17 december 2003 gert-jan nooren 1. 17 december 2003 gert-jan nooren 2 its ssd in 2003

Download 17 december 2003 Gert-Jan Nooren 1. 17 december 2003 Gert-Jan Nooren 2 ITS SSD in 2003

If you can't read please download the document

Upload: adelia-short

Post on 18-Jan-2018

222 views

Category:

Documents


0 download

DESCRIPTION

17 december 2003 Gert-Jan Nooren 3 SSD modules on ladder

TRANSCRIPT

17 december 2003 Gert-Jan Nooren 1 17 december 2003 Gert-Jan Nooren 2 ITS SSD in 2003 17 december 2003 Gert-Jan Nooren 3 SSD modules on ladder 17 december 2003 Gert-Jan Nooren 4 start of module production assembly robot for ladders control, read-out, DAQ beam test highlights in 2003 17 december 2003 Gert-Jan Nooren 5 Design parameters on the edge -> highly sensitive to process parameters -> MPW yield 50, 98, 8 % Improved process control -> Engineering run yield % Thinning down to 150m for better radiation length in progress HAL25 status 17 december 2003 Gert-Jan Nooren 6 components of the modules 1.HAL25-chip TAB-bonded on its Al chipcable (6 chips/hybrid) 3. sensor (768 strips/side) 2. Hybrids (2 hybrids/mod) 17 december 2003 Gert-Jan Nooren 7 ALICE SSD Module 17 december Module scanner laser 1.06 m wavelength positioning ~1.5 m spot diameter < 20 m Aleksey Sokolov 17 december 2003 Gert-Jan Nooren 9 Readout of the modules P-Hybrid N-Hybrid control ALCAPONE EndCap ALABUF analog out Sensor V bias FEROM 17 december 2003 Gert-Jan Nooren 10 Assembly robot Pick & place robot for modules Automatic positioning to a few micrometers Acceptance test 19 December 17 december 2003 Gert-Jan Nooren 11 September 2003 beam test Prototype 4-module EndCap 17 december 2003 Gert-Jan Nooren 12 September 2003 beam test 5 module telescope 17 december 2003 Gert-Jan Nooren 13 September 2003 beam tests S/N for 4 modules N P N P N P N P Very preliminary - provided by Trieste team Module SN0002Module SN0003Module HN0001Module HN0002 Canberra sensorITC sensor 17 december 2003 Gert-Jan Nooren 14 Beam tests Integration in real Cern environment: read-out chain proven up to ADC Sensor quality problem revealed: Canberra takes action ITS = SPD + SDD + SSD beamtest end 2004 Status and plans 17 december 2003 Gert-Jan Nooren 15 Beam tests Integration in real Cern environment: read-out chain proven up to ADC Sensor quality problem revealed: Canberra takes action ITS = SPD + SDD + SSD beamtest end 2004 Module production Helsinki is bonding chips at production speed modules produced, yield and speed unknown Testing infrastructure for chips and hybrids fully operational Strasbourg and Trieste (MIPOT) starting in Q1 Status and plans 17 december 2003 Gert-Jan Nooren 16 Beam tests Integration in real Cern environment: read-out chain proven up to ADC Sensor quality problem revealed: Canberra takes action ITS = SPD + SDD + SSD beamtest end 2004 Module production Helsinki is bonding chips at production speed modules produced, yield and speed unknown Testing infrastructure for chips and hybrids fully operational Strasbourg and Trieste (MIPOT) starting in Q1 Read-out EndCap ready for mass production FEROM design ready, first prototype Q2 Patchpanels and cables layout almost frozen Status and plans 17 december 2003 Gert-Jan Nooren 17 Beam tests Integration in real Cern environment: read-out chain proven up to ADC Sensor quality problem revealed: Canberra takes action ITS = SPD + SDD + SSD beamtest end 2005 Module production Helsinki is bonding chips at production speed modules produced, yield and speed unknown Testing infrastructure for chips and hybrids fully operational Strasbourg and Trieste (MIPOT) starting in Q1 Read-out EndCap ready for mass production FEROM design ready, first prototype Q2 Patchpanels and cables layout almost frozen Assembly First ladder Q1/Q2 Module testing with laser set-up Status and plans 17 december 2003 Gert-Jan Nooren 18 June 2003 beam tests module SN0003 Charge matching N P