Code No. Description Unit Rate
14.1 Demolishing lime concrete manually / by mechanical
means including disposal of material with all lifts and
upto 50 m lead etc. complete as per direction of theEngineer- in-charge.
Cum. R 136.70
14.2 Demolishing cement concrete manually / by
mechanical means including disposal of material with
all lifts and upto 50 m lead etc. complete as per
direction of the Engineer- in-charge:-
14.2.1 1 : 3 : 6 or leaner mix. Cum R 305.50
14.2.2 1 : 2 : 4 or richer mix. Cum R 460.40
14.3 Demolishing reinforced cement concrete manually /by mechanical means including stacking of steel bars
properly and disposal of unserviceable material with
all lifts and upto 50 m lead etc. complete as per
direction of the Engineer- in-charge.
Cum R 583.20
14.4 Demolishing reinforced brick work manually / by
mechanical means including stacking of steel bars,
bricks/ brick slump properly and disposal of
unserviceable material with all lifts and upto 50 m lead
etc. complete as per direction of the Engineer- in-
charge.
Cum R 435.00
14.5 Extra for cutting reinforcement in RCC or R.B. work
manually / by mechanical means (payment to made on
the cross sectional area of RCC or R.B. work) etc.
complete as per direction of the Engineer- in-charge.
Sqm. R 257.80
Dismantling of utilities like water supply lines, electric and telephone lines is
required to be done under the supervision of concerned departments with prior
information to the users.
The dismantled materials should be examined and a realistic assessment and
provision should be made after due process for the salvage value for such
materials, can be utilised for works or auctioned.
SUB HEAD : 14.0DISMANTLING AND DEMOLISHING WORK
For dismantling of structures, which remain submerged in water, the cost may be
enhanced by 50%. If site condition warrant lowering of water level to facilitate
dismantling, the cost may be enhanced by additional 25%.
\\vboxsrv\conversion_tmp\scratch_6\218141169.xls.ms_office/Schedule SH:14-Page:2
-
8/12/2019 14. Building Works_ Dismantaling & Demolishing
2/4
SH:14/DISMANTLING_DEMOLISH
Code No. Description Unit Rate
14.6 Extra for scrapping, cleaning and straightening
reinforcement obtained from RCC or R.B. work etc.
complete as per direction of the Engineer- in-charge. Kg. R 1.30
14.7 Demolishing brick work including stacking of
serviceable materials and disposal of unserviceablematerials with all lifts and upto a lead of 50m etc.
complete as per direction of the Engineer- in-charge:-
14.7.1 In mud mortar. Cum R 117.00
14.7.2 In lime mortar. Cum R 139.40
14.7.3 In cement mortar. Cum R 335.60
14.8 Removing mortar from brick and cleaning bricks
including stacking bricks and disposal rubbish with all
lifts and upto a lead of 50 m etc. complete as perdirection of the Engineer- in-charge:-
14.8.1 In mud mortar. Each R 0.80
14.8.2 In lime mortar. Each R 0.90
14.8.3 In cement mortar. Each R 1.10
14.9 Dismantling doors, windows and clerestory windows (
steel or wood ) shutter including chowkhats,
architrave, hold fasts etc. complete including stacking
of serviceable materials and unserviceable materialsseparately with all lifts and upto a lead of 50m etc.
complete as per direction of the Engineer- in-charge:-
14.9.1 Of area 3 sqm and below. Each R 83.60
14.9.2 Of area beyond 3 sqm. Each R 113.20
14.10 Dismantling doors, windows and clerestory windows (
steel or wood ) shutter including stacking of
serviceable materials and unserviceable materials
separately with all lifts and upto a lead of 50m etc.
complete as per direction of the Engineer- in-charge:-
14.10.1 Of area 3 sqm and below. Each R 36.00
14.10.2 Of area beyond 3 sqm. Each R 46.00
\\vboxsrv\conversion_tmp\scratch_6\218141169.xls.ms_office/Schedule SH:14-Page:3
-
8/12/2019 14. Building Works_ Dismantaling & Demolishing
3/4
SH:14/DISMANTLING_DEMOLISH
Code No. Description Unit Rate
14.11 Dismantling wood work in frames, trusses, purlins,
rafters, etc. upto 10m span and 5m height including
stacking of serviceable materials and unserviceable
materials separately with all lifts and upto a lead of 50
m etc. complete as per direction of the Engineer- in-
charge:-
14.11.1 Of sectional area 40 sq cm and below. Mtr. R 5.00
14.11.2 Of sectional area beyond 40 sq cm. Cum. R 712.90
14.12 Extra for dismantling trusses, rafters, purlins etc. of
wood work for every additional span of 1 m or part
thereof beyond 10 m etc. complete as per direction of
the Engineer- in-charge:-
14.12.1 Of sectional area 40 sq cm and below. Metre/ metrespan
R 0.40
14.12.2 Of sectional area beyond 40 sq cm. Cum/ metrespan
R 96.10
14.13 Extra for dismantling trusses, rafters, purlins etc. of
wood work for every additional height of 1 m or part
thereof beyond 5 m etc. complete as per direction of
the Engineer- in-charge:-
14.13.1 Of sectional area 40 sq cm and below. Metre/ metreheight
R 0.70
14.13.2 Of sectional area beyond 40 sq cm. Cum/ metreheight
R 178.80
14.14 Dismantling steel work in single section including
dismembering and stacking of serviceable materials
and unserviceable materials separately with all lifts
and upto a lead of 50 m etc.complete as per direction
of the Engineer- in-charge:-
14.14.1 R.S Joists. Kg. R 0.80
14.14.2 Channels, angles, tees and flats. Kg. R 0.60
14.15 Dismantling steel work in built up section in channels,
angles, tees, flats including all gusset plates, bolts, nuts,
cutting rivets, welding including dismembering and
stacking of serviceable materials and unserviceable
materials separately with all lifts and upto a lead of 50
m etc. complete as per direction of the Engineer- in-
charge.
Kg. R 1.50
\\vboxsrv\conversion_tmp\scratch_6\218141169.xls.ms_office/Schedule SH:14-Page:4
-
8/12/2019 14. Building Works_ Dismantaling & Demolishing
4/4
SH:14/DISMANTLING_DEMOLISH
Code No. Description Unit Rate
14.16 Dismantling steel work in built up section manually /
mechanically without dismembering and stacking of
serviceable materials and unserviceable materials
separately with all lifts and upto a lead of 50 m etc.
complete as per direction of the Engineer- in-charge.
Kg. R 1.20
14.17 Dismantling steel work in frames, trusses, purlins, and
rafters etc. upto 10 m span and 5 m height including
dismembering and stacking of serviceable materials
and unserviceable materials separately with all lifts
and upto a lead of 50 m etc. complete as per direction
of the Engineer- in-charge.
Kg. R 1.60
14.18 Extra for dismantling trusses, rafters, purlins etc. of
steel work for every additional span of 1 m or part
thereof beyond 10 m etc. complete as per direction of
the Engineer- in-charge.
Kg/ metre
span.R 0.20
14.19 Extra for dismantling trusses, rafters, purlins etc. of
steel work for every additional height of 1 m or part
thereof beyond 5 m etc. complete as per direction of
the Engineer- in-charge.
Kg/ metre
height.R 0.40
14.2 Dismantling dry brick pitching in floors, drains etc.
including stacking of serviceable materials and
unserviceable materials separately with all lifts and
upto a lead of 50 m etc.complete as per direction of the
Engineer- in-charge.
Cum. R 211.80
14.21 Dismantling GS sheet roofing including ridges, hips,
valleys, gutters wind ties etc. including dismembering
and stacking of serviceable materials and
unserviceable materials separately with all lifts and
upto a lead of 50 m etc.complete as per direction of the
Engineer- in-charge.
Sqm. R 26.30
14.22 Dismantling old plaster or pointing, raking out joints,
cleaning and preparing the surface for re-plastering or
re-pointing including disposal of rubbish to the
dumping ground with all leads and lifts etc.complete asper direction of the Engineer- in-charge.
Sqm. R 14.20
14.23 Dismantling old glass panes from wooden / steel
structures including stacking of serviceable materials
and disposal of rubbish and unserviceable materials to
the dumping ground with all leads and lifts
etc.complete as per direction of the Engineer- in-
char e.
Sqm. R 7.50