135 Street / Anthony Henday Drive Connection
What:
The City will construct 135 Street to replace 127 Street as an arterial connection to Anthony Henday Drive.
When:
Anticipated Construction Start: 2018
![Page 2: 135 Street / Anthony Henday Drive Connection€¦ · to Anthony Henday Drive and determined the need to close this STREET ACCESS connection. • 7R SUHSDUH IRU WKLV FORVXUH WKH &LW\](https://reader033.vdocument.in/reader033/viewer/2022042713/5fa6afd1948c9e3720045bd2/html5/thumbnails/2.jpg)
• operational concerns at the 127 Street right-in/right-out access to Anthony Henday Drive and determined the need to close this connection.
•
Anthony Henday Drive. •
Project Background
NEW
135
STR
EET
127
STR
EET
ELLERSLIE ROAD
PARK AND RIDE
KEY PLAN
FUTUREINTERCHANGE
N
EXISTING 127STREET ACCESS
FUTURE HERITAGE
TRAIL
![Page 3: 135 Street / Anthony Henday Drive Connection€¦ · to Anthony Henday Drive and determined the need to close this STREET ACCESS connection. • 7R SUHSDUH IRU WKLV FORVXUH WKH &LW\](https://reader033.vdocument.in/reader033/viewer/2022042713/5fa6afd1948c9e3720045bd2/html5/thumbnails/3.jpg)
Project Summary
135 Street Connection to Anthony Henday Drive
• 135 Street will replace 127 Street as a major arterial connection to Anthony Henday Drive.
•
•
Ellerslie Road Twinning – 135 Street to 127 Street
•
•
construction.
NEW
135
STR
EET
127
STR
EET
ELLERSLIE ROAD
PARK AND RIDE
KEY PLAN
FUTUREINTERCHANGE
N
FUTURE HERITAGE
TRAIL
![Page 4: 135 Street / Anthony Henday Drive Connection€¦ · to Anthony Henday Drive and determined the need to close this STREET ACCESS connection. • 7R SUHSDUH IRU WKLV FORVXUH WKH &LW\](https://reader033.vdocument.in/reader033/viewer/2022042713/5fa6afd1948c9e3720045bd2/html5/thumbnails/4.jpg)
Ellerslie Road Design Summary
NEW
135
STR
EET
ELLERSLIE ROAD
PARK AND RIDE
KISS
AN
D R
IDE
ACC
ESS
TRAN
SIT
ACC
ESS
127
STR
EET
MAC
EWAN
RO
AD
GRAYDON HILL
THIS AREA HAS BEEN DESIGNATED FOR ROADWAY WIDENING, BUT TREE
CONSTRUCTION OCCURRED
INTERSECTION TO BE UPGRADED TO ACCOMMODATE ACCESS TO THE PARK AND RIDE AND INCREASED LEFT TURN CAPACITY FOR NORTHBOUND AND SOUTHBOUND TRAFFIC
NEW SIGNALIZED INTERSECTION AT 135 STREET WITH SHARED-USE PATH CONNECTION TO PARK AND RIDE / TRANSIT CENTER
WIDENING OF ELLERSLIE ROAD TO THE WEST WILL BE COMPLETED AS
RIGHT-IN / RIGHT-OUT KISS AND RIDE
ELLERSLIE ROAD
GGGRAYDONGGG N HILLLLLLLLLLL
WIDENING OF ELLERSLIE EAST OF 127 STREET CURRENTLY BEING DESIGNED. FUNDING TO BE REQUESTED WITH 2019-2022 CAPITAL BUDGET.
LEGEND
EXISTING ROADWAY
NEW ROADWAY
PROPOSEDSHARED-USE PATH
EXISTING SHARED-USE PATH
FUTURE EXTENSION OF
TRANSIT CENTRE ACCESS FROM ELLERSLIE ROAD
N
![Page 5: 135 Street / Anthony Henday Drive Connection€¦ · to Anthony Henday Drive and determined the need to close this STREET ACCESS connection. • 7R SUHSDUH IRU WKLV FORVXUH WKH &LW\](https://reader033.vdocument.in/reader033/viewer/2022042713/5fa6afd1948c9e3720045bd2/html5/thumbnails/5.jpg)
135 Street Design Summary
NEW 135 STREET
KISS AND RIDE NEW SIGNALIZED INTERSECTION
PARK AND RIDE
FUTURE TRANSIT ORIENTED
FUTUFFUTUFUTUTFFFUTUFUTUTFUTUREREREEERERE REEEETTTTTRTRATRATRANRANRANRANTR SIT ORIENTEDNTENTEDEDEDEDDDDNTEDDD
FUTURE TRANSIT ORIENTED
FFUTUFUTUFUTUFUTUFUTUFFFUTURERRERE EEEEREEREEETRTRATRANTRANRANRATTTTRRATRTTTT SIT ORIENTENTETETENTETTEDEDEDEDDDEDDEDDDDEDDDD
LEGEND
EXISTING ROADWAY
NEW ROADWAY
PROPOSEDSHARED-USE PATH
EXISTING SHARED-USE PATH
TRANSIT AND KISS AND RIDE ACCESS
BE IMPLEMENTED WHEN WIDENING OCCURS.
ACCESS TO / FROM EASTBOUND
GREATER ACCELERATION / DECELERATION DISTANCES THAN THE EXISTING 127 STREET ACCESS. FUTURE INTERCHANGE
CONFIGURATION TO BE DETERMINED BY ALBERTA TRANSPORTATION.
ELLE
RSL
IE R
OAD
NCESS TS TS TS TTTHANHANHAHAHAHAN THTHTHTHTHEEEE EEEEACCEESSSSSAAAAACCECCECCECCECCCECCCEEEEESSSSSSSSSSSS.S..S .S.
ANTHONY HENDAY OFF RAMP
ON RAMP
ANTHONY HENDAY
N
![Page 6: 135 Street / Anthony Henday Drive Connection€¦ · to Anthony Henday Drive and determined the need to close this STREET ACCESS connection. • 7R SUHSDUH IRU WKLV FORVXUH WKH &LW\](https://reader033.vdocument.in/reader033/viewer/2022042713/5fa6afd1948c9e3720045bd2/html5/thumbnails/6.jpg)
Anticipated Construction Timelines
anticipated in 2019
alternate routes to Anthony Henday Drive will be required.
shared in spring 2018.CONSTRUCTION STAGING
NEW
135
STR
EET
127
STR
EET
ELLERSLIE ROAD
PARK AND RIDE
N
EELLELLELLEEEE LELELERSLIRSLIRSL EEEEELLELLEE LELE LISLIRSLIRSLIRS EEEEEEEEEEEEEEEEELLELLERR ISLIRSRSLISLIRSLLERREEEELLEEELLERSLIRSLIEEEEEELLEEELLERSLIRSLIEEEELLELLELLLELELERSLIRSLIRSLIEERRRREEEEEEEEEEEELLEEL RSLIELL ELLLLLLLEEEEERRRSSLL EEEIEEIIE
35
355353ST
RE
STR
EST
RE
STSSN
EW
EWEW
W
EWWE1111
NEWWWW
NEW
NEW
1111W
NEW
NEW
NEW
NEW
1111EE
NNNEEE
NE
NNEEEE
NNE
NEW
NE
NNE
1N
EWE13
511
STR
ET
NEEWWWWW
NEW
NEW
111N
EWWWN
EWEW11111333
NEWW
NEW
1111E
RR555
EST
RRRN
EEEWWWW11
TRE
TRE
TRE
STR
11135 35353535353
STR
EST
RE
STR
EST
RE
S111
RE
135
STR
E13
5ST
RE
TTT13133333133
55SSTSTTT
RRREE
REE
TTE
RRRRRRRRRRRRRRRRRTTT5555555555
11E
TRE
STR
EST
RS
111 TRE
TRE
TRE
TREE
TETETETT12
712
712
7 12
7 12
7 7 2711STSTSTTSS
22111127
1111122222227
SSSTSTSSTSTTS77
SS77
SSSTR
ETRR
ETR
EETTTTTETTT
2721111ST
RE
SEEEEE
2712727271111
RE
STR
ESS
EEETR
EETE
REEPARKPARKPARKPARKPP ANDANDANDAND RIDRIDRIDRIDEEEEEEAAAAAA ND RIDDEEEEEEENDD RRIDDEEEEEENNNDDDDDDDDDDDDD RRRRRRRRRRRRRIDDDDEEEEEEEEEEEEEEEENNNNNNNNNNNNDDDDDDDDDDDDDDDDDDDDDD RRRRRRRRRRRRRRRRRRRRRIIIIIIDDDDDDDDDDDDEEEEEEEEEEEEEEEEEEEEEARKRKKK AARKKK AARRRRRRRKKKK AAAAAAAAAARRRRRRRRRRRRRRRRRRRRRRRRRRKKKKKKKKKKKKKK AAAAAAAAAAAAAAAAAKKKKKKKKKKKKKKKKK AAAAAAAAAAAAAA DDDDDDDDDDDDDDAAAAAAAAAAAAAAAAAA DDDDDDKKKKKKKKAAAAAAAAA NNNNNNNNNNNNNN
TTTTTTTTEEEE
TETETTETEETTTTTTTETTEEEETTTTTTTEETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTEEEEETETETEETTTTTT
ETETTEEEEEEEEETTTTTT
EEETTTTTTTETEEEETTTTETETETTTTTETTTTTTTTTTTTTTTTT
2018
TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT
ANTICIPATED
2018-2019(BY OTHERS)
E RRROOROOAADDDDDDDDDDE RE RE RE RE RROOOROOROOROOAAADDDDDDDAADADDDAAADE ROOROOAADDDDDE ROROOAADDDDDE RE RRE RROROOOAAADDDDE ROOAAADDDDDDAAADDDDDOOOOOADDE RRROOOOOAAAADDDDDDAAAAAROROAAADDDDDDDADDDROOR AADDDDDDDARRRROOOAAADEE
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
2018-2019