NPS MANAGEMENT PLANNING FOR THE NORTH
CANDADIAN RIVER(from Canton dam through Lake
Overholser)
![Page 2: 1 NPS MANAGEMENT PLANNING FOR THE NORTH CANDADIAN RIVER (from Canton dam through Lake Overholser)](https://reader036.vdocument.in/reader036/viewer/2022081702/55157111550346486b8b4efc/html5/thumbnails/2.jpg)
2
Greg Kloxin – Senior Technical WriterOklahoma Conservation CommissionWater Quality DivisionP.O. Box 531342401 N. Lincoln Blvd., Room 224Oklahoma City, OK 73152-3134
Em: [email protected]: 405-522-4737
![Page 3: 1 NPS MANAGEMENT PLANNING FOR THE NORTH CANDADIAN RIVER (from Canton dam through Lake Overholser)](https://reader036.vdocument.in/reader036/viewer/2022081702/55157111550346486b8b4efc/html5/thumbnails/3.jpg)
3
• OCC is state’s technical lead for nonpoint source program in the state
• The NPS program is non-regulatory
• Pollution abatement accomplished via education and voluntary implementation of BMPs with cost share incentives
WHO?
![Page 4: 1 NPS MANAGEMENT PLANNING FOR THE NORTH CANDADIAN RIVER (from Canton dam through Lake Overholser)](https://reader036.vdocument.in/reader036/viewer/2022081702/55157111550346486b8b4efc/html5/thumbnails/4.jpg)
4
• OCC is engaged in drafting a Watershed Based Plan (WBP) for the segment from Canton Lake dam to Lake Overholser dam
• WBP is a holistic context for planning and management:• Intro – plan area, description, partners, background• Info and analysis –id’s key pollutants, sources, current loads,
reports monitoring results to date; info needed to set WQ goals• Proposed management measures – load reductions needed, BMPs
proposed, reductions expected from BMPs, targeting of BMPs• Implementation plan – public info/ed. and outreach plan; project
schedule and costs• Monitoring and adaptive management approach – interim
milestones, load reduction criteria, evaluation framework, monitoring plan and partners
WHAT?
![Page 5: 1 NPS MANAGEMENT PLANNING FOR THE NORTH CANDADIAN RIVER (from Canton dam through Lake Overholser)](https://reader036.vdocument.in/reader036/viewer/2022081702/55157111550346486b8b4efc/html5/thumbnails/5.jpg)
5
• OCC currently working with OSU to develop model to accomplish the following:• 1) identify critical source areas contributing
pollutants to Lake Overholser• 2) determine the endpoint for Lake Overholser
necessary to meet Oklahoma Water Quality Standards
• 3) determine possible agricultural practices that may be implemented to meet this endpoint
WHEN?
![Page 6: 1 NPS MANAGEMENT PLANNING FOR THE NORTH CANDADIAN RIVER (from Canton dam through Lake Overholser)](https://reader036.vdocument.in/reader036/viewer/2022081702/55157111550346486b8b4efc/html5/thumbnails/6.jpg)
6
• OCC anticipates WBP with finished model by first part of next year
• Working with relevant conservation districts to build necessary local stakeholder participation (CDs came to us before the TMDL was released)
• Work to begin implementation project to fund locally led educational efforts, BMP implementation in critical source areas and monitoring necessary to show results
HOW?