PEFP status
Jihwa KimPAL, KOREA
EPICS Collaboration meetingDec 8-10, 2004 RICOTTI,Tokai, JAPAN
Pohang Accelerator LaboratoryPOSTECH
Bird’s eye View of the Site
2
I.PEFP Goal Plan, Schedule Status of Accelerator Development Project progress
II. 20Mev Control System History Development Status of Sub Control System .Vacuum,RF,Event,Beam Monitor, PS ,Utility
EPICS Collaboration meetingDec 8-10, 2004 RICOTTI,Tokai, JAPAN
Pohang Accelerator LaboratoryPOSTECH
Outline
3Pohang Accelerator Laboratory
POSTECH
Proton Engineering Frontier Project
PAL, Pohang
KAERI,Deajeon
KAERI – Korea Atomic Energy Research Institute
KAPRA – Korea Accelerator & Plasma Research AssociationKIGAM – Korea Institute of Geoscience & Mineral ResourcesKAIST – Korea Advanced Institute Science and Technolgy
Under construction for 20Mev Commissioning in KAERI-Deajeon
Collaboration withKAERI , PAL,KAPRA,KIGAM,KAIST.
Final Site will be selected by end of thisyear.
4
Project Goal
Refer to Slide materials(Page 3̃8)presented at ICFA-HB 2004October 20.2004 , Beansheim ,Germany“Status and progress of the PEFP Project”
By Byung-Ho Choi & PEFP Team
5
Plan of PEFP(100MeV Linac & Utilization)
6
Project Schedule
7
Basic Accelerator Parameters
8
Status of Acceleraor Development(Nov. 2002)
9
Project Progress
10
Control System for 20MeV Commissioning
Pohang Accelerator LaboratoryPOSTECH
First Phase Development(2002.7̃2003.6) . Control System Architecture . Control ToolKit Chioce(EPICS) .Vacuum Control System\\\\\\Second Phase Development(2003.7̃2004.6) . RF Control System\\\\\. Event System for Timing Control\\\\\
Third Phase Development (2004.7̃2005.6)
.Beam Monitor Control
.Power Supply Control
.Cooling Water Monitoring .Intergration and Commissioning
EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN
Scheduled to 20 MeV commissioning in April 2005 at KAERI,DeajeonDevelopment of Control System to satisfy this mission has been executed at PAL in 3Phases for last 3 years.
11
Ralph LangerBESSY ,Berin,GermanyJuly 28̃August 5,2004EPICS Lab. At PAL
Pohang Accelerator LaboratoryPOSTECH
EPICS Expert Invitation for Review
Bob DalesioLANL ,USAMay 27 ̃31,2003Seminar room at PAL
EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN
12Pohang Accelerator Laboratory
POSTECH
Vacuum Control System
EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN
Windows based PCRS422 Interface(63 Ports)EPICS base 3.14.1 MEDMInstalled and Working at KAERI site
13Pohang Accelerator LaboratoryPOSTECH
RF Control System
EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN
10MHz, Sine
6
0
2
x
x
x
x
1
5
Ee
2
x
8
2
0
5
RF & CLOCKGENERATOR
FIELD/RESONANCECONTROLLER
LOW LEVELCONTROLLER
(StrongARM CPU &FPGA)
KLYSTRONAMPLIFIER
KLYSTRON POWERSUPPLIES
PROGRAMMABLELOGIC
CONTROLLER
ETHER-NET HUB
TIMING, RTDL(?)
T0, RF GATE
SOLID STATEAMPLIFIER
RF_PAL
PEFPVOLTGE
CONTROLLER(8CHs)
DISPLAY, MONITOR& CONTROL(FP)
Low Level RFPULSEMODULATOR RFQ
1 2 3 4 5
7 8 9 11 2
A B
1 xx
x
9
3
10
4x
1
x7x
1x
th
A
1x
6
x
x
1 x
4x
11x
x
7x
1x
C
LLRF(4U SUBRACK)
ETHER-NET LINERS232 or 485
Multi-Connected directlyWire Connected
Down Conversion&
Distribution
Coupled RF(Fwd, Ref. Cavit, etc.)
RF(350MHz)
LO(340MHz)
Clock
SBC
MFS
VME based IOC
MVME5100
SUN workstations
Ethernet
PWRD/I
16ch
A/I
8ch
D/I
16ch
D/O
16ch
A/I
8ch
A/I
8ch
A/O
4chCPU
1746IB16
1746IB16
1746OB16
1746NI8
1746NI8
1746NI8
1746N04V
1747L552
1746P2
EasyView
PWR
CPU
COM
ACPOWER
ON
OFF
110.0V 10.0A
AC POWER LINE CONDITIONER
STOCK DRAWER
EPICS IOC(Developed) CPU : MVME5100 VME I/O: MFL32A EPICS Base 3.13.8
14
VMEbus MFL32A
•500W(+5V,-12V,+12V)•.12 slots, VME64x with P0•Remote Control(RS422,LAN)
VME Bus Subrack
Pohang Accelerator LaboratoryPOSTECH
Human CC,INChttp://www.humancc.co.kr
VME Tech ,INChttp://www.vmetech.co.kr
Domestic Products
EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN
•16bits ADC,0~+10V :8Ch•16bits DAC,0~+10V:2Ch•DIO:32Ch•10/100Base T Ethernet•RS232C ,32bit CPU
15
-Development Progress . Detailed Specification . System Configuration Layout . Hardware Setup and Software module Test . Lab Test
Pohang Accelerator LaboratoryPOSTECH
Timing Control
EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN
Event system for timing control has been selected.TIMO from SLS made contribution.
16
Tank 1DT : 51L=444.5cmE=7.2MeV
CT BPPM BPPM
Tank 2DT : 39L=465.5cmE=11.5MeV
Tank 3DT : 33L=475.8cmE=15.8MeV
Tank 4DT : 29L=444.5cmE=20.0MeV
CTBPPMBeam Stop
BP
PM
#3
BP
PM
#4
RFQDCCT
#1DCCT
#2CT BPPM
Button Signals
Button Signals Button Sig
nalsButton Signals
EPICS VME IOC crate
BPPMLow-level Electronicscrate#2
BP
PM
#1
BP
PM
#2
BPPMLow-level Electronicscrate#1
CPU
ADC#1
ADC#2
Ethernet
EPICS IOC(Developing) CPU : MVME5100 ADC#1 : VTR812/10 ADC#2 : AVME9325-5 EPICS Base 3.13.6
Pohang Accelerator LaboratoryPOSTECH
BPM/DCCT Control System(Third Phase)
EPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN
Low Level Electronics(Working)-Bergoz Customized Hardware module
17Pohang Accelerator Laboratory
POSTECHEPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN
Power Supply Control System for DTL_Q
#1 PS
EPICS VME IOC
CPU
IP CarrierIP
TM
IP IP IP
#2 PS
#35 PS
#42 PS
(5Ea)
Fiber Optic
IP:Industry PackTM:Transition Module
DSP:Digital Signal ProcessingADC:Analog Digital Converter
PS:Power Supply Pack
Simulation Board With Power Supply
Intf. With Controller
Control Team PEFP
CPU : MVME5100
(Digital Power Supply)
Selected the SLS Power Supply Type.
H/W Modules are delivered & setting them up
18Pohang Accelerator Laboratory
POSTECHEPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN
Still gathering information for Utility
Utility Control(Cooling Water)
19Pohang Accelerator Laboratory
POSTECHEPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN
Main Control Screen for PEFP
20
PEFP Final Site will be selected by end of this year.
20Mev Control System for PEFPIOC LevelRF (Developed)Vacuum (Developed)Event System for Timing Control (Developed)
Beam Monitor (Developing)
Power Supply(Developing)
Utility(Still gathering control requirement)
OPIMEDM Switch to EDM
Channel Archiver(From Kay)
More things..
EPICS Training to PEFP Physicist, EngineerPohang Accelerator Laboratory
POSTECHEPICS Collaboration MeetingEPICS Collaboration MeetingDecember 8~10 ,2004 RICOTTI, Tokai JAPANDecember 8~10 ,2004 RICOTTI, Tokai JAPAN
Summary & Plan