IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten Year Cycling Network Implementation Plan The recommended Ten Year Cycling Network Implementation Plan identifies approximately 525 centreline kilometers (km) of new infrastructure (if counted in each lane direction, more than 1000 lane km). This new network includes: 280 centreline km of bicycle lanes or cycle tracks on Fast Busy Streets; 55 road km of sidewalk-level boulevard trails along Fast Busy Streets; and, 190 centreline km of cycling routes along Quiet Streets. Included within this proposed network are approximately 100 centreline km along eight arterial roadways for which Major Corridor Studies would be undertaken to evaluate the feasibility of cycling facilities. Five (5) major grade separations (bridges or tunnels) have been identified in order to provide cycling facilities that cross major highways, railways or ravines. A summary of the proposed network length by facility types is provided in Exhibit 10-2. The recommended 10-year Capital Plan scenario is the $16 M per year scenario ($140 M from 2017 to 2025). This scenario would provide the resources necessary to initiate the design and delivery of the vast majority (85%) of the proposed network projects. The program would allow for sixteen of the seventeen Major Corridor Studies identified to be initiated, so as to complete impact analysis, design and consultation. However, insufficient funding would be available to fund the construction of the proposed cycling infrastructure that may be recommended in four of the studies within the ten year period (namely cycling facilities along Midland Avenue and a Highway 401 crossing of Yonge Street would be unfunded). Four additional Full-time Equivalent (FTE) staff starting in year 2017 and two starting in year 2018 would be needed to deliver the projects. In addition to new projects identified to connect and grow the Cycling Network, part of the mandate of the Cycling Network Implementation Plan will be to renew existing Cycling Network routes, to improve their quality. Existing bike lanes may be "renewed" by updating or improving the quality of their signs and markings. In some cases this may include the addition of new markings to intersections or the addition of painted buffers. In some cases bike lanes may be upgraded to cycle tracks if it is feasible to add separation. Signed routes on Quiet Streets may be upgraded with the addition of wayfinding, shared-lane pavement markings, or with additional traffic calming or traffic operational interventions to slow down or reduce the motor vehicle traffic. The Renew component of the Cycling Network Implementation Plan includes funding for this work as well as intersection safety improvements and the expansion of the City's new wayfinding signage strategy (refer to Section 9.1.1).

Upload: others

Post on 21-Feb-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

April 17, 2016 86

10 Recommended Ten Year Cycling Network Implementation Plan

The recommended Ten Year Cycling Network Implementation Plan identifies approximately 525 centreline kilometers (km) of new infrastructure (if counted in each lane direction, more than 1000 lane km). This new network includes:

280 centreline km of bicycle lanes or cycle tracks on Fast Busy Streets;

55 road km of sidewalk-level boulevard trails along Fast Busy Streets; and,

190 centreline km of cycling routes along Quiet Streets.

Included within this proposed network are approximately 100 centreline km along eight arterial roadways for which Major Corridor Studies would be undertaken to evaluate the feasibility of cycling facilities.

Five (5) major grade separations (bridges or tunnels) have been identified in order to provide cycling facilities that cross major highways, railways or ravines.

A summary of the proposed network length by facility types is provided in Exhibit 10-2.

The recommended 10-year Capital Plan scenario is the $16 M per year scenario ($140 M from 2017 to 2025). This scenario would provide the resources necessary to initiate the design and delivery of the vast majority (85%) of the proposed network projects. The program would allow for sixteen of the seventeen Major Corridor Studies identified to be initiated, so as to complete impact analysis, design and consultation. However, insufficient funding would be available to fund the construction of the proposed cycling infrastructure that may be recommended in four of the studies within the ten year period (namely cycling facilities along Midland Avenue and a Highway 401 crossing of Yonge Street would be unfunded). Four additional Full-time Equivalent (FTE) staff starting in year 2017 and two starting in year 2018 would be needed to deliver the projects.

In addition to new projects identified to connect and grow the Cycling Network, part of the mandate of the Cycling Network Implementation Plan will be to renew existing Cycling Network routes, to improve their quality. Existing bike lanes may be "renewed" by updating or improving the quality of their signs and markings. In some cases this may include the addition of new markings to intersections or the addition of painted buffers. In some cases bike lanes may be upgraded to cycle tracks if it is feasible to add separation. Signed routes on Quiet Streets may be upgraded with the addition of wayfinding, shared-lane pavement markings, or with additional traffic calming or traffic operational interventions to slow down or reduce the motor vehicle traffic. The Renew component of the Cycling Network Implementation Plan includes funding for this work as well as intersection safety improvements and the expansion of the City's new wayfinding signage strategy (refer to Section 9.1.1).

Page 2: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

!

!

!

!

!

(

(

(

(

(

CITY OF

MISSISSAUGA

CITY OF

BRAMPTON

CITY OF

PICKERING

TOWN OF

RICHMOND HILLCITY OF

MARKHAM

CITY OF

VAUGHAN

VIC

TOR

I APA

RK

AVE

HEATH ST W

HARBORD ST

BAYVIE

W AV

E

BARTON AVE

AN TIB

E

S

D R

LAIR

D D

R

MID

LAN

DAV

E

CO

NLIN

SR

D

CA

RLA

WAV

E

DIXON RD

RO

YAL

YO

RK

RD

DUNDASST

W

OS

SIN

GTO

NAV

E

VAUGHANRD

WO

OD

BINE AVE

HIG

HW

AY27

N

ADE LAIDE STE

YON

GE

ST

HU

NTSM

ILLB

LV D

MA

XO

ME

AV

E

KEELE S

T

GARY DR

DU

FFERIN

ST

RU

NN

YME

DE R

D

OS

L ER

ST

ROGERS RD

STEPHE

N

DR

VARN A

DR

PORT U

NIO

N R

D

STEELES AVE W

BLOOR ST W

BIRC

HM

OU

NT

RD

ISABELLA

ST

FELSTEAD AVE

THE

EA

ST

MALL

KEELE S

T

EGLINTON AVE E

KENN

ETH

AVE

KINGSTON RD

SHEPPARD AVE E

EASTERN AVECH

UR

CH

ST

EIREAN

N

QU

AY

MAR

LEE AVE

DUNDAS ST E

MO

RN

ING

SIDE

AV

E

SCAR

LETT

RD

OVE

RLEA BLVD

MALVER

N

ST

GERRARD ST E

MCNICOLL AVE

NA

NTU

CK

ET

BLVD

WELLINGTON ST W

HAVENDALE

RD

ST CLAIR AVE W

SHAW

ST

GILTS PU

RDR

AVENU

ER

D

TAPSC

OTT

RD

EGLINTON AVE W

ALBION RD

FINCH AVE E

WE

ND

ELL AVE

ELLESMERE RD

DANFORTH AVE

LESLIE S

T

CH

RISTIE S

T

FINCH AVE W

GERRARD ST EBELLAM

Y RD

N

KIPLIN

G AVE

KING

STO

NRD

MA

RK

HA

MR

D

BRIM

LEY R

D

EMPRESS AVE

ROYALCREST

RD

DO

RIS

AVE

LAKE SHORE BLVD W

HUNTINGWOOD DR

MILLWOOD RD

KING ST W

ROSEMOUNTAVE

ELLESMERE RD

SENLA

C R

D

LESLIE

ST

LAWRENCE AVE E

TOR

RE

SDA

LEA

VE

JANE

ST

MAR

TIN G

RO

VE R

D

CHAPLIN CRES

LAKE SHORE BLVD W

KIPLING

AVE

LAWRENCE AVE W

MC

CO

WA

NR

D

NASSAU

ST

WELLINGTON ST W

GLENGROVE AVE W

ISLING

TON

AVE

BELFIELD RD

DO

VER

CO

UR

T R

D

HUM

BER

COL LEGE BLVD

MAPLE LEAF DR

COSBURN AVE

OR

TON

PAR

KR

D

LOG

AN AV

E

GLENLAKE AVE

PAR

KS

IDE

DR

ALNES

S ST

EVANS AVE

WAR

DE

N AVE

KE

NN

ED

YR

D

BEDFO

RD

RD

SOU

TH

KINGSWA

Y

DUPONT ST

CO

NC

OR

DE

PL

EAS TLIBERTY

ST

HEATH ST E

YORK MILLS RD

LAKE SHORE BLVD E

DU

ND

AL

K

DR

BLOOR ST W

HIG

HW

AY 27 S

ANNETTE ST

SE

NTINE

LRD

BISHOP AVE

COMMISSIONERS ST

THE QUEENSWAY

SC

AR

BO

RO

UG

HG

OLF

CLU

BR

D

THE WESTWAY

WESTONRD

SAMMON AVE

QUEEN ST E

TIMB E RB

AN

K

B LVD

QUEENS

QUAY E

RO

CK

CLIFFE

BLVD

O CONNOR DR

LAKE SHORE

BLVD W

OA

KWO

OD

AVE

SHEPPARD AVE W

THE QUEENSWAY

OLD FINCH AVE

THE POND RD

DAVENPORT RD

WILSON AVE

RATHBURN RD

FLE

M

I NGTO NRD

QUEEN ST W

RANEE AVE

ELLISAVE

REXDALE BLVD

BROOKE AVE

DO

NM

ILL S

RD

G

REEN

BELT DR

OLD

K INGSTO

N

RD

OLD

WE

STO

NR

D

DUNDAS ST

W

LEX

FI ELD

AVE

DU

FFERIN

ST

MILL

RD

COLLEGE ST

JAMESO

N

AVE

CO

XW

ELL

AVE

MORTIMER AVE

LAKE SHORE BLVD E

RUSTIC RD

CR

OC

KFO

RD

BLV

D

CH

ESTE

RLE

BLV

D

BROO KB

A

NKSD

R

CLO

NM

ORE

DR

LAWRENCE AVE E

DAVISVILLE AVE

PASSMORE AVE

BURNHAMTHORPE RD

BERTRAND AVE

ST CLAIR AVE E

MO

RR

ISH

RD

PH

AR

MAC

YAV

E

UN

IVE

RS

ITYAV

E

SHER

BO

UR

NE S

T

EAST

AVE

TRANSIT

RD

EGLIN

TON

AVE

W

MOORE AVE

TR UDELLE ST

DRIFTWOOD

AVECRESCENT

RD

WILM

ING

TON

AVE

QUEENS QUAY W

GR

AC

E ST

RICHMOND ST W

N UGGET

AVE

MILNER AVE

DA

NFO

RTH

RD

PAR

KLAW

NRD

SI LVER

THO

RN

AVE

MAN

SE R

D

BRO

CK AVE

JARVIS ST

WOBURN

AVE

TRETHEWEYDR

LAKE SHORE BLVD E

PH

AR

MA

CY

AVE

JOH

N

GARLAN DBL

VD

VAN HORNE AVE

ST CLAIR AVE E

DU

PLEX

A VE

INVE R GORDON

AVE

THISTLE

DO

WN

BLVDM

EAD

OW

VALE

RD

FEN

SIDE

DR

VICTO

RIA S

T

FASKEN DR

SILVE

RST

ON

E

DR

BETHRIDGE RD

MIMICO

AVE

SEWE

LLS

RD

LAN

SD

OW

NE

AVE

SHROPSHIREDR

GA

LLOW

AY R

D

ROSELAWN AVE

CATHERINEST

MORNING

STAR DR

KILBARRY RD

MACK

AVE

LAWSON RD

GENERATIO

NB

LVD

DO

NLA

ND

S AVE

C HURCH ST

STEELES AVE E

KEELE S

T

CA

L ED

ON

IAR

D

LAMBTON AVE

JON

ES AVE

DA

WE

SR

D

DISCO RD

CANMORE

BLVD

BR

OW

NS

LINE

MOSSBAN

K

DR

DU

NN

AVE

PITFIELD R D

MILL ST

PR

INCE PHILIP

BLVD

M CLEVI

NAV

E

HOPEST

HUMBERSIDE

AVE

MANOR RD E

ADELAIDE

ST W

CHURCHAVE

DUNCANM ILL RD

ELM R

D

PO

PL A

R

PLA

INS

R D

COMSTOCK RD

BE N LEIG

HDR

MC

C

AUL S

T

NEW TORONTO ST

WALSHAVE

OLD

PARKRD

CASSAVE

THIRTIETH

ST

FLEET ST

LAPPIN

AVE

MU RIS

ON

BLV D

SHAV

ER

AVE S

BONI SAVE

MOUN

T

OLIVE DR

FRONT ST E

BRIM

ORTON

DR

FRONT ST W

L

A NYARD

R D

SHOREHAM

DR

JED

B UR

GH

RD

AVONDALE AVE

SYMIN

GTO

N AVE

HALLAM ST

BRAYMO

RE BLVD

ERINGATE DR

FAYW

OO

DB

LVD

HU

MBE

RBL

VD

SPAD

INA

RD

BE

EC

RO

FT

RD

ELDER

AVE

BERRY RD

EASTW OOD

RD

COR O NATION DR

BURROWS HAL

L BL VD

MA

INS

T

YONGE

BLVD

WIN

COTT

DR

INGRAM

DR

CORPORATE

DR

FLORENCE AVE

UN

DE

RH

ILLD

R

BLACK

CREEKDR

ST LAWR

EN

CE

AVE

CLEN

DE

NAN

AV

E

SAVARIN ST

ST JOHNS

RD

KIDRO NVALLE Y

DR

ROSEDALE VALLEY RD

WAS

HBUR

NW

AY

BI C

KN

ELL

AVE

NORSEMAN ST

EDITHD

R

DYN

AMIC

DR

CAR

LING

VIEW

DR

VARSITYRD

FENN

AVE

LINKW

OO

D

LANE

WILSO

NH

EIGH

TSB

LVD

TWYN RIVE

RS

DR

OLD FINCH AVE

DENTON AVE

OA

SIS BLV

D

CUMMER AVE

VILLAGE

GREENSQ

MERTON ST

FENMAR DR

W

INTERMU

T E

BLV D

B

ARBER

G

REENERD

SW EENEY

D R

PRI NCESS

MARG ARETBL

VD

DOR COTAVE

PRIN

CE

ED

WAR

D D

R S

SLANAV

E

ROSELAWN

AVE

TORRESDALE

AVE

BERING

AVE

BROADWAY AVE FAIRFAX CRES

SCARDEN

AVE

ADVANCE RD

DENLOW

BLVD

FOR

ES

T

GR

OVE

DR

IN

G LETO

NB

LVD

THE

KINGSWAY

HIS

COCK

BLVD

BEAR

E RD

FERRIS RD

ARLETAA V

E

ST GE

OR

GE

ST

GRANDRAVINE

DR

HU

MBE

RL IN

EDR

B ER

NER

T RL

NEWTON D R

CHER

RY

ST

AT

T WELLD

R

JUDSON ST

BARTLEY DR

LITTLES

R

D

PAG

EAVE

CORVETTE AVE

B RIMWOODBLV

D

LIN

G

R D

HYMUS RD

WIN

DE

RM

ERE

AVE

CHURCHILL AVE

LA ROSE AVE

SLOA

NE

AV

E

MONTGOMERYRD

EGLINTON

AVEW

F

RI EN

DSHIP

AV E

ELMH

U

R ST DR

HARR

ISO

NR

D

GUILDWOOD PKW Y

BIRMINGHAM ST

MILD

EN

HA

LL

RD

WILFR

ED

AVE

F ENE

LON

DR

BELLAMY R

D

S

JOH

N

T AB OR

T

RL

HOLIDAY

DR

SPAD

INA

AVE

ELM

AVE

WOODSWORT

H

RD

ELM

RIDGEDR

DU

VAL DR

GLEN

CE

DA

RR

D

SOUDAN AVE

NE

ILSO

NDR

LUMSDEN

AVE

KIN

GS

TON

RD

MO

UN

T

PLE

AS

AN

T

RD

EXBURY RD

DENNETT

DR

BURTONRD

FIF

ES

HIRE

RD

BAN

BU

RY

RD

MID

LAN

D AVE

CASTLE FIELDAVE

MEA

DO

WVALE R

D

HILD

AAV

E

KEELER BLVD

FALSTAFF AVE

VALERMO DR

GER

VAIS

DR

CLY

DE

AV E

CAC

TU

SAVE

GEARY

AVE

POPLAR

RD

RED

PATH

AVE

GERRARD

STE

ORMONT DR

PLA

CE

NTIA

B LVD

SPENVALLEY

DR

EARL PL

MELROSE AVE

UPJO

HN

RD

FIELDW

AY

RD

F OXRIDGE

DR

CAN

MO

TOR

AVE

IND

IAN

RD

RAY

AVE

CASSANDRABLVD

HA

WK

SB

UR

Y DR

SIG

NE

TD

R

ED E NB

RID

GED

R

BR

IMLE

YR

DSWICKST EED AVE

FORT YORK

BLVD

OA

KL

EY

BLVD

HIL

LC

RE

S

GORDON

MACKAY RD

CASEBRIDGECRT

OAKST

MAS

ON

RD

R ESO

URCES

RD

SERVI

CE RD

CIVICRD

ORFUS RD

BER GAMOT AVE

HIGH

PARK

BLVD

PASSMORE

AVE

TI FF

IELDR

D

INDUSTRY ST

BRIDGELAND

AVE

GIBBS RD

FOUR

WINDS DR

CO

NLIN

S RD

ALA

MO

SA

DR

THORNMOU

NT

DR

CH

ESSWO

O

D

DR

CANA DIAN

RD

IS LA

ND

RD

STEEPROCK

DR

WIN

ON

A

DR

SUNRISE AVE

TUXEDO CRT

PETR

OLIA

RD

VALHALLA

INN RD

RIDGETOP RD

QU

EENS

PL ATE

DR

OAKR

IDGE

DR

GARYRAY DR

ELLERSLIE AVE

PLEWES RD

CUR LE

WD

R

G

OLDFINCHCRT CORO NATION

DR

POST RD

EAST DR

TAN

GIER

SR

D

RACINE RD

PRO

DU

CTIO

N

DR

BURCANA RD

GOLDEN

GATE CRT

ASHTONBEE RD

DUNELM ST

MILLIKE

N BLV

D

WIL

LIA

MC

ARS

ON

CR

ES

CLAYS

ON

RD

JUTLAND RD

TYCOS DR

PICK

ERIN

G TO

WN

LINE

MONOGRAM PL

LESM

IL L RD

UPTON RD

TEMPO

AVE

TORYORK DR

RI V

ALD

A

RD

TITAN RD

THEBR IDLEPATH

FINCH AVE

E

MID

DLE

FIELD

RD

LIVING

STON

RD

BATHU

RST

ST

MO

UN

TPLE

AS

AN

TR

D

RIVE

R S

T

SOR

AUR

EN AVE

PARLIAM

ENT

ST

BR

OA

DV

IEW

AVE

MC

CO

WAN

RD

PROGRESS AVE

BAY

ST

RE

NFO

RT

HD

R

DO

N M

ILLS RD

SPAD

INA

RD

CAR

RIE

RD

R

RO

NC

ESVALLES

AVE

NEILSONR

D

NORTH QUEEN ST

OR

I OLE

PK

WY

BOR

O

U GH D R

MILITARYTRL

MA

RIN

E

P A RA

DE

D R

HUM

BE

RW

O

O D BLVD

SI LVER

SP

R

INGS

BLVD

STDEN N

IS

DR

THE

DON

WA

YE

C

HA RTLAND B LVD

S

GOLD

HA

W

K TR L

DW

IGH

T AVE

BLOOR

RAM

P

THE

WE

ST

MALL

WE

L LESW

ORT

H

DR

KINGSTON R

D

SENECA HILL

DR

CAN

LISH

RD

BR

IAND

R

PAPE AV

E

PARK

RD

TALB

OT

RD

AVEN

UE R

D

THE KINGSWAY

PO

RTR

OYA

L

T RL

EM MET

T

AV E

LY

NNBR

OOK DR

PLUG HAT

RD

KINGS LAKE

R

D

ELLING

TON

DR

RAL

EIG

H A

VE

NO

RF IN

CH

DR

ARROW

RD

WE

STMO

RE D

R

BA

M

BU R

GH

C

R C L

HU

LLMA

R

D R

CALVINGTON DR

ROUGE

RIVER DR

AL

EXMUIR

BLVD

MC

INTO

SH S

T

BAN BURYRD

BAN

BURY

RD

SHA

UG

HNES

SY

BLVD

FAWCETT

TRL

CROW

TRL

HORNER AVE

PACKARD

BLVD

BIRKDA

LE

RD

GLE

N R

D

GR

AN

D AVE

SIN

NO

TTR

D

DEW E

YDR

UPPER

CANADA

DR

GO

RD

ON

BA

KE

RRD

MILLWICKDR

CO

N

SUMER S

R

D

WI LLI A

MR

ALLENRD

OA

KD

AL E

RD

MILVAN DR

MID

WE

STR

D

T OR

BA

RR

IER

D

BR

AH

MS

AVE

FINCHD

EN

ES

Q

CO

MM

A N DERB

LV

D

SKYW

AYAV

E

RONS

ON D

R

FL INT

RD

NO

RE

LCO

DR

C HA

NN

EL

NI N

EC

RT

PRINCE

ANDREW

PL

RA

IL

S IDE

RD

HO

WD

EN

RD

LAKE ONTARIO

±

Data source: City of Toronto / IBI Group, 2016Projection: NAD 1927 MTM 3

Date: April 2016Cartography: Vélo Québec

0 3 6 km

!

Toronto

U.S.A

LAKE ONTARIO

EXHIBIT 10-1Map of Ten Year Cycling Network

Implementation PlanRecommended Routes

LegendCycling Network and Trails Plan

Existing Cycling Network

Rail LineFreewayMajor Road Arterial Road Network

Green Space

Major Corridor Study

Bike Lane / Cycle Track

Trail / Boulevard Trail

Quiet Street Route

Bike Lane / Cycle Track

Trail / Boulevard Trail

Quiet Street Route

Tunnel or Bridge!(

Page 3: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

April 17, 2016 88

10.1 Integration of 2012 Trail Plan Recommendations The Ten Year Cycling Network Plan incorporates the projects identified in the 2012 Bikeway Trails Implementation Planxxiv. Approximately 17 km of trails were installed between 2012 and 2016 as part of this Plan. The remaining projects have been incorporated in the Ten Year Cycling Network Implementation Plan with the exception of the two trail segments as part of the Finch Corridor Trail (connection in west to Humber Trail and in the east to the Scarborough Railpath), and the northern limit of the proposed trail project along Black Creek was revised. These routes were identified as infeasible because they require large structures across highway and rail corridors and were replaced with the following on-street routing:

Finch Street West installation as per the Finch LRT project (multi-use trail and cycletrack) to connect the western limits of the Finch Corridor Trail (at Norfinch) with theHumber Trail. This avoids the challenging Hwy 400 crossing;

McNicoll Avenue (between Pharmacy Avenue and Brahms Avenue) instead of theFinch Hydro Corridor to avoid the challenging Hwy 404 crossing;

Finch Street East and Middlefield Road to connect to Scarborough Railpath, whichavoids the challenging rail crossing required with the Finch Corridor Trail; and,

Culford Road, between Black Creek Drive and Rustic Road, instead of following theboulevard for this northern segment of Black Creek Drive, which was found to beinfeasible.

10.2 Implementation Plan Approval Process The proposed Cycling Network Implementation Plan identifies and recommends on-street cycling routes that are well integrated with the bikeway trail routes to provide a cohesive system of cycling routes across the city. If approved by Council, the Cycling Network would be implemented as follows:

Consider the capital funding required to implement the proposed Ten-Year CyclingNetwork Implementation Plan at a rate of $16 million dollars annually in the annualcapital and operating budget process, as well as the operating budget required tofund the maintenance costs of newly constructed cycling infrastructure;

Undertake the detailed design and public consultation required to deliver cyclinginfrastructure projects contained within the Ten-Year Cycling NetworkImplementation Plan;

Undertake and manage the Major Corridor Studies identified for new cyclinginfrastructure contained within the Ten-Year Cycling Network Implementation Planand report back to Public Works and Infrastructure Committee on each study'srecommendations; and,

Provide a two year update to the Public Works and Infrastructure Committee onimplementation progress of the Ten Year Cycling Network Implementation Plan, andfuture updates as appropriate.

10.3 Exploring the Impacts of the Recommended Network This discussion focuses on the impacts of providing a connected network. As the network plan outlined in this report is implemented, the quality and coverage of the Cycling Network will expand faster than it has ever before across the City of Toronto.

To clarify the terminology used in this section:

Page 4: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

April 17, 2016 89

• The existing network refers to all of the network links that were installed as of December 2015;

• The recommended network refers to the full $16M network scenario identified through this plan, which includes all of the Major Corridor Studies; and,

• The approved network refers to the plan approved by council in June 2016 which excludes several major corridor studies identified in the recommended plan.

10.3.1 Summary of Recommended Network by District The recommended network put forward in this plan provides a comprehensive network comprised of attractive and context-sensitive facilities throughout the four districts of the city. A summary of the types and length of facilities recommended to be implemented over the ten-year period is as follows, and as summarized in Exhibit 10-2 and Exhibit 10-3:

In Etobicoke York District, the recommended network consists of 59 km of cyclingfacilities on Fast Busy Streets, 47 km on Quiet Street facilities, 23 km of multi-usetrails including boulevard trails and off-street trails for a total of 129 km. This willincrease the existing cycling network by about 80% from 156 km to a total of 285km;

In North York District, the recommended network consists of 64 km of cyclingfacilities on Fast Busy Streets, 67 km of Quiet Street facilities, and 28 km of multi-use trails. Added to the 122 km of existing cycling facilities, this will increase thenetwork by about 130% to a total of 281 km in North York District;

In Scarborough District, the recommended network consists of 79 km of cyclingfacilities on Fast Busy Streets, 17 km of Quiet Street facilities, and 42 km of trails fora total of 138 km. Added to the 134 km of existing cycling facilities, this will doublethe cycling network length to 252 km; and,

In Toronto-East York District, the recommended network consists of 78 km of cyclingfacilities on Fast Busy Streets, 60 km on Quiet Streets, and 17 km of trails for a totalof 155 km. Added to the 198 km of existing network, this will grow the cyclingnetwork by almost 80% to 353 km.

Some observations about the type of facilities that are recommended to be implemented over the ten-year period in each District are as follows:

The grid network of local streets in the Etobicoke District, Toronto and East YorkDistrict and North York District allows for the development of direct routes usingQuiet Streets. The predominantly curvilinear design of local streets in ScarboroughDistrict provides fewer opportunities for direct travel by Quiet Streets; and,

There are fewer opportunities for boulevard trails along arterial roads in the Torontoand East York District due to the type of development fronting the streets.

The cycling network in Toronto and East York District will be more extensive than the other Districts when the recommended Ten Year Cycling Network Plan routes are complete. The greater route coverage is due to a number of factors in this District, including more cyclists and cycling trips, higher population and employment density, more short trips, and a longer existing cycling network (by 20 to 40%).

Page 5: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

April 17, 2016 90

Exhibit 10-2: Summary Table – Centreline Kilometres of Existing and Recommended Network for Scenario 3 (Uplift to $16M Annual Budget)

Fast Busy Streets

Bike lanes 104 km 31 km 40 km 27 km 23 km 120 km 224 km

Buffered bike lanes 2 km 9 km 3 km 13 km 9 km 34 km 36 km

Cycle tracks 19 km 20 km 21 km 39 km 46 km 126 km 145 km

On-Street Facilities Subtotal 125 km 59 km 64 km 79 km 78 km 280 km 405 km

Trails

Boulevard multi-use trail 33 km 13 km 15 km 21 km 1 km 49 km 82 km

Multi-use trail 264 km 2 km 2 km 2 km 0 km 6 km 270 km

Trails previously approved for constrcution by City Council (2012

Bikeway Trails Plan)12 km 8 km 11 km 19 km 16 km n/a 66 km

Trail Subtotal 309 km 23 km 28 km 42 km 17 km 55 km 418 km

Quiet Street Cycling Routes

Quiet Streets Facilities Subtotal 159 km 47 km 67 km 17 km 60 km 190 km 337 km

Existing Network 593 km 156 km 122 km 134 km 198 km km

Recommended Network 579 km 128 km 159 km 138 km 154 km km

Total (Existing + Recommended) Network 1,172 km 285 km 281 km 272 km 352 km 1,160 km

Existing

Existing

Total

All Districts

Total

All Districts

RecommendedExisting +

Recommended

ScarboroughToronto and

East York

RecommendedCycling Network Facility Type(Centreline km)

Existing Recommended Recommended Recommended

Total

All Districts

Etobicoke -

York

North

York

Page 6: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

April 17, 2016 91

Exhibit 10-3: Scenario 3 Recommended Infrastructure - Centreline Kilometres by District

10.3.2 Improving Access to Transit The proposed Cycling Network will dramatically improve access to both existing and proposed transit stations. For this analysis, the length of the existing, approved and recommended Cycling Networks that fall within 800m and 2000m of existing and future transit stations were summarized to provide a sense of the overall servicing of these stations, as illustrated in Exhibit 10-5.

A summary was also developed to calculate the total number of stations that are served in each scenario. Presently, 15 GO stations and 62 TTC stations are located within 800m of a Cycling Network route. If approved and constructed, the Cycling Network Implementation Plan Routes would be built in proximity to 4 additional GO Transit stations and 12 TTC Stations.

There are currently no Cycling Network routes in proximity to the following GO Transit and TTC Stations, but routes recommended as part of the Ten-Year Cycling Network Implementation Plan may be designed to serve these routes.

Exhibit 10-4: Existing Cycling Network and Transit Stations

GO STATION Underserved By Existing

Cycling Network

TTC STATION Underserved By Existing

Cycling Network Scarborough Station - GO Sheppard-Yonge -

TTC Wilson - TTC York Mills - TTC

Kipling - GO Kipling - TTC Bayview - TTC Downsview - TTC Sheppard-Yonge - TTC

Ellesmere - TTC Bessarion - TTC

North York Centre - TTC

McCowan - TTC Scarborough Centre - TTC

0

20

40

60

80

100

120

140

160

Etobicoke - York North York Scarborough Toronto and East York

Bike Lanes or Cycle Tracks Boulevard Trails Quiet Street Cycling Routes

Page 7: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

CITY OF

MISSISSAUGA

CITY OF

BRAMPTON

CITY OF

PICKERING

TOWN OF

RICHMOND HILLCITY OF

MARKHAM

CITY OF

VAUGHAN

LAKE ONTARIO

Data source: City of Toronto / IBI Group, 2016Projection: NAD 1927 MTM 3

Date: July 2016Cartography: Vélo Québec

0 3 6 km

Toronto

U.S.A

LAKE ONTARIO

Page 8: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

April 17, 2016 93

10.3.3 Crossing Barriers There were many comments received throughout plan consultation about the importance of crossing barriers, and the recommended network has the potential to dramatically improve access across some of the notable barriers throughout the city of Toronto, including Highway 401, Highway 427, Highway 400, the Humber River, the Don River and Don Valley Parkway, and the many rail lines bisecting the city.

In order to illustrate the potential impact of the network, a geographic analysis of barriers was carried out. For this analysis, various barriers were identified and mapped using ArcGIS (including watercourses, freeways, rail lanes and median-running transit). The existing, approved and recommended Cycling Networks were analyzed for intersections with these barriers to give a sense of the impact of these routes.

As depicted in Exhibit 10-6, several types of barrier crossings are identified throughout the network.

Proposed Tunnels and Bridges:

Five (5) major grade separations (bridges or tunnels) have been identified in order to provide cycling facilities that cross major highways, railways or ravines. These grade separations would provide important links to cross significant barriers to Cycling Network connectivity and studies are recommended to further assess their feasibility and cost.

Page 9: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

CITY OF

MISSISSAUGA

CITY OF

BRAMPTON

CITY OF

PICKERING

TOWN OF

RICHMOND HILLCITY OF

MARKHAM

CITY OF

VAUGHAN

VIC

TOR

IAPA

RK

AV

E

BAYVIE

W AVE

BARTON AVE

A NTIB

ES

DR

GR

EEN

WO

OD

AVE

LAIR

D D

R

SPAD

INA AVE

MID

L AN

DAV

E

CO

NLIN

S RD

CAR

LAW AV

E

DIXON RD

RO

YAL

YO

RK

RD

OS

SIN

GTO

NAV

E

WO

OD

BINE AVE

ADELAID E STE

YON

GE

ST

HU

NTSM

ILLB

L V D

MA

XO

ME

AV

E

KEELE S

T

OS

L ER

ST

ROGERS RD

STEPHE

N

DR

VARNA

DR

PORT U

NIO

N R

D

STEELES AVE W

BIRC

HM

OU

NT R

D

RU

SS

ELL

HILL

RD

FUND

Y BAY

BL V D

ISABELLA

ST

THE

EA

ST

MA

LL

KEELE S

T

EGLINTON AVE E

CHE

RO

KEE

BLV D

YOR

K ST

KENN

ETH

AVE

KINGSTON RD

SHEPPARD AVE E

EASTERN AVE

CH

UR

CH

ST

EIREANN

QUAY

SCAR

LETTR

D

OVERL

EA BLVD

MCNICOLL AVE

NA

NTU

CK

ET

BLVD

WELLINGTON ST W

HAVENDALE

RD

ST CLAIR AVE W

SHAW

ST

GILTS PU

R DR

TAPS

CO

TTRD

ALBION RD

FINCH AVE E

WE

ND

ELL AVE

ELLESMERE RD

LES

LIES

T

FINCH AVE W

BE

LLAM

YR

DN

KIP

L ING

AVE

KING

STON

RD

MA

RK

HA

MR

D

BR

IMLE

YR

D

ROYALCREST

RD

DO

RIS

AVE

LAKE SHORE BLVD W

HUNTINGWOOD DR

KING ST W

ROSEMOUNTAVE

ELLESMERE RD

SENLA

C R

D

LAKE SHORE BLVD W

LAWRENCE AVE E

JANE

ST

CHAPLIN CRES

LAKE SHORE BLVD W

LAWRENCE AVE W

MC

CO

WA

NR

D

NASSAU

ST

GLENGROVE AVE W

ISLING

TON

AVE

BELFIELD RD

DO

VER

CO

UR

T RD

HU

MB

ER

COL LEGE BLVD

COSBURN AVE

OR

TON

PARK

RD

LOG

AN AV

E

PAR

KS

IDE

DR

ALNES

S ST

EVANS AVE

WAR

DE

N AVE

KE

NN

ED

YR

D

BEDFO

RD

RD

SOU

TH

KINGSWA

Y

DUPONT ST

EASTLIBE RTY

S T

HEATH ST E

YORK MILLS RD

LAKE SHORE BLVD E

DU

ND

AL

K

DR

BLOOR ST W

HIG

HW

AY27

S

ANNETTE ST

SE

NTI N

EL

RD

COLBECK

ST

COMMISSIONERS ST

THE QUEENSWAY

THE WESTWAY

WE

STO

NR

D

SAMMON AVE

QUEEN ST E

TI M BER

BA

NK

BLV D

QUEENS QUAY

E

O CONNOR

DR

OA

KWO

OD

AVE

SHEPPARD AVE W

DREWRY AVE

OLD FINCH AVE

THE POND RD

DAVENPORT RD

WILSON AVE

RATHBURN RD

FLE

M

I NGTON

R D

QUEEN ST W

RANEE AVE

ELLISAVE

REXDALE BLVD

BROOKE AVE

DO

NM

ILL

SR

D

GREENBE

LTDR

OLD

KINGSTON

RD

OLD

WE

STO

NR

D

DUNDAS ST W

DU

FFERIN

ST

MILL RD

JAMESO

N

AVE

GLENCAIRN AVE

CO

XW

ELL AVE

LAKE SHORE BLVD E

RUSTIC RD

CH

ESTERLE

BLV

D

BROO KB

A

NKS

DR

LAWRENCE AVE E

PASSMORE AVE

BERTRAND AVE

ST CLAIR AVE E

MO

RR

ISH

RD

PHA

RM

ACY

AVE

UN

IVER

SITY

AVE

SHER

BO

UR

NE S

T

EAST AVE

TRANSIT

RD

EGLI

NTON

AVE

W

MOORE AVE

TR UDELLE ST

DRIFT

W

OODA

VE

CRESCENT

RD

QUEENS QUAY W

GR

AC

E ST

NUGGET AVE

MILNER AVE

DA

NFO

RTH

RD

S

ILVER

THO

RN

AV

E

PAR

K

LAWN

RD

MAN

SE R

D

BRO

CK AVE

JARVIS ST

BEVE

R LYGLE

NBLV D

WOBURN

AVE

PH

AR

MA

CY

AV E

JOH

N

GARLA N DBL

VD

DUNC

AN

W OODS

DR

ST CLAIR AVE E

DU

PLEX

AV

E

INVER GORDON

AVE

BEVER

LEY ST

ME

AD

OW

VALER

D

FEN

SIDE

DR

BLYTHWOOD RD

VICTO

RIA S

T

FASKEN DR

BETHRIDGE RD

MIMICO

AVE

SE

WE

LLS

RD

LANS

DO

WN

EAV

E

BLOOR ST E

GA

LLOW

AY RD

ROSELAWN AVE

CATHERINEST

GRAYDONHALL

D R

MORNING

STAR DR

MACK

AVE

DO

NLA

ND

S AVE

CHURCH ST

STEELES AVE E

KEELE S

T

CA

LED

ON

IAR

D

LAMBTON AVE

JON

ES AVE

DA

WE

SR

D

DISCO RD

CANMORE

BLVD

BR

OW

NS

LINE

MOSSBAN

KD

R

DU

NN

AVE

PITFIELD

RD

CU

L FO

RD

RD

MILL ST

PR

INC

E

PHILIP

BLVD

MCLE

VINAV

E

HOPEST

B

ANNATYNE

DR

MURR AY

ROSS

PKWYDUNCA NMILL RD

WH

ITE

HE

ATHE

RB

LVD

ELM R

D

COMSTOCK RD

BE N LEI GH

DRM

C C

AU

L ST

NEW TORONTO ST

WALSHAVE

MAM

MO

TH

HAL LTR

L

M

CR

AEDR

CA SS AVE

LAPPIN

AVE

MU RISO

N

B LVD

SHAV

ER

AVE S

BONI S

AVE

MO

U NT

OLIVE DR

FRONT ST E

BRIM

ORTON DR

FRONT ST W

L

A NYARD

RD

SHOREHAM DR

JED

BU

RG

H

RD

AVONDALE AVE

SYMIN

GTO

N AVE

HALLAM ST

BRI

DLEWO

OD

BLVD

CEN

TENN

IAL RD

FAYW

OO

DB

LVD

HU

MBE

RBL

VD

SPAD

INA R

D

ELDER

AVE

BERRY RD

NASHDENE RD

EASTW OOD

RD

COR ONATION DR

MA

INS

T

BURROWSHALL

BLVD

YONGE

BLVD

WIN

COTTD

R

INGRAM

DR

FLORENCE AVE

UN

DE

RH

ILLD

R

BLAC

KC

REE

KD

R

CLEN

DE

NAN

AV

E

SAVARIN ST

CLIN

TON

ST

ST JOHNS

RD

KIDRO NVALLE Y

DR

BI C

KN

ELL

AVE

NORSEMAN ST

EDITHD

R

AR

M

OUR

BLV

D

DY

NAM

ICDR

WILLO

WD

ALE

AVE

CAR

LING

VIEW

DR

VARSITYRD

CLA NS

MAN

B LVD

FENN AVE

LINKW

OO

D

LANE

WILSO

NH

EIG

HT

SB

LVD

TWYN RIV

ER

S DR

OLD FINCH AVE

DENTON AVE

ELLENDALEDR

OA

SIS BLV

D

CUMMER AVE

VILLAGE

GREENSQ

FENMAR DR

W

INTERMU

T

EBLVD

CAN

ONG

ATE

TRL

BARBE R

G

REENE RD

NYM

ARKAVE

HOLLIS AVE

PR I N CESS

MARGARETBL

VD

DOR COTAVE

PRIN

CE

ED

WAR

D D

R S

SL ANAVE

ROSELAWN

AVE

CH

ALK

FA

RM

DR

TOR

RESD

A

LE

AVE

BERING

AVE

THE ESPLANAD E

BROADWAY AVE FAIRFAX CRES

SCARDEN

AVE

ADVANCE RD

CORIN

T H I ANB

LVD

DENLOWBLVD

FORE

STG

RO

VED

R

IN

G LETO

NB

LVD

THE

K INGSWAY

HIS

COCKBL

VD

BEAR

E RD

FERRIS RD

ST GE

OR

GE

ST

GRANDRAVINEDR

HU

MB

ERLINE

DR

BER

NER

TRL

NEWTON DR

ALL IANCE AVE

CHER

RYST

ATTW

ELLDR

JUDSON ST

BA

RTLEY DR

SHO

RN

CLIFF E

RD

LITT

LES

RD

PAG

EAVE

CORVETTE AVE

ALL AN

FORD

RD

BRIMWOOD

BLVD

LIN

GR

D

HYMUS RD

WIN

DE

RM

ERE

AV

E

LA ROSE AVE

SL

OAN

EA

VE

MONTGOMERYRD

EGLINTON

AVE W

F

RIEN

DSHIP

AV E

ELMH URST DR

HAR

RIS

ON

RD

BIRMINGHAM ST

MILD

EN

HA

LL

RD

WILFR

ED

AVE

GUN

NS

RD

F ENE

LON

DR

OVERBROOK PL

BELLAMY R

D

S

JOHN

T AB OR

T

RL

SPAD

INA

AVE

ELM

AVE

WOODSWORT

HRD

ELM

RIDGEDR

DUNDAS

ST E

GLE

NC

EDA

R

RD

SOUDAN AVE

NE

ILSO

NDR

LUMSDEN

AVE

KIN

GS

TON

RD

MO

UN

T

PLE

AS

AN

T

RD

EXBURY RD

LLOY

D

MAN

OR

RD

FISHERVILLE RD

MID

LAN

D

AVE

PA INT ED

POST

DR

MEA

DO

WVALE R

D

HILD

A AVE

KEELER BLVD

PA RKVIEW

H ILL

CR ES

FALSTAFF AVE

VALERMO DR

GE

RVAI

SD

R

GEARY

AVE

POPLAR

RD

PLAC

E

NTIA

BLVD

SPENVALLEY

DR

EARL PL

BEECHGROVEDR

MELRO SE AVE

UPJO

HN

RD

FIELDW

AY

RD

FOXRIDGE

DR

CAN

MO

TOR

AVE

IND

IAN

RD

RAY

AVE

CASSANDRA

BLVD

HA

WK

SB

UR

Y

DR

SIG

NE

TD

R

CENTENN

IAL

P

A R K

BLV

D

EDE NB

RID

GEDR

BR

I MLEY

RD

S

WICKSTEED AVE

HILL

CR

ES

GORDON

MACKAY RD

CASEBRIDGE

CRT

OAKST

MAS

ON

RD

ELM

RIDGE

DR

PALMER

STON

BLVD

RESOURCES

RD

CIVICRD

ORFUS RD

BER GAMOT AVE

HIGH

PARK

BLVD

PASSMORE

AVE

NEP

TUNE

DR

INDUSTRY ST

BRIDGELAND

AVE

GIBBS RD

CANA DIAN

RD

ISLA

ND

RD

STEEPROCK

DR

SUNRISE AVE

TUXEDO CRT

PARK HOME

AVE

PATRICIA AVE

PE

TROLIA

RD

OAKRIDGE

DR

GARYRAY DRELLERSLIE AVE

PLEWES RD

VE

NTU

R E

DR

G

OLDFINCHCRTCOR O NATION DR

M

ELFO

R DD R

EAST DR

TAN

GIER

SR

D

RACINE RD

PRO

DU

CTIO

N

DR

HIG

HPA

RK

AVE

ASHTONBEE RD

DUNELM ST

MILLIKE

N BLV

D

CLAYS

ON

RD

JUTLAND RD

TYCOS DR

PICK

ERIN

G TO

WN

LINE

METROPOLITAN

RD

LESMIL

L RD

UPTON RD

TORYORK DR

RI V

ALD

A

RD

TITAN RD

PARK

LANE CRCL

THEBRIDLE

PATH

FINCH AVE

E

MID

DLE

FIELD

RD

LIVING

STON

RD

BATHU

RST ST

MO

UN

TP

LEA

SA

NT

RD

RIVE

R S

T

SOR

AUR

EN AVE

PARLIAM

ENT ST

BRO

ADVIEW

AVE

MC

CO

WAN

RD

FORTYORK

BLVD

BAY STR

EN

FOR

TH

DR

SPAD

INA R

D

CA

RR

I ER

DR

RO

NC

ESVALLES

AVE

CH

ER

RY

ST

NE

ILSO

NRD

NORTH QUEEN ST

OR

IOLE

PK

WY

MILITARY TRL

MA

RIN

E

PARA

DE

DR

HUM

BE

RW

O

O D BLVD

SILVER

SPRINGS

B

LVD

ST DEN N

ISDR

T HE

DONW

AYE

C

HA R TLAND B LVD

S

GO

LDH

AW

K TRL

BLOO

RR

AMP

THE

WE

STM

ALL

WE

LLES

W

ORT

H

DR

KINGSTON R

D

SENECA HILL DR

CAN

LISH

RD

BRIA

N D

R

PAPE AV

E

ST

PHIL

LI P

SR

D

PARK

RD

TALB

OT

RD

AVEN

UE R

D

A

L T ON

TO

WE

RS

CR

CL

THE KINGSWAY

GLE

N

R

USH

BLVD

PO

RTR

OYA

L

T RL

EM M

ET

T

AVE

LY

NNBR

OOK DR

PLUG HAT

RD

KINGSL AKE

R

D

DONM

ILLS

RD

E

ELLING

TON

DR

RAL

EIG

H A

VE

NO

RF IN

CH

DR

ARROWR

D

WE

STMO

RE D

R

BAMB

UR

GH

CRC

L

HU

LLMA

R

D R

THE

DO

NWAY

W

CALVINGTON DR

AL

EXMUIR

BLVD

FAIRVIEWMALLDR

MC

INTO

SH S

T

BANBURY RD

BAN

BU

RYR

D

FAWCE

TTTRL

WIC

K SO N

TRL

CRO

WTRL

GLE

N

WATFO

RD

DR

HORNER AVE

PACKARD

BLVD

BIRKDALE

RD

GLE

N R

D

GR

AN

D AVE

BAYMIL LS

BLVD

THIS

TL

E

DO

WNBLV

D

DO

NM

ILLS

RD

W

DEWE

YD

R

HU

PF

IELD

TRL

UPPER

CANADA

DR

GO

RD

ON

BA

KE

RR

D

VA

LLEY

WO

ODS

RD

MILLWICK DR

CO

N SUME RS

RD

WILL IA

MR

ALLENRD

OA

KD

ALE

RD

MILVAN DR

MID

WE

ST

RD

TOR

BARR

IE RD

BR

AH

MS

AV

E

FINCHD

EN

ESQ

CO

M

M AN DER

BLV

D

SKYWAY

AVE

R ON

SON

DR

FL I N

TR

D

NO

RE

LCO

DR

CH

AN

NE

L

NIN

EC

RT

BIL L YBIS HOP

W AY PRINCE

ANDREW

PL

RA

IL

S IDE

RD

HO

WD

EN

RD

LAKE ONTARIO

Data source: City of Toronto / IBI Group, 2016Projection: NAD 1927 MTM 3

Date: July 2016Cartography: Vélo Québec

0 3 6 km

Page 10: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

April 17, 2016 95

Proposed Network Projects that Cross Barriers:

A number of the Cycling Network Projects also cross major barriers. The type of crossing provided will be worked out in detailed design with the appropriate approval agencies. The summary tables below illustrate the total number of crossings for each barrier type. Exhibit 10-9 also illustrates the additional crossings that make up the recommended network (including the Major Corridor Studies to be reviewed as part of the Cycling Network Implementation Plan Two Year Review Report) compared to the approved network. Of particular note are the four additional freeway crossings and ten additional rail line crossings associated with those corridors.

Exhibit 10-7: Proposed Cycling Network Projects that Cross Barriers

Project Name Barrier Crossed Proposed Facility Type(s)

Avenue Road - York Downs / Armour / Bombay / Avenue / Ridley Hwy. 401 Bike Lanes or Cycle Tracks

Bloor - Keele to Dundas Street West Humber River Major Corridor Study

Dundas - Royal York to Scarlett Humber River Bike Lanes or Cycle Tracks

Dufferin - Dufferin / Ranee / Flemington / Blossomfield / Varna Hwy. 401 Bike Lanes or Cycle Tracks

Eglinton - Approved as part of Eglinton Crosstown LRT Don Valley Parkway Bike Lanes or Cycle Tracks

Finch - Approved as part of Eglinton Crosstown LRT Hwy. 400, Black Creek Bike Lanes or Cycle Tracks

Jane - Steeles to south of Hwy. 401 Hwy. 401 Bike Lanes or Cycle Tracks

Kipling - Bloor to Waterfront Trail Gardiner Expressway Bike Lanes, Cycle Tracks or Boulevard Trail

Midland - Lawrence to Sheppard Hwy. 401 Major Corridor Study

Morningside - Connection over Hwy. 401

Hwy. 401, Highland Creek Bike Lanes or Cycle Tracks

North Queen - Mississauga to Kipling Hwy. 427 Bike Lanes or Cycle Tracks

Port Union - Sheppard to Waterfront Trail Hwy. 401 Bike Lanes or Cycle Tracks

Progress - Midland to Sheppard Hwy. 401 Bike Lanes or Cycle Tracks

Rathburn - East Mall to Mississauga Hwy. 427 Bike Lanes or Cycle Tracks

Sheppard - to be undertaken in coordination with Sheppard LRT Hwy. 404 Bike Lanes or Cycle Tracks

St. Philips – Westway / Martin Grove / Lawrence / St Phillips Humber River Bike Lanes or Cycle Tracks

Page 11: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

April 17, 2016 96

Exhibit 10-8: Proposed Cycling Network Projects that May Require a Grade Separation to Cross a Barrier

Project Name Barrier Crossed

Overlea Bridge - (Thorncliff Park Drive to Don Mills Road) Don River

Warden Hydro Corridor Tunnel - (Crocus to Warden Hydro Corridor) 401

Richmond-Adelaide - (Eastern to Power) Don River

Yonge Street - (Linell - Don Valley Golf Course) 401

Rustic Road Bridge - (Connie Street to Cartwright Avenue) Railway

Exhibit 10-9: Summary of Barrier Crossings

Type of Barrier Number of New Locations the Barrier is Crossed

Approved Network Recommended Network

St. Clair Streetcar 8 9

Freeways 31 35

Rail Lines 84 94

Rivers and creeks 85 98 Total 208 236

In addition to the crossings identified as part of the Ten Year Cycling Implementation Plan, additional upgrades to existing crossings and new grade-separated crossings may be implemented as part of Metrolinx or Ministry of Transportation, Ontario projects or other related planned infrastructure work not identified in this Plan.

10.4 Streets Not Identified as Cycling Network Routes The approved network identifies capital projects for cycling infrastructure to be implemented over the ten years. It does not identify all potential cycling improvements or new infrastructure opportunities that may present themselves in the coming years or plan for a timeframe beyond the ten years. The following City of Toronto strategies will contribute to expansion of the cycling network beyond what has been identified in the Ten Year Cycling Implementation Plan.

10.4.1 Bicycle Friendly Streets In 2001 Toronto City Council adopted the Toronto Bike Plan, which included Policy direction supporting investments for conceptual goals beyond the routes identified in the Cycling Network Ten Year Plan.

Section 5.2-2 of the Bike Plan states that the City of Toronto will "Develop a two kilometre grid of north-south and east-west routes. The guiding principle for the Cycling Network is that it be accessible within a five minute bike ride from all residences. Assuming a moderate cycling speed of 12 km/h, a five minute ride would cover one kilometre."

Page 12: 10 Recommended Ten Year Cycling Network …...IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto April 17, 2016 86 10 Recommended Ten

IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

April 17, 2016 97

10.4.2 Complete Streets Guidelines The City of Toronto’s Complete Streets Guidelinesxxv describe a design process which is inclusive for all modes. When observing the Complete Streets design process, the presence of the Cycling Network Implementation Plan routes means that the appropriate cycling facility type for the road class should be included as part of the scope of the project.

When the Complete Streets Design process is applied to streets where a Cycling Network Route has not been identified, the outcome may be a cycling facility, or modifications to the roadway that will improve conditions for cycling in the absence of dedicated cycling infrastructure.

Through this design process, space is allocated based on a variety of inputs including project objectives and constraints, local context, city-wide priorities and public engagement.

The complete streets design process helps improve conditions for cycling in Toronto in two ways:

It ensures that cycling facilities are considered as part of the design process; and,

It ensures that bike friendly streets policies are applied to all streets.

Safety is a fundamental goal of the Complete Streets Design process, and cannot be traded-off for other needs.

10.4.3 Streets Identified in Future Studies At the time that each proposed Cycling Network project is scheduled, Transportation Services will work with local area councillors and undertake public consultation as part of the detailed design process. This process may result in new routes being identified in a given network, which would change or enhance the original network recommendations.

Finally, this implementation plan recognizes a number of studies being undertaken by other divisions or agencies, which may afford opportunities for additional routes to be added to the network. The studies actively underway at the time that the Ten Year Cycling Network Implementation Plan was being developed are mapped in Appendix F.

10.4.4 Revisions and Updates to the MCIC Projects Coordinating the implementation of cycling facilities with MCIC projects will require some flexibility in the Cycling Infrastructure Delivery Program. It is anticipated that the Cycling Network can be implemented more efficiently with co-ordination than has been achieved in the past. As discussed in Section 7.2, MCIC projects are reviewed and adjusted quarterly and projects are shifted from year to year based on a variety of changing resources and priorities. The MCIC co-ordinated Cycling Network projects will also need to shift accordingly to match assigned road projects. In addition, new MCIC projects may be added within the ten year timeframe and may provide opportunities to include cycling facilities that have not been identified in this plan or other strategies.

Beyond ten years, continued MCIC co-ordination is recommended to enhance efficiencies of implementation and further expand the cycling network.