YOUR REF: Not Applicable OUR REF: DA-2012-367
10 April 2013 Sandsky Developments C/- McLynskey Planners Pty Ltd PO Box 257 WEST BURLEIGH QLD 4219 Dear Sir/Madam AMENDED PLANS ACCEPTABLE Proposal: Material Change of Use - Multiple Dwelling Units (4) Application Number: DA-2012-367 Address: 29-31 James Muscat Drive, WALKERSTON QLD 4751 Property Description: Lot 153 on SP163503
Council acknowledges receipt of the revised plan of development for the above proposal received 11 March 2013. The approved plans are attached herein and satisfy condition 2 of the Decision Notice DA-2012-367. Would you please update your records accordingly, if you require further information please contact the Darryl Bibay. Yours faithfully Leah Harris Principal Planner
This is a Mackay Regional Council Digitally Signed Document
DN
DN
MB
MB
DNDN
MB
MB
□□
□□
□□
□□
♦♦ ♦♦
♦ ♦♦
□□ □□□
□
□
□
□
□□
□□
♦♦ ♦♦♦
♦♦
♦♦
♦♦
♦
♦
♦
♦
♦
♦♦
♦♦♦♦
♦
♦
♦♦
♦♦
♦♦
□ □□♦ ♦♦
□ □□ □
♦♦♦
♦♦♦♦
♦
♦ ♦♦♦
♦
25.75
25.7
5
25.
50
26.00
26.25
25.
50
25.
75
26.
00
26.25
26.50
26.00
□ □□ □
♦ ♦♦ ♦
J a
m e
s M
u s
c a
t D
r i
v e
3721
19
50
5706450
4
5600 12527 18455 4000
18
45
51
10
00
landscaping screening in front of street fencing for privacy
unit 1
unit 2
unit 3 unit 4
meterbox, positiontbc on site
letter box
letter box
letter box
landscaping screening in front of street fencing for privacy
meterbox, positiontbc on site
3000 litre rainwatertank
3000 litre rainwatertank
rece
ssed
con
tinuo
usflo
w h
ws,
pos
ition
tbc
on s
itere
cess
ed c
ontin
uous
flow h
ws,
pos
ition
tbc
on s
ite
met
erbo
x, p
ositi
ontb
c on
site
met
erbo
x, p
ositi
ontb
c on
site
recessed continuousflow hws, positiontbc on site
recessed continuousflow hws, positiontbc on site
3000 litre rainwatertank
3000 litre rainwatertank
1.5m x 2.4m slab forfreestandingclothesline
1.5m x 2.4m slab forfreestandingclothesline
1.1m x 0.5m slab forac unit
1.1m x 0.5m slab forac unit
entry entry
exposed aggregatedriveway
1.1m x 0.5m slab forac unit
1.5m x2.4m slabforfreestandingclothesline
1.5m x2.4m slabforfreestandingclothesline
1.1
m x
0.5
m s
lab
for
ac u
nit
private open space136sqm
private open space194sqm
private open space86sqm
land
scap
ing
scre
enin
g in
fron
t of
str
eet
fenc
ing
for
privac
y
W a y n e S t r e e t
1500
private open space110sqm
45
00
4000
pad level approx. 26.00
pad level approx. 26.00
pad level approx. 26.300 pad level approx. 26.300
concretedriveway
entry
entry 1500
return timber fencingto screen clotheslinefrom street
boundary6,854
boundary 6,584
boundary 10,393boundary 2,849
boun
dary 2
,849
boun
dary
2,8
49
boundary 7,4
04
boun
dary
22
,287
boundary 40,582
bound
ary 7,2
84
boundary 32,264
approx. FFL 26.310
approx. FFL 26.310
approx. FFL 26.610 approx. FFL 26.610
• site works, including retaining walls, may be subject tochange to suit final site conditions.
• all site works are currently based on disclosure plansfrom developer and must be confirmed by certifiedsurveyor prior to final construction plans beingcompleted.
• location of services may change once final connectionpoints are obtained.
"Preliminary"
FENCING LEGEND
pool fencing w/ timber posts
new 1800 high timber fencing
PLAN
DRAWN
DATE DRAWNSCALE
FACADE
SHEET #COPYRIGHT PROPERTY OF SANDSKY DEVELOPMENTS PTY LTD, ALL RIGHTS RESERVED, ANY DISCREPANCY OR DEVIATION FROM THIS PLAN IS TO BE REPORTED TO SANDSKY DEVELOPMENTS PTYLTD FOR PLAN AMENDMENT. NO RESPONSIBILITY WILL BE ACCEPTED FOR UNREPORTED DEVIATIONS OR ALTERATIONS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.
This plan certified correct is the one referred to in the inital agreement and Iunderstand changes hereafter may not be possible. These plans supercede allother previous plans or sketches.
Ph 1300 655 210PO Box 3353Helensvale TC 4212
Please Read Carefully
builders of quality new homesABN 57 082 556 194
QBSA lic no 1014147
Owner/s: .......................................................................................
Witness: ........................................................................................
Date: ..............................................................................................
FOR SANDSKY DEVELOPMENTS PTY LTDREAL PROPERTYDESCRIPTION
JOB #:
CHKD
CURRENT REVISION /ISSUED DATE
As indicated on A3A 05.10.12
LOT 153 CNR JAMES MUSCAT & WAYNE STREETWALKERSTON
CUSTOM QUADPLEX
08.06.12
MJH 02
RENDERED BRICK
V2012.1
LOT 153 / SP1635032957 & 2958
DBM
1 : 150
Site Plan
This is a Mackay Regional Council Digitally Signed Document
UPUP
wm
spac
e
wm
spac
e
MB
MB
• lift off hinges to wc door• provide gpo & cold water provisions to dw space• sarking to external walls• continuous flow hws, position to be confirmed• mechanically vent rooms without natural ventilation• all shower roses to be AAA rated• water pressure limited to 500KPa at the meter• all ground drains to be >1000m from gas bottle
location• noggens to be positioned where indicated in
bathroom at 1100 afl for fixing of towel rail (TR)• puddle flanges to be used on all floor & shower
wastes (both slab and timber floors)
Note:
2400 Sectional Door2400 Sectional Door
A 0906
720 csd
720
tub
820
----
720
820
A 0
909
D 1
809
FSF
2127
820
dining
living
kit
garage
ldy
kitdining
living
ldy
garage
FSF
2127
820
720
720 csd
820720
D 1
809
A 0
909
820
A 0906
pant
ryoh
cre
f sp
ace
ohc
ubo
dw space
ref sp
ace
pant
ryoh
c
ohc
ubo
dw space
wc wc
basin basin
alfresco
porch porch
alfresco
3000 litre rainwatertank
3000 litre rainwatertank
split
sys
tem
a/c
uni
t
split
sys
tem
a/c
uni
t
18455
350 1650 3870 230 3020 215 3020 230 3870 1650 350
230 3790 800 1700600
215600
1700 800 3790 230
230 3800 70 1750 70 1200 215 1200 70 1750 70 3800 230
18455
350 1650 350 1380 230 2070 230 5935 230 2070 230 1380 350 1650 350
230 1000 70 1000 70 3020 215 3020 70 1000 70 1000 230
11
92
0
60
02
50
03
50
23
00
35
01
06
07
00
35
03
71
0
60
02
30
61
00
23
04
76
0
23
01
50
01
00
04
49
07
05
30
70
22
00
10
00
23
0
23
03
10
09
01
60
07
05
60
02
30
10
00
11
92
0
60
02
50
03
50
23
00
35
01
06
07
00
35
03
71
0
60
02
30
61
00
23
04
76
0
23
01
50
01
00
04
49
07
05
30
70
22
00
10
00
23
0
23
03
10
09
01
60
07
05
60
02
30
10
00
meterbox, positiontbc on sitemeterbox, position
tbc on site
recessed continuousflow hws, positiontbc on site
recessed continuousflow hws, positiontbc on site
stor
age
6m
3
stor
age
6m
3
SF / FF 1818 SF / FF 1818
line of upper floor over
line of floor over line of floor over
linen linen
COLOUR NOTES:• Refer to Colour Specification schedule for
detailed internal and external colours/materials• "FWC" denotes placement of internal feature
walls (if applicable in colour specifications)• Refer to detail sheet for typical wet area tile
layouts
Plans are subject to change to meetsite and covenant/council requirements.Ground lines are indicative only andshould not be relied upon.
"Preliminary"
PLAN
DRAWN
DATE DRAWNSCALE
FACADE
SHEET #COPYRIGHT PROPERTY OF SANDSKY DEVELOPMENTS PTY LTD, ALL RIGHTS RESERVED, ANY DISCREPANCY OR DEVIATION FROM THIS PLAN IS TO BE REPORTED TO SANDSKY DEVELOPMENTS PTYLTD FOR PLAN AMENDMENT. NO RESPONSIBILITY WILL BE ACCEPTED FOR UNREPORTED DEVIATIONS OR ALTERATIONS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.
This plan certified correct is the one referred to in the inital agreement and Iunderstand changes hereafter may not be possible. These plans supercede allother previous plans or sketches.
Ph 1300 655 210PO Box 3353Helensvale TC 4212
Please Read Carefully
builders of quality new homesABN 57 082 556 194
QBSA lic no 1014147
Owner/s: .......................................................................................
Witness: ........................................................................................
Date: ..............................................................................................
FOR SANDSKY DEVELOPMENTS PTY LTDREAL PROPERTYDESCRIPTION
JOB #:
CHKD
CURRENT REVISION /ISSUED DATE
1 : 100 on A3A 05.10.12
LOT 153 CNR JAMES MUSCAT & WAYNE STREETWALKERSTON
CUSTOM QUADPLEX
08.06.12
MJH 03
RENDERED BRICK
V2012.1
LOT 153 / SP1635032957 & 2958
DBM
Lower Floor Plan
Area Schedule - Unit 1Name Area Squares
U1 - Garage 18.55 m² 2.00U1 Lower Living 54.08 m² 5.82U1 - Alfresco 6.00 m² 0.65U1 - Porch 1.82 m² 0.20U1 - Upper Living 48.60 m² 5.23
129.04 m² 13.88
Area Schedule - Unit 2Name Area Squares
U2 - Lower Living 54.08 m² 5.82U2 - Upper Living 48.60 m² 5.23U2 - Alfresco 6.00 m² 0.65U2 - Porch 1.82 m² 0.20U2 - Garage 18.55 m² 2.00
129.04 m² 13.88
Overall Building AreaArea Squares
258.08 m² 27.77
This is a Mackay Regional Council Digitally Signed Document
DNDN
shr
shr wc
820
820
820
820
A 0609A 0609
D 1509D 1509D 1509D 1509
720 c
sd
720 c
sd
wc
stud
y no
ok
bed 1carpet
bed 2carpet
bed 2carpet
bed 1carpet
1800 sldrs720
A 0906 SF 0618
SF
12
18
shr
shrwc
720 c
sd
720 c
sd
wc
1800 sldrs720
SF 0618
SF
12
18
wircarpet
wircarpetens
ens
ens
ens
roberobe
A 0
909
A 0
909
A 0
909
A 0
909
A 0906
stud
y no
ok
12735
70 3100 90 1200 90 1710 215 1710 90 1200 90 3100 70
70 3100 70 3020 215 3020 70 3100 70
12735
870 230 2070 230 5935 230 2070 230 870
230 1000 70 1000 70 3020 215 3020 70 1000 70 1000 230
230 2070 70 1900 70 1050 215 1050 70 1900 70 2070 230
85
90
70
35
30
70
21
20
32
01
25
01
00
02
30
70
24
00
70
14
50
70
53
07
03
20
07
06
60
85
90
70
35
30
70
21
20
32
01
25
01
00
02
30
70
24
00
70
14
50
70
53
07
03
20
07
06
60
7.0
°
7.0
°
7.0
°
x2x2
• lift off hinges to wc door• provide gpo & cold water provisions to dw space• sarking to external walls• continuous flow hws, position to be confirmed• mechanically vent rooms without natural ventilation• all shower roses to be AAA rated• water pressure limited to 500KPa at the meter• all ground drains to be >1000m from gas bottle
location• noggens to be positioned where indicated in
bathroom at 1100 afl for fixing of towel rail (TR)• puddle flanges to be used on all floor & shower
wastes (both slab and timber floors)
Note:
COLOUR NOTES:• Refer to Colour Specification schedule for
detailed internal and external colours/materials• "FWC" denotes placement of internal feature
walls (if applicable in colour specifications)• Refer to detail sheet for typical wet area tile
layouts
Plans are subject to change to meetsite and covenant/council requirements.Ground lines are indicative only andshould not be relied upon.
"Preliminary"
PLAN
DRAWN
DATE DRAWNSCALE
FACADE
SHEET #COPYRIGHT PROPERTY OF SANDSKY DEVELOPMENTS PTY LTD, ALL RIGHTS RESERVED, ANY DISCREPANCY OR DEVIATION FROM THIS PLAN IS TO BE REPORTED TO SANDSKY DEVELOPMENTS PTYLTD FOR PLAN AMENDMENT. NO RESPONSIBILITY WILL BE ACCEPTED FOR UNREPORTED DEVIATIONS OR ALTERATIONS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.
This plan certified correct is the one referred to in the inital agreement and Iunderstand changes hereafter may not be possible. These plans supercede allother previous plans or sketches.
Ph 1300 655 210PO Box 3353Helensvale TC 4212
Please Read Carefully
builders of quality new homesABN 57 082 556 194
QBSA lic no 1014147
Owner/s: .......................................................................................
Witness: ........................................................................................
Date: ..............................................................................................
FOR SANDSKY DEVELOPMENTS PTY LTDREAL PROPERTYDESCRIPTION
JOB #:
CHKD
CURRENT REVISION /ISSUED DATE
1 : 100 on A3A 05.10.12
LOT 153 CNR JAMES MUSCAT & WAYNE STREETWALKERSTON
CUSTOM QUADPLEX
08.06.12
MJH 04
RENDERED BRICK
V2012.1
LOT 153 / SP1635032957 & 2958
DBM
Upper Floor Plan
Area Schedule - Unit 1Name Area Squares
U1 - Garage 18.55 m² 2.00U1 Lower Living 54.08 m² 5.82U1 - Alfresco 6.00 m² 0.65U1 - Porch 1.82 m² 0.20U1 - Upper Living 48.60 m² 5.23
129.04 m² 13.88
Area Schedule - Unit 2Name Area Squares
U2 - Lower Living 54.08 m² 5.82U2 - Upper Living 48.60 m² 5.23U2 - Alfresco 6.00 m² 0.65U2 - Porch 1.82 m² 0.20U2 - Garage 18.55 m² 2.00
129.04 m² 13.88
Overall Building AreaArea Squares
258.08 m² 27.77
This is a Mackay Regional Council Digitally Signed Document
• Refer to colour specifications schedule fordetailed internal and external colours/materials
• Articulation joints as per engineering details
Note:
Plans are subject to change to meetsite and covenant/council requirements.Ground lines are indicative only andshould not be relied upon.
"Preliminary"
Lower Floor0
Lower Ceiling2440
Upper Floor2760
Upper Ceiling5200
metal powdercoated fasciasand gutters
custom orb roof sheeting
painted hardies newportcladding
brickwork with rendered andpainted finish
painted hardies easylapcladding (2440x1200vertical sheets)
painted hardies newportcladding
Lower Floor0
Lower Floor0
Lower Ceiling2440
Lower Ceiling2440
Upper Floor2760
Upper Floor2760
Upper Ceiling5200
Upper Ceiling5200
3000 litre rainwatertank
7.0°
7.0°
7.0°
painted hardies newportcladding
brickwork with rendered andpainted finish
metal powdercoated fasciasand gutters
painted hardies newportcladding
metal powdercoated fasciasand gutters
PLAN
DRAWN
DATE DRAWNSCALE
FACADE
SHEET #COPYRIGHT PROPERTY OF SANDSKY DEVELOPMENTS PTY LTD, ALL RIGHTS RESERVED, ANY DISCREPANCY OR DEVIATION FROM THIS PLAN IS TO BE REPORTED TO SANDSKY DEVELOPMENTS PTYLTD FOR PLAN AMENDMENT. NO RESPONSIBILITY WILL BE ACCEPTED FOR UNREPORTED DEVIATIONS OR ALTERATIONS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.
This plan certified correct is the one referred to in the inital agreement and Iunderstand changes hereafter may not be possible. These plans supercede allother previous plans or sketches.
Ph 1300 655 210PO Box 3353Helensvale TC 4212
Please Read Carefully
builders of quality new homesABN 57 082 556 194
QBSA lic no 1014147
Owner/s: .......................................................................................
Witness: ........................................................................................
Date: ..............................................................................................
FOR SANDSKY DEVELOPMENTS PTY LTDREAL PROPERTYDESCRIPTION
JOB #:
CHKD
CURRENT REVISION /ISSUED DATE
1 : 100 on A3A 05.10.12
LOT 153 CNR JAMES MUSCAT & WAYNE STREETWALKERSTON
CUSTOM QUADPLEX
08.06.12
MJH 05
RENDERED BRICK
V2012.1
LOT 153 / SP1635032957 & 2958
DBM
Front Elevation
Right Elevation
This is a Mackay Regional Council Digitally Signed Document
• Refer to colour specifications schedule fordetailed internal and external colours/materials
• Articulation joints as per engineering details
Note:
Plans are subject to change to meetsite and covenant/council requirements.Ground lines are indicative only andshould not be relied upon.
"Preliminary"
Lower Floor0
Lower Ceiling2440
Upper Floor2760
Upper Ceiling5200
painted hardies newportcladding
brickwork with rendered andpainted finish
painted hardies easylapcladding (2440x1200vertical sheets)
metal powdercoated fasciasand gutters
custom orb roof sheeting
3000 litre rainwatertank
3000 litre rainwatertank
Lower Floor0
Lower Floor0
Lower Ceiling2440
Lower Ceiling2440
Upper Floor2760
Upper Floor2760
Upper Ceiling5200
Upper Ceiling5200
painted hardies newportcladding
brickwork with rendered andpainted finish
painted hardies easylapcladding (2440x1200vertical sheets)
3000 litre rainwatertank
painted hardies newportcladding
PLAN
DRAWN
DATE DRAWNSCALE
FACADE
SHEET #COPYRIGHT PROPERTY OF SANDSKY DEVELOPMENTS PTY LTD, ALL RIGHTS RESERVED, ANY DISCREPANCY OR DEVIATION FROM THIS PLAN IS TO BE REPORTED TO SANDSKY DEVELOPMENTS PTYLTD FOR PLAN AMENDMENT. NO RESPONSIBILITY WILL BE ACCEPTED FOR UNREPORTED DEVIATIONS OR ALTERATIONS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.
This plan certified correct is the one referred to in the inital agreement and Iunderstand changes hereafter may not be possible. These plans supercede allother previous plans or sketches.
Ph 1300 655 210PO Box 3353Helensvale TC 4212
Please Read Carefully
builders of quality new homesABN 57 082 556 194
QBSA lic no 1014147
Owner/s: .......................................................................................
Witness: ........................................................................................
Date: ..............................................................................................
FOR SANDSKY DEVELOPMENTS PTY LTDREAL PROPERTYDESCRIPTION
JOB #:
CHKD
CURRENT REVISION /ISSUED DATE
1 : 100 on A3A 05.10.12
LOT 153 CNR JAMES MUSCAT & WAYNE STREETWALKERSTON
CUSTOM QUADPLEX
08.06.12
MJH 06
RENDERED BRICK
V2012.1
LOT 153 / SP1635032957 & 2958
DBM
Rear Elevation
Left Elevation
This is a Mackay Regional Council Digitally Signed Document
UPUP
wm
spac
e
wm
spac
e
MB
MB
• lift off hinges to wc door• provide gpo & cold water provisions to dw space• sarking to external walls• continuous flow hws, position to be confirmed• mechanically vent rooms without natural ventilation• all shower roses to be AAA rated• water pressure limited to 500KPa at the meter• all ground drains to be >1000m from gas bottle
location• noggens to be positioned where indicated in
bathroom at 1100 afl for fixing of towel rail (TR)• puddle flanges to be used on all floor & shower
wastes (both slab and timber floors)
Note:
2400 Sectional Door2400 Sectional Door
A 0906
720 csd
720
tub
820
720
820
A 0
909
D 1
809
FSF
2127
820
dining
living
kit
garage
ldy
kitdining
living
ldy
garage
FSF
2127
820
720
720 csd
820720
D 1
809
A 0
909
820
A 0906
pant
ryoh
cre
f sp
ace
ohc
ubo
dw space
ref sp
ace
pant
ryoh
c
ohc
ubo
dw space
wc wc
basin basin
alfresco
porch porch
alfresco
3000 litre rainwatertank
3000 litre rainwatertank
split
sys
tem
a/c
uni
t
split
sys
tem
a/c
uni
t
18455
350 1650 3870 230 3020 215 3020 230 3870 1650 350
230 3790 800 1700600
215600
1700 800 3790 230
230 3800 70 1750 70 1200 215 1200 70 1750 70 3800 230
18455
350 1650 350 1380 230 2070 230 5935 230 2070 230 1380 350 1650 350
230 1000 70 1000 70 3020 215 3020 70 1000 70 1000 230
11
92
0
60
02
50
03
50
23
00
35
01
06
07
00
35
03
71
0
60
02
30
61
00
23
04
76
0
23
01
50
01
00
04
49
07
05
30
70
22
00
10
00
23
0
23
03
10
09
01
60
07
05
60
02
30
10
00
11
92
0
60
02
50
03
50
23
00
35
01
06
07
00
35
03
71
0
60
02
30
61
00
23
04
76
0
23
01
50
01
00
04
49
07
05
30
70
22
00
10
00
23
0
23
03
10
09
01
60
07
05
60
02
30
10
00
meterbox, positiontbc on sitemeterbox, position
tbc on site
recessed continuousflow hws, positiontbc on site
recessed continuousflow hws, positiontbc on site
stor
age
6m
3
stor
age
6m
3
SF / FF 1818 SF / FF 1818
line of upper floor over
line of floor over line of floor over
linen linen
COLOUR NOTES:• Refer to Colour Specification schedule for
detailed internal and external colours/materials• "FWC" denotes placement of internal feature
walls (if applicable in colour specifications)• Refer to detail sheet for typical wet area tile
layouts
Plans are subject to change to meetsite and covenant/council requirements.Ground lines are indicative only andshould not be relied upon.
"Preliminary"
PLAN
DRAWN
DATE DRAWN
SCALE
FACADE
SHEET #COPYRIGHT PROPERTY OF SANDSKY DEVELOPMENTS PTY LTD, ALL RIGHTS RESERVED, ANY DISCREPANCY OR DEVIATION FROM THIS PLAN IS TO BE REPORTED TO SANDSKY DEVELOPMENTS PTYLTD FOR PLAN AMENDMENT. NO RESPONSIBILITY WILL BE ACCEPTED FOR UNREPORTED DEVIATIONS OR ALTERATIONS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.
This plan certified correct is the one referred to in the inital agreement and Iunderstand changes hereafter may not be possible. These plans supercede allother previous plans or sketches.
Ph 1300 655 210PO Box 3353Helensvale TC 4212
Please Read Carefully
builders of quality new homesABN 57 082 556 194
QBSA lic no 1014147
Owner/s: .......................................................................................
Witness: ........................................................................................
Date: ..............................................................................................
FOR SANDSKY DEVELOPMENTS PTY LTDREAL PROPERTYDESCRIPTION
JOB #:
CHKD
CURRENT REVISION /ISSUED DATE
1 : 100 on A3A 05.10.12
LOT 153 CNR JAMES MUSCAT & WAYNE STREETWALKERSTON
CUSTOM QUADPLEX
08.06.12
MJH 03
RENDERED BRICK
V2012.1
LOT 153 / SP1635032957/2958
DBM
Lower Floor PlanBuilding 2
Area Schedule - Unit 3Name Area Squares
U3 - Lower Living 54.08 m² 5.82U3 - Garage 18.55 m² 2.00U3 - Porch 1.82 m² 0.20U3 - Alfresco 6.00 m² 0.65U3 - Upper Living 48.60 m² 5.23
129.04 m² 13.88
Area Schedule - Unit 4Name Area Squares
U4 - Garage 18.55 m² 2.00U4 - Upper Living 48.60 m² 5.23U4 - Alfresco 6.00 m² 0.65U4 - Porch 1.82 m² 0.20U4 - Lower Living 54.08 m² 5.82
129.04 m² 13.88
Overall Building AreaArea Squares
258.08 m² 27.77
This is a Mackay Regional Council Digitally Signed Document
DNDN
shr
shr wc
820
820
820
820
A 0609A 0609
D 1509D 1509D 1509D 1509
720 c
sd
720 c
sd
wc
stud
y no
ok
bed 1carpet
bed 2carpet
bed 2carpet
bed 1carpet
1800 sldrs720
A 0906 SF 0618
SF
12
18
shr
shrwc
720 c
sd
720 c
sd
wc
1800 sldrs720
SF 0618
SF
12
18
wircarpet
wircarpetens
ens
ens
ens
roberobe
A 0
909
A 0
909
A 0
909
A 0
909
A 0906
stud
y no
ok
12735
70 3100 90 1200 90 1710 215 1710 90 1200 90 3100 70
70 3100 70 3020 215 3020 70 3100 70
12735
870 230 2070 230 5935 230 2070 230 870
230 1000 70 1000 70 3020 215 3020 70 1000 70 1000 230
230 2070 70 1900 70 1050 215 1050 70 1900 70 2070 230
85
90
70
35
30
70
21
20
32
01
25
01
00
02
30
70
24
00
70
14
50
70
53
07
03
20
07
06
60
85
90
70
35
30
70
21
20
32
01
25
01
00
02
30
70
24
00
70
14
50
70
53
07
03
20
07
06
60
7.0
°
7.0
°
7.0
°
x2x2
frosted glassfrosted glass frosted glass frosted glass
• lift off hinges to wc door• provide gpo & cold water provisions to dw space• sarking to external walls• continuous flow hws, position to be confirmed• mechanically vent rooms without natural ventilation• all shower roses to be AAA rated• water pressure limited to 500KPa at the meter• all ground drains to be >1000m from gas bottle
location• noggens to be positioned where indicated in
bathroom at 1100 afl for fixing of towel rail (TR)• puddle flanges to be used on all floor & shower
wastes (both slab and timber floors)
Note:
COLOUR NOTES:• Refer to Colour Specification schedule for
detailed internal and external colours/materials• "FWC" denotes placement of internal feature
walls (if applicable in colour specifications)• Refer to detail sheet for typical wet area tile
layouts
Plans are subject to change to meetsite and covenant/council requirements.Ground lines are indicative only andshould not be relied upon.
"Preliminary"
PLAN
DRAWN
DATE DRAWN
SCALE
FACADE
SHEET #COPYRIGHT PROPERTY OF SANDSKY DEVELOPMENTS PTY LTD, ALL RIGHTS RESERVED, ANY DISCREPANCY OR DEVIATION FROM THIS PLAN IS TO BE REPORTED TO SANDSKY DEVELOPMENTS PTYLTD FOR PLAN AMENDMENT. NO RESPONSIBILITY WILL BE ACCEPTED FOR UNREPORTED DEVIATIONS OR ALTERATIONS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.
This plan certified correct is the one referred to in the inital agreement and Iunderstand changes hereafter may not be possible. These plans supercede allother previous plans or sketches.
Ph 1300 655 210PO Box 3353Helensvale TC 4212
Please Read Carefully
builders of quality new homesABN 57 082 556 194
QBSA lic no 1014147
Owner/s: .......................................................................................
Witness: ........................................................................................
Date: ..............................................................................................
FOR SANDSKY DEVELOPMENTS PTY LTDREAL PROPERTYDESCRIPTION
JOB #:
CHKD
CURRENT REVISION /ISSUED DATE
1 : 100 on A3B 11.03.13
LOT 153 CNR JAMES MUSCAT & WAYNE STREETWALKERSTON
CUSTOM QUADPLEX
08.06.12
MJH 04
RENDERED BRICK
V2012.1
LOT 153 / SP1635032957/2958
DBM
Upper Floor PlanBuilding 2
Area Schedule - Unit 3Name Area Squares
U3 - Lower Living 54.08 m² 5.82U3 - Garage 18.55 m² 2.00U3 - Porch 1.82 m² 0.20U3 - Alfresco 6.00 m² 0.65U3 - Upper Living 48.60 m² 5.23
129.04 m² 13.88
Area Schedule - Unit 4Name Area Squares
U4 - Garage 18.55 m² 2.00U4 - Upper Living 48.60 m² 5.23U4 - Alfresco 6.00 m² 0.65U4 - Porch 1.82 m² 0.20U4 - Lower Living 54.08 m² 5.82
129.04 m² 13.88
Overall Building AreaArea Squares
258.08 m² 27.77B
This is a Mackay Regional Council Digitally Signed Document
• Refer to colour specifications schedule fordetailed internal and external colours/materials
• Articulation joints as per engineering details
Note:
Plans are subject to change to meetsite and covenant/council requirements.Ground lines are indicative only andshould not be relied upon.
"Preliminary"
Lower Floor0
Lower Ceiling2440
Upper Floor2760
Upper Ceiling5200
metal powdercoated fasciasand gutters
custom orb roof sheeting
painted hardies newportcladding
brickwork with rendered andpainted finish
painted hardies easylapcladding (2440x1200vertical sheets)
custom orb cladding, inselect colour
Lower Floor0
Lower Floor0
Lower Ceiling2440
Lower Ceiling2440
Upper Floor2760
Upper Floor2760
Upper Ceiling5200
Upper Ceiling5200
3000 litre rainwatertank
7.0°
7.0°
7.0°
custom orb cladding, inselect colour
brickwork with rendered andpainted finish
metal powdercoated fasciasand gutters
painted hardies newportcladding
PLAN
DRAWN
DATE DRAWN
SCALE
FACADE
SHEET #COPYRIGHT PROPERTY OF SANDSKY DEVELOPMENTS PTY LTD, ALL RIGHTS RESERVED, ANY DISCREPANCY OR DEVIATION FROM THIS PLAN IS TO BE REPORTED TO SANDSKY DEVELOPMENTS PTYLTD FOR PLAN AMENDMENT. NO RESPONSIBILITY WILL BE ACCEPTED FOR UNREPORTED DEVIATIONS OR ALTERATIONS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.
This plan certified correct is the one referred to in the inital agreement and Iunderstand changes hereafter may not be possible. These plans supercede allother previous plans or sketches.
Ph 1300 655 210PO Box 3353Helensvale TC 4212
Please Read Carefully
builders of quality new homesABN 57 082 556 194
QBSA lic no 1014147
Owner/s: .......................................................................................
Witness: ........................................................................................
Date: ..............................................................................................
FOR SANDSKY DEVELOPMENTS PTY LTDREAL PROPERTYDESCRIPTION
JOB #:
CHKD
CURRENT REVISION /ISSUED DATE
1 : 100 on A3A 05.10.12
LOT 153 CNR JAMES MUSCAT & WAYNE STREETWALKERSTON
CUSTOM QUADPLEX
08.06.12
MJH 05
RENDERED BRICK
V2012.1
LOT 153 / SP1635032957/2958
DBM
Front Elevation
Right ElevationBuilding 2
This is a Mackay Regional Council Digitally Signed Document
• Refer to colour specifications schedule fordetailed internal and external colours/materials
• Articulation joints as per engineering details
Note:
Plans are subject to change to meetsite and covenant/council requirements.Ground lines are indicative only andshould not be relied upon.
"Preliminary"
Lower Floor0
Lower Ceiling2440
Upper Floor2760
Upper Ceiling5200
painted hardies newportcladding
brickwork with rendered andpainted finish
painted hardies easylapcladding (2440x1200vertical sheets)
metal powdercoated fasciasand gutters
custom orb roof sheeting
3000 litre rainwatertank
3000 litre rainwatertank
Lower Floor0
Lower Floor0
Lower Ceiling2440
Lower Ceiling2440
Upper Floor2760
Upper Floor2760
Upper Ceiling5200
Upper Ceiling5200
custom orb cladding, inselect colour
brickwork with rendered andpainted finish
painted hardies easylapcladding (2440x1200vertical sheets)
3000 litre rainwatertank
painted hardies newportcladding
PLAN
DRAWN
DATE DRAWN
SCALE
FACADE
SHEET #COPYRIGHT PROPERTY OF SANDSKY DEVELOPMENTS PTY LTD, ALL RIGHTS RESERVED, ANY DISCREPANCY OR DEVIATION FROM THIS PLAN IS TO BE REPORTED TO SANDSKY DEVELOPMENTS PTYLTD FOR PLAN AMENDMENT. NO RESPONSIBILITY WILL BE ACCEPTED FOR UNREPORTED DEVIATIONS OR ALTERATIONS. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.
This plan certified correct is the one referred to in the inital agreement and Iunderstand changes hereafter may not be possible. These plans supercede allother previous plans or sketches.
Ph 1300 655 210PO Box 3353Helensvale TC 4212
Please Read Carefully
builders of quality new homesABN 57 082 556 194
QBSA lic no 1014147
Owner/s: .......................................................................................
Witness: ........................................................................................
Date: ..............................................................................................
FOR SANDSKY DEVELOPMENTS PTY LTDREAL PROPERTYDESCRIPTION
JOB #:
CHKD
CURRENT REVISION /ISSUED DATE
1 : 100 on A3B 11.03.13
LOT 153 CNR JAMES MUSCAT & WAYNE STREETWALKERSTON
CUSTOM QUADPLEX
08.06.12
MJH 06
RENDERED BRICK
V2012.1
LOT 153 / SP1635032957/2958
DBM
Rear Elevation
Left ElevationBuilding 2
frosted glass frosted glass
frosted glassB
This is a Mackay Regional Council Digitally Signed Document