2006/2007 pta funding chart rounds 1, 2 and 3 · 2006/2007 pta funding chart rounds 1, 2 and 3 ......
TRANSCRIPT
2006/2007 PTA Funding Chart
Rounds 1, 2 and 3
Jurisdiction
Economic
Development General Awarded Amount Activity
City of Angels X $35,000.00 Sewer Infrastructure Study
City of Angels X $35,000.00 Community Branding, Development, and Marketing Action Plan
City of Artesia X $35,000.00
Housing Inventory and Housing Condition Survey; Preparation of General
Allocation Application
City of Bishop X $35,000.00
Internet enabled Geographical Information System with additional Geospatial
Data Layers
City of Capitola X $35,000.00 Capitola Village Parking Study
City of Corning X $35,000.00 Geographic Information System
City of Corning X $70,000.00
Planning Study for Flood Prevention in Southwest Corning; Retail Trade and
Analysis Market Oppurtunity Study
City of Dixon X $67,200.00
Economic Development Market Analysis; Action Plan for Prioritized Site
Development
City of Dorris X $70,000.00
Feasibility Study and Preliminary Engineering for Cheese Manufacturing
Plant; Economic Development Marketing and Training Report
City of Dunsmuir X $70,000.00 Geographical Information System
City of Dunsmuir X $45,526.00 California Enterprise Zone Application; Enterprise Zone Marketing Plan
City of Eureka X $35,000.00 Brain Injury Recovery Center Feasibility Study
City of Eureka X $35,000.00 Eco-Hostel Feasibility Project
City of Ferndale X $61,250.00 Housing Condition Study; Household Income and Interest Survey;
City of Fort Bragg X $70,000.00
Wastewater Collection Facilities Management Plan; Economic Development
Market Analysis and Strategy ; Web site launch
City of Fort Bragg X $35,000.00 Geographic Information System
City of Gonzales X $35,000.00
Affordable Multi-Housing Site Specific Analysis; Preparation of Grant
Application
City of Greenfield X $70,000.00
Economic Development Comprehensive Report and Marketing Plan;
Drainage Study
City of Greenfield X $70,000.00
City-wide 10 year Park and Recreational Master Plan; Development of
Readiness to Modernize Greenfield Memorial Hall
City of Holtville X $70,000.00 Downtown Design Guidelines; Form- Based Regulating Code
City of Huron X $70,000.00 Trucking Impact Study; Sewer Infrastructure Analysis
City of King City X $70,000.00
Economic Development Strategy and Master Plan; Airport Facilities
Improvement Plan
City of King City X $57,907.00 Master Drainage Plan; Pedestrian Bridge Relocation Plan
Page 1 of 3
2006/2007 PTA Funding Chart
Rounds 1, 2 and 3
City of Lindsay X $70,000.00
Housing Strategy Plan for Infill Development; Preliminary Infrastructure Need
Analysis
City of Live Oak X $35,000.00 Design and Redevelopment of the Live Oak Recreational Trail
City of Montague X $70,000.00 California Enterprise Zone Application; Industrial Park Marketing Plan
City of Mount Shasta X $45,000.00 Enterprise Zone Application; Economic Development Marketing Tools
City of Mount Shasta X $35,000.00
Final Design Documents in Support of 100% TIG Housing Development;
Environmental Impact Report; Mapping and Subdivision Analysis
City of Oroville X $70,000.00
Economic Development Strategy Plan; Revitilization Plan for Oroville
Municipal Airport Fix Base Operation Facility
City of Oroville X $70,000.00 Open Space and Trails Master Plan Study
City of Plymouth X $35,000.00 Circulation Element, Sewer Plans and Specification
City of Plymouth X $70,000.00 Circulation Element, Sewer Plans and Specification
City of Riverbank X $35,000.00 Preliminary Land Use and Urban Design Plan
City of San Joaquin X $35,000.00 Downtown Feasibility Study; Retail vs. Retail & Office
City of Shasta Lake X $35,000.00 Storm Drain Master Plan
City of Shasta Lake X $35,000.00 Hotel/Conference Center Feasibility Study
City of Soledad X $35,000.00 State CDBG Over-The-Counter Application; Market Assessment Study
City of Suisun City X $35,000.00 Transit Oriented Feasibility Study
City of Tehama X $35,000.00 Housing Needs survey; Income survey; Grant Application Preparation
City of Tehama X $35,000.00 Compiling Datasets for Economic Development and Internet Marketing
City of Weed X $45,000.00 California Enterprise Zone Application; Enterprise Zone Marketing Plan
City of Weed X $70,000.00
Environmental Review Documents for Sewer Public Works Project;
Wastewater Disposal Expansion Study for Future Affordable Housing
Projects; and Final Plans for Specifications for New Police and Fire Station
Facility
City of Yreka X $35,000.00 Water and Sewer Conservation Materials for TIG Households
City of Yreka X $45,000.00 California Enterprise Zone Application; Enterprise Zone Marketing Plan
County of Amador X $35,000.00
Homeless Needs Assessment; Continuum of Care Plan; Preparation of CDBG
Application
County of Butte X $33,960.00 Business Capital Access Analysis and Loan Marketing Strategy Plan
Page 2 of 3
2006/2007 PTA Funding Chart
Rounds 1, 2 and 3
County of Calaveras X $35,000.00 Homeless Assessment, Contiuum of Care
County of El Dorado X $35,000.00 Continuum of Care Strategy for the Homeless
County of Humboldt X $70,000.00 Ten Year Homelessness Plan and Affordable Housing Feasibility Study
County of Humboldt X $35,000.00 Wastewater Project Site Feasibility Plan
County of Humboldt/Trinity X $70,000.00 Humboldt County Business Plan and Trinity County Business Plan
County of Imperial X $35,000.00 Consultant to Evaluate Potential Projects
County of Lake X $70,000.00
Upper Lake Revitilization Plan; Pear Packing Re-Use Facilities Study;
Lucerne Hotel Mixed Use Study; Clark's Island Redevelopment Analysis
County of Mariposa X $70,000.00
Drainage Study; Development of Hydrological Calculations; Environmental
Documents
County of Mendocino X $35,000.00 Preparation of Eight Grant Applications
County of Modoc X $35,000.00 Preliminary Engineering and Design Study for New Fire Station
County of Mono X $35,000.00 June Lake Economic Development Study
County of Nevada X $35,000.00 Loma Rica Infrastructure Master Plan
County of Siskiyou X $35,000.00 Preliminary Engineering Sludge Treatment Study
County of Siskiyou X $53,900.00 Enterprise Zone Marketing Plan and Tools
County of Trinity X $35,000.00 Health Services Master Plan and Application for Funding
County of Tulare X $35,000.00
Final Plans and Specifications for Phase I Environmental Study; Property
Appraisals; Cost Estimates
County of Tulare X $70,000.00
State CDBG Over-The-Counter Application; Business Revolving Loan Fund
Market Study
County of Tuolumne X $35,000.00 Homeless Assessment, Contiuum of Care and Cultural Resources Survey
Town of Truckee X $35,000.00 Parking Structure Feasibility Study
TOTAL: $2,624,743.00
Page 3 of 3