1 pefp status jihwa kim pal, korea epics collaboration meeting dec 8-10, 2004 ricotti,tokai, japan...

20
1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Labor atory POSTECH Bird’s eye View of the Site

Upload: morgan-baker

Post on 12-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

1

PEFP status

Jihwa Kim

PAL, KOREA

EPICS Collaboration meeting

Dec 8-10, 2004 RICOTTI,Tokai, JAPAN

Pohang Accelerator LaboratoryPOSTECH

Bird’s eye View of the Site

Page 2: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

2

I.PEFP Goal Plan, Schedule Status of Accelerator Development Project progress

II. 20Mev Control System History Development Status of Sub Control System .Vacuum,RF,Event,Beam Monitor, PS ,Utility

EPICS Collaboration meetingDec 8-10, 2004 RICOTTI,Tokai, JAPAN

Pohang Accelerator LaboratoryPOSTECH

Outline

Page 3: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

3Pohang Accelerator Laboratory

POSTECH

Proton Engineering Frontier Project

PAL, Pohang

KAERI,Deajeon

KAERI – Korea Atomic Energy Research Institute

KAPRA – Korea Accelerator & Plasma Research Association

KIGAM – Korea Institute of Geoscience & Mineral Resources

KAIST – Korea Advanced Institute Science and Technolgy

Under construction for 20Mev Commissioning in KAERI-Deajeon

Collaboration with KAERI , PAL,KAPRA,KIGAM,KAIST.

Final Site will be selected by end of this year.

Page 4: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

4

Project Goal

Refer to Slide materials(Page 3~8)presented at ICFA-HB 2004October 20.2004 , Beansheim ,Germany“Status and progress of the PEFP Project”

By Byung-Ho Choi & PEFP Team

Page 5: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

5

Plan of PEFP(100MeV Linac & Utilization)

Page 6: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

6

Project Schedule

Page 7: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

7

Basic Accelerator Parameters

Page 8: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

8

Status of Acceleraor Development(Nov. 2002)

Page 9: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

9

Project Progress

Page 10: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

10

Control System for 20MeV Commissioning

Pohang Accelerator LaboratoryPOSTECH

First Phase Development(2002.7~2003.6) . Control System Architecture . Control ToolKit Chioce(EPICS) .Vacuum Control System Second Phase Development(2003.7~2004.6) . RF Control System . Event System for Timing Control

Third Phase Development (2004.7~2005.6)

.Beam Monitor Control

.Power Supply Control

.Cooling Water Monitoring .Intergration and Commissioning

EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN

Scheduled to 20 MeV commissioning in April 2005 at KAERI,DeajeonDevelopment of Control System to satisfy this mission has been executed at PAL in 3Phases for last 3 years.

Page 11: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

11

Ralph LangerBESSY ,Berin,GermanyJuly 28~August 5,2004EPICS Lab. At PAL

Pohang Accelerator LaboratoryPOSTECH

EPICS Expert Invitation for Review

Bob DalesioLANL ,USAMay 27 ~31,2003Seminar room at PAL

EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN

Page 12: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

12Pohang Accelerator Laboratory

POSTECH

Vacuum Control System

EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN

Windows based PCRS422 Interface(63 Ports)EPICS base 3.14.1 MEDMInstalled and Working at KAERI site

Page 13: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

13Pohang Accelerator LaboratoryPOSTECH

RF Control System

EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN

10MHz, Sine

6

0

2

x

x

x

x

1

5

Ee

2

x

8

2

0

5

RF & CLOCKGENERATOR

FIELD/RESONANCECONTROLLER

LOW LEVELCONTROLLER

(StrongARM CPU &FPGA)

KLYSTRONAMPLIFIER

KLYSTRON POWERSUPPLIES

PROGRAMMABLELOGIC

CONTROLLER

ETHER-NET HUB

TIMING, RTDL(?)

T0, RF GATE

SOLID STATEAMPLIFIER

RF_PAL

PEFPVOLTGE

CONTROLLER(8CHs)

DISPLAY, MONITOR& CONTROL(FP)

Low Level RFPULSEMODULATOR RFQ

1 2 34 5

7 8 9 11 2

AB

1 xx

x

9

3

10

4x

1

x7x

1x

th

A

1x

6

x

x

1 x

4x

11x

x

7x

1x

C

LLRF(4U SUBRACK)

ETHER-NET LINERS232 or 485

Multi-Connected directlyWire Connected

Down Conversion&

Distribution

Coupled RF(Fwd, Ref. Cavit, etc.)

RF(350MHz)

LO(340MHz)

Clock

SBC

MFS

VME based IOC

MVME5100

SUN workstations

Ethernet

PWRD/I

16ch

A/I

8ch

D/I

16ch

D/O

16ch

A/I

8ch

A/I

8ch

A/O

4chCPU

1746IB16

1746IB16

1746OB16

1746NI8

1746NI8

1746NI8

1746N04V

1747L552

1746P2

EasyView

PWR

CPU

COM

ACPOWER

ON

OFF

110.0V 10.0A

AC POWER LINE CONDITIONER

STOCK DRAWER

EPICS IOC(Developed) CPU : MVME5100 VME I/O: MFL32A EPICS Base 3.13.8

Page 14: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

14

VMEbus MFL32A

•500W(+5V,-12V,+12V)•.12 slots, VME64x with P0•Remote Control(RS422,LAN)

VME Bus Subrack

Pohang Accelerator LaboratoryPOSTECH

Human CC,INChttp://www.humancc.co.kr

VME Tech ,INC http://www.vmetech.co.kr

Domestic Products

EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN

•16bits ADC,0~+10V :8Ch•16bits DAC,0~+10V:2Ch•DIO:32Ch•10/100Base T Ethernet•RS232C ,32bit CPU

Page 15: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

15

-Development Progress      . Detailed Specification       . System Configuration Layout      . Hardware Setup and Software module Test      . Lab Test

Pohang Accelerator LaboratoryPOSTECH

Timing Control

EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN

Event system for timing control has been selected.TIMO from SLS made contribution.

Page 16: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

16

Tank 1DT : 51L=444.5cmE=7.2MeV

CT BPPM BPPM

Tank 2DT : 39L=465.5cmE=11.5MeV

Tank 3DT : 33L=475.8cmE=15.8MeV

Tank 4DT : 29L=444.5cmE=20.0MeV

CTBPPMBeam Stop

BP

PM

#3

BP

PM

#4

RFQDCCT

#1DCCT

#2CT BPPM

Button Signals

Button Signals Button

SignalsButton Signals

EPICS VME IOC crate

BPPMLow-level Electronicscrate#2

BP

PM

#1

BP

PM

#2

BPPMLow-level Electronicscrate#1

CP

U

AD

C#

1

AD

C#

2

Ethernet

EPICS IOC(Developing) CPU : MVME5100 ADC#1 : VTR812/10 ADC#2 : AVME9325-5 EPICS Base 3.13.6

Pohang Accelerator LaboratoryPOSTECH

BPM/DCCT Control System(Third Phase)

EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN

Low Level Electronics(Working)-Bergoz Customized Hardware module

Page 17: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

17Pohang Accelerator Laboratory

POSTECHEPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN

Power Supply Control System for DTL_Q

#1 PS

EPICS VME IOC

CP

U

IP Carrier

IP

TM

IP

IP

IP

#2 PS

#35 PS

#42 PS

(5Ea)

Fiber Optic

IP:Industry PackTM:Transition Module

DSP:Digital Signal ProcessingADC:Analog Digital Converter

PS:Power Supply Pack

Simulation Board With Power Supply

Intf. With Controller

Control Team PEFP

CPU : MVME5100

(Digital Power Supply)

Selected the SLS Power Supply Type.

H/W Modules are delivered & setting them up

Page 18: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

18Pohang Accelerator Laboratory

POSTECHEPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN

Still gathering information for Utility

Utility Control(Cooling Water)

Page 19: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

19Pohang Accelerator Laboratory

POSTECHEPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN

Main Control Screen for PEFP

Page 20: 1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View

20

PEFP Final Site will be selected by end of this year.

20Mev Control System for PEFP

IOC Level RF (Developed)Vacuum (Developed)Event System for Timing Control (Developed)

Beam Monitor (Developing)

Power Supply(Developing)

Utility(Still gathering control requirement)

OPIMEDM Switch to EDM

Channel Archiver(From Kay)

More things..

EPICS Training to PEFP Physicist, Engineer

Pohang Accelerator LaboratoryPOSTECHEPICS Collaboration MeetingEPICS Collaboration Meeting

December 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN

Summary & Plan