1932 sd mtg determination final memo - nfpa · letter ballot for nfpa 1932 per the regulations...

3
National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 • Fax: 617-770-0700 • www.nfpa.org M E M O R A N D U M TO: NFPA Technical Committee on Fire Department Ground Ladders FROM: Jenny Depew, Administrator, Technical Projects DATE: December 17, 2013 SUBJECT: NFPA 1932 Second Draft Meeting Determination FINAL Ballot Results (F2014) Per the Regulations Governing the Development of NFPA Standards at 4.4.8.4, if no Public Comments are received the Technical Committee shall determine, by a Letter Ballot supported by at least a majority vote, whether or not to schedule a meeting, to consider the development of Second Revisions to the Draft. According to the ballot results, the Technical Committee vote did not meet Simple Majority, therefore, a Second Draft Meeting will be scheduled. Below is a summary of the voting. To view any comments received, please refer to the attached report. 15 Members Eligible to Vote 3 Ballots Not Returned (Clifford, Cole, Waldschmidt) 6 Yes, we DO need a Second Draft Meeting (w/comment: Glatts) 6 No, we DO NOT need to schedule a Second Draft Meeting (w/comment: Hillenbrand) 0 Abstained As always please feel free to contact me if you have any questions.

Upload: others

Post on 19-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1932 SD mtg determination FINAL memo - NFPA · Letter Ballot for NFPA 1932 Per the Regulations Governing the Development of NFPA Standards 4.4.8.4, if no Public Comments have been

National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 • Fax: 617-770-0700 • www.nfpa.org

M E M O R A N D U M TO: NFPA Technical Committee on Fire Department Ground Ladders FROM: Jenny Depew, Administrator, Technical Projects DATE: December 17, 2013 SUBJECT: NFPA 1932 Second Draft Meeting Determination FINAL Ballot Results (F2014)

Per the Regulations Governing the Development of NFPA Standards at 4.4.8.4, if no Public Comments are received the Technical Committee shall determine, by a Letter Ballot supported by at least a majority vote, whether or not to schedule a meeting, to consider the development of Second Revisions to the Draft. According to the ballot results, the Technical Committee vote did not meet Simple Majority, therefore, a Second Draft Meeting will be scheduled. Below is a summary of the voting. To view any comments received, please refer to the attached report.

15 Members Eligible to Vote 3 Ballots Not Returned (Clifford, Cole, Waldschmidt) 6 Yes, we DO need a Second Draft Meeting (w/comment: Glatts) 6 No, we DO NOT need to schedule a Second Draft Meeting (w/comment: Hillenbrand) 0 Abstained

As always please feel free to contact me if you have any questions.

Page 2: 1932 SD mtg determination FINAL memo - NFPA · Letter Ballot for NFPA 1932 Per the Regulations Governing the Development of NFPA Standards 4.4.8.4, if no Public Comments have been
Page 3: 1932 SD mtg determination FINAL memo - NFPA · Letter Ballot for NFPA 1932 Per the Regulations Governing the Development of NFPA Standards 4.4.8.4, if no Public Comments have been