Sustainable School Architecture
CHPS and High Performance School Grants
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
2/54
Sustainability
1. Sites and buildingsdesigned forcomplete life cycle
2. Integration of sitedevelopment,building orientationmassing, systemsand features
3. Individualperformance criteriaset, met, andmonitored
4. Building operationand maintenance
considered indesign
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
3/54
Where are the students?
They are mostly in existing buildings!
California Classroom need projections 2007 to 2012 Data fromState Agencies
Nationwide
55million students
5million faculty
20%of Americas population
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
4/54
1. Building asorganism
2. Sites and buildings
designed together3. Building as cultural
meaning
Integrated Design
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
5/54
Sustainability
1. Sites and buildingsdesigned forcomplete life cycle
Reuse of existing buildings is the most important strategyAt least 20% of a buildings energy use is during constructionFew buildings are built/replaced annually20% of landfill debris is construction debris
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
6/54
Sustainability
1. Sites and buildingsdesigned forcomplete life cycle
2. Site development,building orientationand massing,systems andfeatures designed in
an integrated way
Adapt buildings and sites to the context and climateDaylightNatural ventilation and thermal comfortReuse of existing development
Monday, October 4, 2010
S t i bilit
-
8/13/2019 1.27 Sustainable School Arch
7/54
Sustainability
1. Sites and buildingsdesigned forcomplete life cycle
2. Site development,building orientationand massing,systems andfeatures designed in
an integrated way3. Individualperformance criteriaset, met, andmonitored
Light spaces appropriate to users and tasks
Right size mechanical systemsMonday, October 4, 2010
S t i bilit
-
8/13/2019 1.27 Sustainable School Arch
8/54
Sustainability
1. Sites and buildingsdesigned forcomplete life cycle
2. Site development,building orientationand massing,systems andfeatures designed in
an integrated way3. Individualperformance criteriaset, met, andmonitored
4. Building operation
and maintenanceconsidered indesign
Passive features can be automatic too.Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
9/54
Market makerMany building types
Third party verification
K-12 EducationHigh performance school grants
Verification or design standard
Residential developmentsTax credit funding standardIncludes community process
Voluntary until 2010Many building typesLEED Silver
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
10/54
CHPS 2009 CriteriaLeadership, Educationand Innovation (LEI)Sustainable Sites (SS)
Water (WE)Energy (EE)Climate Change (CL)Materials (ME)Indoor Environmental Quality (IEQ)
LEED 2009 CriteriaSustainable Sites
WaterEnergyMaterialsIndoor Environmental QualityInnovation in DesignRegional Priority
Green Communities 2008 CriteriaIntegrated Design
Site, Location and Neighborhood FabricSite ImprovementsWater ConservationEnergy EfficiencyMaterials Beneficial to the EnvironmentHealthy Living Environment
Operations and Maintenance
Green Metrics
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
11/54Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
12/54
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
13/54
Modernization HPS grants
Increase Mod Base Grant by:
2% at 20 points plus 0.025 % for each point from 21 through33 points; or
2.35 % at 34 points plus 0.24 % for each point from 35through 40 points; or
4 % at 41 points plus 0.36 % for each point from 42 through54 points; or
9.05 % at 55 points plus 0.060 % for each point from 56through 77 points.
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
14/54
District HPS Mod Grant Calculation
Ford Elementary500 K-6 Grants
Basic Mod Grant: $3,366
500 X $3,366 = $1,683,000CHPS Goal: 41points
41 points = 4.0 % increase
HPS Grant = $1,683,000 X .04 = $67,320
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
15/54
High Performance SchoolCase Studies
Pilot school Georgina Blach Intermediate School
High Performance District Los Altos, CA
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
16/54
Pilot School
Georgina Blach Intermediate School,before modernization
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
17/54
Original Finger school Campus
Public (grades 7-8)Built 1958, 1962, 1978450 students34,000 sf13 acres
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
18/54
Campus after modernization
75,000 sfDaylit teaching spacesNew quadNew library
New gymNew systemsEnergy use reducedby 45%
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
19/54
High Performance Decision Points
Participate in demonstration program? additional utility funding
additional technical support
potential unproven technology
potential competing goals
ongoing site visits and monitoring unknown effects on construction
PG+E lightingclassroomhelped set desired lightlevels
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
20/54
No dark classrooms
New classroom
Original classroom
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
21/54
Los Altos climate
Temperate, Mediterranean climate withlittle need for cooling
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
22/54
Fresh air AND energy efficiency
Teachers union agreement required air conditioningCooling load reduced to reduce unit sizes and increase efficiencyPassive stack ventilation developed to reduce air conditioning hours
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
23/54
Reuse existing structures
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
24/54
Reduce impermeable paving
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
25/54
Show your work
Glazing orientation varies with solarorientation
Roof run-off visible under canopy
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
26/54
New library inserted between twoexisting buildings
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
27/54
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
28/54
Thorough modernization
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
29/54
Maximize north light
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
30/54
Automate fresh air
Fresh air drawn in through louverEnergy management systemactivates clerestory window operator
operator
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
31/54
Daylight compensation dimming
Sensors measure illumination anddim lights to maintain constant levels
Monday, October 4, 2010
I t t d D i
-
8/13/2019 1.27 Sustainable School Arch
32/54
Integrated Design
Monday, October 4, 2010
Integrated Design
-
8/13/2019 1.27 Sustainable School Arch
33/54
Integrated Design
Monday, October 4, 2010
Decision flow
-
8/13/2019 1.27 Sustainable School Arch
34/54
Decision flow
Seismicimprovement
New shearpanels
ReducedWindow area
New work atroof
New clerestorywindows
New plywoodroof deck
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
35/54
Before no lateral system
After shear walls installed, displaywindows added, roof diaphragmstrengthened, roof monitors added
Monday, October 4, 2010
Modernization vs replacement
-
8/13/2019 1.27 Sustainable School Arch
36/54
Modernization vs replacement
Does the site plan work? for education
for sustainability
Are classroom structures sound? What kind of funding is available?
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
37/54
Redirect drainageReplace agedportablesRehab classroomsRemove deterioratedadministrative buildingReplace existingmultipurpose
Plan for the futureReplace portablesNew flex spaceNew kindergartens
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
38/54
Existing permanent facilities limited
Existing construction shoddyExisting classrooms dark
Drainage problems at existing site
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
39/54
Monday, October 4, 2010
Classroom transformation
-
8/13/2019 1.27 Sustainable School Arch
40/54
Classroom transformation
Monday, October 4, 2010
Classroom transformation
-
8/13/2019 1.27 Sustainable School Arch
41/54
Classroom transformation
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
42/54
Fundingsources
State funding Developer bondsNeeds Classrooms used all day Space for teacher prep Flexibility Cost effective designStrategies Use (e) buildings better Create defined academies Repeat prototypes
Plan for future uses High performance design Phase construction
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
43/54
Prototyping high performance
Bounce south lightNorth light direct
Monday, October 4, 2010
Fit site needs and energy needs
-
8/13/2019 1.27 Sustainable School Arch
44/54
gy
Two learning communities
Monday, October 4, 2010
Daylight, fresh air, flexibility
-
8/13/2019 1.27 Sustainable School Arch
45/54
Tight budget
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
46/54
Vanden music room, high performance, integrated design
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
47/54
How farcan weafford to
go? New Construction& Site Work:
CHPS Verified
Monday, October 4, 2010
Meet basic CHPS goals:
-
8/13/2019 1.27 Sustainable School Arch
48/54
g
Daylighting
Energy efficiency
Finish selection
Future Upgrades
Ceiling
Monday, October 4, 2010
E Morris Cox School New Construction
-
8/13/2019 1.27 Sustainable School Arch
49/54
E. Morris Cox School New Construction
45 points(exponential incentive funding relationship)
10.5% cost factor(4% landscape) 23% better than title 24
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
50/54
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
51/54
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
52/54
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
53/54
Monday, October 4, 2010
-
8/13/2019 1.27 Sustainable School Arch
54/54
Ohlone Elementary School, Palo Alto
Monday, October 4, 2010