13 topsides

Upload: haidar1992

Post on 04-Jun-2018

244 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 13 Topsides

    1/16

    Topsides, Floaters

    & Onshore Facilities

  • 8/13/2019 13 Topsides

    2/16

    TOPSIDES FLOATERS CONCRETE JACKETS ONSHORE CONSTRUCTION

    Offshore topsides

    facilities

    Floating oil &

    gas facilities

    Concrete GBS for

    offshore platforms

    Steel jackets for

    offshore platforms

    Onshore oil and gas

    and petrochemical

    facilities

    Construction and

    maintenance

    services

    Kvaerner is a specialised engineering, procurement and construction

    (EPC) company. As a preferred partner for oil and gas operators,

    Kvaerner is focused on delivering complete solutions to some of the

    worlds most demanding projects through reliable, effective and flexible

    execution models.

    HSE is a core value

    At Kvaerner, concern for health, safety and the environment is more than a

    core value; it is also an effective way to work. Our HSE mindset is founded on

    the belief that all incidents can be prevented. We work systematically to ensure

    continuous improvement of our HSE culture and performance.

    > We strive continuously for zero harm to people, the environment,material and non-material assets.

    > We focus on employee health and on further improvement of thework environment.

    > We require every employee to take personal responsibility for HSEby focusing on their own behaviour.

    PARTNER

    KVAERNER

  • 8/13/2019 13 Topsides

    3/16

    Engineering

    The engineering phase is the basis not

    only for the subsequent procurement of

    equipment and the construction of the

    facility, but for building a facility which

    will operate effectively for decades

    to come. Our multi-disciplined

    organisation covers all phases

    of technical and administrativefunctions needed to execute

    demanding engineering tasks

    for our customers.

    Procurement

    Kvaerner provides best value procurement

    from subcontractors to customers by

    leveraging global sourcing networks

    and market knowledge. Our supply

    management and procurement

    organisation supports project

    execution through a pro-active

    process for optimising the lead-time, total costs and quality,

    mitigating risk and ensuring

    HSE performance.

    Construction

    Kvaerners services include specialised

    in-house fabrication yards with decades

    of experience from demanding projects

    combined with the capacity of high

    quality partners. With Kvaerners

    flexible execution model we

    deliver reliable and cost-effective

    solutions while ensuring a highdegree of local content when

    it benefits the project. All our

    projects are supervised by

    Kvaerners senior project and

    construction management.

    M

    aritH

    omm

    edal/

    Statoil

    A

    SN

    or

    sk

    eSh

    ell

    3

  • 8/13/2019 13 Topsides

    4/16

    Solutions for different needsand demands

    4

  • 8/13/2019 13 Topsides

    5/16

    TOPSIDESKvaerner is a leading contractor for engineering,

    procurement, and project management, as well

    as construction for oil and gas facilities, bothfor topsides on fixed or floating platforms, and

    onshore processing facilities.

    Different reservoirs and development concepts

    require tailored solutions. Kvaerner has gained

    experience from a number of projects over the

    last decades.

    Kvaerner has delivered topsides for fixed

    platforms both on steel jackets and gravity

    based structures (GBS), and is among very few

    contractors with experience in delivering all

    types of floating platforms; semi-submersible

    production platforms and drilling rigs, TLPs

    and FPSOs. This enables Kvaerner to deliver

    optimum solutions for our clients.

    Kvaerners services also include major

    modification work onshore and offshore,

    including demolition and disposal of

    installations at end of field life.

    FLOATERS

    ONSHORE

    5

  • 8/13/2019 13 Topsides

    6/16

    Kvaerners comprehensive capabilities and proven track record include complete deliveries of

    floating offshore platforms, platform topsides and onshore facilities for oil and gas processing.

    With the flexibility to handle all contract formats and project execution models, our servicesinclude the full value chain from concept through completion.

    Delivery of complete projects

    Close integration between various phases is critical

    to the projects long-term success. Poor quality may

    delay the start of production or reduce the capacity.

    A delayed delivery may have significant knock-on

    effects for our customers. This is why Kvaerner strives

    to offer attractive technical solutions combined with

    skilled people and effective, reliable performance.

    For more than 40 years, Kvaerner has delivered

    floating platforms, topsides and onshore facilities

    to some of the industrys most demanding projects.

    Sitting on the floating hull or fixed substructure,

    the topsides are the heart of an offshore platform.

    The topsides hold the facilities to process oil and

    gas from the reservoir in the seabed below.

    Depending on the water depth, a fixed or floating

    structure will be selected. In order to allow the platform

    to maintain operation even in harsh weather, the

    floating hull must have characteristics which manage

    the movement from currents, wind and waves.

    When delivering an onshore facility, which typically

    combines oil and gas processing technologies withcivil engineering work, an effective project execution

    model is imperative for a successful result. Kvaerner

    has extensive experience in delivering onshore oil

    and gas facilities.

    On time, budget and with the agreed quality

    > More than 10 semi-submersibles, including deepwater floatingproduction and exploration drilling units.

    > Two of the worlds most innovative and productive tensionleg platforms (TLP).

    > Six of the worlds most advanced and effective floatingproduction storage and offloading units (FPSO).> More than 20 topsides for floating platforms (semi-submersibles,

    TLPs and FPSOs).

    > More than 20 topsides for platforms with a steel jacket substructurestanding at the seabed. Kvaerner has also delivered more than

    40 steel jacket substructures.

    > More than 20 topsides for platforms with a concrete GravityBased Structure (GBS) standing on the seabed. Kvaerner has also

    delivered 17 concrete GBS structures.

    > More than 10 projects for onshore oil and gas processing facilities.> Market leader in delivering platforms for deep water, harshenvironment and arctic conditions.

    > Life cycle optimization from Day 1: Flexibility for later upgrades.> Market leader for delivering large onshore facilities for subsea-

    to-shore development projects, where streams are received from

    subsea wells offshore via pipeline to the onshore treatment plant.

    6

  • 8/13/2019 13 Topsides

    7/16

    Heidrun, the worlds first concrete TLP.

    Njord, the worlds first built for purpose semi-submersible production platform.

    Nyhamna Ormen Lange: Onshore facility for processing and export of gas.

    yvin

    dH

    agen

    /Statoil

    A

    SN

    or

    sk

    e

    Shell

    S

    tatoil

    7

  • 8/13/2019 13 Topsides

    8/16

    Offshore

    topside facilities

    Offshore

    topside facilities

    Statfjord A

    1977Draugen

    1994

    Gullfaks C

    1989

    Oseberg A

    1988

    Nelson

    1993

    Snorre TLP

    1992

    Eldfisk is one of the fields in the Greater Ekofisk Area offshore

    Norway. Both the Ekofisk field itself and the associated Eldfisk

    have since the 1970s been developed with several offshore

    platforms with steel jacket substructures. Kvaerner has over

    the decades delivered the majority of this extensive

    development. In March 2011, the company was also awarded

    the EPC contract for delivery of topsides, bridges and a flare

    for the new Eldfisk 2/7 S platform. Kvaerner will deliver the

    15 500 tonne topsides and the other components forthe new platform in time for installation in 2014.

    Grane is a drilling and production platform with the topsides

    installed on a steel jacket substructure. Kvaerner delivered the

    full EPC value chain for both topsides and jacket. Even when

    introducing several new methods and technologies, including

    systems for processing of very heavy oil, the project broke

    several previous performance records. Grane was recognised

    as a benchmark delivery on most key parameters, including

    HSE, efficiency, schedule, and budget management.

    Offshore

    topsides facilities

    Offshore

    topsides facilities

    ELDFISK GRANE

    yvin

    dH

    agen

    /Statoil

    C

    on

    ocoPhillip

    s

    8

  • 8/13/2019 13 Topsides

    9/16

    Offshore

    topside facilities

    Offshore

    topside facilities

    Hibernia

    1996

    Heidrun

    1994Troll A

    1995

    Snorre B

    2002

    Njord

    1997

    Laminaria

    1999

    Kvaerner has been involved in several projects for arctic

    conditions offshore Canada, including the Hibernia platform.

    As a leading contractor, Kvaerner was involved in all phases

    of the project development, for both the topsides and the

    substructure. The substructure is built to withstand contact

    with drifting ice. To utilize local employees, Kvaerner played

    a key role in establishing a fabrication yard in Bull Arm,

    Newfoundland.

    With a total height from seabed to the tip of the flare of 481

    meters, the Troll A holds the title the largest object ever moved

    by man. Troll is one of the worlds largest offshore gas fields,

    and the Troll A platform has been dubbed as one of the worlds

    modern engineering marvels. Kvaerner performed the full EPC

    scope for the gravity base substructure (GBS), and the EP and

    C scope for the large topsides with gas processing facilities

    before the complete platform was towed out to the field

    and installed. In addition, Kvaerner has been involvedin developing other installations at the Troll field.

    Offshore

    topsides facilities

    Offshore

    topsides facilities

    HIBERNIA TROLL A

    yvin

    dH

    agen

    /Statoil

    Exx

    onM

    obil

    9

  • 8/13/2019 13 Topsides

    10/16

    Ormen Lange

    2007

    Adriatic LNG

    2009

    Snhvit

    2007

    Valhall

    2003

    Troll B

    2002

    Kristin

    2005

    The Kristin semi-submersible production platform is located in a

    region prone to harsh environment offshore Norway and within

    a deep reservoir causing high pressure and high temperature.

    The platform is made to handle a well stream with a pressure

    of 900 bars and temperatures of 170 degrees Celsius.

    The semi-submersible production platform Gja is built for

    operations in harsh winds and waves. It is the worlds first

    floating production platform with electrical power from shore,

    thus reducing the CO2 emissions from the platform.

    KRISTIN GJA

    Floating oil &

    gas facilities

    Floating oil &

    gas facilities

    M

    aritH

    omm

    edal/

    Statoil

    10

  • 8/13/2019 13 Topsides

    11/16

    TCM Mongstad

    2011

    Kollsnes

    2011

    Eldfisk

    2014

    Edvard Grieg

    2015

    Aker H6-e

    2009

    Gja

    2010

    At the Mongstad refinery, Kvaerner has been a key contractor,

    installing new and environmentally friendly technology for

    carbon capture from gas emissions. The Technology Centre

    (TCM) is installed for testing green technologies.

    The LNG facility at Melkya receives gas via seabed pipelines

    directly from subsea wells at the Arctic Snhvit field in the

    Barents Sea. In the development of this subsea-to-shore

    project, Kvaerner was the installation contractor for onshore

    facilities on the island Melkya, just outside one of the worlds

    most Northerly cities, Hammerfest.

    TCM MONGSTAD SNHVIT LNG

    Onshore oil and gas and

    petrochemical facilities

    Onshore oil and gas and

    petrochemical facilities

    EilivL

    er

    en

    /Statoil

    T

    echn

    olo

    gyCen

    tr

    eMon

    gstad

    11

  • 8/13/2019 13 Topsides

    12/16

    Feasibility &

    concept

    Opportunity appraisal

    Feasibility studies

    Concept selection

    Concept definition

    System

    definition

    System definition

    System design & layout

    development

    Global design

    Detailing &

    fabrication

    Detailed design

    Work preparation

    Prefabrication

    Fabrication

    Assembly

    & erection

    Transport & positioning

    Assembly

    Mechanical completion

    System

    completion

    Commissioning

    Transport & installation

    Take-over

    Close-out

    Kvaerner is a main contractor with practical experience gained from large projects in

    challenging environments. Our comprehensive track record includes fixed and floating

    substructures for offshore platforms and terminals, topsides for offshore platforms and

    terminals. We have also delivered a wide range of onshore based facilities for oil and

    gas processing or industrial purposes.

    yvin

    dH

    agen

    /Statoil

    12

  • 8/13/2019 13 Topsides

    13/16

    H

    ar

    ald

    _P

    etter

    sen

    /Statoil

    Studies and front-end

    Kvaerner prefers to be involved in the

    early stages of a project and contribute

    to the customers decision process on the

    development concept, through the phases

    for feasibility studies, field development

    planning and FEED, as well as for the

    establishing of a project execution strategy.

    The FEED phase is critical to the long-term

    success of the overall project objectives.

    While a projects business plan typically

    identifies the financial opportunity, theFEED establishes a set of process operating

    conditions and specifies the equipment

    needed to achieve the necessary level

    of reliability, efficiency and safety.

    Hence, this phase sets the direction for

    the subsequent project phases.

    Engineering

    Kvaerner has an experienced engineering

    organisation, capable of executing several

    simultaneous projects. In addition, we

    work closely with Aker Solutions and other

    recognized engineering partners.

    Our network of offices at strategic international

    locations is often leveraged to provideadditional capacity or to contribute with

    relevant expertise and experience.

    When necessary, we also use selected

    strategic partners worldwide, including high-

    Kvaerners delivery of oil and gas offshore

    platforms and onshore facilities is based

    on our own Project Execution Model (PEM),

    which has been developed, proved and

    documented on numerous projects.

    Kvaerners PEM approach ensures that

    projects are systematically planned and

    executed. The model combines effective

    performance with a careful detection of

    possible challenges during the projects life

    cycle, and enables pro-active mitigation

    and risk management.

    The use of PEM assures quality in every step

    of the project, through a clear definition of

    milestones, elements and quality parameters.

    This systematic approach provides transparency

    for both the project team and for the customer.

    The continuously updated project overview

    identifies opportunities for flexibility.

    Technology development

    After project completion a systematic analysis

    is performed. Ideas that work well are harvested

    for further improvement, as part of Kvaerners

    continous improvement.

    Kvaerner carefully invests in developingnew technological solutions and new methods.

    It is this development that brings new

    knowledge and ideas to the table when a new

    project is being considered by our customers.

    value engineering hubs, to assist in various

    parts of the project execution.

    The detailed engineering phase also provides

    specific instructions which enable the

    fabrication of the new installation with

    maximum efficiency.

    Procurement

    The documentation from detailed engineering

    is an important tool to enable the procurement

    organisation to gain the best terms and

    conditions from vendors, including theidentification and ordering of long lead items

    at an early stage. Kvaerners organisation

    includes extensive experience in procurement

    for both onshore and offshore projects.

    Our expertise includes the overview of

    alternative suppliers and vendors, market

    prices and quality standards for specific items

    and systematic follow-up routines after the

    orders have been placed.

    Two floating platforms delivered in sequence from Kvaerner Stord.

    Kvaerner has been a key contractor through the development andexpansion phases at the Krst onshore facility.

    Kvaerner continuously train operators to the highest standardof quality and efficiency.

    Kvaerner was in early 2012 awarded the EPC contracts for the newEdvard Grieg platform, which is scheduled to be installed in 2015.

    Kvaerner was the main contractor for the Snorre B semi-submersibleproduction platform. Kvaerner was previously also the main contractor

    for the Snorre A TLP (tension leg platform).

    Kvaerners engineers and project managers have extensive experiencein developing effective concepts and reliable execution plans.

    Illu

    strasjon

    sbild

    e-

    Sh

    utter

    stock

    13

  • 8/13/2019 13 Topsides

    14/16

    Mating of topsides and hull.

    Gja on its way to field from Kvaerner Stord.

    Close cooperation between engineeringand procurement.

    H

    ar

    aldP

    etter

    sen

    /Statoil

    Construction

    Kvaerner can offer construction for both

    offshore platforms and onshore facilities

    based on more than 40 years of experience.

    Kvaerner has also established strategic

    partnerships with other leading, best-value

    fabricators. This ensures flexibility, as

    well as the ability to deliver projects in

    selected regions.

    Cooperation between Kvaerner and its

    strategic partners is based on the PEM modeland a close on site cooperation between

    the experts from Kvaerner and its partners.

    All parts of the delivery are performed

    according to the high standards and with the

    reliability that is expected from Kvaerner.

    Local content is a key factor for many oil

    and gas projects. Kvaerner has long and

    documented experience of contributing

    to local content and to the establishing of

    long term local value creation through use

    of local suppliers and through training and

    effectively integrating local subcontractors.

    Hook-up and CommissioningThe delivery of an offshore platform or

    onshore plant typically involves hundreds

    of thousands of small and large deliveries of

    products, systems and services from suppliers

    around the world. Kvaerner ensures that

    everything comes together with the maximum

    efficiency and desired quality.

    Kvaerner offers hook-up and commissioning

    for floating platforms or platform topsides

    at this modern facility. For hook-up and

    commissioning of onshore facilities,

    Kvaerners experienced operators and

    construction managers will perform the

    hook-up and commissioning at the plant site.

    Kvaerner covers all hook-up and

    commissioning disciplines typically required,

    such as process and marine system design,

    piping, layout, material handling, pipe stress,

    secondary structural steel (steel decks, access

    and support systems), HVAC and safety

    systems, electrical, instrumentation, telecom,

    mechanical equipment, risers, J-tubes and

    pipeline interfaces.

    Installation of topsides

    Different substructure solutions require

    different installation methods of the topsides.

    For fixed steel structures, the topsides will belifted onto the substructure in one or more

    modules at the field. Depending on the size

    of the topsides, this might cause extensive

    offshore hook-up work.

    For floating facilities and gravity based

    substructures, the mating will be performed

    inshore by float over. This will require minimal

    offshore hook-up work. For FPSOs, the topsides

    will be installed keyside. Kvaerner has over

    the last decades gained extensive experience

    on all these installation methods.

    End of life services

    Kvaerner has state of the art facilities

    and experienced personnel to carry out

    a safe demolition and disposal of closeddown installations.

    Hands-on project management

    All our projects, including those executed

    with strategic partners or local contractors,

    are supervised by Kvaerners own project

    managers. The in depth expertise, the proven

    experience and the hands-on approach of

    our experts are some of the factors that

    make Kvaerner unique, and have made our

    brand recognised as the reliable, effective

    contractor for the most demanding projects.

    14

  • 8/13/2019 13 Topsides

    15/16

    Kvaerners mission is to successfully execute

    some of the worlds most demanding projects

    through living our values.

    In any organisation, values are essential for

    building trust in each other, in our partners,

    in our customers and with society. All the

    Kvaerner businesses share a common set of

    values the compass that guides our policies,

    our operations and ultimately, our behaviour.

    For further information, please visit our web

    site: www.kvaerner.com

    HSE mindset

    We take personal

    responsibility forHSE because

    we care

    Our mission:

    Successfully

    planning and

    executing

    demanding EPC

    projects, through:

    Hands-on

    management

    We know our

    business and get

    things done

    Customer drive

    Building customer

    trust is key to

    our business

    Open and direct

    dialogue

    We encourage

    early and honest

    communication

    People and teams

    All our major

    achievements areteams efforts

    Delivering results

    We deliver

    consistently andstrive to beat

    our goals

    Our common values

  • 8/13/2019 13 Topsides

    16/16

    Production:ZPIRIT

    Photos:Exx

    onM

    obil,Kv

    aern

    er,

    Sh

    ell,

    yvin

    dH

    agen

    ,Statoil

    Cover:Ph

    otom

    on

    tageof

    Gja-ZPIRIT

    Kvrner Stord AS

    EldyaneNO-5411 Stord

    Norway

    Telephone: + 47 53 41 80 00

    Telefax: + 47 53 41 80 01

    www kvaerner com

    Kvaerner Contracting Ltd

    30 Eastbourne TerraceLondon, W2 6LG

    United Kingdom