To reduce the changeover time of supply lines for increasing the manufacturing rate of Coca-Cola beverages, in Coca-Cola Beverages Private Limited. Problem Statement: The assignment will include the study of following methods to reduce the changeover time: 1. To observe and measure the total changeover time. 2. To identify internal versus external steps. 3. To convert as many internal steps as possible to external steps. 4. To eliminate waste from internal steps. 5. To eliminate waste from external steps. 6. To standardize and maintain the new changeover procedure. Group Members: Baqir Manzoor (11-ME-34) Zaid-bin-farooq (11-ME-46) Hammad Ahmad (11-ME-64) Abdul Wahab (11 ME-70) Muhammad Yaseen (11-ME-82) Hafiz Sikandar Hayat (11-ME-142)

Upload: zain-ulabideen

Post on 13-Dec-2015

212 views

Category:

Documents


0 download

DESCRIPTION

me

TRANSCRIPT

Page 1: 11-ME-34,46,64,70,82,142

To reduce the changeover time of supply lines for increasing the

manufacturing rate of Coca-Cola beverages, in Coca-Cola

Beverages Private Limited.

Problem Statement:

The assignment will include the study of following methods to reduce the changeover time:

1. To observe and measure the total changeover time.

2. To identify internal versus external steps.

3. To convert as many internal steps as possible to external steps.

4. To eliminate waste from internal steps.

5. To eliminate waste from external steps.

6. To standardize and maintain the new changeover procedure.

Group Members:

Baqir Manzoor (11-ME-34)

Zaid-bin-farooq (11-ME-46)

Hammad Ahmad (11-ME-64)

Abdul Wahab (11 –ME-70)

Muhammad Yaseen (11-ME-82)

Hafiz Sikandar Hayat (11-ME-142)