1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

Upload: vernon-arnold

Post on 17-Jan-2018

218 views

Category:

Documents


0 download

DESCRIPTION

3/27 Floor-mounted boiler replacement External combustion Stirling cycle What is the WhisperGen

TRANSCRIPT

Page 1: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

1/27

ea technology

DCHP Field TrialsPractical Experiences with the WhisperGen

Project Manager : Rob GreenPresented by Yvonne Dickson

Page 2: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

2/27

Overview

• Introduction to the WhisperGen• History of EA Technology’s involvement• WhisperGen & the Stirling Cycle• Field trials• Performance

– Does it save money?– Does it reduce CO2 emissions?

Page 3: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

3/27

• Floor-mounted boiler replacement

• External combustion• Stirling cycle

What is the WhisperGen

Page 4: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

4/27

WhisperGen in the home

WhisperGen

microCHPunit

GRID ELECTRICITYIMPORT / EXPORT

GAS100%

EXHAUST10%

GENERATION10 %

HEAT80 %

Page 5: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

5/27

Project History• 1999 - studies of commercial viability• 2000 - lab demo of Mk I WhisperGen• 2001 - Mk I

• 3 trial houses + test house + lab endurance• 2002 - alpha trial Mk II

• 13 houses + lab endurance (4)• 2003 - beta trial Mk III

• 15 Chester + 13 Ipswich + lab (Mk II & III)• 2003 / 4 - Mk IV

• pre-launch checks - 3 Chester houses

Page 6: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

6/27

Powergen market launch 2004• EA Technology training of installers• Monitoring for Carbon Trust & DTI

Project History (2)

Page 7: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

7/27

Piston

RegeneratorGas Flame

Cooling Circuit

The Stirling Cycle

Piston

Gas

Page 8: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

8/27

The Stirling Cycle

Page 9: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

9/27

compression at constant temperature

The Stirling Cycle

Page 10: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

10/27

displacement / regeneration at constant volume

The Stirling Cycle

Page 11: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

11/27

expansion at constant temperature

The Stirling Cycle

Page 12: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

12/27

displacement / regeneration at constant volume

The Stirling Cycle

Page 13: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

13/27

WhisperGen & the Stirling Cycle

ReturnFlow

Generator

Wobble Yoke

Air

GasHOT END

COLD END

Exhaust Cooler

4 CylinderNitrogen FilledStirling Engine

Page 14: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

14/27

WhisperGen

• Mk IV current– 0.85 kWe / 6 kW t– 1.2 kWe / 8 kW t

• Mk V soon– ~ 1 kWe / 7 kW t to ~ 1 kWe / 15 kW t

Page 15: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

15/27

The need for field trials

Prototype:– Ease of installation– Reliability– Operational experience– Control systems– User acceptability– Performance / Economics– Improvements

Page 16: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

16/27

The need for field trials (2)

Market ready:• Carbon Trust

– CO2 emissions– Product accreditation

• DTI / electricity suppliers– Electricity metering / settlement

Page 17: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

17/27

EA Technology Field Trials

Page 18: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

18/27

What to measure?

• Electricity kWh– Generation– House in and out

• Heat output• Gas input• Temperatures?

Page 19: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

19/27

Findings

• Range of house types & occupancy patterns– Both affect run hours– Occupant behaviour – big variable

• Sales + Accreditation?• User acceptability

– Noise– Speed of response

Page 20: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

20/27

Electricity

-1

-0.5

0

0.5

1

1.5

2

2.5

3

00:00 02:00 04:00 06:00 08:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 00:00

time

kW (a

vera

ge o

ver 1

5 m

in)

14/02/02House useHouse ImportHouse ExportWG Export

Page 21: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

21/27

Electricity

-1

-0.5

0

0.5

1

1.5

2

2.5

3

00:00 02:00 04:00 06:00 08:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 00:00

time

kW (a

vera

ge o

ver 1

5 m

in)

17/04/02House useHouse ImportHouse ExportWG Export

Page 22: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

22/27

Electricity

-1

-0.5

0

0.5

1

1.5

2

2.5

3

00:00 02:00 04:00 06:00 08:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 00:00

time

kW (a

vera

ge o

ver

15 m

in)

09/03/02House useHouse ImportHouse ExportWG Export

Page 23: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

23/27

Economics – does it save money?

• Well matched (application & engine)– £150 to £200 / year (~ €250 / year)

• Need long run hours– Occupancy pattern– House heat loss (need large houses)

• Mk V

Page 24: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

24/27

Government targets CO2

- Global warming / Kyoto- dCHP high priority

• dCHP in context of house- 60 WhisperGen sites to be monitored

- 40 Powergen- 20 Northern Ireland

Carbon Trust Monitoring Trial

Page 25: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

25/27

Carbon Trust Method

Pulses (Gas, electric, heat)

Temperatures Logger / receiver

Telemetry systemGSM

Page 26: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

26/27

Does it save CO2?

• Comparing against?– Boiler (B rated 86%+, A rated ~93%)– Central power station

• If dCHP overall efficiency >= boiler efficiency– Obviously reduces CO2 emissions

• If dCHP overall efficiency < boiler efficiency– Not so clear cut

Page 27: 1/27 ea technology DCHP Field Trials Practical Experiences with the WhisperGen Project Manager : Rob Green Presented by Yvonne Dickson

27/27

Conclusions• WhisperGen is commercially available

– Stirling Cycle, External Combustion• Field trials are essential to prove:

– Customer acceptability, reliability, use patterns export (utilisation) etc. etc.

• Occupant behaviour has a big effect• Mk V should expand market for WhisperGen• Saves CO2?