11-11-25 6049-tng ppt agm presentation v3 · microsoft powerpoint - 11-11-25 6049-tng_ppt agm...

18
AGM Presentation 28 November 2011 Managing Director – Paul Burton ASX Code: TNG

Upload: others

Post on 31-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

AGM Presentation 28 November 2011

Managing Director – Paul Burton

ASX Code: TNG

Page 2: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

DisclaimerForward-Looking StatementsThis presentation has been prepared by TNG Ltd. This document contains background

information about TNG Ltd current at the date of this presentation. The presentation is in summary

form and does not purport to be all inclusive or complete. Recipients should conduct their own

investigations and perform their own analysis in order to satisfy themselves as to the accuracy

and completeness of the information, statements and opinions contained in this presentation.

This presentation is for information purposes only. Neither this presentation nor the information

contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the

purchase or sale of TNG Ltd shares in any jurisdiction.

This presentation may not be distributed in any jurisdiction except in accordance with the legal

requirements applicable in such jurisdiction. Recipients should inform themselves of the

Competent Person’s StatementThe information in this report that relates to Exploration Results and Exploration Targets is based

on information compiled by Paul Burton who is a Member of The Australasian Institute of Mining

and Metallurgy and a Director of TNG Limited. Paul Burton has sufficient experience relevant to

the style of mineralisation and type of deposit under consideration and to the activity which he is

undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian

Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Paul Burton

consents to the inclusion in the report of the matters based on his information in the form and

context in which it appears.

The information in this report that relates to Mineral Resources is based on information compiled

by Jeremy Peters who is a Member of The Australasian Institute of Mining and Metallurgy and a

full time employee of Snowden Mining Industry Consultants Pty Ltd. Jeremy Peters has sufficient requirements applicable in such jurisdiction. Recipients should inform themselves of the

restrictions that apply in their own jurisdiction. A failure to do so may result in a violation of

securities laws in such jurisdiction.

This presentation does not constitute investment advice and has been prepared without taking

into account the recipient's investment objectives, financial circumstances or particular needs and

the opinions and recommendations in this presentation are not intended to represent

recommendations of particular investments to particular persons. Recipients should seek

professional advice when deciding if an investment is appropriate. All securities transactions

involve risks, which include (among others) the risk of adverse or unanticipated market, financial

or political developments.

To the fullest extent permitted by law, TNG Ltd, its officers, employees, agents and advisers do

not make any representation or warranty, express or implied, as to the currency, accuracy,

reliability or completeness of any information, statements, opinions, estimates, forecasts or other

representations contained in this presentation. No responsibility for any errors or omissions from

this presentation arising out of negligence or otherwise is accepted.

This presentation may include forward looking statements. Forward looking statements are only

predictions and are subject to risks, uncertainties and assumptions which are outside the control

of TNG Ltd. Actual values, results or events may be materially different to those expressed or

implied in this presentation.

full time employee of Snowden Mining Industry Consultants Pty Ltd. Jeremy Peters has sufficient

experience relevant to the style of mineralisation and type of deposit under consideration and to

the activity which he is undertaking to qualify as a Competent Person as defined in the 2004

Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore

Reserves’. Jeremy Peters consents to the inclusion in the report of the matters based on his

information in the form and context in which it appears.

Mr Damian Connelly, MAAusIMM, Chartered Processional (MET), tMMICA, MSME, MSAIMM was

responsible for the preparation of the metallurgical test work results reported herein. Mr Connelly

has sufficient experience to the activity which he is undertaking to qualify as a Competent Person

as defined in the 2004 Edition of the “Australasian Code for Reporting of the Exploration Results,

Mineral Resources and Ore Reserves. Mr Connelly consents to the inclusion in the report of the

matters based on his information in the form and context in which is appears.

Page 3: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Excellent progress and results in 2011:

� Mount Peake scoping study February

� MOU with major Chinese group February

� TIVAN Metallurgical process advanced March

� Capital Raising for Pilot Plant/Feasibility March

� FeV scoping study April

� TIVAN - International Patent Application May

� Resource drilling and New targets identified June

� LOI signed with major Chinese Group ECE August

� Resource upgrade October

� $13.4M Investment agreement finalised November

� Mount Peake PFS Results November

Page 4: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Rapid progress since

discovery of Mount Peake in 2008

Page 5: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Mount Peake

�100% ownedLeases

�Close to key infrastructureinfrastructure

� Huge Upsidepotential

Page 6: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

KEY INTERIM PRE-FEASIBILITY STUDY OUTCOMES*

� Life of mine revenues of $10.4B � Pre-tax IRR of 25.7% � Total pre-production capital cost estimate of A$476M� Pre-tax Nett annual cash flow of $151.3M� Pre-tax Nett annual cash flow of $151.3M� Initial 17.2-year mine life � 2.5Mtpa operation expanding to 5Mtpa� TIVANTM Process remains cheaper than standard process.

� Internationally recognized consultants used

* Detail and competent person statement in appendix

Page 7: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

THE TNG/METS ADVANTAGETIVANTM Process

� Hydrometallurgy - successfully extracts vanadium, titanium and iron

�High recoveries and purities

�acid leaching and solvent extraction�acid leaching and solvent extraction

�Cheaper OPEX and CAPEX

Page 8: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Forecast vanadium prices, 2003 to 2015

Source: Roskill

Page 9: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Titanium: Comparison of world sponge production with forecast to 2015

Source: Roskill

Page 10: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Value – adding Potential

Ferro-Vanadium Scoping study Key Outcomes*:

�Processing rate (life-of-mine): 2 Mt/annum

�Total FeV metal production: 105k tonnes

�Capital Estimate: $43.8M

�Additional potential Annual Nett Revenue $78M/annum

* Detail and competent person statement in appendix

Page 11: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Page 12: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Future Plans:Future Plans:

Page 13: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Next Stage:

� Key Consultants to progress Mount Peake:

� Appointment Key Project staff

� Completion of major Investment

Page 14: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Major Investment transaction

benefits:

� $13.4 million investment

� Future development of Mount Peake

� Potential access to Chinese finance,

EPCM and final product end-users

� Strategic partnership other projects

Page 15: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Corporate Snapshot

Shares on Issue 285m

Cash

Investments

Receivables $2.51m

387m

$14.5m

POST TRANSACTION

Top 20 Shareholders hold 35.9% of Issued Capital

TNG

Receivables $2.51m

Major Shareholders

WWB Investments 9.07%

4.98%

3.26%

$14.5m

Ao-Zhong (ECE) 15.1% Aosu 14.9%

CBH

JP Morgan

ASX Code:

Page 16: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

TNG SUMMARY

� 100% of Mount Peake project

� Robust project, competitive OPEX and CAPEX

� Experienced team delivering on project

� TIVAN process = additional business opportunity� TIVAN process = additional business opportunity

� Outlook for strategic metals prices strong

� Huge upside to resource potential

� 100% owned prospective ground for Copper acquired

� JV for Gold, Nickel, Zinc, Lead with leading companies

� TNG well funded = platform for growth in 2012

Page 17: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

We thank our Shareholders for their continued support

ASX:TNG

Page 18: 11-11-25 6049-TNG PPT AGM presentation V3 · Microsoft PowerPoint - 11-11-25 6049-TNG_PPT AGM presentation V3 [Compatibility Mode] Author: paul.burton Created Date: 11/27/2011 4:18:50

ON TRACK TO BUILDING A WORLD CLASS ON TRACK TO BUILDING A WORLD CLASS FERROUS METALS BUSINESSFERROUS METALS BUSINESS

Appendix:• Exploration Targets :The potential quantity and grade in any reference to exploration targets and resource potential is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and that it is uncertain if further exploration will result in the determination of a Mineral Resources

• Pre-Feasibility Study Reference to the PFS is to the ASX announcement on 23rd November has been prepared based on the Company’s presently delineated mineral resource estimate and any investment decision should be considered based on this information. based on this information.

•Key assumptions of PFS include:Operating costs and pit slope angles related to mining estimated to a Pre-Feasibility Study level (±25%)V2O5 price of US$20,305/tonne (>80% grade)TiO2 price of US$400/tonne (> 67% grade)Fe2O3 price of US$200/tonne (>66% grade)Royalty rate of 2.5% per tonne of plant feedDiscount rate of 8%A$/US$ exchange rate of 0.85 US$ = 1A$

•Nett annual Cash Flowis defined as the average discounted cash flow per annum after all CAPEX (pre-strip CAPEX, initial CAPEX, and expansion CAPEX) has been deducted, but ignores cost or source of capital, hedging, tax, depreciation, rehabilitation and salvage.