1 lecture 6 inventory management chapter 11. 2 economic production quantity (epq) model: variant of...

33
1 Lecture 6 Inventory Management Chapter 11

Upload: felipe-best

Post on 29-Mar-2015

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

1

Lecture6

Inventory ManagementChapter 11

Page 2: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

2

Economic production quantity (EPQ) model: variant of basic EOQ model

Production done in batches or lots Replenishment order not received in one lump sum

unlike basic EOQ model Inventory is replenished gradually as the order is

produced hence requires the production rate to be greater than the

demand rate This model's variable costs are

annual holding cost, and annual set-up cost (equivalent to ordering cost).

For the optimal lot size, annual holding and set-up costs are equal.

Economic Production Quantity (EPQ)Economic Production Quantity (EPQ)

Page 3: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

3

EPQ = EOQ with Incremental Inventory EPQ = EOQ with Incremental Inventory ReplenishmentReplenishment

Page 4: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

4

EPQ Model AssumptionsEPQ Model Assumptions Demand occurs at a constant rate of D items per

year. Production capacity is p items per year.

p > D Set-up cost: $Co per run.

Holding cost: $Ch per item in inventory per year. Purchase cost per unit is constant (no quantity

discount). Set-up time (lead time) is constant. Planned shortages are not permitted.

Page 5: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

5

EPQ Model FormulaeEPQ Model Formulae Optimal production lot-size (formula 11-16 of

book)

Run time: Q */p

Time between set-ups (cycle time): Q */D years

Total cost (formula 11.15 of book)

Dp

p

C

DCQ

h

o

20

oh CQ

DQC

P

DTC )1(

2

1

Page 6: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

6

Example: Non-Slip Tile Co.Example: Non-Slip Tile Co. Non-Slip Tile Company (NST) has been using production runs of

100,000 tiles, 10 times per year to meet the demand of 1,000,000 tiles annually.

The set-up cost is $5,000 per run Holding cost is estimated at 10% of the manufacturing cost of $1

per tile. The production capacity of the machine is 500,000 tiles per month.

The factory is open 365 days per year. Determine

Optimal production lot size Annual holding and setup costs Number of setups per year Loss/profit that NST is incurring annually by using their present

production schedule

Page 7: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

7

Management Scientist SolutionsManagement Scientist Solutions

Optimal TC = $28,868 Current TC = .04167(100,000) + 5,000,000,000/100,000

= $54,167 LOSS = 54,167 - 28,868 = $25,299

Page 8: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

8

Only one item is involved Annual demand is known Usage rate is constant Usage occurs continually Production occurs periodically Production rate is constant Lead time does not vary No quantity discounts

Economic Production Quantity AssumptionsEconomic Production Quantity Assumptions

Page 9: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

9

Too much inventory Tends to hide problems Easier to live with problems than to eliminate

them Costly to maintain

Wise strategy Reduce lot sizes Reduce safety stock

Operations StrategyOperations Strategy

Page 10: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

10

28-Jan-00 29-Jan-99 Change Percent

Current assets:Cash $3,809 $1,726 $2,083 121%Short-term investments 323 923 (600) -65%Account receivables, net 2,608 2,094 514 25%Inventories 391 273 118 43%Other 550 791 (241) -30% Total current assets 7,681 5,807 1,874 32%

Property, plant, and equipment, net 765 523 242 46%Long-term investments 1,048 532 516 97%Equity securities and other investments 1,673 --- 1,673Goodwill and others 304 15 289 1927%

Total assets $11,471 $6,877 $4,594 67%

LIABILITIES AND STOCKHOLDERS' EQUITY

Current liabilities:Accounts payable $3,538 $2,397 $1,141 48%Accrued and other 1,654 1,298 356 27% Total current liabilities 5,192 3,695 1,497 41%

Long-term debt 508 512 (4) -1%Other 463 349 114 33%

Total liabilities 6,163 4,556 1,607 35%Stockholders' equity:

Preferred stock --- ---Common stock and capitalin excess of $0.01 per value 3,583 1,781 1,802 101%Retained earnings 1,260 606 654 108%Other 465 (66) 531 Total stockholders' equity 5,308 2,321 2,987 129% Total liabilities and stockholders' equity $11,471 $6,877 $4,594 67%

The Balance Sheet – Dell Computer Co.

Page 11: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

11

Income Statement – Dell Computer Co.(in millions, except per share amount)

28-Jan-00 29-Jan-99Net revenue $25,265 $18,243Cost of revenue 20,047 14,137Gross margin 5,218 4,106Operating expenses: Selling, general and administrative 2,387 1,788 Research, development, and engineering 568 272 Total operating expenses 2,955 2,060Operating income 2,263 2,046Other income 188 38Income before income taxes 2,451 2,084Provision for income taxes 785 624Net income $1,666 $1,460Earnings per common share: Basic $0.66 $0.58 Diluted $0.61 $0.53Weighted average shares outstanding: Basic 2,536 2,531 Diluted 2,728 2,772Retained Earnings: Balances at beginning of period 606 607 Net income 1,666 1,460 Repurchase of common stocks (1,012) (1,461) Balances at end of period $1,260 $606

Fiscal Year Ended

Page 12: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

12

Debt RatioDebt Ratio What It Measures: The extent to which a firm uses debt financing How You Compute: The ratio of total debt to total assets

Debt ratio =Total debt

Total assets

$6,

$11,

.

163

471

53 73%

Page 13: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

13

Inventory Turnover RatioInventory Turnover Ratio

What It Measures: How effectively a firm is managing its inventories.

How You Compute: This ratio is computed by dividing sales by inventories

Inventory turnover ratio =

times

balanceinventoryAverage

Sales

10.762/)391$273($

265,25$

Page 14: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

14

Lecture6

MGMT 650Simulation – Chapter 13

Page 15: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

15

Simulation Is …Simulation Is … Simulation – very broad term

methods and applications to imitate or mimic real systems, usually via computer

Applies in many fields and industries

Simulation models complex situations

Models are simple to use and understand

Models can play “what if” experiments

Extensive software packages available

ARENA, ProModel Very popular and powerful method

Page 16: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

16

ApplicationsApplications Manufacturing facility Bank operation Airport operations (passengers, security, planes,

crews, baggage, overbooking) Hospital facilities (emergency room, operating

room, admissions) Traffic flow in a freeway system Waiting lines - fast-food restaurant, supermarkets Emergency-response system Military

Page 17: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

17

Example – Simulating Machine BreakdownsExample – Simulating Machine Breakdowns

The manager of a machine shop is concerned about machine breakdowns.

Historical data of breakdowns over the last 100 days is as follows

Simulate breakdowns for the manager for a 10-day period

Number of Breakdowns Frequency

0 10

1 30

2 25

3 20

4 10

5 5

Page 18: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

18

Simulation ProcedureSimulation ProcedureNumber of Breakdowns Frequency Probability Cum Prob Corresponding Random Numbers

0 10 0.10 0.10 01 to 101 30 0.30 0.40 11 to 402 25 0.25 0.65 41 to 653 20 0.20 0.85 61 to 854 10 0.10 0.95 86 to 955 5 0.05 1.00 96 to 00

100

Day Random Number Simulated # of Breakdowns1 90 42 73 33 82 34 16 15 94 46 92 47 68 38 5 09 84 310 91 4

19

Expected number of breakdowns = 1.9 per day

Page 19: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

19

Statistical AnalysisStatistical AnalysisDay # Replication 1 Replication 2 Replication 3 Replication 4 Replication 5 Replication 6 Replication 7 Replication 8Replication 9 Replication 10

1 1 4 4 1 0 2 5 1 1 02 3 5 0 2 0 4 3 2 0 33 3 1 1 1 2 1 0 1 1 54 1 2 2 3 2 3 1 1 1 15 2 0 1 1 1 5 2 2 0 26 0 2 3 1 3 1 4 3 2 27 1 1 2 2 1 2 1 1 1 08 3 3 2 2 0 4 2 1 3 29 1 1 1 2 2 1 4 0 1 4

10 5 1 3 2 3 2 1 0 1 1

2.00 2.00 1.90 1.70 1.40 2.50 2.30 1.20 1.10 2.00

95 % confidence interval for mean breakdowns for the 10-day period is given by:

]955.1,665.1[)10

458.0(262.281.1

21;1

n

stx

n

Page 20: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

20

Monte Carlo SimulationMonte Carlo Simulation

Monte Carlo method: Probabilistic simulation technique used when a process has a random component

Identify a probability distribution Setup intervals of random numbers to match

probability distribution Obtain the random numbers Interpret the results

Page 21: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

21

Example 2 – Simulating a Reorder Example 2 – Simulating a Reorder Policy Policy

The manager of a truck dealership wants to acquire some insight into how a proposed policy for reordering trucks might affect order frequency

Under the new policy, 2 trucks will be ordered every time the inventory of trucks is 5 or lower

Due to proximity between the dealership and the local office, orders can be filled overnight

The “historical” probability for daily demand is as follows

Simulate a reorder policy for the dealer for the next 10 days Assume a beginning inventory of 7 trucks

Demand (x) P(x)

0 0.50

1 0.40

2 0.10

Page 22: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

22

Example 2 SolutionsExample 2 Solutions

x P(x) Cum P(x) RN Day RN Demand Begin Inv End Inv Reorder0 0.5 0.5 01 to 50 1 81 1 7 6 01 0.4 0.9 51 to 90 2 20 0 6 6 02 0.1 1.0 91 to 00 3 82 1 6 5 2

4 34 0 7 7 05 85 1 7 6 06 35 0 6 6 07 10 0 6 6 08 14 0 6 6 09 84 1 6 5 210 92 2 7 5 2

Page 23: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

23

In-class Example 3 using MS-ExcelIn-class Example 3 using MS-Excel The time between mechanics’ requests for tools in a

AAMCO facility is normally distributed with a mean of 10 minutes and a standard deviation of 1 minute.

The time to fill requests is also normal with a mean of 9 minutes and a standard deviation of 1 minute.

Mechanics’ waiting time represents a cost of $2 per minute.

Servers represent a cost of $1 per minute. Simulate arrivals for the first 9 mechanic requests and

determine Service time for each request Waiting time for each request Total cost in handling all requests

Assume 1 server only

Page 24: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

24

AAMCO SolutionsAAMCO SolutionsInter-request time Cum Int-req time Service Time Service Begins Service Ends Wait Time

8.76 8.76 9.57 8.76 18.33 0.005.49 14.25 9.25 18.33 27.58 4.085.21 19.46 8.63 19.46 28.09 0.003.98 23.44 8.19 23.44 31.63 0.004.66 28.10 6.09 28.10 34.19 0.006.71 34.81 9.15 34.81 43.96 0.006.31 41.12 9.93 41.12 51.05 0.005.57 46.70 8.66 46.70 55.36 0.006.38 53.08 9.67 53.08 62.75 0.00

Sum of wait 4.08

Server cost/min 1Waiting cos/min 2

Total cost 70.91

Page 25: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

25

Simulation Models Are BeneficialSimulation Models Are Beneficial

Systematic approach to problem solving Increase understanding of the problem Enable “what if” questions Specific objectives Power of mathematics and statistics Standardized format Require users to organize

Page 26: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

26

Different Kinds of SimulationDifferent Kinds of Simulation

Static vs. Dynamic Does time have a role in the model?

Continuous-change vs. Discrete-change Can the “state” change continuously or only at

discrete points in time? Deterministic vs. Stochastic

Is everything for sure or is there uncertainty? Most operational models:

Dynamic, Discrete-change, Stochastic

Page 27: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

27

Discrete Event SimulationDiscrete Event SimulationExample 1 - A Simple Processing Example 1 - A Simple Processing

SystemSystem

Page 28: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

28

Advantages of SimulationAdvantages of Simulation

Solves problems that are difficult or impossible to solve mathematically

Flexibility to model things as they are (even if messy and complicated)

Allows experimentation without risk to actual system

Ability to model long-term effects

Serves as training tool for decision makers

Page 29: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

29

Limitations of SimulationLimitations of Simulation

Does not produce optimum solution

Model development may be difficult

Computer run time may be substantial

Monte Carlo simulation only applicable to random systems

Page 30: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

30

Fitting Probability Distributions to Existing Fitting Probability Distributions to Existing DataData

Data Summary

Number of Data Points = 187Min Data Value = 3.2

Max Data Value = 12.6Sample Mean = 6.33Sample Std Dev = 1.51

Histogram Summary

Histogram Range = 3 to 13

Number of Intervals = 13

Page 31: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

31

ARENA – Input AnalyzerARENA – Input AnalyzerDistribution Summary

Distribution: Gamma Expression: 3 + GAMM(0.775, 4.29)

Square Error: 0.003873

Chi Square Test Number of intervals = 7 Degrees of freedom = 4

Test Statistic = 4.68 Corresponding p-value = 0.337

Kolmogorov-Smirnov Test Test Statistic = 0.0727

Corresponding p-value > 0.15

Data Summary

Number of Data Points = 187Min Data Value = 3.2

Max Data Value = 12.6Sample Mean = 6.33Sample Std Dev = 1.51

Histogram Summary

Histogram Range = 3 to 13Number of Intervals = 13

Page 32: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

32

Simulation in IndustrySimulation in Industry

Page 33: 1 Lecture 6 Inventory Management Chapter 11. 2 Economic production quantity (EPQ) model: variant of basic EOQ model Production done in batches or lots

33

Course ConclusionsCourse Conclusions Recognize that not every tool is the best fit for every problem Pay attention to variability

Forecasting Inventory management - Deliveries from suppliers

Build flexibility into models Pay careful attention to technology

Opportunities Improvement in service and response times

Risks Costs involved Difficult to integrate Need for periodic updates Requires training

Garbage in, garbage out Results and recommendations you present are only as reliable as the model and its

inputs Most decisions involve tradeoffs Not a good idea to make decisions to the exclusion of known information