Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 01
AWARD TRACKER by District — MARCH 2008
DISTRICT
01-398504 01-Lak-29-20.4/R34.4
Place Rubberized Hot MixAsphalt On ExistingSurfacing
3/19/2008 X GRANITE CONSTRUCTIONCOMPANY
10,527,741.103/28/2008
No Goal
01-4293U4 01-Men-101-111.5/112.1
Improvement Of HighwayStructural Sections, DrainageAnd Lighting.
2/27/2008 X ARGONAUT CONSTRUCTORS 1,497,992.00 NONE REPORTED3/6/2008
No Goal
01-466404 01-Lak-53-3.0 Modify Existing TrafficSignal And ImproveIntersection
2/20/2008 NORTH BAY CONSTRUCTION INC 405,206.00
$2,820.00
EMPIRE FENCE CO INCROBERT PENNY
1,670.001,150.00
DVDV
57
3/7/2008
DVBE: 3% 0.7%
01-480804 01-DN,Hum-101,299-Var
Construct Concrete RusticRail And Post Fence.
3/4/2008 WAHLUND CONSTRUCTION INC 69,638.00
$2,200.00
ROBERT PENNY 2,200.00 DV 73/12/2008
DVBE: 3% 3.2%
$5,020.00401Total for District $12,500,577.10
0.0% 0.0%3.0% 1.9%
Average DBEAverage DVBE
1Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 02
AWARD TRACKER by District — MARCH 2008
DISTRICT
02-328034 02-Sha-5,44-R22.5/R26.9,L0.3/L2.8
Existing Hwy And Ramps ToBe Widened By Grading AndPaving With Rac.
2/20/2008 X GOLDEN STATE BRIDGE INC 59,395,523.80
$999,233.00
JERRY LEE FORD 999,233.00 B 13/5/2008
No Goal 1.7%
X
02-4C3104 02-Plu-49-2.7/7.0 Widen Shoulder And PlaceHot Mix Asphalt Overlay
3/4/2008 X GRANITE CONSTRUCTIONCOMPANY
3,444,444.00 NONE REPORTED3/12/2008
No Goal
$999,233.00202Total for District $62,839,967.80
0.0% 0.8%Average DBEAverage DVBE
2Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 03
AWARD TRACKER by District — MARCH 2008
DISTRICT
03-1E4304 03-Sac-160-46.2 Replace Bridge Railing 3/12/2008 BUGLER CONSTRUCTION 293,820.00
$8,950.00
THOMAS & PRATT 8,950.00 DV 73/26/2008
DVBE: 3% 3.0%
03-1E6004 03-Col-5-R2.3/R13.8Polyester Overlay AndMethacrylate Seal Of BridgeDeck
2/26/2008 DEBRUIN CONSTRUCTION INC 188,000.00
$650.00
GLOBAL ENVIRONMENTAL 650.00 DV 73/7/2008
DVBE: 3% 0.3%
03-2e9504 03-Pla-80-34.9 Repair Slope 2/27/2008 X CAL - NEVA CONSTRUCTIONSERVICES INC
83,395.003/7/2008
No Goal
03-2M6204 03-ED-50-74.7/80.4 Place Microsurfacing OnRoadway
3/12/2008 VALLEY SLURRY SEAL COMPANY 1,323,456.903/25/2008
DVBE: 3%
03-2M8404 03-Pla,Nev-20-42.8/44.2
Rehabilitate Culverts WithPlastic Pipeliner
3/12/2008 HARVEY'S EXCAVATING &HAULING INC
121,845.00
$20,380.00
ANCHOR SUPPLY COMPANYROBERT PENNY
19,230.001,150.00
DVDV
77
3/25/2008
DVBE: 3% 16.7%
03-2M9904 03-But-162-24.2/31.1 Seal Coat And ReplacePavement Marking AndStriping.
3/18/2008 NORTHWEST PAVING 311,839.50
$16,846.00
TITAN DVBE 16,846.00 DV 73/26/2008
DVBE: 5% 5.4%
03-3E1904 03-ED-50-3.1 Stabilize Cut Slope 3/11/2008 X DOUG VEERKAMP GENERALENGINEERING INC
91,999.00
$4,500.00
A C DIKE CO 4,500.00 C F 23/18/2008
No Goal 4.9%
3Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 03
AWARD TRACKER by District — MARCH 2008
DISTRICT
03-3E2304 03-But,Nev-80,99-22.0/22.4,34.2/34.9
Construct Thrie Beam AndConcrete Barrier.
2/26/2008 X GRANITE CONSTRUCTIONCOMPANY
730,730.003/3/2008
No Goal
03-3E2704 03-Sie-49-3.1Repair Embankment,G th ti R i f t
2/27/2008 X GRANITE CONSTRUCTIONCOMPANY
94,055.00
$650.00
ESWPPP CONSULTANTS 650.00 AP 73/6/2008
No Goal 0.7%
03-3E3404 03-Sie-49-18.8 Reconstruct EmbankmentAnd Repair Traveled Way
3/12/2008 X HARVEY'S EXCAVATING &HAULING INC
142,085.003/21/2008
No Goal
03-3M0004 03-Sac-160-9.6/G35.0
Seal Coat And ReplacePavement Striping AndMarking.
3/4/2008 NORTHERN CALIFORNIA PAVINGINC
1,004,965.00
$1,900.00
ROBERT PENNY 1,900.00 DV 73/21/2008
DVBE: 3% 0.2%
03-4C5304 03-Sie,Yub-49-Var Replace Culverts AndConstruct Rsp.
3/11/2008 HANSEN BROS ENTERPRISES 325,424.00
$6,647.00
NITTA EROSION CONTROLROBERT PENNY
5,397.001,250.00
DVDV
67
3/27/2008
DVBE: 3% 2.0%
$60,523.001003Total for District $4,711,614.40
0.0% 1.1%3.3% 4.0%
Average DBEAverage DVBE
4Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 04
AWARD TRACKER by District — MARCH 2008
DISTRICT
04-2A0304 04-CC-80-3.4/3.8 Highway Planting AndIrrigation System.
3/4/2008 WATKIN & BORTOLUSSI INC 164,019.00
$1,150.00
ROBERT PENNY 1,150.00 DV 73/17/2008
DVBE: 3% 0.7%
04-4C1524 04-Sol-80-20.1/30.6 Crack Seal And Overlay OnThe Mainline With ShoulderBacking.
3/11/2008 X GHILOTTI BROS INC 37,373,422.003/18/2008
No Goal
$1,150.00104Total for District $37,537,441.00
0.0% 0.0%3.0% 0.7%
Average DBEAverage DVBE
5Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 05
AWARD TRACKER by District — MARCH 2008
DISTRICT
05-0C6604 05-SLO-166-15.3/16.2,21.3/22.0
Construct Passing And LeftTurn Lane To ImproveExisting Roadway.
2/27/2008 SOUZA CONSTRUCTION INC 1,296,688.70
$40,262.64
DVBE TRUCKING & 40,262.64 DV 43/6/2008
DVBE: 3% 3.1%
05-0C8814 05-SB-101-16.5, 65.2 Install Changeable MessageSigns
2/27/2008 T D S ENGINEERING 394,311.00
$21,243.99
HI2LO VOLTAGE WIRING 21,243.99 DV 73/6/2008
DVBE: 3% 5.4%
05-0L4304 05-SB-1-R26.8/R27.7 Correct Super Elevation AndPlace Hot Mix Asphalt (openGraded).
2/26/2008 UNION ASPHALT INC 438,487.60
$16,384.00
TITAN DVBEAPCO INC
10,660.005,724.00
DVDV
72
3/5/2008
DVBE: 3% 3.7%
05-0p0104 05-SBt-156-R16.2/R16.9
Resurface Existing RoadwayWith Hma (gap Graded).
2/27/2008 PAVEX CONSTRUCTION DIVISION 393,438.00
$14,204.00
JOSH SANTORO TRUCKINGTITAN DVBE
10,304.003,900.00
DVDV
47
3/11/2008
DVBE: 3% 3.6%
$92,094.63605Total for District $2,522,925.30
3.0% 4.0%Average DBE
Average DVBE
6Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 06
AWARD TRACKER by District — MARCH 2008
DISTRICT
06-462804 06-Fre-99,180-34.4/36.0, R90.9/R94.0
Perform Highway PlantingAnd Install Irrigation System
3/5/2008 WATKIN & BORTOLUSSI INC 1,710,316.00
$6,497.00
ROBERT PENNYTITAN DVBE
1,700.004,797.00
DVDV
77
3/18/2008
DVBE: 3% 0.4%
$6,497.00206Total for District $1,710,316.00
3.0% 0.4%Average DBE
Average DVBE
7Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 07
AWARD TRACKER by District — MARCH 2008
DISTRICT
07-127234 07-LA-138-90.4/92.0 Widen ConventionalHighway From 2 To 4 LanesOn Embankment.
2/14/2008 GRANITE CONSTRUCTIONCOMPANY
5,050,505.003/3/2008
DVBE: 3%
07-168004 07-LA-5,14-R71.2/R74.0,R40.3/R42.3
Hov Lanes And ConnectorsTo Be Constructed.
2/21/2008 X M C M - SECURITY PAVING J V 114,415,513.753/27/2008
No Goal
07-2M4104 07-LA-134-L4.6/R12.6
Replace Bridge Joint Seals. 3/6/2008 J MC LOUGHLIN ENGINEERING COINC
176,910.00
$650.00
ROBERT PENNY 650.00 DV 73/18/2008
DVBE: 3% 0.4%
07-2Y4304 07-LA-60-30.6/R37.5 Cold Plane Ac Pvmt & PlaceRac (type G ), & ReplaceLoop Detectors.
1/24/2008 ORTIZ ASPHALT PAVING INC 899,657.77
$960.00
AFA CONSTRUCTION GROUP 960.00 DV 73/24/2008
DVBE: 3% 0.1%
07-3Y0604 07-LA-60-R5.0/12.0 Seal Deck WithMethacrylate, Repair SpallAnd Replace Joint Seal.
3/13/2008 J MC LOUGHLIN ENGINEERING COINC
750,394.95
$650.00
ROBERT PENNY 650.00 DV 73/26/2008
DVBE: 3% 0.1%
07-3Y1204 07-LA-60-18.0/R30.5 Seal Deck WithMethacrylate, Repair SpallAnd Replace Joint Seal.
3/6/2008 PAVE - TECH INC 361,827.00
$73,129.00
WEI INDUSTRIES 73,129.00 DV 73/19/2008
DVBE: 3% 20.2%
07-4S3404 07-LA-170-R32.6/R33.0
Place Rock Slope ProtectionAnd Mulch.
2/28/2008 BELAIRE-WEST LANDSCAPE INC 80,020.00
$3,000.00
ROBERT PENNY 3,000.00 DV 73/11/2008
DVBE: 3% 3.7%
8Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 07
AWARD TRACKER by District — MARCH 2008
DISTRICT
07-4S3604 07-LA-101-33.2/33.4 Replace Double Metal BeamBarrier With ConcreteBarrier.
3/13/2008 AUTOBAHN CONSTRUCTION INC 418,709.00
$14,070.00
GLOBAL ENVIRONMENTALWCC CONSTRUCTORS
2,820.0011,250.00
DVDV
77
3/25/2008
DVBE: 3% 3.4%
07-4S3804 07-LA-101-0.9/8.1 Replace Concrete PavementAnd Ac Surfacing.
3/13/2008 ALL AMERICAN ASPHALT 505,403.00
$17,500.00
THOMAS & PRATT 17,500.00 DV 53/28/2008
DVBE: 3% 3.5%
$109,959.00807Total for District $122,658,940.47
0.0% 0.0%3.0% 3.9%
Average DBEAverage DVBE
9Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 08
AWARD TRACKER by District — MARCH 2008
DISTRICT
08-0G7004 08-Riv-10-R105.0/R134.3
Cold Plane And PlaceRubberized Hot Mix Asphalt(open Graded)
2/21/2008 FNF CONSTRUCTION INC 3,926,690.00
$6,774.00
GLOBAL ENVIRONMENTAL 6,774.00 DV 73/7/2008
DVBE: 3% 0.2%
08-0G7304 08-Riv-10-R144.1/R156.6
Cold Plane And Place 0.08'Rubberized Hot Mix Asphalt(open Graded)
3/6/2008 GRANITE CONSTRUCTIONCOMPANY
2,318,791.00
$70,255.00
TITAN DVBESAM'S EQUIPMENT &AFA CONSTRUCTION GROUP
63,000.002,975.004,280.00
DVDVDV
777
3/17/2008
DVBE: 3% 3.0%
08-0H2824 08-SBd-5730 Construct New Buildings ForThe Southern RegionalLaboratory.
1/31/2008 DJM CONSTRUCTION CO INC 26,781,662.023/3/2008
DVBE: 3%
08-0H4504 08-SBd-18-R11.2/R17.7
Construct Centerline RumbleStrip.
2/21/2008 ORTIZ ASPHALT PAVING INC 320,491.13
$9,323.57
GLOBAL ENVIRONMENTAL 9,323.57 DV 73/5/2008
DVBE: 3% 2.9%
08-0J5904 08-Riv-243-13.3/29.7 Place Seal Coat 3/6/2008 GRAHAM CONTRACTORS INC 747,941.00
$23,300.00
TITAN DVBE 23,300.00 DV 73/14/2008
DVBE: 3% 3.1%
08-0J6004 08-SBd-138-14.2/R23.9
Place Chip Seal Coat 3/13/2008 GRAHAM CONTRACTORS INC 638,530.60
$21,506.00
TITAN DVBE 21,506.00 DV 73/28/2008
DVBE: 3% 3.4%
08-0K4604 08-SBd-62-27.2/30.7 1-1/4 " Rubberized Hot MixAsphalt (type G) Overlay
3/13/2008 ORTIZ ASPHALT PAVING INC 160,807.17
$650.00
GLOBAL ENVIRONMENTAL 650.00 DV 73/28/2008
DVBE: 3% 0.4%
10Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 08
AWARD TRACKER by District — MARCH 2008
DISTRICT
$131,808.57808Total for District $34,894,912.92
3.0% 1.9%Average DBE
Average DVBE
11Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 09
AWARD TRACKER by District — MARCH 2008
DISTRICT
09-326404 09-Mno-158-0.0/1.7 Widen Shoulder AndResurface Pavement WithHot Mix Asphalt.
3/18/2008 DON GARCIA EXCAVATING ANDPAVING INC
550,643.00
$107,213.00
NITTA EROSION CONTROLPAR & SON INC
11,138.0096,075.00
DVDV
67
3/27/2008
DVBE: 5% 19.5%
$107,213.00209Total for District $550,643.00
5.0% 19.5%Average DBE
Average DVBE
12Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 10
AWARD TRACKER by District — MARCH 2008
DISTRICT
10-0H5304 10-Mer-152-33.7/34.2
Install Signals, Curb RampsAnd Improve Intersection.
3/12/2008 T D S ENGINEERING 306,022.00
$27,540.00
HI2LO VOLTAGE WIRING 27,540.00 DV 73/25/2008
DVBE: 5% 9.0%
10-0N0104 10-SJ-5-0.3/R13.8 Repair And ResurfaceHighway With RubberizedHot Mix Asphalt.
3/11/2008 TEICHERT CONSTRUCTION 2,111,945.00
$650.00
ROBERT PENNY 650.00 DV 73/24/2008
DVBE: 3% 0.0%
10-414814 10-Mer-99-38.3/R42.7
Construct Freeway,Interchange, Bridges, AndLocal Roads
3/4/2008 BAY CITIES PAVING & GRADINGINC
30,526,644.48
$656,678.00
APCO INCTITAN DVBEDAN A WELLSALL COUNTIES TRUCKING
27,064.001,500.00
158,510.00469,604.00
DVDVDVDV
2744
3/20/2008
DVBE: 3% 2.2%
X
10-444204 10-Ama,Alp-88-86.9,3.6
Demolish Building,Construct Two NewBuildings, RemodelBuildings
3/4/2008 YOUNGER GENERALCONTRACTORS INC
5,693,000.00
$5,000.00
THOMAS & PRATTTITAN DVBE
1,000.004,000.00
DVDV
76
3/18/2008
DVBE: 3% 0.1%
$689,868.00810Total for District $38,637,611.48
3.5% 2.8%Average DBE
Average DVBE
13Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 11
AWARD TRACKER by District — MARCH 2008
DISTRICT
11-167884 11-Imp-78,111-R19.5/R24.5,37.6/38.5
Construct 4-lane DividedExpressway AndInterchange.
2/14/2008 X SKANSKA USA CIVIL WESTCALIFORNIA DISTRICT INC
68,613,955.00
$857,071.00
BERT W SALAS, INC 857,071.00 AP 13/11/2008
No Goal 1.2%
X
11-270604 11-SD-8-R42.6/R43. Repair Slope And ErosionControl, And ConstructDrainage Facilities.
2/21/2008 X NEWPORT GRADING INC 175,031.00 NONE REPORTED3/7/2008
No Goal
11-284004 11-Imp-8-R83.6/R84.0
Ramp Rehabilitation. 2/28/2008 BEADOR CONSTRUCTIONCOMPANY INC
342,700.00
$10,265.00
BEADOR & SON 10,265.00 DV 23/11/2008
DVBE: 3% 3.0%
11-284104 11-Imp-8-R23.3/R23.7
Pavement Rehabilitation AndInstall Metal Beam GuardRail.
3/13/2008 GRANITE CONSTRUCTIONCOMPANY
684,988.003/26/2008
DVBE: 3%
$867,336.00311Total for District $69,816,674.00
0.0% 0.6%3.0% 1.5%
Average DBEAverage DVBE
14Page No.
Contract Award Bid Open Fed Awarded Amt Subcont DBE/DVBE Subcontract Amt Ethnic Const Number Date Dist/Co/Rte/PM Description of Work Date Aid Bond Contractor $ Goal Cert ($ Cert) Group Type
Major and Minor AConstruction Contracts
CALTRANS 12
AWARD TRACKER by District — MARCH 2008
DISTRICT
12-0C6404 12-Ora-5-42.8/43.6 Widen Existing Ramp WithAc, Install Signs And ModifyTraffic System.
2/28/2008 MC KENNA GENERALENGINEERING INC
1,954,345.00
$24,422.00
GLOBAL ENVIRONMENTALTHOMAS & PRATT
6,622.0017,800.00
DVDV
75
3/13/2008
DVBE: 3% 1.2%
12-0F8204 12-Ora-5-13.8 Widen Ramp WithRubberized Ac, ConstRetaining Wall, InstallSignal.
3/6/2008 O'DONNELL CONSTRUCTION INC 1,604,600.50
$48,220.00
GLOBAL ENVIRONMENTALTITAN DVBE
22,185.0026,035.00
DVDV
77
3/19/2008
DVBE: 3% 3.0%
12-0H3604 12-Ora-241-14.4/17.5 Overlay Existing PavementWith Rubberized Open GradeAc ("rac" O)
2/21/2008 ALL AMERICAN ASPHALT 787,000.00
$166,956.00
GLOBAL ENVIRONMENTALPAR & SON INC
3,450.00163,506.00
DVDV
77
3/5/2008
DVBE: 3% 21.2%
12-0H9704 12-Ora-91-0.7/4.6 Remove And ReplaceConcrete Slabs At VariousLocations.
2/21/2008 J MC LOUGHLIN ENGINEERING COINC
302,601.753/7/2008
DVBE: 3%
$239,598.00612Total for District $4,648,547.25
3.0% 6.4%Average DBE
Average DVBE
Total for State $3,310,300.2060$393,030,170.72
0.0% 0.7%3.1% 3.7%
Average DBEAverage DVBE
15Page No.