1 welcome to eq2440 project in wireless communication and eq2430 project course in signal processing...
Post on 21-Dec-2015
217 views
TRANSCRIPT
1
Welcome toEQ2440 Project in Wireless Communication
and
EQ2430 Project Course in Signal Processing and
Digital Communications
Kick-off MeetingFebruary 16, 2011
Per Zetterberg
School of Electrical Engineering
2
Program
• Who are we?• Introduction to the course.• Presentation of the projects.• Application form.
3
Who are we?
Per ZetterbergCourse responsible
Senay Negusse
Maksym GirnykSamer Medawar
Mattias Andersson
Course assistants
4
Course Facts• Credits: 12.• Grade: ECTS. A-F.• Group work.• Number of students per group
4-7 : Real-time based projects (Smartphone/android or Ubuntu)
2-3 : Matlab projects.• You choose among a set of “eligible” projects.• We form groups and assign a leader.• One Project assistant per group.• Course responsible: Per Zetterberg.• Prototype responsible: You!• Goals and time-table are specified, how to achieve this
is up to the team.
New this year!
5
Areas groups will work with• Algorithms (Matlab).• Project management.• Reports (Word or LaTeX)• Video (upload to youtube)• Web-pages.• Oral presentation (PowerPoint)• Setting up experiments, connecting cables.• Integrating.• Debugging, debugging, debugging.
• Smartphone-programming (android, eclipse)• PC-programming (matlab-GUI or gcc-realtime)• Radio experiments.
Some will work with
6
Real-time based projects
4-6 students per group.
• Real-time processing on smart-phone or Ubuntu PC.• Receiving data from sensors (e.g. A/D converters)
transmitting data on actuators (e.g. D/A converters).• Presentation on of results on PC.• The signal processing in real-time is one of the major
challenges due to the resulting code/algorithm structure and computational-time constaints.
Group member roles:• Programmer.• Matlab/theory developer.• Group leader/generalist.
New this year!
7
USRP based projects
• USRP = Universal Software Radio Peripheral• Used to transmit and receive wideband (4-8MHz) signals
over real radio transmitters and receivers.• Matlab interface to download and upload I&Q samples
for off-line development.• Real-time implementations sre also possible.• The signals are distorted by real-world RF-impairments
(non-linearities, intersymbol-interference, phase-noise, frequency offset).
• Developing and analyzing algorithms under real-world distortions is one the main challenges.
8
Smartphone/android based projects
• Display : plots and text.• Microphone.• Loudspeaker.• Magnetometer
measurements.• Wifi RSSI measurements.• Send data using Wifi.• Acceloremeters.• Touch screen.
Features used in our projects:
9
Group work
• One group member is group leader.• Several tasks has to solved at the same time.• Group members will have to specialize in different
areas.• Project plan.• Weekly meetings and reports.• Examination is individual so every member has to
contribute proportionally.
Individual examination and reflective diary
10
Programmers: Rush before Easter break!
dc
• Around 5 persons per group.• Typical: 2 programmer + 2 theory + 1 leader• Intense programming study the first 3-weeks (until Easter).• Recommended: Group meeting before course start. Select
programmers.
11
What would be your advice to a student who chooses this course next year ?• Don’t choose another course at the same period. Start really early with
everything.• Start working from the beginning• Work hard in the beginning and try to ease up in the end• Work hard in the beginning of the project• Start working from the first day, and don’t take more than a week off,
during the Easter• Choose it, but take it alone, with nothing else.• Work work work.• Take the course if you like to work hard.• Start early. Implement on DSP asap.• Don’t read other courses in parallel• Take it!
12
Eligible Projects
1. Wireless Ethernet tunnel (USRP project).2. OFDM with phase-noise compensation (USRP
project).3. Sound radar (smartphone/android)4. Teleconference with noise cancellation
(smartphone/android)5. WiFi finger-print.
1-2: USRP projects. 3-5: Android projects.All real-time projects except #2.Approx. 5 students per group project except project #2 with approx. 3 members.
13
Project #1:Wireless Ethernet tunnel
• Modulation/demodulation
• Coding
• Automatic repeat request (ARQ)
• Multiple Access
• Surf over your own air interface!
WallConnectEthernet
USRPUSRP
EthernetTunnel
Surf here
14
Project #2:OFDM with phase-noise compensation
Su
bca
rrierss
RXTX
Su
bca
rrierss
Ideal OFDM
Su
bca
rrierss
RXTX
Su
bca
rrierss
Phase-noise OFDM
tjtxty exp
• Phase-noise causes ISI
• Phase-noise prevalent at 60GHz.
• Low-cost oscillator=> large phase-noise.
• Experiment on USRP.
15
Project #3: Sound RadarMeasure distance to wall using smartphone
Measure the distance the wall directly using an acoustic radar pulseOR
(i) Measure the distance to the floor using an acoustic radar pulse(ii) Point the phone to the edge between the wall and the floor(iii) Measure θ using the accelerometer and calculate the distance to the wall
floord
walld
Walll
Navigation in smoked room!
16
Project #4: Teleconference with noise (interference) cancellation
Conference room
Internett
TalkTalk
Noise
• Echo cancellation• Noise suppression• Use both conference
microphones
17
Project #5: WiFi finger-print
AP
AP
AP
AP
• Construct map of RSSI measurements.• Use map and measurements to estimate location.• Hot topic for wireless systems.
18
Project Application Form
• Deadline February 24.• Name, project choice, skills.• Group formation by March 14.• Project manager assigned (group can request change).• More information on projects on course homepage:
http://www.kth.se/ees/utbildning/kurshemsidor/signal-commth/EQ2430/VT11-1
19
Before you go!
• Remember: intense programming learning during first three weeks.
• Sign the participant list and fill in your email.• Take a “project application form”.• Watch the course web-pages:
http://www.kth.se/ees/utbildning/kurshemsidor/signal-commth/EQ2430/VT11-1
• See you March 21 at 13.15 in D32 if not earlier!