2 nd general assembly
DESCRIPTION
2 nd General Assembly. WP9- NEW METHODS TO ASSESS THE IMPACT OF COASTAL OBSERVING SYSTEMS. Main WP9 Objectives and partnership WP9 Plan of work WP9 impacts Progress toward objectives Deviations from project work programme and actions taken. Outline. WP9 Main Objectives. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/1.jpg)
Nadia PinardiI CMCCI Via A.Moro 44, Bologna
www.jerico-fp7.eu May 5 to 7 2014 / Oslo / Norway
2nd General Assembly
WP9- NEW METHODS TO ASSESS THE IMPACT OF COASTAL OBSERVING SYSTEMS
![Page 2: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/2.jpg)
General Assembly 2 - JERICO - 2www.jerico-fp7.eu
OUTLINE
Main WP9 Objectives and partnershipWP9 Plan of workWP9 impactsProgress toward objectivesDeviations from project work
programme and actions taken
![Page 3: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/3.jpg)
General Assembly 2 - JERICO - 3
WP9 MAIN OBJECTIVES
WP9 should apply sophisticated data assimilative models and statistical methods to demonstrate the impact of coastal observations in analyses and forecasts
Two types of experiments are carried out:1.Impact of existing observational platforms (OSE)2.Impact of future observational platforms (OSSE)
www.jerico-fp7.eu
![Page 4: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/4.jpg)
General Assembly 2 - JERICO - 4www.jerico-fp7.eu
PARTNERS
• CMCC• IFREMER• CNRS• DMI• DELTARES• HCMR• HZG• RBINS-OD
![Page 5: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/5.jpg)
General Assembly 2 - JERICO - 5
WP9 IMPACTS
ANY SUSTAINABLE COASTAL MONITORING SYSTEM SHOULD SHOW ITS IMPACT ON THE QUALITY OF MODEL ANALYSES FOR FORECASTING AND RECONSTRUCTIONS (RE-ANALYSIS) --- see major international groups like GODAE OCEANVIEW OSE-OSSE
OSSE OFFERS THE ONLY OBJECTIVE WAY TO ASSESS THE IMPACT OF NEW TECHNOLOGIES ON MODEL ANALYSES
OSE WILL HELP TO DEFINE THE MINIMUM OBSERVING SYSTEM REQUIREMENTS AND THE POSSIBLE GAPS OF SELECTED TECHNOLOGIES
INTEGRATION OF OBSERVATIONS AND MODELS GIVES THE STATE-OF-THE-ART DATA SETS FOR MSFD ASSESSMENTS
www.jerico-fp7.eu
![Page 6: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/6.jpg)
General Assembly 2 - JERICO - 6
WP9 REGIONS OF WORK
www.jerico-fp7.eu
ADRIATIC
AEGEAN BAY OF BISCAY
NORTH SEA
BALTIC
OSE CMCC HCMR DELTARES
HZGRBINS-
OD
DMI
OSSE CMCC CNRS-IFREMER
HZGRBINS-
OD
DMI
![Page 7: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/7.jpg)
General Assembly 2 - JERICO - 7
WP9 FOCUS OBSERVATIONS
www.jerico-fp7.eu
ADRIATIC AEGEAN BAY OF BISCAY
NORTH SEA
BALTIC
OSE FISHERY OBSERVING
SYSTEM TEMP.
HF RADAR &
FERRYBOX SST
TIDE GAUGES
&HF RADAR& BUOY
STATIONS
SATELLITE SST
OSSE FISHERY OBSERVING
SYSTEM TEMP. &
SAL.
FIXED STATION
& GLIDERS & FERRY
BOX
HF RADAR &
BUOY STATIONS
XBT PROFILES
AND MOORED STATIONS
![Page 8: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/8.jpg)
General Assembly 2 - JERICO - 8
WP9 ASSIMILATIVE TOOLS AND DYNAMICAL MODELS
www.jerico-fp7.eu
ADRIATIC AEGEAN BAY OF BISCAY
NORTH SEA
BALTIC
1/48 deg model
&3DVAR
1/48 deg model
& SEEK Filter
1/50 deg model
& Matrix
representer
1 to 5 km models
&Kalman filter,
Observational
sensitivity analysis
2 km model&
3DVAR
![Page 9: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/9.jpg)
General Assembly 2 - JERICO - 9www.jerico-fp7.eu
ADRIATIC SEA: OSE FOR FISHERY OBSERVING SYSTEM DATA (CMCC)
7 fishing vessels
Data from CNR, WP4
![Page 10: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/10.jpg)
General Assembly 2 - JERICO - 10
ADRIATIC SEA: OSE FOR FISHERY OBSERVING SYSTEM DATA (CMCC)
![Page 11: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/11.jpg)
General Assembly 2 - JERICO - 11
ADRIATIC SEA: OSE FOR FISHERY OBSERVING SYSTEM DATA (CMCC)
Improvement due to full FOS data assimilation
Improvement due to HALF FOS data
Temperature rmse over all misfits
Temperature rmse over all misfits
![Page 12: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/12.jpg)
General Assembly 2 - JERICO - 12www.jerico-fp7.eu
AEGEAN SEA: OSE FOR HF RADAR and FERRY BOX (HCMR)
HF RADAR FERRYBOX
![Page 13: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/13.jpg)
General Assembly 2 - JERICO - 13
WEEKS (MAY-DEC 2010)
Black: EXP0 (weekly assimilation of SSH,SST & T/S Argo profiles)Red: EXP1 (additional assimilation of surface currents)Green: EXP2 (additional assimilation of u-component of surface currents) Blue: EXP3 (additional assimilation of v-component of surface currents)
AEGEAN SEA: OSE FOR HF RADAR (HCMR)
![Page 14: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/14.jpg)
General Assembly 2 - JERICO - 14
Control experiment: Weekly assimilation of satellite SSH & SST and T/S Argo profilesEXP1: Additionally, daily assimilation of SST FerryBox data along the route from Heraklion to Piraeus
AEGEAN SEA: OSE FOR FERRY BOX SST data (HCMR)
![Page 15: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/15.jpg)
General Assembly 2 - JERICO - 15
BAY OF BISCAY AND THE ENGLISH CHANNEL:OSSE on Ferrybox, gliders and fixed stations (IFREMER, CNRS)
Loire river: fixed station+ glider section
Western English Channel : Ferrybox + Glider section
![Page 16: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/16.jpg)
General Assembly 2 - JERICO - 16Period : 03/05/2006 – 25/05/2006
BAY OF BISCAY: larger number of modes greater than 1 means better network (IFREMER, CNRS)
Southern glider
Northern gliderMooring station
gliders
![Page 17: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/17.jpg)
General Assembly 2 - JERICO - 17
Period : 03/05/2006 – 25/05/2006
ENGLISH CHANNEL: larger number of modes greater than 1 means better network (IFREMER, CNRS)
Ferry Box has the major impact
![Page 18: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/18.jpg)
General Assembly 2 - JERICO - 1818
NORTH SEA-GERMAN BIGHT: OSE FOR HF RADAR (HZG)
![Page 19: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/19.jpg)
General Assembly 2 - JERICO - 1919
Relative Re-construction errors for surface currents in the North Sea assuming that we have observations in the German Bight
NORTH SEA-GERMAN BIGHT: OSE for HF RADAR (HZG)
![Page 20: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/20.jpg)
General Assembly 2 - JERICO - 20
North Sea observing networks
Existing, plus 1
NORTH SEA: OSE FOR PROFILING MOORED BUOY STATIONS (RBINS-OD)
Existing, plus 1
![Page 21: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/21.jpg)
General Assembly 2 - JERICO - 21
SST ens. standard deviation
RMS Error after data assimilation of temperature profiles
NORTH SEA: OSE FOR PROFILING MOORED BUOY STATIONS (RBINS-OD)
![Page 22: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/22.jpg)
General Assembly 2 - JERICO - 22
Network comparison
Station 4
Station 13
NORTH SEA: OSE FOR PROFILING MOORED BUOY STATIONS (RBINS-OD)
![Page 23: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/23.jpg)
General Assembly 2 - JERICO - 23
NORTH-SEA: OSE ON TIDE GAUGES (DELTARES)
Assimilating nearby stations gives immediate impact on the forecast accuracy at Dutch stations
Colors indicatedifferent stationsassimilatedM
ore
accu
rate
![Page 24: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/24.jpg)
General Assembly 2 - JERICO - 24
Assimilating upstream stations improves the accuracy at longer forecast lead times.
NORTH SEA: OSE ON TIDE GAUGES (DELTARES)
Mor
e ac
cura
te
Colors indicatedifferent stationsassimilated
![Page 25: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/25.jpg)
General Assembly 2 - JERICO - 25
Forecast accuracy DCSMv6(at selection of 13 Dutch coastal stations)
0
1
2
3
4
5
6
7
8
9
10
11
-6hr to 0hr 0hr to 6hr 6hr to 12hr 12hr to 18hr 18hr to 24hr 24hr to 30hr 30hr to 36hr 36hr to 42hr 42hr to 48hr
Lead time interval
RM
SE
(cm
)
without Kalman filter
with Kalman filter
NORTH SEA: OSE ON TIDE GAUGES (DELTARES)
Improvement in the first 18-24 hr of forecast
![Page 26: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/26.jpg)
General Assembly 2 - JERICO - 26
The OSSE experiments in the Baltic Sea assimilate the T/S profiles from XBT and moored buoy.
BALTIC SEA: OSSE ON XBT LINES AND MOORED STATIONS (DMI)
![Page 27: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/27.jpg)
General Assembly 2 - JERICO - 27
BALTIC SEA: OSE ON SATELLITE SST (DMI)
![Page 28: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/28.jpg)
General Assembly 2 - JERICO - 28
DEVIATIONS FROM PROJECT WORK PROGRAMME AND ACTIONS TAKEN
DEVIATION from PROGRAM
ACTION REQUESTED
D9.5 LATE DELAY TO NOV. 2014
D9.6 LATE DELAY TO NOV. 2014
Recommended meeting with other WPs not done
EXTEND WP9 duration to end of project (6 mnts extension) and organize the meeting in November 2014
Recommended meeting with other WPs not done
Start a special issue with Jerico OSE & OSSE results
![Page 29: 2 nd General Assembly](https://reader035.vdocument.in/reader035/viewer/2022062314/5681497e550346895db6c8d8/html5/thumbnails/29.jpg)
General Assembly 2 - JERICO - 29
PROBLEM TO SOLVE: MEANING OF MILESTONES IN DOW