Work Order
Work Order NO : 000001 Work Trade :Mechanical
Work Order Status : Closed Work Type : Corrective
Work priority : Emergency
Assigned to : FET Collage Received by : ibraheem khress Requester : Dr khaleel Abu shgair Received Data/Time : Phone Number :
PM Target Start Data : PM Target End Data :
Problem Description : Slide movement and accuracy
Note to Technician : inspection the lubricant and wear particle
Failure Code : 1 Check list No:
Asset No : 1,2,3,4 Location NO : 2
Asset Name : Fagor Turning Location Name : CNC LAB
Case description Action Taken Prevention Taken
Part and labor Details
**D=Direct Issue , I = Inventory
Data and Time work was started Data : Time :
Data and Time work was completed Data : Time :
Certification and Work Completion Name and Signature of Technician/Engineer Name and Signature of Requester/Supervisor
………………Name ………………Signature Data : Time :
………………Name ………………Signature Data : Time :
Please rate our services :
1-Poor 2-Fair 3-Good 4-Very Good 5-Excellent
Stop the machine Prolong tine 1-Clean the old grease2 -Greasing and Lubrication
3-Move axis 4 -Greasing and Lubrication
5 -Warm up the axis
![Page 2: Document1](https://reader036.vdocument.in/reader036/viewer/2022082516/55cf8f1c550346703b990f4c/html5/thumbnails/2.jpg)
Work Order
Work Order NO : 000001 Work Trade :Mechanical
Work Order Status : Open Work Type : Prevention
Work priority : Normal
PM checklist Daily
Checklist No : 1
Checklist Desc:
1- Lubricant the machine
2- clean the machine after usage