1800 gervais street renovations - construction - phase iipurchasing.sc.edu/solicitations/h27-z008-b...

22
LOCATION MAP NO SCALE SHEET No. DESCRIPTION SHEET No. DESCRIPTION SHEET No. DESCRIPTION 803-731-0650 office Belka Engineering 7 Clusters Court # 201 Columbia, South Carolina 29210 Swygert & Associates 803-791-9300 office G100 COVER SHEET & INDEX G101 CODE SHEET & GENERAL NOTES AD100 DEMOLITION PLANS A100 FLOOR PLANS A200 CASEWORK AND DETAILS E0.1 ELECTRICAL SYMBOLS, LEGEND, AND SCHEDULES E1.1 LIGHTING DEMOLITION PLANS E1.2 POWER/SYSTEMS DEMOLITION PLANS E2.2 POWER RENOVATION PLANS MECHANICAL ENGINEER ELECTRICAL ENGINEER ARCHITECT 1329 State Street Cayce, South Carolina 29033 803-765-0838 p compass5partners.com Compass 5 Partners, LLC A500 DOOR SCHEDULE AND DETAILS G102 LIFE SAFETY PLAN A501 FINISH SCHEDULE E2.1 LIGHTING RENOVATION PLANS Drawn: REVISIONS Checked: 1329 State Street Cayce, SC 29033 803 765 0838 compass5partners.com Compass 5 Partners, LLC 1800 Gervais Street Renovations - Construction - Phase II Columbia, SC Date: C 2012 Compass 5 Partners, LLC Project Number: FOR BIDDING 07-13-12 06-29-12 MEC BRB H27-Z008-B COVER SHEET 1800 Gervais Street Renovations - Construction - Phase II Columbia, SC PROJECT LOCATION 1315 State Street Cayce, South Carolina 29033 A600 REFLECTED CEILING PLAN Project Number: H27-Z008-B P100 FLOOR PLAN, NOTES, SCHEDULE, AND LEGEND MD100 DEMOLITION PLANS M100 FLOOR PLANS E2.3 SYSTEMS RENOVATION PLANS E3.1 SYSTEMS SINGLE LINE DIAGRAM M200 DETAILS, NOTES, SCHEDULES, AND LEGEND A400 ENLARGED PLANS AND INTERIOR ELEVATIONS

Upload: others

Post on 18-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

LOCATION MAP

NO SCALE

SHEET No.DESCRIPTION

SHEET No.DESCRIPTION

SHEET No.DESCRIPTION

803-731-0650 office

Belka Engineering

7 Clusters Court # 201

Columbia, South Carolina

29210

Swygert & Associates

803-791-9300 office

G100COVER SHEET & INDEX

G101CODE SHEET & GENERAL NOTES

AD100DEMOLITION PLANS

A100FLOOR PLANS

A200 CASEWORK AND DETAILS

E0.1ELECTRICAL SYMBOLS, LEGEND, AND SCHEDULES

E1.1LIGHTING DEMOLITION PLANS

E1.2POWER/SYSTEMS DEMOLITION PLANS

E2.2POWER RENOVATION PLANS

MECHANICAL ENGINEER ELECTRICAL ENGINEER

ARCHITECT

1329 State Street

Cayce, South Carolina

29033

803-765-0838 p

compass5partners.com

Compass 5 Partners, LLC

A500DOOR SCHEDULE AND DETAILS

G102LIFE SAFETY PLAN

A501FINISH SCHEDULE

E2.1LIGHTING RENOVATION PLANS

Drawn:

REVISIONS

Checked:

13

29

S

ta

te S

tre

et C

ayce, S

C 2

90

33

803

7

65

08

38

co

mpa

ss5

pa

rtn

ers.co

m

Com

pass 5 P

artners, LLC

18

00

G

erva

is S

tre

et R

en

ova

tio

ns - C

on

stru

ctio

n - P

ha

se

II

Colum

bia, S

C

Date:

C 2012 Compass 5 Partners, LLC

Project Number:

FOR BIDDING 07-13-12

06-29-12

MEC

BRB

H27-Z008-B

COVER SHEET

1800 Gervais Street Renovations - Construction - Phase II

Columbia, SC

PROJECT

LOCATION

1315 State Street

Cayce, South Carolina

29033

A600REFLECTED CEILING PLAN

Project Number: H27-Z008-B

P100FLOOR PLAN, NOTES, SCHEDULE, AND LEGEND

MD100DEMOLITION PLANS

M100FLOOR PLANS

E2.3SYSTEMS RENOVATION PLANS

E3.1SYSTEMS SINGLE LINE DIAGRAM

M200DETAILS, NOTES, SCHEDULES, AND LEGEND

A400 ENLARGED PLANS AND INTERIOR ELEVATIONS

Page 2: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

TABLE 5.6-1. DESIGN CODES AND STANDARDS

TABLE 5.6-2. BASIC CODE REVIEW INFORMATION

TABLE 5.6-3: BUILDING AREA (EXISTING)

TABLE 5.4: BUILDING HEIGHT

TABLE 5.6-5: BUILDING DESIGN OCCUPANT LOAD

TABLE 5.6-8: STRUCTURAL DESIGN INFORMATION

TABLE 5.6.9: PLUMBING INFORMATION

TABLE 5.6-7: OTHER FIRE PROTECTION REQUIREMENTSREFERENCE SYMBOLS

MATERIAL SYMBOLS

EXISTING BUILDING MASS

UNIT MASONRY

CONCRETE

LAMINATED WOOD MATERIAL

(PLYWOOD, LVL, ETC.)

LAMINATE SUBSTRATE

GYPSUM BOARD

RIGID FOAM INSULATION

BATT INSULATION

TABLE 5.6-10: MECHANICAL INFORMATION

TABLE 5.6-11: ELECTRICAL INFORMATION

104A

2

GENERAL NOTES

Drawn:

REVISIONS

Checked:

13

29

S

ta

te S

tre

et C

ayce, S

C 2

90

33

803

7

65

08

38

co

mpa

ss5

pa

rtn

ers.co

m

Com

pass 5 P

artners, LLC

18

00

G

erva

is S

tre

et R

en

ova

tio

ns - C

on

stru

ctio

n - P

ha

se

II

Colum

bia, S

C

Date:

C 2012 Compass 5 Partners, LLC

Project Number:

FOR BIDDING 07-13-12

06-29-12

MEC

BRB

H27-Z008-B

CODE REVIEW

WALL TYPES

GENERAL NOTES

INTERNATIONAL EXISTING BUILDING CODE: 2009 EDITION

Page 3: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

64'--0" TRAVEL DISTANCE

83'-10" TRAVEL DISTANCE

19'-4"

139'-9" TRAVEL DISTANCE

A1

MAIN LEVEL LIFE SAFETY PLAN

A2

BASEMENT LEVEL LIFE SAFETY PLAN

Drawn:

REVISIONS

Checked:

13

29

S

ta

te S

tre

et C

ayce, S

C 2

90

33

803

7

65

08

38

co

mpa

ss5

pa

rtn

ers.co

m

Com

pass 5 P

artners, LLC

18

00

G

erva

is S

tre

et R

en

ova

tio

ns - C

on

stru

ctio

n - P

ha

se

II

Colum

bia, S

C

Date:

C 2012 Compass 5 Partners, LLC

Project Number:

FOR BIDDING 07-13-12

06-29-12

MEC

BRB

H27-Z008-B

LIFE SAFETY

PLANS

LEGEND

LIFE SAFETY NOTES

Page 4: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

KEYED DEMOLITION NOTES GENERAL DEMOLITION NOTES

DEMOLITION COORDINATION & EXTENT

BASEMENT LEVEL DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

A1

MAIN LEVEL DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

C1

Drawn:

REVISIONS

Checked:

13

29

S

ta

te S

tre

et C

ayce, S

C 2

90

33

803

7

65

08

38

co

mpa

ss5

pa

rtn

ers.co

m

Com

pass 5 P

artners, LLC

18

00

G

erva

is S

tre

et R

en

ova

tio

ns - C

on

stru

ctio

n - P

ha

se

II

Colum

bia, S

C

Date:

C 2012 Compass 5 Partners, LLC

Project Number:

FOR BIDDING 07-13-12

06-29-12

MEC

BRB

H27-Z008-B

DEMOLITION

PLANS

3

3 6

11

ABOVE

6

18

12

12

12

12

12

12

12

4

13

12

14

12

121212121212121212121212

12

12

12

12

12

10

166

6

16

16

9

LEGEND

12

12

12121212

10

10

10

121212121212

6 8

17

9

18

19

10

7

15

20

21

Page 5: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

A1

MAIN LEVEL RENOVATION PLAN

C1

BASEMENT LEVEL RENOVATION PLAN

Drawn:

REVISIONS

Checked:

13

29

S

ta

te S

tre

et C

ayce, S

C 2

90

33

803

7

65

08

38

co

mpa

ss5

pa

rtn

ers.co

m

Com

pass 5 P

artners, LLC

18

00

G

erva

is S

tre

et R

en

ova

tio

ns - C

on

stru

ctio

n - P

ha

se

II

Colum

bia, S

C

Date:

C 2012 Compass 5 Partners, LLC

Project Number:

FOR BIDDING 07-13-12

06-29-12

MEC

BRB

H27-Z008-B

FLOOR

PLANS

029.1

028.1

026.1

027.1

025.1

024.1

023.1

H001.1

103.1

H003.1

1

2

3

4

5

2

2 2

4 4 4 4

2

2 2 2

2

2

2

2 2

2

H013.1

H003.2

3 SIM

2

SIM - UNDERSIDE

OF CLNG

3

Page 6: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

A1

MAIN LEVEL REFLECTED CEILING PLAN

C1

BASEMENT LEVEL REFLECTED CEILING PLAN

Drawn:

REVISIONS

Checked:

13

29

S

ta

te S

tre

et C

ayce, S

C 2

90

33

803

7

65

08

38

co

mpa

ss5

pa

rtn

ers.co

m

Com

pass 5 P

artners, LLC

18

00

G

erva

is S

tre

et R

en

ova

tio

ns - C

on

stru

ctio

n - P

ha

se

II

Colum

bia, S

C

Date:

C 2012 Compass 5 Partners, LLC

Project Number:

FOR BIDDING 07-13-12

06-29-12

MEC

BRB

H27-Z008-B

REFLECTED

CEILING PLANS

Page 7: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

A4

CASEWORK - SECTION

A5

CASEWORK - SECTION

Drawn:

REVISIONS

Checked:

13

29

S

ta

te S

tre

et C

ayce, S

C 2

90

33

803

7

65

08

38

co

mpa

ss5

pa

rtn

ers.co

m

Com

pass 5 P

artners, LLC

18

00

G

erva

is S

tre

et R

en

ova

tio

ns - C

on

stru

ctio

n - P

ha

se

II

Colum

bia, S

C

Date:

C 2012 Compass 5 Partners, LLC

Project Number:

FOR BIDDING 07-13-12

06-29-12

MEC

BRB

H27-Z008-B

CASEWORK AND

DETAILS

B1

INTERIOR ELEVATION

B2

INTERIOR ELEVATION

ADJ. SHELVING

4" BACKSPLASH

A1

FARADAY CAGE AND MECH/ELEC COORDINATION SECTION (TYP)

Page 8: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

℄℄

Drawn:

REVISIONS

Checked:

13

29

S

ta

te S

tre

et C

ayce, S

C 2

90

33

803

7

65

08

38

co

mpa

ss5

pa

rtn

ers.co

m

Com

pass 5 P

artners, LLC

18

00

G

erva

is S

tre

et R

en

ova

tio

ns - C

on

stru

ctio

n - P

ha

se

II

Colum

bia, S

C

Date:

C 2012 Compass 5 Partners, LLC

Project Number:

FOR BIDDING 07-13-12

06-29-12

MEC

BRB

H27-Z008-B

ENLARGED PLANS

AND INTERIOR

ELEVATIONS

MIN.

5 SHELVES

T-1

T-9

T-6

T-7

T-4

T-3

T-5

T-2

T-8

A2

TESTING ROOM 015

A3

TESTING ROOM 015

A4

TESTING ROOM 015

B5

TESTING ROOM 015

B2

TESTING ROOM 018

B3

TESTING ROOM 018

B4

TESTING ROOM 018

B5

TESTING ROOM 018

C2

TESTING ROOM 019

C3

TESTING ROOM 019

C4

TESTING ROOM 019

C5

TESTING ROOM 019

D1

ENLARGED PLAN

015.1

4

3

5

3

35

5

3

3

2

2

2

2

2

2

2

2

2

3

33

5

3

5

017.1

018.1

019.1

020.1

H001.2

016.1

H001.3

2

2

2

2

TOILET TISSUE DISPENSER

ID DESCRIPTION

PAPER TOWEL DISPENSER

MIRROR GLASS UNIT

ROBE HOOK

GRAB BAR 42"

GRAB BAR 36"

SOAP DISPENSER

GRAB BAR 18"

T-1

T-2

T-3

T-4

T-5

T-7

T-8

T-6

D4

TOILET ACCESSORY ELEVATIONS

FOLD-DOWN BABY CHANGING STATIONT-9

BASIS OF DESIGN

BOBRICK - B6806 x 42

BOBRICK - B6806 x 36

BOBRICK - B6806 x 18

BOBRICK - B-165-2436

BRADLEY 9124

KOALA CARE - KB108-12

BOBRICK - B-262

BOBRICK - B-2112

BOBRICK - B-2888

2

Page 9: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

2

DOOR JAMB DETAIL

D5

DOOR HEAD DETAIL

E5

Drawn:

REVISIONS

Checked:

13

29

S

ta

te S

tre

et C

ayce, S

C 2

90

33

803

7

65

08

38

co

mpa

ss5

pa

rtn

ers.co

m

Com

pass 5 P

artners, LLC

18

00

G

erva

is S

tre

et R

en

ova

tio

ns - C

on

stru

ctio

n - P

ha

se

II

Colum

bia, S

C

Date:

C 2012 Compass 5 Partners, LLC

Project Number:

FOR BIDDING 07-13-12

06-29-12

MEC

BRB

H27-Z008-B

CEILING AND DOOR

SCHEDULE AND

DETAILS

DOOR JAMB DETAIL

D6

DOOR HEAD DETAIL

E6

DOOR DETAIL

E4

DOOR FRAME DETAILS

D4

STOREFRONT INFILL DETAIL

A2

DTL @ 2 ADJACENT WALLS W/

NO ATTACHMENT TO WALL

ANGLE PER SEISMIC "C"

E3

D2

FIXTURE SEISMIC TIE

(4 PER FIXTURE)

D3

SEISMIC CEILING ASSEMBLY

A1

SEISMIC CEILING ASSEMBLY

PARTITION INFILL PLAN DETAIL

B2

STOREFRONT INFILL PLAN DETAIL

B3

END WALL @ WINDOW DETAIL

B4

C2

ACOUSTICAL WALL PANEL DETAILS

Page 10: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

ROOM

NUMBER ROOM NAME FLOOR BASE

WALLS

CEILING

100

RECONFIRMED PRIOR TO DEMOLITION

SF

ALL COLORS AND MATERIALS TO BE

N E S W

Drawn:

REVISIONS

Checked:

13

29

S

ta

te S

tre

et C

ayce, S

C 2

90

33

803

7

65

08

38

co

mpa

ss5

pa

rtn

ers.co

m

Com

pass 5 P

artners, LLC

18

00

G

erva

is S

tre

et R

en

ova

tio

ns - C

on

stru

ctio

n - P

ha

se

II

Colum

bia, S

C

Date:

C 2012 Compass 5 Partners, LLC

Project Number:

FOR BIDDING 07-13-12

06-29-12

MEC

BRB

H27-Z008-B

FINISH

SCHEDULE

RECEPTION/ADMIN

101 MEETING/WORKROOM

103 MEETING

104 COPY

105 STORAGE

106 OFFICE

107 OFFICE

108 MEETING

110 OFFICE

111 OFFICE

112 OPEN MEETING

113 OFFICE

114 OFFICE

115 OPEN MEETING

117 MEETING

116 OFFICE

118 OFFICE

119 OFFICE

120 OFFICE

121 SUPPLIES

122 OFFICE

123 DATA ANALYSIS

124 KITCHEN

125 PRESENTATION/MEETING

126 OFFICE

127 OFFICE

128 MEETING

129 OFFICE

130 STORAGE

131 OFFICE

132 OFFICE

133 OFFICE

134 OFFICE

135 OFFICE

136 OFFICE

137 WOMEN'S TOILET

138 TOILET

139 MEN'S TOILET

102 DATA ANALYSIS

109 OFFICE

140 OFFICE

141 OFFICE

ROOM

NUMBER ROOM NAME FLOOR BASE

WALLS

CEILING

001

SFN E S W

JANITOR

002 TOILET

004 WORKROOM

004A STUDIO

006 BREAKROOM

007 MEETING ROOM

008 PSYCHOLINGUISTICS WKRM.

010

011 WORKROOM

012 BABY LAB CONTROL ROOM

013 BABY LAB TESTING

014

015 TESTING ROOM

016 CLEAN ROOM

015A RECEIVING AREA

017 CONTROL ROOM

018 TESTING ROOM

019 TESTING ROOM

020 CONTROL ROOM

021 TOILET

022 SERVER STAGING

022A IT SERVER ROOM

023 EYE TRACKING

024 EYE TRACKING

025

026

027

028

029

H001 HALLWAY

003 MECHANICAL

009 MOBILE EYE TRACKING

H101 HALLWAY

H102 HALLWAY

H103 HALLWAY

H104 HALLWAY

ST001 STAIR

ST002 STAIR

005 WORKROOM

EYE TRACKING

EYE TRACKING

EYE TRACKING

EYE TRACKING

EYE TRACKING

NOTES NOTES

- PT1

CPT4 (RUGS)

EXST UNDER

PT7

--

CPT2

CPT3

CPT2

-- -

CPT2

-

CPT2

-

CPT2

- - - - -

CPT2

- - - - -

CPT2

-

CPT2

-

-

CPT2 PT6 --

CPT2 - - - - -

PT6PT6CPT2 -

CPT2 -

CPT2 -

CPT2 PT6PT6 -

- - - - -

CPT2 --

CPT2 PT6 --

PT6PT6 --CPT2

CPT2 PT6PT6 -PT6

CPT2 ---

-

-

PT1

--EXST -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

PT1PT2

PT1

PT6CPT2 PT6PT6

VWC1 AT SOFFITS AS SHOWN A501; 24" CPT3 BORD.

PT4 ABOVE BACKSPLASH & BELOW WALL CABS

CPT2 -- -

PT1PT1 PT1

CPT2 PT6 ---

-PT6PT6PT6 PT6CPT2

CPT2

CPT2

CPT2

CPT2

CPT2

CPT2

CPT2

-----

-----

-----

VCT2

PT6PT6 PT6

PT6

PT6PT6 PT6PT6

PT6 PT6

PT6

--

--

-

-

- - - -

-

-

CPT1

-

-

--

-

-

CARPET

CPT1: BENTLEY PRINCE ST. - BROADLOOM - ROAD SIDE ATTRACTIONS - 8RD300630R - SHIELD'S DATE FARM - 802148

CPT2: BENTLEY PRINCE ST. - BROADLOOM - EASY ST. - RAZOR HILL - 8RH200630R - TERIYAKI HUT - 800931

CPT3: PATCRAFT DESIGN WEAVE - CLOISONNE II - I0132 - AUTUMNAL - 32719

CPT4: BENTLEY PRINCE ST. - BROADLOOM - OSCAR WORTHY - 40W260620R - CULTURE MONSTER - 442717

PAINT

PT1: LEMON CHIFFON - EGGSHELL - HARMONY LINE (LOW VOC) - SW6686

PT2: COPPER HARBOR - EGGSHELL- HARMONY LINE (LOW VOC) - SW6634

PT3: MATCH EXISTING DOOR AND DOOR TRIM - FERROUS METAL PAINT ON HOLLOW METAL LOCATIONS

PT4: CRUSING - EGGSHELL - HARMONY LINE (LOW VOC) - SW6782

PT5: LEAP FROG - EGGSHELL - HARMONY LINE (LOW VOC) - SW6431

PT6: MATCH EXISTING WALL COLOR

PT7: CEILING WHITE

VINYL WALL COVERING

VWC1: MAHARAM - COBBLE 395540 - #007 VELLUM VWC2: MAHARAM - SARI 399426 - #006 GRASS

VINYL COMPOSITION TILE

VCT1: ARMSTRONG STANDARD EXCELON 51830 COTTAGE TAN 12X12

VCT2: MANNINGTON NATURE'S PATH SELECT - PRINCETON CHERRY 12169 - NATURAL 3"X48"

WALL BASE

RB1: JOHNSONITE 6" WALL BASE 63 BURNT UMBER B

CPT2

ACT2

CPT2

VCT1

CPT2

CPT2

CPT2

CPT2

CPT2

CPT2

CPT2

CPT2

CPT2

CPT2

ACT1

CPT2

X101 VESTIBULE

------

CPT4 RUGS THIS ROOM - SEE FINISH PLAN

24" CPT BORDER - SEE FINISH PLAN

24" CPT3 BORDER

24" CPT3 BORDER SEE FINISH PLAN

CPT1

CPT1

CPT1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

SS1 AT COUNTER TOP, PL1 AND PL2 AT CASEWORK. SEE A200.

ACOUSTICAL WALL PANELING

AWP1: NOVAWALL MULTI-INCH FABRIC WALL SYSTEM - 2" - XOREL STRIE - COLOR TBD BY ARCHITECT

SOLID SURFACE

SS1: CORIAN - LINEN

PLASTIC LAMINATE

PL1: WILSON ART 4944-38 CASUAL LINEN

ACOUSTICAL CEILING

ACT1: USG - RADAR CLIMA PLUS 2210 / USG

15

16

" DX/DXL INT. DUTY (BASIS OF DESIGN)

ACT2: ACOUSTICAL SURFACES - dBA PANELS - SOUND SILENCER WITH USG

15

16

" ALL ALUMINUM GRID

VCT1

CPT2

-

--

--

VCT1

VCT1

CPT2

CPT2

CPT2

CPT2

CPT2

CPT2

CPT2

PT6

CPT2

RB1

CPT2

CPT2

-

-

-

-

-

-

-

-

-

-

-

-

- - - -

- - - ---

- - - ---

ACT GRID AND PANELS AT EAST WALL ONLY.

USE EXISTING SALVAGED PANELS.

TOUCH-UP PAINT ON WALLS AS REQUIRED. MATCH COLOR.

TOUCH-UP PAINT ON WALLS AS REQUIRED. MATCH COLOR.

PT1PT1

(N & E)

P1; P2; P3; W2

P1; P2; W1; W2

PT7

SOFFIT

PT3

FLR REG

PT3

FLR REG

RB1 L1; P4; W2; W3; W4; W5

RB1 L1; W1

RB1

RB1

RB1

- -

- -

RB1 - - -

L1; L2; P4; W1; W3

L2; P4; P5 (UPPER CORNER); W1; W3

RB1 DEMO2; W1

RB1 L2; P4; W1; W3

- L2; W1; W3; W4

W1; W3; W4

(S & E)

--

RB1 DEMO2; P8

DEMO2; P8

CPT1

CPT1

RB1

PT1

PT5

- - - --

- - - --

L2; W1; W3; W4; W6

L2; W1; W3; W6

W3; W4--

P7; P9; W2

RB1

(E)

- - -

- -RB1

D3; L2; W1; W3; W6

L2; W1; W3; W6

L2; P4; P6; W1; W3

RB1

(S & W)

RB1 - W1; W4; W6

RB1

(S & E)

- - W3; P4

RB1 PT1 P4; W2-DOOR; W3

- DEMO5; L2

L2; P3; P5; W2 (DOOR); W4; W5

RB1

RB1

(WALL BOX)

PT1

VWC1

W1; W3RB1 -

-- D3; P7; W1; W3; W4

DEMO2; W1; W4PT5

W1; W3; W4

RB1

- -

W4; W7

D3; W1; W3; W4- --

W1; W3; W4; W6--

- P6; W1; W3; W4

W1; W4

RB1

(E & W)

-

RB1 D2; D3; W1

D3; W1; W3; W4

RB1

(E, N & W)

--

-

-

- -

-

-

-

-

RB1 --- W1; W4; W5

RB1

W4

W2; W5

W4; W5; P5

W4; W5; P5

W4; W5; P5

SEE PAINT LOCATIONS A501; STAIR HANDRAILS TO BE PAINTED PT3 W1; W4

- - -

RB1

COGNITION WORKROOM

RB1 PT6PT6-

- - - -

-

RB1 PT4PT6 --

PT6- --RB1

RB1 - - - -

RB1 PT6- PT6-

RB1 PT6PT6- PT6

PT6--RB1 -

RB1 PT1 PT1

RB1 PT1PT1 PT1PT1

RB1 PT4PT1 PT1PT1

RB1

PT1PT1 PT1PT1

RB1 PT1PT4 PT1PT1

RB1 PT1PT1 PT1PT1

RB1 PT1PT1 PT1PT1

RB1

RB1

RB1 PT1PT1 PT1PT1

RB1 PT1PT1 PT1PT1

RB1 PT1PT1 PT1PT1

RB1 PT1PT1 PT1PT1

RB1 PT1PT1 PT1PT1

RB1 PT1PT1 PT1PT1

RB1 PT1PT1 PT1PT1

RB1 PT1PT1 PT1PT1

RB1 - - - -

RB1 PT1PT1 PT1PT1

RB1 - - -

RB1 - - - -

W4

W1; W3; W6

W3; P10

W1; W3; W4

W2; W3

W1; W3

W1; W3

P4; W3

P4; W1; W3; W6

D4; P4; W1; W3

ACT GRID AND PANELS AT EAST WALL ONLY.

USE EXISTING SALVAGED PANELS.

PAINTING AND WALLS - P

1. PREP AND PAINT FLOOR REGISTERS AT WINDOW WALLS. FERROUS METAL

PAINT. (PT-3)

2. PATCH AND PAINT PLASTER SOFFIT AND CEILING ALONG PERIMETER. CEILING

WHITE.

3. PREP AND PAINT WINDOW FRAMES COMPLETE. MATCH EXISTING COLOR.

4. IN LIMITED LOCATIONS, CLEAN, CAULK AND PAINT WINDOW FRAMES WHERE

LOOSE DEBRIS EXISTS.

5. CLEAN, REPAIR, AND REGLUE EXISTING WALLPAPER SEAMS.

6. PAINT TO MATCH ALL UNPAINTED AREAS ON EXISTING BOOKSHELVES.

7. CLEAN AND REMOVE ADHESIVES FROM EXISTING BOOKSHELVES THIS ROOM.

EXISTING FINISH TO REMAIN.

8. REPAIR, PATCH, AND PREP WALL AS REQUIRED FROM WING WALL

DEMOLITION.

9. PAINT SHELVING BASE TO MATCH EXISTING. (PT3)

10. SECURE BACKSPLASH PANEL TO WALL IN EXISTING LOCATION.

DOORS AND TRIM - D

1. CLEAN ANODIZED ALUMINUM DOOR TRIM THROUGHOUT.

2. PAINT PREVIOUSLY PAINTED WOOD DOOR FRAME TO MATCH EXISTING.

3. PAINT THE CORRIDOR-SIDE FACE OF DOOR TO MATCH EXISTING.

4. REMOVE EXISTING CORNER WOOD WALL TRIM AND ADHESIVE.

LAMINATE - L

1. REPAIR AND REPLACE EDGE BANDING AT SILL AT EXT. WALL.

2. CLEAN EXPOSED FACES AT LAMINATE SILL UNIT.

CLEANING AND WOOD WALLS - W

1. REMOVE ALL MOUNTING HOOKS AND NAILS (EXCLUDING DOOR STOPS)

2. CLEAN AND OIL ALL EXPOSED EXISTING WOOD OR WOOD PANELING WITH

LEMON OIL SOLUTION (FORMBYS PENETRATING LEMON OIL TREATMENT).

3. WRAP AND PROTECT IN PLACE ALL EXISTING WINDOW BLINDS (VENETIAN AND

VERTICAL).

4. CLEAN ALL SWITCHES & FACEPLATES EXISTING TO REMAIN.

5. SPOT CLEAN WALL COVERING IN LIMITED AREAS.

6. REPLACE MISSING SWITCH FACEPLATE TO MATCH EXISTING.

7. CLEAN ALL WALL/SHELF SURFACES PRIOR TO PAINTING.

DEMOLITION - DEMO

1. NOT USED

2. REMOVE WALL COVERING COMPLETE IN AREAS SHOWN. PREP AND PATCH TO

RECEIVE FINISH PER FINISH SCHEDULE.

3. NOT USED

4. NOT USED.

5. REMOVE WALL COVERING AT KITCHEN SOFFIT. PREP AND PATCH TO RECEIVE

FINISH PER FINISH SCHEDULE.

NOTES:

1. ANY CUT, PATCH, DAMAGED OR UNSIGHTLY WALL CONDITION SHALL BE PATCHED AND PAINTED FROM 'CORNER TO

CORNER' TO INCLUDE THE ENTIRE WALL

2. ANY TIE-IN TO ADJACENT CORRIDOR FINISHES SHALL TIE IN AT LOGICAL JUNCTURES.

3. HM FRAMES (EXISTING AND NEW), METAL REGISTERS, AND ADJACENT METAL CASING TO BE PT3. TYP. TWO FINISH COATS

INTERIOR SEMI-GLOSS ACRYLIC ENAMEL OVER INTERIOR FERROUS METAL PRIMER. CONFIRM WITH ARCHITECT.

4. CLEAR ANODIZED ALUMINUM FRAMES & TRIM TO BE CLEANED. NO PAINT ON ALUMINUM TRIMS.

5. ALL NEW GWB SURFACES TO RECEIVE INTERIOR GWB PRIMER #45 & TWO COATS INTERIOR EGG SHELL ACRYLIC MPI #139.

6. ALL FINISHES TO BE COORD. WITH OWNER AND ARCHITECT IN A 'FINISHES COORDINATION MEETING' PRIOR TO DEMO.

7. EXISTING PAINTED WOOD TRIM AND FRAMES TO BE PAINTED WHERE NOTED. CONFIRM WITH ARCHITECT.

BABY RECEIVING & STAGING

ACT2

ACT2

ACT2

ACT2

RB1

ACT1

ACT1

ACT1

ACT1

ACT1

ACT1

ACT1

ACT1

ACT1

ACT1

ACT1

ACT1

CPT2

CPT2

CPT3

CPT2

CPT3

CPT1

BASEMENT

RB1

RB1

RB1

RB1

RB1

-

VCT1

PT7

GRID

CPT2

CPT1

BASEMENT

AWP1 AWP1 AWP1 AWP1

PT1PT1 PT1PT1

AWP1 AWP1 AWP1 AWP1

PT1PT1 PT1PT1

AWP1 AWP1 AWP1 AWP1

PT6PT6PT6 PT6

PT6PT6

PT6

PT6PT6

PT6PT6

-

PT1; PT2 @

BOOKCASE

PT5

PT1 PT1 -

RB1

TRIM AS REQ

SEE NOTE

PT1PT2

PT1

(WALL BOX)

PT4

SEE NOTE

RB1

RB1

RB1

RB1

BASEMENT

RB1

BASEMENT

STAIR HANDRAILS TO BE PAINTED PT3

PT4

SEE NOTE

PT1

SEE NOTE

PT1PT1

PT6

H002 HALLWAY

CPT2

RB1

H003 HALLWAY

CPT2

RB1

PT1PT1 PT1PT2

PT1PT1 PT1PT2 ACT1

ACT1SEE ACCENT PAINT LOCATIONS ON FINISH PLANS SHEET A501

SEE ACCENT PAINT LOCATIONS ON FINISH PLANS SHEET A501

SEE ACCENT PAINT LOCATIONS ON FINISH PLANS SHEET A501

Page 11: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

SCALE: 1/8" = 1'-0"

A1

MAIN LEVEL FINISH PLAN

SCALE: 1/8" = 1'-0"

C1

BASEMENT LEVEL FINISH PLAN

Drawn:

REVISIONS

Checked:

13

29

S

ta

te S

tre

et C

ayce, S

C 2

90

33

803

7

65

08

38

co

mpa

ss5

pa

rtn

ers.co

m

Com

pass 5 P

artners, LLC

18

00

G

erva

is S

tre

et R

en

ova

tio

ns - C

on

stru

ctio

n - P

ha

se

II

Colum

bia, S

C

Date:

C 2012 Compass 5 Partners, LLC

Project Number:

FOR BIDDING 07-13-12

06-29-12

MEC

BRB

H27-Z008-B

FINISH PLANS

LEGEND

PT4

PT1

PT1

PT5 PT5

PT1

FINISH NOTES

1

11

2 3

3

3

3

5

2

FINISH KEYNOTES

1

6

1

2

PT2

7

7

VWC2

VWC2 VWC2

VWC1

VWC1

VWC1

PT5

PT2

PT2

PT5

Page 12: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

C 2010 Compass 5 Partners, LLC

Drawn:

REVISIONS

Checked:

Date:

Project Number:

06-29-12

Swygert & Associates

FOR BIDDING 07-13-12

H27-Z008-B

TFS

FLOOR PLANS,

NOTES, SCHEDULE,

AND LEGEND

DEM

Page 13: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

C 2010 Compass 5 Partners, LLC

Drawn:

REVISIONS

Checked:

Date:

Project Number:

06-29-12

Swygert & Associates

FOR BIDDING 07-13-12

H27-Z008-B

WCL

DEMOLITION

PLANS

DEM

Page 14: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

C 2010 Compass 5 Partners, LLC

Drawn:

REVISIONS

Checked:

Date:

Project Number:

06-29-12

Swygert & Associates

FOR BIDDING 07-13-12

H27-Z008-B

WCL

FLOOR PLANS

DEM

Page 15: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction

C 2010 Compass 5 Partners, LLC

Drawn:

REVISIONS

Checked:

Date:

Project Number:

06-29-12

Swygert & Associates

FOR BIDDING 07-13-12

H27-Z008-B

WCL

DETAILS, NOTES,

SCHEDULES,

AND LEGEND

DEM

Page 16: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction
Page 17: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction
Page 18: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction
Page 19: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction
Page 20: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction
Page 21: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction
Page 22: 1800 Gervais Street Renovations - Construction - Phase IIpurchasing.sc.edu/solicitations/H27-Z008-B Drawings.pdf · 2012. 7. 16. · 1800 Gervais Street Renovations - Construction