Work Order
Work Order NO : 000012 Work Trade :Mechanical
Work Order Status : Closed Work Type : corrective
Work priority : Emergency
Assigned to : FET Collage Received by : ibraheem khress Requester : Dr khaleel Abu shgair Received Data/Time : Phone Number :
PM Target Start Data : PM Target End Data :
Problem Description : Problem in Motion and Spindle Rotation
Note to Technician : small error on dimensions show up
Failure Code : 1 Check list No:
Asset No : 1,2,3,4 Location NO : 2
Asset Name : Fagor Turning Location Name : CNC LAB
Case description Action Taken Prevention Taken
Part and labor Details
**D=Direct Issue , I = Inventory
Data and Time work was started Data : Time :
Data and Time work was completed Data : Time :
Certification and Work Completion Name and Signature of Technician/Engineer Name and Signature of Requester/Supervisor
………………Name ………………Signature Data : Time :
………………Name ………………Signature Data : Time :
Please rate our services :
1-Poor 2-Fair 3-Good 4-Very Good 5-Excellent
Temperature fluctuates as the part is machined
Stabilize the temperature of the blank by providing enough coolant while machining.
Work Order
Work Order NO : 000012 Work Trade :Mechanical
Work Order Status : Open Work Type : Prevention
Work priority : Normal
PM checklist
Checklist No : 4
Checklist Desc:
1- Check spindle belts 2- Check spindle temperature and adjust chiller card 3- Check chiller system and adjust, and clean pump filter, fill if necessary 4- Check drawbar for proper retention and pressure at tool in/out 5- Check and adjust spindle tram 6- Change Spindle Motor filter if applicable