic Transfer Switches and Control Gears.

o High Voltage Equipment’s.

o Bus bar Casings, Cable Trunking Systems and Cable Trays

o Power and Control Cables.

o Electrical Equipment’s, Consumables & Accessories.

o Electrical Tools and Test Equipment’s.

o TV Satellite Systems.

o A/C and D/C Motors & Servo Hydraulics.

o Fractional H.P Motors & AC and DC Drives.

o Inverter, Rectifiers, Soft Starters.

o Lighting Systems and Equipment’s.

o Central Air-conditioning (HVAC) Systems.

o Airfield Lighting Systems and Accessories.

o AC/DC Bus bar Riser System.

o Oil Field Equipment’s and Accessories.

Page 9: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 10: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 11: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 12: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 13: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 14: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

CONTRACTOR ADWEA APPROVED LIST

Page 15: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 16: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 17: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 18: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 19: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 20: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 21: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 22: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 23: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 24: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 25: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

COMPETENT ENGINEERS FOR L.V. AND H.V. WORKS

Page 26: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

COMPETENT JOINTER FOR L.V. AND H.V. CABLE WORKS

Page 27: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 28: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 29: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 30: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 31: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 32: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 33: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 34: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 35: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 36: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 37: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 38: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 39: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 40: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 41: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 42: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 43: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 44: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

FEDERAL ELECTRICITY & WATER AUTHORITY (FEWA)

Page 45: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 46: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

FEDERAL ELECTRICITY & WATER AUTHORITY (FEWA)

L.V. and H.V. Electrical works license

Page 47: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

ABU DHABI POLICE (GHQ)

Page 48: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Page 49: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Critical Infrastructure and Coastal Protection Authority (CICPA)

Page 50: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

ABU DHABI AIRPORTS (ADAC)

Page 51: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

JOINTER LICENSE

Page 52: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

ORGANIZATIONAL CHART

Page 53: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

Organizational Chart

Projects Manager Secretary

Driver

Accountant

Electrical Design Engineer

Electrical Project Engineer

Draftsman Electrical Site Engineer

Electrical Supervisor

Forman

Helper

Electrician

Assistant Engineer

Managing Director

Page 54: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

LIST OF STAFF

Page 55: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

THE MANAGEMENT -A

MANAGING DIRECTOR ENGR.AHMED MAKAWY 1) MANAGEMENT SPROJECT -B PROJECT ENGINEER ENGR. ASADDUDIN MOHAMED 1)

PROJECT ENGINEER ENGR. MOHAMMED MUSTAFA 2)

SITE ENGINEER ENGR. MAHMOUD SHAABAN 3) DESIGN ENGINEER ENGR. ARGEL DE ALA DAVID 4)

OFFICE ADMINISTRATION -C

PROCUREMENT OFFICER COLLEEN JEWEL UY 1)

ACCOUNTANT LIEZLY ANN ARENIEGO 2)

EXECUTION TEAM -D

(3) NOs SUPERVISORS 1)

(4) NOs TECHNICIANS 2)

(6) NOs ELECTRICIAN 3)

(15) NOs HELPER 4)

( 2 ) NOs DRIVERS 5)

Page 56: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

LIST OF TOOLS

Page 57: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

LIST OF TOOLS:

UNIT QTY DESCRIPTION NO (A ) MACHINERY & EQUIPMENT

NOs 1 JCB ( excavator) 1 NOs 1 Bobcat 2 NOs 1 Survey equipment 3 NOs 1 Cable trailers for 11 K.V 4 NOs 1 Cable trailers for 33 KV 5 NOs 1 Vibrators 6 NOs 1 Excavators 7 Sets 3 Tools for termination &: jointing 8 Sets 1 Generator ( 300 KV , 250 KV) 9 NOs 1 Small equipment, tools" consumables 10 NOs 1 Welding machines 11 NOs 1 Gas cutting set 12 NOs 2 Water tank (GRP) 13 NOs 3 Crimping tool complete set 14 NOs 1 Megger, Earth Tester 15 NOs 7 Multi meter 16 NOs 7 Voltmeter 17 NOs 3 'Grinders 9" 18 NOs 4 Hilty drill machine 19 NOs 1 grinder 4" 20 NOs 1 Nail gun 21 NOs 1 Cable detector 22 NOs 1 DC High Voltage Insulator Tester 23 NOs 1 LV LIVE TOOLES 24 NOs 1 EARTH TESTER 25

OHM ELECTROMECHANICAL CONTRACTING also manages and maintains a wide range of tools and appliances necessary to get the job done. The majority of equipment, when not in use, is stored centrally in Abu Dubai and transferred expediently to any location on as need basis.

OHM ELECTROMECHANICAL CONTRACTING has invested in a large number

of heavy machinery as well as vehicles necessary for the site and transportation of our employees.

UNIT QTY DESCRIPTION NO (B) VEHICLES

NOs 1 Mitsubishi Pick UP 3 Ton 1 NOs 2 Mitsubishi Pick UP 1.5 Ton 2 NOs 1 Toyota BUS 14 SEAT 3

Page 58: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

LIST OF PROJECTS

Page 59: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

List of Projects:

OHM ELECTROMECHANICAL CONTRACTING has undertaken many projects of different clients including Government, Semi Government, Etisalat and some private companies and completed in the due time at best satisfaction of the authorities concerned under the supervision of the skilled Engineering and technical staff. We wish to register our name with you, and for this purpose please find attached some of our completed projects.

Year Client Project Name

2019 INTERNATIONAL CAPITAL REGION

(ICT)

ICT LOGISTICS PARK-I,MUSSAFAH, ABU DHABI Modification of Civil& MEP Works for upgrading of Existing Substation, Supply, Install, Testing & Commissioning of LV Panel and LV cables.

2019 ABU DHABI FARMERS' SERVICES CENTRE

UPGRADE THE ELECTRICAL NETWORK AT MODEL FARM- AL DHAFRA Supply, Install, Testing & Commissioning of LV Panel and LV cables and Civil Works

2019 VELOCITY PROPERTY

DEVELOPMENT LLC

A HIGH RISE TOWER DEVELOPMENT COMPRISING RESIDENTIAL AND SERVICES APARTMENT- CAPITAL VIEWS Design, Supply, Install and delivery of Temporary Power Supply Works

2019 COMMAND OF

MILITARY WORKS

CMW18057-C003 - CONSTRUCTION OF THE BASIC TRAINING CENTER, PHASE 4 , IN ZAYED MILITARY CITY Supply, Install, Testing & Commissioning, Maintenance of Electrical works, Fire Alarm, Earthing & Lightning System, Telephone and T.V. works

2019 PIVOT ENGINEERING

APOLLO PHASE-II 33KV installation of Electrical Works and ADDC Approval/Coordination.

2019 H.H.SHEIKH SULTAN BIN ZAYED AL NAHYAN

EMIRATES HERITAGE CLUB Supply, Install, Testing & Commissioning of High voltage works, HV Panel, Transformer, QRM, TRM, Cables, LV Panels and LV cables

2019 DUSIT THANI

ANNUAL SERVICE MAINTENANCE SERVICE MANAGEMENT AT DUSIT THANI Annual Maintenance Testing of 11KV Switchgear Panels, Transformer, DC Charger & Battery Banks, LV MDB,LV Capacitor Panel and Earthing system and Thermographic scan Test in accordance to ADDC ‘s specification and QC procedure

2018 BLOOM PROPERTIES

SOHO SQUARE, SADIYAT ISLAND, ABU DHABI. Supply, installation, testing and commissioning of 22kV Switchgear, Transformers, Cables, DC System and all Substation related works.

2018 BLOOM PROPERTIES

PARKVIEW PROJECT, SADIYAT ISLAND, ABU DHABI. Supply, installation, testing and commissioning of 22kV Switchgear, Transformers, Cables, DC System and all Substation related works.

Page 60: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

2018 MANAZEL EXTERNAL STREET LIGHTS – A REEF 2 Supply, installation, testing and commissioning of 14meter long street light poles.

2018 ADVETI

SECONDARY TECHNICAL SCHOOL – BANIYAS P563 Electrical MV works and Maintenance Works (Supply, Install, Testing & Commissioning of High voltage works, HV Panel, Transformer, QRM, TRM, Cables, LV Panels and LV cables).

2018 GOVERNMENT OF

FUJAIRAH MINISTRY OF

PRESIDENTIAL AFFAIRS

SHEIKH KHALIFA HOSPITAL- FUJAIRAH, U.A.E. Temporary Connection for Substation (Supply, Install, Testing & Commissioning of Transformer, QRM, TRM, MDB, Capacitor Bank, HV and LV Cables.

2018 MUSANADA

CONSTRUCTION OF PUBLIC PROSECUTOR’S OFFICE Supply, Install, Testing & Commissioning of Transformer, QRM, TRM, MDB, SMDB, Capacitor Bank, HV & LV Cables and any ADDC liaison and coordination.

2018 REEM DEVELOPERS

MIXED-USE RESIDENTIAL BUILDING, PLOTS C106-107, RAWDHAT, ABU DHABI Supply, Install, Testing & Commissioning of Transformer, QRM, TRM, MDB, SMDB, Capacitor Bank, HV & LV Cables including Termination of cables and any ADDC liaison and coordination.

2018 ABU DHABI

DISTRIBUTION COMPANY

SUPPLY AND INSTALLATION OF SECTOR MEASURING POINTS IN EASTERN REGION Coordination, Application, Termination and Energization of ADDC Electrical Connection by an approved Competent Person.

2018 COMMAND OF

MILITARY WORKS

LV CABLE WORKS – ZAYED MILITARY CITY Supply and Laying of LV Cables including cable joints and termination for CMW.

2018 GEN.

AUTHORITY OF PORTS AND

INFRA. WORKS

11KV CABLE RELOCATION WORKS AND LV CABLE NETWORKS 11KV cable joint and termination relocation, Coordination, Application, Termination and Energization of ADDC Electrical Connection by an approved Competent Person.

2017 MANAZEL

AL REEF 2- VILLAS, AL SAMHA-EAST OLD Supply, Install, Testing & Commissioning of High voltage works, HV Panel, Transformer, QRM, TRM, Cables, LV Panels and LV cables.

2017 FUJAIRAH POLICE- GHQ

FUJAIRAH POLICE-GHQ Supply, Install, Testing and commissioning of MDB, SMDB, DBs, Capacitor Bank and LV cables.

2017 Mr. Ahmed

Abdulla Zahran Alnabhani

MR. AHMED ALNABHANI WORKSHOP Supply, Install, Testing & Commissioning of Electrical works, Telephone and T.V. works. (MDB, SMDB, DBs, and L.V. cables)

2017 ADAC ABU DHABI INTERNATIONAL AIRPORT Installation, Testing and Commissioning of LV Electrical works on 49 Gate Houses.

Page 61: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

2017 COMMAND OF

MILITARY WORKS

CAMP 141276 IN ZAYED MILITARY CITY Supply, Install, Testing and Commissioning of 15KV cables between 15KV Package Unit to pick point.

2017 MASDAR CITY NEIGHBORHOOD ONE RESIDENCES- ABU DHABI Install, Testing & Commissioning of Dry Type Transformers each 1000KVA 22/0.4KV and 22KV panel and 22KV cable termination.

2017 REPTON ABU

DHABI SENIOR SCHOOL (REPTON

SCHOOL 2)

REPTON ABU DHABI SENIOR SCHOOL (REPTON SCHOOL 2) Supply, Install, Testing and Commissioning of disruption network (MDBs. SMDBs, METER BOX, CAPACITOR BANK, and LV SWITCH CABLES).

2017 PARK VIEW REAL ESTATE CO. LLC.

RESIDENTIAL DEVELOPMENT ON SHAMS C52/C53 Supply, Installation, Testing and Commissioning of MDBs, SMDB, Electrical Meter box and LV cables for Temporary power supply works.

2016 SEA PALACE- H. H. SHK.

MOHMED BIN KHALED

CONSTRUCTION, COMPLETION AND MAINTENANCE OF SEA PALACE Installation, Testing and Commissioning of QRM, Oil Type Transformer, HV and LV cables, RTU and DMS Integration.

2016 ADDC

MAINTENANCE OF STREET LIGHT POLE IN WESTERN REGION Installation, Laying, Excavation and backfilling of LV cables for street light works.

2016 BOROUGE

BOROUGE Consultant for LV works, Supervision of LV works, and coordination with ADDC for inspection, installation of all electrical works and high voltage works.

2016 GASCO

YAS-MINA ZAYED GAS PIPELINE Excavation, laying, Testing & Commissioning, Back filling, Termination of LV Cable between ADDC feeder pillar to Yas mina Zayed Gas pipe line and another work same in al saadiyat island for laying, excavation, testing and commission

2016 ADNOC ADNOC Al Marfa Marine Substation Supply, Installation, Testing, Excavation, Laying and Backfilling of LV Main Cables.

2015 ABU DHABI POLICE

IRRIGATION PUMP STATION Supply, Installation, Testing and commissioning of electrical work.

2015

MUSANADA

33KV OHL WORKS Supply, Install, Testing and Commissioning of 33KV Terminal Tower and Temporary modification on suspension tower to be terminal, diverting 33KV OHL to UGC AND dismantling existing towers.

2015

WESTERN REGION MUNICIPALITY

TILAL LIWA- HOTEL ROAD Supply, Install, Testing & Commissioning of Street Light, Over Head Line and 11KV cable.

Page 62: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

2015

ADAC

District Coolant plant Supply, Installation, Testing and commissioning of four feeders 22KV to primary PSS1 (ARPPRY5).

2015 ADNOC

ADNOC DISTRIBUTION- CAMEL RACE Supply, Install, Testing & Commissioning of LV Electrical works (LV panels, cable wire, capacitor bank, circuit breakers, switch gear panels).

2015

AMITY

INTERNATIONAL SCHOOL

Amity International school Supply, Installation, Testing and commissioning of (11KV works) Transformers, QRM, TRM, HV Joints, Terminations and cables.

2015 ADNOC

ADNOC Petrol Station- Gayathy, WR Supply, Install, Testing & Commissioning of LV Electrical works ((LV panels, cable wire, capacitor bank, circuit breakers, switch gear panels).

2015 Judicial Department

JUDICIAL DEPARTMENT Removal & Cancellation of Street Light as per ADDC. All Pole Lights will be restored to ADDC Store.

2015

ETIHAD RAILWAY

ETIHAD RAILWAY- ABU DHABI Supply, Installation, Testing and commissioning of Diverting 11KV Overhead transmission Line route to Underground cable.

2015

ALI AL

SHAMSI

ALI AL SHAMSI BUILDING Supply, Install, Testing & Commissioning of LV Electrical Works, Fire Alarm System, Telephone and T.V. System.

2015

ABU DHABI

FALCON HOSPITAL

ABU DHABI FALCON HOSPITAL Supply, Install, Testing & Commissioning of LV Electrical Works (MDB, Capacitor Bank, SMDB, FDB and LV cables.)

2015 WESTERN REGION MUNICIPALITY

WESTERN REGION MUNICIPALITY Supply and Replacement of Street Light, Metal Halide Light to LED.

2015

Mr. Mohamed Al Mansoori

MR. MOHAMED AL MANSOORI Supply, Installation, Testing and commissioning of LV Electrical Works (LV panels, Capacitor bank, circuit breakers, switch gear panels and LV cables.)

2015

GHANTOOT CONTRACTING

COMPANY

GHANTOOT LABOR CAMP Supply, Installation, Testing and commissioning of MDB & Capacitor bank, SMDB, FDB & CUs, Cables and Wirings, Earthing System, prepare Electrical Shop drawing & inspection, Energize the power supply, Install of 11KV Package unit 1500kVA.

Page 63: 1- INTRODUCTION 2- COMPANY LICENSES 3- ORGANIZATIONAL … · 2020-02-17 · 1- introduction. 2- company licenses. 3- organizational chart. 4- list of staff. 5- list of tools. 6- list

_

2014 Ahmed Al Mouhairbi

AHMED AL MOUHAIRBI BUILDING Supply, install, Testing & commissioning of LV Panel 1600A ACB, Capacitor bank (100KVAR), cables & wirings, earthing system, light and power system.

2014 GCCIA

SILA’ A SECURITY SYSTEM Supply, Installation, Testing and commissioning of All Civil and Electrical Works for Physical Security System (CCTV Cameras , Access System for Doors, Card Readers, OEBs & IEBs)

2014

ROYAL GROUP

AL AJBAN POULTRY FARM Supply and installation of Switchgears & Transformers, Package Unit, HV & LV Joints and Terminations, Lighting (Accessories and Fixtures), Earthing and Lighting Protection.

2014

Dr. Anwar

Sallam

DR. ANWAR VILLA COMPLEX Supply and installation of Capacitor banks, MDB, Lights and power system, Emergency and Exit Lighting.