1 setso tf setso tf nacmpf sg congestion management and ntc
TRANSCRIPT
1
SETSO TFSETSO TF NACMPF SGNACMPF SG
Congestion Management and NTCCongestion Management and NTC
2
ContentsContents
1.1. DACFDACF/NTC/NTC procedure procedure
2.2. Congestion ManagementCongestion Management
3.3. Time afterTime after reconnection reconnection
4.4. NeNecessary projects and investmentscessary projects and investments
5.5. SummarySummary
3
1. 1. Day Ahead Congestion ForecastDay Ahead Congestion Forecast
Day Ahead Congestion Forecast - DACF: Exchange of the network models and security analysis on daily basis.
DACF is harmonized within SETSO countriesInitiated the usage of DACF models in detection of network congestions
Since 1.3.2004: All countries reached the level of sending two models per day (10h30 and 3h30)
Standard of UCTE is reached but still we use “old” instruments and tools.
Aug Sep Oct Nov Dec Jan Feb Mar Apr May
20042003
Wed 10h30
Wed 10h30 and3h30
Each working day 10h30 and
Wed. 3h30
Each day 10h30 and
Wed. 3h30
Each day 10h30 and 3h30
4To transfer DACF activities to UCTE
UA
DK
RO
HU
BiH
MK
BG
HR
SI
CZ
ACH
P
SCG
D
SK
PL
E
LB
NL
AL
Every day 10:30 i 3:30
10:30 every day + Wednesday 3:30
10:30 every working day + Wednesday 3:30
Twice per week
GR
I
F
5
2. 2. Net Transfer CapacityNet Transfer Capacity
DONE:
Values for Winter 2003/04 are calculated and published on ETSO web-site
Values for Summer 2004 are calculated and updated according to the reconnection situation
Turkey joined the process of calculation the seasonal NTC values
FUTURE
To transfer NTC calculation in UCTE after the reconnection of two UCTE zones
but market wants more, so we have to implement quicker and better tools.
6
NTC NTC values for SEEvalues for SEESummer 2004Summer 2004(merged UCTE)(merged UCTE)
TO MW VALUE PROVIDED BY
JIEL(1) 300 // 400 Albania // EKC
Greece 250 Albania and Greece
Albania 400 Albania and EKC
Bosnia and Herzegovina 625 Bosnia and Herzegovina-ZEKC (2)
Bulgaria 500 // 550 EKC // BulgariaCroatia 300 EKCGreece 200 EKC and GreeceHungary 1000 EKCRomania 1500(4) // 1820(5) EKC // Romania
Croatia 475 Bosnia and Herzegovina (ZEKC)
JIEL(1) 480 Bosnia and Herzegovina-ZEKC (2)
JIEL(1) 1100 // 900 Bulgaria // EKCGreece 680// 400 Bulgaria // GreeceRomania 970 (4) // 1970 (5) Bulgaria // RomaniaTurkey 587 Turkey(7)
Romania 2390 (5) Romania
Bosnia and Herzegovina 680 Bosnia and Herzegovina (ZEKC)
JIEL(1) 500 EKCHungary 300 Hungary and CroatiaSlovenia 1000 Slovenia
Albania 80(6)//250 Greece//Albania
JIEL(1) 0(6)//600 Greece//EKC
Bulgaria 0(6) Greece
Italy 0(6)//300 Greece//Italy
Austria 700 HungaryCroatia 600 Hungary and CroatiaJIEL(1) 750 EKCRomania 700 RomaniaSlovakia 0 // 600 Hungary // Slovakia
JIEL(1) 1000(4) // 1580(5) EKC // RomaniaBulgaria 830(4) // 2230(5) Bulgaria // Romania
Bulgaria + JIEL(1) 2710(5) RomaniaHungary 1650(5) RomaniaSlovakia and Ukraine 1530(5) Romania
Greece 600 GreeceAlbania+Bulgaria+JIEL
Romania
JIEL(1)
Hungary
Greece
Croatia
Bulgaria + JIEL(1)
Bosnia and Herzegovina
Bulgaria
Indicative values for Net Transfer Capacities ( NTC ) in Europe -SEE RegionSummer 2004, working day, peak hours (Non-binding values)
FROM
Albania
7
ContentsContents
1.1. DACFDACF/NTC/NTC procedure procedure
2.2. Congestion ManagementCongestion Management
3.3. Time afterTime after reconnection reconnection
4.4. NeNecessary projects and investmentscessary projects and investments
5.5. SummarySummary
8
22. Congestion Management. Congestion Management
GOAL:
To establish the capacity allocation/congestion management procedures in SEE area (according to ETSO rules based on Directive 1228/2003):
Detection of the congestions in SEE area
Evaluation of European CM methods
Overview of CM methods already applied in SEE
Proposal for the future CM methods
Workshop with regulators and joint meeting with ETSO TF
To explore the possibilities for practical implementation of such methods form:
- technical, and
- organizational point of view (in cooperation with the regulators)
9
ESM
APG
ELES
CROISMO
KESH
Transelectrica(TEL)
NEK
HTSO
GRTN
MAVIR
TEIAS
ZEKC
EPS
EPCG
Present CM methodsPresent CM methods (before 1.07.2004) (before 1.07.2004)
Pro rata 50:50 + C.C.Redisp.
Pro rata 50:50
A->H: AuctionH->A: Pro rata
50:50HU:Auction
CRO: pro rata
Pro rata 50:50
2nd zone:
1. Mostly operational measures (but not market-based)
2. Maintenance program Coordination
SEE: Present Congestion
Management methods
10
22. C. Congestion ongestion MManagamentanagament: : FFutureuture
1st zone: Bilateral NTC auctions and on border lines with 2nd zone
2nd zone: Coordinated auction
Why: In a highly meshed grid the coordinating auction is best solution because it reflects the independens of power transactions
But
Overregional understending of the problem necessary
Multilateral agreement necessary
Is difficult to implement
It is worth trying!!!
Pilot-project for the investigation of the technical aspects of Coordinated Auction started
11
SR
MK
A
SLOCRO
AL
RO
BG
GR
I
HU
T
BiH
CG
Proposals for CM in futureProposals for CM in future
2nd zone:
Pilot project on implementation the Coordinated Auction method
Auction, other (discussed)
AuctionAuction
1 2 3 4 5 6 7 8 9 10 11 12from EPS EPS EPS EPS EPS EPS EPCG EPCG ESM TEL NEK HTSO
to TEL NEK ESM KESH EPCG ERS ERS KESH HTSO NEK HTSO KESHTEL PTDF 65 25 7 1 2 0 0 2 7 -35 -10 -3 1NEK PTDF 36 46 13 2 3 0 0 3 13 36 -18 -5 2ESM PTDF 17 7 70 3 3 0 0 3 -30 17 24 -6 3
KESH PTDF 16 2 17 34 31 0 0 31 17 16 18 35 4EPCG PTDF 4 -1 4 6 87 0 0 -13 4 4 3 7 5ERS PTDF 7 -3 3 4 64 25 75 -11 3 7 4 7 6EPS PTDF -12 8 1 -8 -89 0 0 11 1 -12 -4 -3 7ERS PTDF -5 1 2 0 -22 24 76 2 2 -5 -4 -2 8
KESH PTDF 5 5 14 30 -54 0 0 46 14 5 10 24 9EPS PTDF -27 -1 -65 -3 -4 0 0 -4 35 -27 -28 7 10
HTSO PTDF 4 11 -23 4 4 0 0 4 77 4 15 -8 11EPS PTDF -17 7 2 -4 -63 -25 -75 12 2 -17 -10 -8 12
EPCG PTDF -2 0 2 0 23 -23 -77 0 2 -2 -2 0 13EPS PTDF -76 -20 -2 -1 -1 0 0 -1 -2 24 4 2 14NEK PTDF -28 21 7 0 0 0 0 0 7 72 -7 0 15ESM PTDF -45 -22 61 2 4 0 0 4 -39 55 33 -6 16
HTSO PTDF -41 -10 37 6 8 0 0 8 37 59 49 -14 17TEL PTDF 21 -18 -1 -1 -1 0 0 -1 -1 -79 3 2 18EPS PTDF -51 -40 -6 -1 -2 0 0 -2 -6 -51 9 3 19
HTSO PTDF -26 -24 35 8 7 0 0 7 35 -26 50 -15 20NEK PTDF 11 30 -29 -6 -6 0 0 -6 -29 11 -59 12 21ESM PTDF -11 -9 27 -4 -3 0 0 -3 -73 -11 -20 7 22
KESH PTDF -14 -14 -24 28 24 0 0 24 -24 -14 -28 48 23EPCG PTDF -10 -5 -10 -30 55 0 0 -45 -10 -10 -15 -25 24EPS PTDF -21 1 -12 -36 -32 0 0 -32 -12 -21 -20 -32 25
HTSO PTDF 2 18 29 -25 -24 0 0 -24 29 2 20 -51 26HPP PIVA EPS PTDF -3 1 -1 -2 -95 0 0 5 -1 -3 -2 -3 27
ERS
TEL
KESH
HTSO
NEK
EPCG
Programs Borders
EPS
ESM
coordinated
auction
1
2
Marginal price 3
4
5
NTC Transfer capacity[MW]
Prices[MW]
NTC auctions
12
ContentsContents
1.1. DACFDACF/NTC/NTC procedure procedure
2.2. Congestion ManagementCongestion Management
3.3. Time afterTime after reconnection reconnection
4.4. NeNecessary projects and investmentscessary projects and investments
5.5. SummarySummary
13
3. 3. Time after reconnectionTime after reconnection
ALREADY DONE:
Virtual calculations for the time after the reconnection:
The calculation of the effect of reconnection (UCTE I and II) on power flows in the region.
Result: No problems after the re-synchronization from the load flow point of view
But how will the market develop? – We have no experience yet!!!
FUTURE:
Monitoring and analysing the new load flows after reconnection
Report for the next Athens forum
14
ContentsContents
1.1. DACFDACF/NTC/NTC procedure procedure
2.2. Congestion ManagementCongestion Management
3.3. Time afterTime after reconnection reconnection
4.4. NeNecessary projects and investmentscessary projects and investments
5.5. SummarySummary
15
Necessary Necessary projects projects and investmentsand investments
Equipment and software programs to facilitate the technical aspects of implementation the Regional Energy Market in South East Europe
Priority 1: IT support for DACF
Access to ftp server
SCADA system
Priority 2: IT support for allocation system
EMS
Electronic Highway
Priority 3: IT support for ETSO Scheduling System (ESS)
Web site
Other
Detail paper about this project is available (Donors paper)
16
ContentsContents
1.1. DACFDACF/NTC/NTC procedure procedure
2.2. Congestion ManagementCongestion Management
3.3. Time afterTime after reconnection reconnection
4.4. NeNecessary projects and investmentscessary projects and investments
5.5. SummarySummary
17
SummarySummary
1.1. DACFDACF/NTC/NTC procedure procedure Transfer to UCTETransfer to UCTEETSO home pageETSO home page
2.2. Congestion ManagementCongestion Management Pilot projectPilot project
3.3. Time after reconnectionTime after reconnection Monitoring aMonitoring andnd analysesanalyses
4.4. NeNecessary projectscessary projects Needed tools for Needed tools for Donors financial Donors financial
supportsupport