2007 energy postgraduate conference 17 – 18 july 2007: massey university turitea campus,...
TRANSCRIPT
![Page 1: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/1.jpg)
2007 Energy Postgraduate Conference2007 Energy Postgraduate Conference
17 – 18 July 2007: Massey University Turitea Campus, Palmerston North 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North
Steve BroomeSteve Broome
Industrial Research LtdIndustrial Research Ltd
18 July 200718 July 2007
Hylink: the Hydrogen LinkHylink: the Hydrogen Link
![Page 2: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/2.jpg)
Industrial Research LtdIndustrial Research Ltd
IRL employs 220 scientific staff.IRL employs 220 scientific staff.
• Former DSIRFormer DSIR
• Involved with a variety of scientific and technology developmentsInvolved with a variety of scientific and technology developments
Hydrogen and Distributed Energy TeamHydrogen and Distributed Energy Team
• R&D at IRL’s Christchurch and Wellington sites.R&D at IRL’s Christchurch and Wellington sites.
• Focus on distributed electricity production. Focus on distributed electricity production. • Microgrids, small-scale generation, grid-injecting electricity.Microgrids, small-scale generation, grid-injecting electricity.
• Focus on the production, storage and use of hydrogen.Focus on the production, storage and use of hydrogen.• Production: Electrolysers, reformation, gasification.Production: Electrolysers, reformation, gasification.
• Storage: carbon nanotubes, sodium borohydrides, gas pipelines.Storage: carbon nanotubes, sodium borohydrides, gas pipelines.
• Use: fuel cells, hydrogen burners. Use: fuel cells, hydrogen burners.
![Page 3: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/3.jpg)
Totara Valley InstallationsTotara Valley Installations
![Page 4: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/4.jpg)
Hylink ConceptHylink Concept
![Page 5: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/5.jpg)
Hylink Prototype in ChristchurchHylink Prototype in Christchurch
Wind turbine 24V Electrolyser Pipeline storage
Alkaline fuel cell
![Page 6: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/6.jpg)
Hylink at Totara ValleyHylink at Totara Valley
![Page 7: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/7.jpg)
Hylink at Totara ValleyHylink at Totara Valley
![Page 8: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/8.jpg)
Hylink at Totara ValleyHylink at Totara Valley
ElectronicsElectronics
![Page 9: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/9.jpg)
Hylink at Totara ValleyHylink at Totara Valley
ElectrolyserElectrolyser
![Page 10: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/10.jpg)
Hylink at Totara ValleyHylink at Totara Valley
Gas pipelineGas pipeline
![Page 11: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/11.jpg)
Hylink at Totara ValleyHylink at Totara Valley
Pipeline Laying – Mole PloughingPipeline Laying – Mole Ploughing
![Page 12: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/12.jpg)
Hylink at Totara ValleyHylink at Totara Valley
Pipeline Laying – Mole PloughingPipeline Laying – Mole Ploughing
![Page 13: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/13.jpg)
Hylink at Totara ValleyHylink at Totara Valley
Pipeline Laying – Mole PloughingPipeline Laying – Mole Ploughing
![Page 14: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/14.jpg)
Hylink at Totara ValleyHylink at Totara Valley
Gas pipelineGas pipeline
![Page 15: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/15.jpg)
Fuel cell, biodiesel generator and inverterFuel cell, biodiesel generator and inverter
Hylink at Totara ValleyHylink at Totara Valley
![Page 16: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/16.jpg)
Hylink at Totara ValleyHylink at Totara Valley
Process efficiencies and costsProcess efficiencies and costs
ItemItem RatingRating EfficiencyEfficiency
Wind turbineWind turbine 300 W300 W ––
Electrolyser electronicsElectrolyser electronics –– ––
ElectrolyserElectrolyser 250 W250 W 66%66%
Electrolyser balance of plantElectrolyser balance of plant –– ––
PipelinePipeline Up to 240 kWUp to 240 kW 98%98%
Pipeline layingPipeline laying –– ––
Fuel cellFuel cell 1 kW1 kW 35%35%
Fuel cell peripheralsFuel cell peripherals –– ––
TotalTotal –– 23%23%Low efficiency but system it is not optimised.Low efficiency but system it is not optimised.
Target effiency is about 43%.Target effiency is about 43%.
![Page 17: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/17.jpg)
Hylink at Totara ValleyHylink at Totara Valley
The Future:The Future:
• Optimise system to maximise efficiency.Optimise system to maximise efficiency.• Integrate IRL-designed alkaline electrolyser and fuel cell technologies.Integrate IRL-designed alkaline electrolyser and fuel cell technologies.
• Install new Hylink system elsewhere Install new Hylink system elsewhere • Larger scale elecrolyser and fuel cell.Larger scale elecrolyser and fuel cell.
• Larger pipeline to increase fuel storage volume.Larger pipeline to increase fuel storage volume.
• Potential for safe over-ground hydrogen transport.Potential for safe over-ground hydrogen transport.
• Try and make it closer to home! Try and make it closer to home!
• Funding-dependant.Funding-dependant.
![Page 18: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/18.jpg)
Hylink at Totara ValleyHylink at Totara Valley
Thanks:Thanks:
Totara Valley Community Totara Valley Community
– – Especially Geoff Smith and Mike PoultonEspecially Geoff Smith and Mike Poulton
Foundation for Research Science and TechnologyFoundation for Research Science and Technology
– – Funding.Funding.
Massey UniversityMassey University
– – Peter Sudol, Ralph Sims and Jim Hargreaves.Peter Sudol, Ralph Sims and Jim Hargreaves.
Industrial Research LtdIndustrial Research Ltd
– – Alister Gardiner, Edward Pilbrow, Eoin McPherson Alister Gardiner, Edward Pilbrow, Eoin McPherson
Mole Drainage ServicesMole Drainage Services
– – Irvine Hoskin. Irvine Hoskin.
Humes Pipelines SystemsHumes Pipelines Systems
Professional Plumbing and GasProfessional Plumbing and Gas
Scanpower and Meridian Energy Ltd.Scanpower and Meridian Energy Ltd.
EcoInnovationEcoInnovation
![Page 19: 2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July](https://reader035.vdocument.in/reader035/viewer/2022062518/56649ec85503460f94bd5971/html5/thumbnails/19.jpg)
Hylink at Totara ValleyHylink at Totara Valley
THE END !THE END !