Opportunities for Streamlining in NPDES Permits
Permitting Tools, Tips and Incentives Session
Presented by:Roosevelt Childress, EPA Region 4
2
Permitting for Environmental Results (PER)
Multiyear initiative which began in 2003.
Three major components: Integrity
• Profiles of Permitting Agencies• Online at http://www.epa.gov/npdes/PER
Efficiency• Electronic tools (eNPDES, eNOI, eDMR, etc)• Watershed-based permitting
Results• Priority permits
3
Permit Efficiency Tools eNPDES
About to be piloted in Regions 1 and 2 Increases efficiency and accuracy Has tools for limit calculation, as well as eliminates double entry
eNOI Available on EPA’s website for facilities under EPA’s MSGP and
CGP. States are also implementing eNOI for their own systems. More info at: http://www.epa.gov/npdes/stormwater/enoi
eDMR Being done on a state by state basis. 13 States have taken the lead as a workgroup on a national
system. Currently not linked to EPA’s main database.
4
Priority Permits
Environmentally significant permits are designated as priority by States, in conjunction with Regions.
Any permit expired 2 or more years is eligible to become a priority permit.
EPA has committed to issuing 95% of designated priority permits on schedule. In FY05, we issued 104.2% of the permits
5
Top reasons for designation
Discharging to an impaired waterbody
Revision of water quality standards General permit development Permit expired more than 10 years Discharging to a targeted watershed Significant changes to facility
operation
6
Performance Track and Priority Permits
EPA will grant States priority permit issuance credit for the issuance of a permit which is: For a Performance Track Facility AND Has requested expedited permitting AND Is facing competitive pressure
7
Performance Track and Priority Permits
Performance Track members (in 38 States) hold 161 permits
Of the 30 of these permits expiring in late 2005-2006, 18 requested expedited permitting
5 of these permits are under competitive pressure and are eligible for the priority permits credit
8
Performance Track and Priority Permits Water Permits Division and the
Performance Track staff are working together to create a template of a cover letter for facilities to request expedited permitting.
Richard Kashmanian of the Performance Track program is also contacting facilities with upcoming permit expirations.
9
For more information …
On Priority Permits: Roosevelt ChildressUSEPA Region 4Chief, Biosolids and NPDES
permits Branch(404) [email protected]
or
Pravin RanaUSEPA HeadquartersWater Permits Division(202) [email protected]
On Performance Track: Richard KashmanianUSEPA HeadquartersPerformance Track Program(202) [email protected]