Work Order Work Order NO : 000001 Work Trade :Mechanical Work Order Status : Closed Work Type : Corrective Work priority : Emergency Assigned to : FET Collage Received by : ibraheem khress Requester : Dr khaleel Abu shgair Received Data/Time : Phone Number : PM Target Start Data : PM Target End Data : Problem Description : Slide movement and accuracy Note to Technician : inspection the lubricant and wear particle Failure Code : 1 Check list No: Asset No : 1,2,3,4 Location NO : 2 Asset Name : Fagor Turning Location Name : CNC LAB Case description Action Taken Part and labor Details **D=Direct Issue , I = Inventory Data and Time work was started Data : Time : Stop the machine Prolong tine 1 - Clean the old grease 2 - Greasing and Lubrication

Upload: ibraheem-khress

Post on 20-Dec-2015

220 views

Category:

Documents


1 download

DESCRIPTION

ppppp

TRANSCRIPT

Page 1: Document1

Work Order

Work Order NO : 000001 Work Trade :Mechanical

Work Order Status : Closed Work Type : Corrective

Work priority : Emergency

Assigned to : FET Collage Received by : ibraheem khress Requester : Dr khaleel Abu shgair Received Data/Time : Phone Number :

PM Target Start Data : PM Target End Data :

Problem Description : Slide movement and accuracy

Note to Technician : inspection the lubricant and wear particle

Failure Code : 1 Check list No:

Asset No : 1,2,3,4 Location NO : 2

Asset Name : Fagor Turning Location Name : CNC LAB

Case description Action Taken Prevention Taken

Part and labor Details

**D=Direct Issue , I = Inventory

Data and Time work was started Data : Time :

Data and Time work was completed Data : Time :

Certification and Work Completion Name and Signature of Technician/Engineer Name and Signature of Requester/Supervisor

………………Name ………………Signature Data : Time :

………………Name ………………Signature Data : Time :

Please rate our services :

1-Poor 2-Fair 3-Good 4-Very Good 5-Excellent

Stop the machine Prolong tine 1-Clean the old grease2 -Greasing and Lubrication

3-Move axis 4 -Greasing and Lubrication

5 -Warm up the axis

Page 2: Document1

Work Order

Work Order NO : 000001 Work Trade :Mechanical

Work Order Status : Open Work Type : Prevention

Work priority : Normal

PM checklist Daily

Checklist No : 1

Checklist Desc:

1- Lubricant the machine

2- clean the machine after usage