2003-2007 g.o. bond program - san antonio...prepared by omb w/ information from public works, parks...

28
Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O. Bond Program Election date: November 4, 2003 Propositions approved: Streets & Pedestrian Improvements $29.4M Drainage Improvements $18.9M Library Improvements $4.0M Parks & Recreation Improvements $27.2M Public Health & Safety Improvements $35.5M (Animal Care Facility, District 2 Comprehensive Health Facility, Emergency Operations Facility & Medical Center Area Senior Multi-Services & Health Center) Election Total: $115.0M 2003 G.O. Bond Proposition 2003 Bond Authorization Funds Spent / Appropriated Funds Unspent / Unappropriated but Designated for Approved Projects % Bond Authorization Remaining Streets & Pedestrian 29,398,217 21,424,249 7,973,968 27% Drainage 18,912,770 18,206,007 706,763 4% Library 3,965,000 2,959,852 1,005,148 25% Parks 27,224,013 14,466,873 12,757,140 47% Public Health & Safety 35,500,000 32,469,166 3,030,834 9% Total $115,000,000 $89,526,147 $25,473,853 22% 2003 G.O. Bond Proposition # of Projects To Be Initiated Under Design Under Construction Complete % Complete Streets & Pedestrian 30 0 4 9 17 57% Drainage 13 0 0 6 7 54% Library 12 0 2 5 5 42% Parks 54 0 8 12 34 63% Public Health & Safety 4 0 0 3 1 25% Total 113 0 14 35 64 57%

Upload: others

Post on 28-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28

2003-2007 G.O. Bond Program Election date: November 4, 2003 Propositions approved: Streets & Pedestrian Improvements $29.4M Drainage Improvements $18.9M Library Improvements $4.0M Parks & Recreation Improvements $27.2M Public Health & Safety Improvements $35.5M (Animal Care Facility, District 2 Comprehensive Health Facility, Emergency Operations Facility & Medical Center Area Senior Multi-Services & Health Center)

Election Total: $115.0M

2003 G.O. Bond Proposition

2003 Bond Authorization

Funds Spent / Appropriated

Funds Unspent / Unappropriated but Designated

for Approved Projects

% Bond Authorization

Remaining Streets & Pedestrian 29,398,217 21,424,249 7,973,968 27% Drainage 18,912,770 18,206,007 706,763 4% Library 3,965,000 2,959,852 1,005,148 25% Parks 27,224,013 14,466,873 12,757,140 47% Public Health & Safety 35,500,000 32,469,166 3,030,834 9%

Total $115,000,000 $89,526,147 $25,473,853 22%

2003 G.O. Bond Proposition

# of Projects

To Be Initiated

Under Design

Under Construction Complete

% Complete

Streets & Pedestrian 30 0 4 9 17 57% Drainage 13 0 0 6 7 54% Library 12 0 2 5 5 42% Parks 54 0 8 12 34 63% Public Health & Safety 4 0 0 3 1 25%

Total 113 0 14 35 64 57%

Page 2: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 2 of 28

2003-2007 G.O. Bond Program Proposition 1 – Streets and Pedestrian Improvements

Bond Project CD Hold Design Construction CompleteADAMS HILL SIDEWALKS - HORAL TO DEAD END 4 x

BLANCO ROAD - HILDEBRAND TO SUMMIT PHASE 1 1 x BROOKS CITY-BASE 3 x CINCINNATI - FREDERICKSBURG TO IH 10 1 x

COMMERCE STREET - RAILROAD TO S. PALMETTO 2 x CORNELL - BRAZOS TO COLORADO 1 x CULEBRA AREA STREETS, PHASE IVA 7 x DECO DISTRICT - FREDERICKSBURG ROAD/TRAVIS BUILDING PARKING LOT 7 x

DUKE AREA STREETS, PHASE I 7 x DURANGO: TRINITY TO DEAD END 5 x

EL MONTE: BLANCO TO SAN PEDRO, PHASE II 1 x

FAY PHASE 2, PART 2 5 x HOUSTON AND COMMERCE UNDERPASS - HOUSTON AND COMMERCE AT IH 37 2 x

KELLY USA 4 & 5 x LA MANDA - WEST AVENUE TO BUCKEYE 1 x MARBACH PHASE I - MILITARY TO PINN 6 x OZARK - ERSKINE TO WILLIAMSBURG 1 x

PEARL PARKWAY - BROADWAY TO AVENUE A 9 x

PEDESTRIAN MOBILITY & TRAFFIC CALMING PROJECTS IN DISTRICT 1 1 x

PEDESTRIAN MOBILITY & TRAFFIC CALMING PROJECTS IN DISTRICT 4 4 x

REDLAND ROAD IMPROVEMENTS - REDLAND WOODS TO JONES MALTSBERGER 10 x RIGHT-OF-WAY ACQUISITION OF HWY 281 CORRIDOR - 1604 TO STONE OAK 9 x ROSABELL STREET - CULEBRA TO INEZ 5 x SCHOOL SAFETY IMPROVEMENTS 9 x SCHOOL SIDEWALK PRIORITY PROGRAM 7 x SKYLINE NEIGHBORHOOD IMPROVEMENTS, PHASE I - ERIN, BELL, CISCO AND MIDDLE STS 10 x SOUTH TEXAS MEDICAL CENTER IMPROVEMENTS 8 x SOUTHTOWN - SOUTH PRESA - CAROLINA TO LOWELL 1 x

STAHL ROAD - O'CONNOR TO JUDSON 10 x

Page 3: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 3 of 28

2003-2007 G.O. Bond Program Proposition 1 – Streets and Pedestrian Improvements

Bond Project CD Hold Design Construction CompleteZARZAMORA - 410 TO APPLEWHITE AND APPLEWHITE - ZARZAMORA TO WATSON 3 x

Page 4: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 4 of 28

2003-2007 G.O. Bond Program Proposition 2 – Drainage Improvements

Bond Project CD Hold Design Construction CompleteALAMO FARMSTEAD DRAINAGE PH I ON WHITBY FROM ABE LINCOLN TO LEON CREEK 7 x ANSLEY BLVD DRAINAGE #1091 4 x CARDIFF AREA DRAINAGE IMPROVEMENTS 2 x

GENERAL MCMULLEN AREA DRAINAGE - DEXTER TO ROSELAWN 5 x LINDA LOU - PRESA TO HACKBERRY 3 x MARNEY PLAZA OUTFALL 3 x OAK GLEN LOW WATER CROSSING WARNING SYSTEM 10 x OCTAVIA #63 PHASE II, PART B 5 x OLYMPIA DRAINAGE AREA PHASE 1 1 x SAN PEDRO/HUISACHE AREA DRAINAGE PHASE I 1 x SINCLAIR ROAD AT ROSILLO CREEK 2 x UPPER OLMOS CREEK 8 x

WEIDNER LOW WATER CROSSING WARNING SYSTEM 10 x

Page 5: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 5 of 28

2003-2007 G.O. Bond Program Proposition 3 – Library Improvements

Bond Project CD Hold Design Construction CompleteALTERNATIVE ENERGY SOURCE FOR HAUSMAN LIBRARY PROJECT 8 x BROOKHOLLOW LIBRARY UPGRADES 9 x

CODY LIBRARY FACILITY AND COLLECTIONS ENHANCEMENT 8 x CODY LIBRARY PARKING LOT EXPANSION 8 x CORTEZ LIBRARY UPGRADES 4 x FOREST HILLS BRANCH LIBRARY UPGRADES 7 x HAUSMAN ROAD LIBRARY UPGRADES/EXPANSION 8 x HERTZBERG LIBRARY STABILIZATION PROJECT 1 x JOHNSTON LIBRARY UPGRADES 4 x MCCRELESS LIBRARY UPGRADES 3 x NORTH EAST ROOSEVELT LIBRARY 2 x PAN AMERICAN LIBRARY UPGRADES 4 x

Page 6: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 6 of 28

2003-2007 G.O. Bond Program Proposition 4 – Parks and Recreation Improvements

Bond Project CD Hold Design Construction CompleteAL FORGE PARK IMPROVEMENTS 4 x ALDERATE PARK WALKING TRAIL 7 x ARNOLD PARK IMPROVEMENTS 4 x

BOTANICAL GARDENS ADA AND FUNSTON ACQUISITIONS 9 x

BRACKENRIDGE PARK - JAPANESE TEA GARDENS REHABILITATION 9 x

CATHEDRAL ROCK NATURE PARK IMPROVEMENTS 6 x

CUELLAR PARK COMMUNITY CENTER ROOF REPLACEMENT 6 x DISTRICT 4 SOCCER FIELD DEVELOPMENT 4 x

DISTRICT 6 PARK LAND ACQUISITION AND DEVELOPMENT 6 x DISTRICT 6 POOL FACILITY REHABILITATION - WESTWOOD TERRACE, NEW TERRITORIES AND CUELLAR PARKS 6 x DISTRICT 9 NEIGHBORHOOD PARK/SPORTS FIELD LAND ACQUISITION 9 x

EISENHOWER PARK AND FRIEDRICH PARK WATER SERVICE IMPROVEMENT 8 x

FATHER BENAVIDES PARK IMPROVEMENTS 5 x FRIESENHAHN PARK IMPROVEMENTS 10 x GOLDEN COMMUNITY PARK 4 x HAUSMAN ROAD PARK LAND ACQUISITION AND SITE DEVELOPMENT 8 x

HERITAGE NEIGHBORHOOD PARK IMPROVEMENTS 4 x HILLSIDE ACRES GARDENS DEVELOPMENT 4 x HISTORIC CITY CEMETARIES FENCING 2 x INGRAM HILLS PARK DEVELOPMENT 7 x JIMMY FLORES PARK IMPROVEMENTS 4 x

LACKLAND TERRACE PARK IMPROVEMENTS 4 x

LAKESIDE PARK IMPROVEMENTS 2 x LAS PALMAS PARK IMPROVEMENTS 5 x

LOS ANGELES HEIGHTS PARK IMPROVEMENTS 1 x

MARKET SQUARE: FARMER'S MARKET REHABILITATION 1 x

MCALLISTER PARK REHABILITATION AND IMPROVEMENTS 9 x MCCLAIN PARK DEVELOPMENT 10 x

MEDINA BASE ROAD PARK IMPROVEMENTS 4 x

Page 7: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 7 of 28

2003-2007 G.O. Bond Program Proposition 4 – Parks and Recreation Improvements

Bond Project CD Hold Design Construction CompleteMILLER'S POND PARK IMPROVEMENTS 4 x MISSION TRAILS FACILITY IMPROVEMENTS 3 x

MITCHELL LAKE/LAND HERITAGE INSTITUTE 3 x MONTICELLO PARK IMPROVEMENTS 7 x MUD CREEK PARK IMPROVEMENTS 10 x MUSEO AMERICANO 1 x NANI FALCON PARK IMPROVEMENTS 7 x NORTHAMPTON PARK DEVELOPMENT 2 x

O.P. SCHNABEL PARK ENTRANCE IMPROVEMENTS 8 x

OLMOS BASIN PARK IMPROVEMENTS 1 x

OSCAR PEREZ MEMORIAL PARK DEVELOPMENT 6 x

PEARSALL PARK IMPROVEMENTS 4 x RAINBOW HILLS PARK IMPROVEMENTS 4 x

REGIONAL YOUTH SPORTS FACILITY IMPROVEMENTS CW x

SAN ANTONIO ZOO FACILITY IMPROVEMENTS 9 x

SOUTH SAN COMMUNITY CENTER PLAYGROUND DEVELOPMENT 4 x SPRING TIME PARK POOL REHABILITATION 8 x STONE OAK PARK IMPROVEMENTS 9 x

TOM SLICK COMMUNITY PARK IMPROVEMENTS 6 x

TOWER OF THE AMERICAS REHABILITATION 1 x WALKER RANCH PARK IMPROVEMENTS 9 x WEST END PARK IMPROVEMENTS 1 x

WESTSIDE BRANCH YMCA ROOF REPLACEMENTS 5 x

WITTE MUSEUM AND PIONEER HALL IMPROVEMENTS 9 x WOODLAWN LAKE PARK IMPROVEMENTS 7 x

Page 8: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 8 of 28

2003-2007 G.O. Bond Program Proposition 5 – Public Health and Safety Improvements

Bond Project CD Hold Design Construction CompleteANIMAL CARE FACILITY CW x DISTRICT 2 COMPREHENSIVE HEALTH FACILITY 2 x EMERGENCY OPERATIONS CENTER CW x MEDICAL CENTER AREA SENIOR MULTI-SERVICES AND HEALTH CENTER 8 & CW x

Page 9: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 9 of 28

1999-2004 G.O. Bond Program Election date: May 1, 1999 Propositions approved: Streets & Pedestrian Improvements $41.3M Drainage Improvements $19.0M Flood Control with Parks Improvements $12.2M Parks & Recreation Improvements $24.2M Library System Improvements $13.2M Public Safety Improvements $30.3M (Police Service Centers Renovation/Expansion, Fire Training Academy & Public Safety Integrated Technology System)

Total Election: $140.2M

1999 G.O. Bond Proposition

1999 Bond Authorization

Funds Spent / Appropriated

Funds Unspent / Unappropriated but Designated

for Approved Projects

% Bond Authorization

Remaining Streets & Pedestrian 41,300,000 29,488,825 11,811,175 29% Drainage 19,000,000 14,310,279 4,689,721 25% Flood Control 12,200,000 9,717,219 2,482,781 20% Parks 24,200,000 24,200,000 0 0% Library and Learning 13,200,000 12,981,029 218,971 2% Public Safety 30,300,000 30,160,019 139,981 0%

Total $140,200,000 $120,857,371 $19,342,629 14%

1999 G.O. Bond Proposition

# of Projects

To Be Initiated

Under Design

Under Construction Complete

% Complete

Streets & Pedestrian 108 6 17 22 63 58% Drainage 17 0 1 3 13 76% Flood Control 4 0 2 1 1 25% Parks 63 0 5 3 55 87% Library and Learning 7 0 0 1 6 86% Public Safety 7 0 0 1 6 86%

Total 206 6 25 31 144 70%

Page 10: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 10 of 28

1999-2004 G.O. Bond Program Proposition 1 – Streets and Pedestrian Improvements

Bond Project CD Hold Design Construction Complete36TH STREET RECONSTRUCTION 6 x

ABE LINCOLN (HORN-ECKHERT) 7 x

ALAMO/BROADWAY CORRIDOR BICYCLE TRANSPORTATION 1 x

ARANSAS STREET (MEERSCHEIDT-WALTERS) 2 x

ARBOR (TRINITY-SAN MARCOS) PH. II 1 x

AVE. B (N) BIKELANE 1, 2 & 9 x

AVE. B (S) BIKELANE 1, 2 & 9 x

BABCOCK RD. ALTERNATE BIKELAN 8 x

BEE STREET (WALTERS-FRANK) 2 x

BELGIUM (PICARDIE-COLISEUM) 2 x

BICYCLE RTE STREET PALN CW x

BITTERS RD RECONSTRUCTION (BROADWAY-NACOGDOCHES) 10 x

BLANCO RECONSTRUCTION (LULLWOOD-SUMMIT) 1 x

BLANCO SIDEWALKS (LOCKHILL-SELMA-PATRICIA) 9 x BOTANICAL GARDENS BIKE RTE (AVE B) 9 x

CALLAGHAN RD RECONSTRUCTION (OLD HWY 90-COMMERCE) 7 x

CALLAGHAN RD RECONSTRUCTION (HEMPHILL-CULEBRA) 7 x

CALLAGHAN RD RECONSTRUCTION (W. HORSESHOE BEND-INGRAM RD) 7 x

CENTRAL BUSINESS DISTRICT - SAN ANTONIO BICYCLE TRANSPORTATION 1 x CINCINNATI BICYCLE TRANSPORTATION (ST. MARY'S UNIVERSITY-NAVIDAD) 1 & 7 x

CINCINNATI/ASHBY BICYCLE TRANSPORTATION (NAVIDAD-N. ST. MARY'S) 1 x

CITYWIDE AMERICANS W/DISABILITIES ACT (ADA) SIDEWALK PROGRAM CW x

CITYWIDE SIDEWALKS MPO/ADA CW x

CLARK (FAIR-SOUTHCROSS) 3 x

CLARK SIDEWALKS (SOUTHCROSS-HOTWELLS) 3 x

CRESWELL (HOUSTON-DEAD END) 2 x

DANBURY SIDEWALKS (BETWEEN NACOGDOCHES & BROADWAY) 10 x DECO DISTRICT (FREDERICKSBURG RD)

1, 7 & CW x

DEMYA RECONSTRUCTION (HUNT-LOOP 410) 4 x

EAST-WEST HUEBNER ACCESS OVER RAILROAD TRACK 8 x

Page 11: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 11 of 28

1999-2004 G.O. Bond Program Proposition 1 – Streets and Pedestrian Improvements

Bond Project CD Hold Design Construction CompleteEL MONTE (BLANCO-SAN PEDRO) 1 x

FAY STREET/ST. JOSEPH (CREIGHTON-NEW LAREDO HWY) 5 x

FLORIDA (IH37-ST. MARY'S) 1 x

FRIO CITY RD RECONSTRUCTION (BRAZOS-ZARZAMORA) 5 x

FRIO CITY/GENERAL HUDNELL ACCESS RAMPS 5 x

GEVERS ST SIDEWALKS (IH10-SOUTHCROSS) 3 x

HACKBERRY (STEVES-SOUTHCROSS) 3 x

HENDERSON PASS SIDEWALKS (THOUSAND OAKS-GOLD CANYON) 10 x

HILDEBRAND @ US HWY 281 INTERSECTION RECONSTRUCTION 9 x HOOVER ST (NOGALITOS-CHARLOTTE) 5 x

HOT WELL SIDEWALKS (IH37-NEW BRAUNFELS) 3 x

HOUSTON (PINE-POLARIS) 2 x

HOUSTON REDEVELOPMENT 7 & CW x

HUNT LANE RECONSTRUCTION (MARBACH RD-US HWY 90) 4 x

IH10 CROSSOVER @ DOMINIION ENTRANCE 8 x

ISOM RECONSTRUCTION (RAMSEY-US HWY 281) 9 x

JO MARIE (W.W. WHITE-DEAD END) 3 x JONES-MALTSBERGER ENGINEERING (U.S. HWY 281-UNION PACIFIC RAILROAD) 9 x

JOSEPHINE GRAYSON BICYCLE TRANSPORTATION 2 x

KING WILLIAM AREA BICYCLE TRANSPORTATION 1 x

KONO (GEMBLER-BELGIUM) 2 x

LARKSPUR (WEST AVE-BALTIC) 9 x

LARKSPUR ELEMENTARY SIDEWALKS 9 x

LELAND PARK TERRACE CURB RECONSTRUCTION 9 x

LEON CREEK BIKE PATH PH I 8 x

LOCKHILL-SELMA (WEST AVE-N.W. MILITARY) 9 x

MALONE BIKE LANE (THEO-QUINTANA-CONCEPCION PARK) 3 & 5 x

MARKET SQUARE REHABILITATION 1 x

MAYFIELD (S. ZARZAMORA-IH35) 4 x

MCCARTY SIDEWALKS & CURBS (LORENE-BLANCO) 9 x

Page 12: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 12 of 28

1999-2004 G.O. Bond Program Proposition 1 – Streets and Pedestrian Improvements

Bond Project CD Hold Design Construction CompleteMCCULLOUGH (BASSE-RAILROAD TRACKS) 9 x

MEDICAL @ FREDERICKSBURG 8 & CW x

MEDICAL DRIVE ENGINEERING (IH10-FREDERICKSBURG) 8 x

MISSION TRAILS CONSTRUCTION 3 x

MOCKERT STREET AREA (MOCKERT, FOREST, W. LAMBERT, KLINE, CASS) 5 x

MONTANA STREET BIKE LANE (ALAMODOME-WALTERS) 2 x MONTERREY STREET RECONSTRUCTION (SAN JOAQUIN-36TH ST.) 6 x

MONTICELLO (S. GEVERS-HILLJE) 3 x

NACOGDOCHES (LOOP 410-DANBURY) CW x

NAKOMA (U.S. HWY 281-WARFIELD) 9 x

NORTHINGTON (S.W. 36TH-S.W.35TH) 6 x

PECAN OVERLAY (MAIN-JEFFERSON) 1 x

PECAN VALLEY DRIVE RECONSTRUCTION ("J" ST-IH10) 2 x

PEDESTRIAN BRIDGE @ HIDDEN COVE ELEMENTARY 4 x PLEASANTON RD (GILLETTE-LOOP 410) 3 x

PLEASANTON RECONSTRUCTION (MOURSUND-GILLETTE) 3 x PRUE RD EXTENSION (PRUE-HUEBNER) 8 x

PRUE RD RECONSTRUCTION (LAUREATE-FREDERICKSBURG) 8 x

RAYBON DRIVE SIDEWALKS 2 x

RICE RECONSTRUCTION (W.W. WHITE-SEMLINGER) 2 x

S. FLORES RECONSTRUCTION (MALONE-OCTAVIA) 5 x

S.W. 41ST ST (CASTROVILLE RD-LAWTON ST.) 6 x

SAMS (DEAD END-DEAD END) 3 x SAN ANTONIO COLLEGE-UTSA DOWNTOWN BICYCLE TRANSPORTATION 1 x SAN PEDRO ALTERNATE BICYCLE TRANSPORTATION (DOT DR.-HOWARD) 9 x

SCHOOL SAFETY PROGRAM CW x

SIGNAL PREEMPTION & IMPROVEMENT (MEDICAL DR.) 8 x

SIGNAL PREEMPTION (MEDICAL CENTER AREA) 8 x SOUTHCROSS BLVD. RECONSTRUCTION (S. NEW BRAUNFELS- S. PRESA) 3 x

Page 13: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 13 of 28

1999-2004 G.O. Bond Program Proposition 1 – Streets and Pedestrian Improvements

Bond Project CD Hold Design Construction CompleteSOUTHTOWN AREA STREET IMPROVEMENTS 1 x

SOUTHWEST CRAFT CENTER INTERSECTION IMPROVEMENTS (NAVARRO & AUGUSTA) 1 & CW x

STAHL @ O'CONNOR, JUDSON, HIGGINS RECONSTRUCTION 10 x

STARCREST RECONSTRUCTION (STUNTMAN-JONES-MALTSBERGER) 9 x TEZEL RD PEDESTRIAN ENHANCEMENTS 6 & 7 x

TEZEL RECONSTRUCTION (RIDGE PATH-OLD TEZEL) 6 x

TEZEL RECONSTRUCTION (TIMBERPATH-RIDGE PATH) 6 x

THOUSAND OAKS EXTENSION IMPROVEMENTS 9 x

U.S. HWY 281/RAILROAD CROSSING @ QUARRY MARKET 9 x

UHR LANE RECONSTRUCTION (HIGGINS-THOUSAND OAKS) 10 x UTSA (DOWNTOWN CAMPUS)-OLLU CORRIDOR BICYCLE TRANSPORTATION 1 & 5 x VANDIVER BICYCLE TRANSPORTATION (LOOP 410-RITTIMAN) 10 x

VILLARET BICYCLE TRANSPORTATION (ZARZAMORA-HWY 16) 4 x

W. CRAIG (ELMENDORF-JOSEPHIN TOBIN) 7 x

WALTERS BICYCLE TRANSPORATION (RIGSBY-FAIR AVE) 2 & 3 x

WOODLAWN AREA STREETS ENGINEERING 7 x

WOODLAWN AVE (BANDERA-MAIDEN) 7 x WOODLAWN AVE (SAN ANTONIO-LAKE) 7 x ZARZAMORA BIKE LANE (IH35-LOOP 410) 4 x

Page 14: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 14 of 28

1999-2004 G.O. Bond Program Proposition 2 – Drainage Improvements

Bond Project CD Hold Design Construction Complete39TH ST #58M PHASE IIA 6 x ANSLEY BOULEVARD DRAINAGE #1091 4 x AVE MARIA DRAINAGE 9 x BLOSSOM/WOODBURY #1007 PHASE II 10 x BUSBY & FLAMINGO DRAINAGE 9 x CULEBRA DRAINAGE PROJECT #58 6 & 7 x DIJON COURT DRAINAGE 9 x DRAINAGE OUTFALL HILLSIDE ACRES 4 x FLORES/BREEDEN/BEACON OUTFALL 1 x GUILBEAU DRAINAGE @ FRENCH CREEK 7 x HARRIS STORM DRAINAGE 5 x

HOWARD DRAINAGE 9 x

IH 35 GEMBLER/WIDEN & SALADO CRK 2 x LANARK DRAINAGE 10 x MILITARY DITCH # 65 4 x OCTAVIA #63 PHASE II 5 x RIP RAP #69 PHASE II 4 x

Page 15: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 15 of 28

1999-2004 G.O. Bond Program Proposition 3 – Flood Control w/ Park Improvements

Bond Project CD Hold Design Construction CompleteJAMES PARK DEVELOPMENT & HOLBROOK RD IMPROVEMENTS 2 x

LEON CREEK RECREATION FACILITIES & DETENTION POND @ LOOP 410/CULEBRA CW x

SAN ANTONIO RIVER IMPROVEMENTS 3 & CW x WHEATLEY HEIGHTS BUYOUT AND SALADO CREEK GREENWAY DEVELOPMENT 2 & CW x

Page 16: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 16 of 28

1999-2004 G.O. Bond Program Proposition 4 – Parks and Recreation Improvements

Bond Project CD Hold Design Construction CompleteADAMS HILL AT HUNT LANE 4 x ALDERATE PARK IMPROVEMENTS 7 x BLUE STAR ARTS IMPROVEMENTS 3 x BROOKS PARK 3 x CALDERON BOYS AND GIRLS CLUB 5 x CENTRO DE ARTES BUILDING 1 & CW x CITY NURSERY RELOCATION /BRACKENRIDGE SURFACE PARKING LOT 9 & CW x COLLINS GARDENS PARK IMPROVEMENTS 5 x

COMANCHE LOOKOUT DEVELOPMENT PHASE II 10 x

DECO DISTRICT-TRAVIS BUILDING RENOVATION

1, 7 & CW x

DUGAS @ ELLISON DRIVE (DUCK POND) 4 x EISENHOWER PARK PLAYGROUND 8 x FRANK GARRETT CENTER 1 x FRIEDRICH PARK REHABILITATION 8 x FRIESENHAHN PARK REHABILITATION 10 x

GILBERT GARZA COMMUNITY CENTER CROSSOVER BRIDGE 6 x GOLDEN PARK IMPROVEMENTS 4 x GUADALUPE ARTS & CULTURAL FACILITY CW x HIGHLANDS PARK 3 x

HIKE & BIKE TRAIL @ ABANDONED RAILROAD TRACK (VALLEY HIGH/SKY HARBOR) 4 x

HISTORIC CIVIC CENTER RIVER LINK 1, 9 & CW x

JEFFERSON POCKET PARK/MONUMENTS IMPROVEMENTS 7 x JIMMY FLORES PARK IMPROVEMENTS 4 x KALLISON PARK 10 x

KNOLLCREST AND MERRY OAKS (GATEWAY TERRACE) 4 x

LACKLAND TERRACE PARK AND CENTER IMPROVEMENTS 6 x

LADY BIRD JOHNSON PARK IMPROVEMENTS 10 x

LAS PALMAS WALKING TRAIL 5 x LEE'S CREEK PARK IMPROVEMENTS 7 x LEON CREEK GREENWAY DISTRICT 7 7 & CW x LEON CREEK GREENWAY DISTRICT 8 8 x LONE STAR BREWERY SITE PARK LAND ACQUISITION AND DEVELOPMENT 5 x

Page 17: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 17 of 28

1999-2004 G.O. Bond Program Proposition 4 – Parks and Recreation Improvements

LORENCE CREEK LINEAR PARK AND UPPER SALADO CREEK GREENWAY DEVELOPMENT CW x MAHNKE PARK DEVELOPMENT PHASE II 9 x MEDINA BASE ROAD AT LOOP 410 4 x MILLER'S POND PARK DEVELOPMENT 4 x MONTICELLO PARK IMPROVEMENTS 7 x NEW TERRITORIES PARK DEVELOPMENT 8 x NORTHRIDGE PARK 10 x NORTHWOOD PARK 10 x OAK HAVEN PARK 9 x

OLMOS BASIN PARK REHABILITATION AND TRAIL SYSTEM DEVELOPMENT 9 & CW x PALO ALTO PARK IMPROVEMENTS 4 x

PARK LAND ACQUISITION AND DEVELOPMENT DISTRICT 6 6 x

PARK LAND ACQUISITION AND DEVELOPMENT DISTRICT 8 8 x

PARK LAND ACQUISITION AND DEVELOPMENT DISTRICT 9 9 x

PARKS AND SOCCER FIELD IMPROVEMENTS DISTRICT 3 3 x PICKWELL PARK 3 x

PRESA COMMUNITY CENTER BASKETBALL FACILITY 3 x RAINBOW HILLS PARK 4 x RAMIREZ PARK IMPROVEMENTS 4 x ROOSEVELT PARK IMPROVEMENTS 5 x

ROSEDALE PARK ENTRANCE REHABILITATION 7 x

SAN ANTONIO RIVER VISITOR SERVICE STATION 1 & CW x

SAN PEDRO PARK REHABILITATION PHASE II 1 & CW x SAN PEDRO PLAYHOUSE 1 x SEELING PARK 7 x SOUTHSIDE LIONS PARK - LAKE 3 x SPICEWOOD PARK IMPROVEMENTS 4 x STINSON PARK DEVELOPMENT 3 x THUNDERBIRD HILLS/INGRAM HILLS AREA 7 x

WALKER RANCH PARK DEVELOPMENT PHASE II 9 x WOODLAWN LAKE PHASE II 7 x

Page 18: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 18 of 28

1999-2004 G.O. Bond Program Proposition 5 – Library System Improvements

Bond Project CD Hold Design Construction CompleteBRANCH LIBRARY (CAMP BULLIS) 8 x

BRANCH LIBRARY (COMMANCHE LK) 10 x BRANCH LIBRARY (O.P. SCHNABEL AREA) 7 & 8 x

BRANCH LIBRARY (PINN RD) 4, 6 & CW x

BROOK HOLLOW BRANCH LIBRARY EXP 9 x GREAT NW BRANCH LIBRARY EXP 6 & 7 x LANDA BRANCH LIBRARY IMPROVEMENTS 9 x

Page 19: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 19 of 28

1999-2004 G.O. Bond Program Proposition 6 – Public Safety Improvements

Bond Project CD Hold Design Construction CompleteEASTSIDE POLICE SERVICE CENTER EXP 2 & 3 x FIRE TRAINING ACADEMY CW x NORTHSIDE POLICE SERVICE CENTER EXP

2, 9 & 10 x

PRUE ROAD POLICE SERVICE CENTER EXP 7, 8 & 9 x PUBLIC SAFETY INTEGRATED TECH SYST CW x SOUTHSIDE POLICE SERVICE CENTER EXP 3, 4 & 5 x WESTSIDE POLICE SERVICE CENTER EXP 5, 6 & 7 x

Page 20: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 20 of 28

1994-1999 G.O. Bond Program Election date: May 7, 1994 Propositions approved: Streets Improvements $25.6M Drainage Facilities $34.4M Park Improvements $41.6M Public Safety Improvements $8.1M (Police Central Substation & Crime Computer Center)

Total Election: $109.7M

1994 G.O. Bond Proposition

1994 Bond Authorization

Funds Spent / Appropriated

Funds Unspent / Unappropriated but Designated

for Approved Projects

% Bond Authorization

Remaining Streets Improvements 25,600,000 25,600,000 0 0% Drainage Facilities 34,400,000 33,432,280 967,720 3% Park Improvements 41,600,000 41,510,000 90,000 0% Public Safety Improvements 8,100,000 8,100,000 0 0%

Total $109,700,000 $108,642,280 $1,057,720 1%

1994 G.O. Bond Proposition

# of Projects

Under Design

Under Construction Complete

% Complete

Streets Improvements 41 0 0 41 100% Drainage Facilities 45 0 2 43 96% Park Improvements 81 1 0 80 99% Public Safety Improvements 2 0 0 2 100%

Total 169 1 2 166 98%

Page 21: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 21 of 28

1994-1999 G.O. Bond Program Proposition 1 – Streets Improvements

34TH STREET (HWY. 90 TO CASTROVILLE ROAD) 6 x

APPLE VALLEY (HAVEN VALLEY TO RAY ELLISON) 4 x ARBOR (TRINITY TO SAN MARCOS) 1 x

BABCOCK RECONST. & BRIDGES (HAUSMAN TO DEZAVALA) 8 x

BOEHMER (BURBANK LOOP TO S. FLORES) 5 x

CONTOUR DRIVE STREET IMPROVEMENTS 9 x COOPWOOD STREET (ACME TO 40TH) 6 x EL MONTE (SAN PEDRO TO MCCULLOUGH) 9 x EMORY (KENTUCKY TO WAVERLY) 7 x ESSEX (HACKBERRY TO PEDMONT) 2 x FAIRDALE (RITTIMAN TO BLOOMDALE) 2 x

GUADALUPE GARDENS (IMPR. OF REMAINING STREETS) 2 x

HIGGINS ROAD (NACHOGDOCHES TO STAHL ROAD) 10 x HOBART STREET (ACME TO 40TH) 6 x KENTUCKY AVENUE (EMORY TO WILSON) 7 x

KINGS CROWN ROAD (O'CONNOR RD. TO BRICKEN/HARDING) 10 x

LAKE BLVD. (WOODLAWN TO DONALDSON) 7 x LAS PALMAS (CHARBEN TO 26TH) 5 x LEAL 1 x LEONHARDT ROAD 10 x

LOCKHILL-SELMA IMPROVEMENTS (ROW AT WURZBACH) 8 x LOS JARDINES SIDEWALKS 5 x MISCELLANEOUS SIDEWALKS 7 x

MONTEZUMA (S. ZARZAMORA TO HAMILTON) 5 x

MORALES STREET (S. ZARZAMORA TO 24TH) 5 x N.W. 19TH (PEREZ TO CULEBRA) 1 x

NACOGDOCHES (BROADWAY TO NEW BRAUNFELS) 9 x

NAVAJO AREA STREETS (NAVAJO, HUTCHISON, BARLITE) 4 x

PRINCE VALIANT/CASTLE KNIGHT/KING ARTHUR-DIS. ACC. 2 x

SAN CARLOS (NAVIDAD TO S. ZARZAMORA) 5 x

SIDEWALKS/ABE LINCOLN FROM PEMBROOK TO ECKHART 7 x

Page 22: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 22 of 28

SIDEWALKS/GULBEAU FROM OLD TEZEL TO WICKERSHAM 7 x

1994-1999 G.O. Bond Program Proposition 1 – Streets Improvements

SIDEWALKS/TEZEL RD FROM WICKERSHAM TO BRAUN 7 x

STAHL RD. #1038 - PHASE I (BELL TO BULVERDE) 10 x

STREETS AROUND WOODLAWN LAKE PARK 7 x THORAIN (R.R. TRACKS TO BLANCO) 1 x

VALLEY HI DRIVE (410 TO RAY ELLISON BLVD.) 4 & 6 x WAVERLY (ZARZAMORA TO GLENMORE) 1 x

WOODLAWN FROM ST. CLOUD PAST LAKE BLVD. 7 x YUCCA (AMANDA TO RAILROAD TRACKS) 2 x

Page 23: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 23 of 28

1994-1999 G.O. Bond Program

Proposition 2 – Drainage Improvements

Bond Project CD Hold Design Construction Complete36TH & GROWDON DRAINAGE 6 x BENRUS/WITT #1059 7 x

BLOSSOM/WOODBURY #1007 (NEAR NACOGDOCHES) 10 x

BOBOLINK 96A (STOREYWOOD TO DENEICE) 1 x BRANIFF-TURBO TO 218 (SAN PEDRO) 9 x

CALLAGHAN DRAINAGE IMPRV. (AT LITTLE LANE) 8 x CALLE MORELIA DRAINAGE (DRIFTWOOD) 6 x CASTLE TRAIL/MIDCROWN INTERSECTION 2 x CHIPINQUE DRAINAGE (DRIFTWOOD) 6 x DRAINAGE STUDIES CW x

DUVAL (PIERCE TO SEGUIN/SEGUIN TO WALTERS) 2 x

ELSMERE/GRAMERCY #57 (W. KINGS HWY., MICHIGAN) 1 x ESCALON ST. #1008 3 x GOLIAD (PECAN VALLEY TO MILITARY) 3 x HAZEL DRAINAGE 5 x

HOLLYHOCK AT HUEBNER CREEK DRAINAGE STRUCTURE 7 x JANDA SUSAN/RIDGECREST 9 x

KENTUCKY-ZARZAMORA TO ALZAN CREEK 1 x

KENTWOOD MANOR (SPRINGHILL AT PIPSTONE) 9 x LARKSPUR 9 x LEON CREEK DRAINAGE IMPROVEMENTS 8 x

LEON CREEK DRAINAGE WATERSHED STUDY 7 x MARCUM DRAINAGE 6 x MARTINEZ CREEK DRAINAGE 1 x MISSION TRAILS 3 & CW x N. FLORES/BREEDEN/BEACON OUTFALL 1 x OAKWOOD 58 BY 7 x

OBSERVATION STREET #1003 (NEAR BRONCO) 6 x OCTAVIA #63 - PHASE I 5 & CW x

PROSPERITY DRAINAGE (ACME TO S.W. 40TH STREET) 6 x QUEEN ANN/ELMHURST DRAINAGE 9 x QUERETARO DRAINAGE (DRIFTWOOD0 6 x QUINTATA TRIANGLE 4 x

Page 24: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 24 of 28

1994-1999 G.O. Bond Program

Proposition 2 – Drainage Improvements

Bond Project CD Hold Design Construction CompleteRAY BON/GALAHAD INTERSECTION SURFACE CHANNEL 2 x RITTIMAN & HOLBROOK 2 x ROSELAWN DRAINAGE 6 x SCIENCE PARK #58 H, I, & J - PHASE III 7 x

SHADY OAKS - ENCINO GRANDE IMPROVEMENTS 9 x

STONEGATE - NOTRE DAME WAKE FOREST & DUKE 7 x

SUNSHINE (E. OF HILLCREST) DRAINAGE STRUCTURE 7 x

UPPER OLMOS CREEK DRNG. IMPR. & DETENTION PONDS 8 x

UPPER SIX MILE CRK #83F (S.W. MILITARY/ZARZAMORA) 4 x W.W. WHITE ROAD - PHASE I 2 x

WHITBY AT HUEBNER CREEK DRAINAGE STRUCTURE 7 x WINGATE/ORIENTAL/FLOYD #1050 5 x

Page 25: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 25 of 28

1994-1999 G.O. Bond Program

Proposition 3 – Park Improvements

Bond Project CD Hold Design Construction Complete"J" ST. PARK 2 x ALDERETE PARK 7 x

APACHE CREEK PARKS (CASSIANO, ESCOBAR, AMISTAD) 5 x

ARNOLD PARK/RAMIREZ COMMUNITY CENTER 4 x BLOSSOM PARK 9 x BOTANICAL CENTER IMPROVEMENTS 9 x BRACKENRIDGE PARK REHABILITATION 9 & CW x BUCKEYE PARK 1 x CAMELOT/PARK VILLAGE 2 x COLLINS GARDEN PARK 5 x COLUMBUS PARK 1 x COMANCHE LOOKOUT ACQUISITION & INITIAL DEVELOPMENT

10 & CW x

COMMANDER'S HOUSE/SENIOR CITIZEN CENTER 1 x CONCEPCION PARK 3 x

COPERNICUS PARK AND COMMUNITY CENTER 2 x CROCKETT PARK 1 x CUELLAR COMMUNITY CENTER 6 x DAWSON PARK AND COMMUNITY CENTER CW x DENVER HEIGHTS COMMUNITY CENTER 2 & CW x DISTRICT 9 PARK LAND ACQUISITION 9 x ELMENDORF PARK IMPROVEMENTS 5 & CW x FRIEDRICH PARK IMPROVEMENTS 8 x FRIESENHAHN PARK 10 x GARZA PARK AND COMMUNITY CENTER 6 x GOVERNMENT CANYON CW x GUADALUPE ARTS CENTER/SCHOOL 5 x

HARLANDALE PARK AND COMMUNITY CENTER 3 x HASKIN PARK 10 x HIGHLAND PARK COMMUNITY CENTER 3 x HISTORIC CIVIC CENTER PROJECT 1 & CW x JAMES PARK CW x

JOE WARD PARK AND COMMUNITY CENTER 7 x JOHN TOBIN COMMUNITY CENTER 1 x KINGSBOROUGH PARK 3 x

Page 26: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 26 of 28

LACKLAND TERRACE CENTER 6 x

1994-1999 G.O. Bond Program Proposition 3 – Park Improvements

Bond Project CD Hold Design Construction CompleteLADY BIRD JOHNSON PARK/LOU HAMILTON COMM. CTR. 10 x LAKESIDE PARK DEVELOPMENT 2 & CW x LEE’S CREEK PARK 7 x LINCOLN COMMUNITY CENTER 2 & CW x LION’S FIELD SENIOR/ADULT CENTER

1, 9 & CW x

MAHNCKE PARK DEVELOPMENT 9 x

MARTIN LUTHER KING PARK IMPROVEMENTS 2 x MARTINEZ PARK 5 x MATEO CAMARGO PARK CW x MCALLISTER PARK IMPROVEMENTS 9 x MEADOWCLIFF COMMUNITY CENTER 6 x MILLERS POND COMMUNITY CENTER 4 x MITCHELL LAKE WETLANDS 3 x

MONTERREY PARK AND COMMUNITY CENTER

6, 7 & CW x

MUSEUM OF ART (LATIN AMERICAN EXHIBIT HALL) 1 & CW x

NORMOYLE PARK AND COMMUNITY CENTER 5 x NORTHRIDGE PARK 10 x NORTHWEST PARK LAND ACQUISITION 6 x NORTHWOOD AREA PARK 10 x O.P. SCHNABEL PARK 7 & CW x OLMOS BASIN PARK/DEVINE RD. 9 x OLMOS SPORTS CENTER 9 x OLYMPIA PARK 1 x

OPEN SP. DEV./LEON CK. AREA (ROCHELLE & SCHNABEL) 7 x PALM HEIGHTS COMMUNITY CENTER 5 x PALO ALTO PARK 4 x PALO ALTO TERRACE PARK 4 x

PARK DEVELOPMENT AT DETENTION PONDS 8 x PARK LAND ACQUISITION 7 x PICKWELL PARK 3 x QUARRY PARK DEVELOPMENT 8 & CW x ROOSEVELT PARK 5 x ROSEDALE PARK 7 x SAN ANTONIO NATATORUM 5 & CW x SAN FERNANDO GYM 1 x SAN PEDRO PARK REHABILITATION 1 & CW x SKYLINE PARK 2 x SOUTHCROSS PARK 4 & CW x

Page 27: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 27 of 28

SOUTHSIDE LIONS PARK 3 x

1994-1999 G.O. Bond Program Proposition 3 – Park Improvements

Bond Project CD Hold Design Construction CompleteSPICEWOOD PARK DEVELOPMENT 4 x STINSON PARK 3 x VAN DE WALLE PARK 6 x VIDAURRI PARK 5 x WESTWOOD VILLAGE LAND ACQUISITION 6 x WITTE MUSEUM IMPROVEMENTS 9 x WOODLAWN LAKE PARK IMPROVEMENTS 7 & CW x

Page 28: 2003-2007 G.O. Bond Program - San Antonio...Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 1 of 28 2003-2007 G.O

Prepared by OMB w/ Information from Public Works, Parks & Recreation and Finance Departments As of 12/11/2006 Page 28 of 28

1994-1999 G.O. Bond Program

Proposition 4 – Public Safety Improvements

Bond Project CD Hold Design Construction CompletePOLICE CENTRAL SUBSTATION CW x POLICE CRIME COMPUTER CENTER CW x