Piping (Home Office) Labor Hour Estimating Warning Introduction # 1 # 2 Make a Copy of the complete WorkBook and save it to your Project data base. # 3 # 4 # 5 # 6 # 7 # 8 # 9 #10 This Excel Worksheet or Workbook "Tool" is locked and password protected. The user may only enter date in the "yellow" cells. Other cells on this "Tool" includes locked "cells" that contain complex math formulas. Care should be taken to learn where these cells are and if the spreadsheet is ever unlocked that the cells with the formulas are not disturbed. Disturbing or altering these cells may render the "Tool" unable to function properly. This WorkBook "Tool" is part of a suite of 6 "Tools" that are intended to aid the Piping Engineering Lead (Senior Supervisor or whatever he or she is called) who has the responsibility to make estimates, schedules, control the work, the hours, report the progress and prepare & files the Final Job Report. These "Tools" are: (1) Piping Engineering & Design Scope of Work, (3) Piping Labor Hour Estimating Forms, (3) Piping Control Level Schedule, (4) Physical Percent Complete Status Report, (5) Design Change Notice and (6) "Janus" Historical Data Log. These 5 WorkBook Tools are intended to be used Authors note: The information used in this example Labor Hour Estimate is pure fiction created by the author and any resemblance to real persons, projects, companies or places is coincidental. Study these instructions and all three of the WorkSheets of this WorkBook. If you have any questions about anything here please contact me via E-mail ([email protected]) and I will help you. The Prerequisite for the use of this tool is a completed and approved Scope of Work (SOW). Without an approved SOW it is not possible to develop a Labor Hour Estimate because there is no definition of what is to be done. Start with the "Estimate Detail" sheet and enter the Project Number in the cell provided in the upper left corner. This number (and others) will be transferred to the Estimate Summary sheet automatically Fill in the quantity of deliverables and activities. Use your "Approved" SOW for all the activities and deliverables. Start with the "Default" hours and adjust up or down depending on the complexity that is expected. You can fill out almost the whole Estimate by only entering a value in the "Quantity" column. You do not need to enter a value in the "Hours" column. The program automatinally uses the "Default" value. If you are not comfortable with the results using the "Default" value then you can enter a greater or lesser value in the "Hours" column. When you have finished entering all the required data on the Estimate Detail sheet, look at the Summary sheet and finish the header information (yellow cells). You will notice that all the Totals and Percantages have been transferred for you. Your next step will be the creation of your CLS (Control Level Schedule). To prepare for that collect the Operation Number/Activity Code totals (example: the 251 A total, thew 251 B total, etc). At the end of the project collect the "actual" numbers for the number of deliverables and the hours it took to do the work. This historical data will help you with the estimate for your next project.

Upload: ans99

Post on 18-Dec-2015

15 views

Category:

Documents


2 download

DESCRIPTION

estimate

TRANSCRIPT

Piping Estimate & Summary

InstructionsPiping (Home Office) Labor Hour EstimatingWarningThis Excel Worksheet or Workbook "Tool" is locked and password protected. The user may only enter date in the "yellow" cells. Other cells on this "Tool" includes locked "cells" that contain complex math formulas. Care should be taken to learn where these cells are and if the spreadsheet is ever unlocked that the cells with the formulas are not disturbed. Disturbing or altering these cells may render the "Tool" unable to function properly.IntroductionThis WorkBook "Tool" is part of a suite of 6 "Tools" that are intended to aid the Piping Engineering Lead (Senior Supervisor or whatever he or she is called) who has the responsibility to make estimates, schedules, control the work, the hours, report the progress and prepare & files the Final Job Report. These "Tools" are: (1) Piping Engineering & Design Scope of Work, (3) Piping Labor Hour Estimating Forms, (3) Piping Control Level Schedule, (4) Physical Percent Complete Status Report, (5) Design Change Notice and (6) "Janus" Historical Data Log. These 5 WorkBook Tools are intended to be used as a "Set" and will bring value to your effort only if you in fact use all of them.Authors note: The information used in this example Labor Hour Estimate is pure fiction created by the author and any resemblance to real persons, projects, companies or places is coincidental.# 1Study these instructions and all three of the WorkSheets of this WorkBook. If you have any questions about anything here please contact me via E-mail ([email protected]) and I will help you.# 2Make a Copy of the complete WorkBook and save it to your Project data base.# 3The Prerequisite for the use of this tool is a completed and approved Scope of Work (SOW). Without an approved SOW it is not possible to develop a Labor Hour Estimate because there is no definition of what is to be done.# 4Start with the "Estimate Detail" sheet and enter the Project Number in the cell provided in the upper left corner. This number (and others) will be transferred to the Estimate Summary sheet automatically# 5Fill in the quantity of deliverables and activities. Use your "Approved" SOW for all the activities and deliverables. Start with the "Default" hours and adjust up or down depending on the complexity that is expected.# 6You can fill out almost the whole Estimate by only entering a value in the "Quantity" column. You do not need to enter a value in the "Hours" column. The program automatinally uses the "Default" value.# 7If you are not comfortable with the results using the "Default" value then you can enter a greater or lesser value in the "Hours" column.# 8When you have finished entering all the required data on the Estimate Detail sheet, look at the Summary sheet and finish the header information (yellow cells). You will notice that all the Totals and Percantages have been transferred for you.# 9Your next step will be the creation of your CLS (Control Level Schedule). To prepare for that collect the Operation Number/Activity Code totals (example: the 251 A total, thew 251 B total, etc).#10At the end of the project collect the "actual" numbers for the number of deliverables and the hours it took to do the work. This historical data will help you with the estimate for your next project.

Page &P

Time Charge CodesPiping Group Time Charge CodesActivity GroupingAcitivity CodePiping Sub-Group Operation Number & Name (*)250251252253254PELPMEPDGPMCPSESupervisionAWork Assignment, Planning, Status Report Meetings w/ Department, Project & Client, Emp.. Perform. Reviews, Technical Direction, P&ID ReviewsWork Assignment, Work review, Meetings, Status Reports, Emp.. Perform. Review, P&ID ReviewsWork Assignment, Work review, Meetings, Status Reports, Emp.. Perform. Review, P&ID ReviewsWork Assignment, Work review, Meetings, Status Reports, Emp.. Perform. Review, P&ID ReviewsWork Assignment, Work review, Meetings, Status Reports, Emp.. Perform. Review, P&ID ReviewsProject Design BasisBSOW, Labor Hour Estimate, Control Level Schedule, Collect, Review and Disseminate Client Criteria, Coordinate Vendor SQ CK, Field TripsSpecifications, Standards, Develop CCC, Vendor Data SQ CKSpecifications, Standards, Plot Plan Developm't, Vendor Data SQ CK, Heat Tracing Criteria, Field TripsEstablish Mat'l Take-Off Data Base, Define Material "Bump" Criteria,Specifications, Standards, Define Pipe Stress Analysis Criteria, Pre-Eng. Pipe Supports Vendor Data SQ CKPreliminary DesignCTranspositions, Vessel Orientations, Model Index, Drawing Index, Layout Studies,Preliminary MTO & RFQDetailed DesignDModel ReviewsSP Item Activities, Model Reviews,2D CADD, 3D CADD, Manual Drawings, Revise Exist. Dwgs.,Model Reviews,Intermediate MTO and POR, Model ReviewsModel Reviews, Pipe Stress Analysis, Hanger Data Sheets, Joint Data Sheets, Review & Sign IsometricsDeliverablesEConstruction Work Packages (CWP)Line ListManual Isometrics, CADD Isometrics, Piping Plans, Piping Sections, Isometric Index, Tie-In Index, Tie-In List, Tie-In Isos., Heat Tracing Isometrics, Heat Tracing Index, Demo Dwg's,Final MTO, PO Supplements, Shortage Reports, Overage Reports,Expansion Joint Dwgs, Spring Hanger Dwgs, Strut Dwgs.ServicesFCADD Coordinator(*) Definition of Piping Sub-Group Numbers & Names250 - PEL = Piping Engineering Lead (See Company Job Description)251 - PME = Piping Material Engineer (See Company Job Description)252 - PDG = Piping Design Group (See Company Job Description)253 - PMC = Piping Material Control (See Company Job Description)254 - PSE = Piping Stress Engineering (See Company Job Description)

Page &P

Estimate Summary ExamplePIPING ENGINEERING AND DESIGN __ SUMMARY OF HOME OFFICE LABOR AND COST ESTIMATE & FINAL REPORTPROJECT NAME:Temple Refinery UpgradePROJECT MANAGER:Al DemmingCLIENT:ACME Products, LLCPREPARED BY (LPE):A. R. TennysonEST. LINE COUNT:900LOCATION:Anywhere,APPROVED BY:A. G. PattersonEQUIV. ISO. COUNT:2160PROJECT NO.:2011-106FINAL REPORT BY:EST. TIC: ($MM)$200MMPLANT TYPE:RefineryREV.:01CONTRACT TYPE :EPCM(EPC, EPCM, etc.)DATE:08/01/11FINAL ISO COUNT :0PIPING ENGINEERINGDISCIPLINE ESTIMATEAPPV'D BUDGETFINAL REPORTOPER. No.GROUPESTIMATED LABOR HOURS% OF TOTALESTIMATED COMPUTER EXPENSES $ESTIMATED TRAVEL & LODGING EXPENSES $BUDGET LABOR HOURS% OF TOTALACTUAL LABOR HOURS% OF TOTAL251PIPE MATERIAL ENGR.7722.79%$500.000252PIPING DESIGN1534055.45%$6,000.000253PIPE MATERIAL CONTROL3800.513.74%0254PIPE STRESS ENGR.562420.33%$1,000.000SUB TOTAL TECHNICAL LABOR HRS =25536.2$0.00$7,500.0000250LPE, DEPT. & STAFF21277.69%0ALLTOTAL LABOR HOURS27663.6100 %0100 %0100 %REMARKS:HRS/ISO=12.81HRS/ISO=0HRS/ISO =0

Estimate Detail ExamplePIPING ENGINEERING & DESIGN HOME OFFICE LABOR, EXPENSE ESTIMATE DETAILPIPING ENGINEERING & DESIGN FINAL REPORT DETAILPLEASE NOTE Only the yellow boxes are for data entryThe area below is to be used only at the end of the project to record the historical actual data.PROJECT NO.2011-1062011-106251. . . . P I P I N G M A T E R I A L E N G I N E E R I N GESTIMATENOTES:FINALSPECIFICATIONSSPEC NO.QUANTITYHOURSDEFAULTLABOR HRSTOTAL LABOR HRSQUANTITYLABOR HRSTOTAL LABOR HRSBPIPING MAT'L LINE CLASS NOTES & DATAReview Existing14.00204BINDIVIDUAL LINE CLASS SPECSReview Existing22520110BPURCHASE (PIPE, VALVES, FITTINGS, ETC.)52001 to 5201010550BTESTING, CLEANING, PASSIVATING0200BSP ITEM - SPEC, LIST, & DATASHEETS52024204880BISULATING,PAINTING,COATING,LINING0200BWELDING / NDE0200TOTAL NUMBER OF SPECIFICATIONS AND HOURS532440ACTIVITIESLABOR HRSLABOR HRSBPROJECT COMMODITY CATLAOG8ACTUAL.ELINE LIST / INDEX - DEVELOP & MAINTAINEST. LINE COUNT9000.5450LINE No. =SUB-TOTAL ACTIVITY MAN HOURS458ASUPERVISION10%=70.2AJUSTMENT70.2252--PIPING MATERIAL ENGINEERING TOTALS - HRS7722.8%02011-1062011-106252 . . . . P I P I N G D E S I G NESTIMATEFINALACTIVITYNUMBERHOURSSCALENUMBERAVG. HOURSDRAWINGS/DOCUMENTSSCALESIZEOFPERDEFAULTTOTAL LABOR HRSSIZEOFOFPERLABORTOTAL LABOR HRS( DWG. SIZE= A - B - C - D - E )(OPTIONAL)(OPTIONAL)ITEMSITEMHRSLABOR HRSDRAWINGSDRAWINGSDRAWINGHRSCTRANSPOSITION LAYOUTS (NON CAD)140100400.00CLAYOUTS, STUDIES, VESSEL ORIENTATIONS2020404000.00CLOCATION CONTROL PLANS (LCP)3401201200.00CPLOT PLANS (SITE AND/OR UNIT)3801002400.00CPIPING INDEX ( PLANS, MODEL, TIE-IN )220400.00BDRAWING /VENDOR PRINT SQ. CK.VARIOUSVARIOUS20012000.00DPIPING PLAN DRAWINGS ( 2D/MANUAL)014100.00D3D MODELING - EQUIPMENT250615000.00D3D MODELING - PIPE LINES710428400.00BPIPING STANDARD & DETAIL DRAWINGS0400EHEAT TRACE DRAWINGS (PIPING ONLY)04.250EDEMOLITION DRAWINGS ( NON-CAD)0150EISOMETRICS (NEW LINES & TIE-INS)N/A3008.252475EPIPING PLAN DRAWINGS (REV EXIST'G)6020401200EPIPING PLAN - AS-BUILTS *0200EEXTRACT PLAN DRAWINGS - 3D251020250EEXTRACT ISOMETRICS - 3D180011800SUB-TOTAL DRAWING QUANTITIES AND LABOR HOURS01110500.000SPECIFICATIONSSPEC NO.QUANTITYHRS. PER.DEFAULTHRSNOTES:QUANTITYHRSBDESIGN, LAYOUT & DRAWING0100BSHOP FABRICATION5102511010BFIELD FABRICATION5102611010BTIE INS5104511010BGEOGRAPHIC COLOR CODE0100BHEAT TRACING0100SUB-TOTAL NUMBER OF SPECIFICATIONS AND LABOR HOURS3000ACTIVITYQUANTITYHRS. PER.DEFAULTHRSQUANTITYHRSBDESIGNER FIELD TRIPSDAYS / HOURS080ETIE IN LISTNo TIE-INS/ HRS PER30130FCAD COORDINATORWEEKS / HOURS1740680EISOMETRIC DRAWING LIST/INDEXISOMETRIC COUNT=210012100SUB-TOTAL ACTIVITY LABOR HOURS28100ASUPERVISION10%=1394.5AJUSTMENT=1394.5251 - PIPING DESIGN TOTALS - DWGS, SPECS, LABOR HOURS1534055.5%02011-1062011-106253 . . . . P I P I N G M A T E R I A L C O N T R O LESTIMATENOTES:FINALACTIVITIESQUANTITYHRS. PER.DEFAULTHRSTOTAL LABOR HRSQUANTITYLABOR HRSTOTAL LABOR HRSBMATERIAL MANAGEMENT CRITERIA, P&ID REVIEW603180CMAT'L TAKEOFF (PRELIM) & RFQPER EQIV. ISO21000.51050DMAT'L TAKEOFF (INTERMEDIATE) & POPER EQIV. ISO21000.511050EMAT'L TAKEOFF (FINAL,MANUAL) & SUPPL.PER ISO5500.51275EMAT'L TAKEOFF (FINAL, DOWNLOAD) & SUPPL.PER ISO18000.5900EMATERIAL OVERAGE?SHORTAGE REPORTS.PER RFQ/PO, ETC0800SUB-TOTAL ACTIVITY MAN HOURS34550ASUPERVISION10%=345.5AJUSTMENT=345.5253 - PIPING MATERIAL CONTROLS TOTAL - LABOR HRS3800.513.7%02011-1062011-106254. . . . P I P E S T R E S S E N G I N E E R I N GESTIMATENOTES:FINALSPECIFICATIONSSPEC NO.QUANTITYHOURSDEFAULTLABOR HRSTOTAL LABOR HRSQUANTITYHRSTOTAL LABOR HRSBANALYSIS5400112020BPRE ENG & ENG SUPPTS5404012020BCOMPONENTS (EXP JTS, STRUTS, ETC)0100BOTHER0200TOTAL NUMBER OF SPECIFICATIONS AND MAN HOURS4000ACTIVITIESQUANTITYHOURSDEFAULTLABOR HRSHRSDSTRESS ANALYSIS ACTIVITIESHRS. PER LINE ACTUAL500105000ESTRESS ANALYSIS PRODUCT DRAWIBGSHRS. PER PRODUCT ACTUAL10880SUB-TOTAL ACTIVITY LABOR HOURSASUPERVISION10%=504AJUSTMENT=504254 - PIPE STRESS ENGINEERING TOTAL -LABOR HRS562420.3%0TECH. TOTAL25536.2002011-1062011-106250 . . . . L E A D P I P I N G E N G I N E E RESTIMATENOTES:FINALACTIVITIESNUMBERHOURSDEFAULTLABOR HRSTOTAL LABOR HRSLABOR HRSTOTAL LABOR HRSBLPE FIELD TRIPS - PRELIM. JOB SITE SURVEYDAYS2648104ECONSTRUCTION WORK PACKAGE PREPEACH1720340XTRIPS - CONSTRUCTION SUPPORTPEOPLE WEEKS x 40 HRSPEOPLE0400XTRIPS - PIPE FAB SHOP SURVEY ( INSPECT./QUALIFY)DAYS080ADEPARTMENT MANAGEMENT REVIEWSQ.A. AUDIT ACTIVITIESDAYS352870ATECHNICAL SUPPORT ACTIVITIESDAYS13028260ATECHNICAL AIDEPEOPLE WEEKS x 40 HRSWEEKS26401040BFRONT END PLANNING (SCOPE, EST, ETC)120ASUPERVISION / COORDINATION / MEETINGS10%=193.4AJUSTMENT=193.4250 - LEAD PIPING ENGINEER & STAFF -TOTAL LABOR HRSFLWB21277.7%0"X" = Activity that is required but will be handled under a different budget.PROJECT OR JOB TOTAL27663.6100%0100%