2009 AGC Construction Industry Conference
Track - Emerging Technologies
Workshop Title - Construction Project Management Tools
NYSDOT Implementation Of Primavera for Construction
![Page 2: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/2.jpg)
Construction Project Management Tools Moderators Jim Stratton, Slate Hill Constructors, Inc. Mark White PE, NYSDOT Office of Construction
Workshop consists of two panel sessions Primavera P6 Panel Primavera Contract Manager Panel
![Page 3: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/3.jpg)
TMTM
Primavera P6 – CPM Scheduling
Panel MembersManuel Silva, PE - NYSDOT Region 11 Construction Patrick Prancl, PE - El Sol ContractingJonathan McNatty - D.R. McNatty & Associates, Inc.Frank A. Perricelli, PE - AECOMBrent VanZandt - NYSDOT Region 8 ConstructionCindy Lancelot - NYSDOT M.O. Construction
![Page 4: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/4.jpg)
TMTM
Manny Silva, PE – NYSDOT Region 11 Construction Area Construction Supervisor
• NYSDOT R-11 Construction 1999 - Present Area Construction Supervisor CPM Coordinator for Construction (2007 – 2009) AGC/NYSDOT Emerging Technologies Subcommittee
• Task Force Meeting on CPM (2008 – 2009)• NYSDOT R-8 Construction 1984 - 1999
Engineer in Charge 1991 - 1999 Inspector 1984 - 1991
• Projects Alexander Hamilton Bridge and Highbridge Ramps - Present
• Largest NYSDOT Construction Contract - $407 million West Side Highway Rehabilitation (Battery Place to W. 59th Street) – 1999 - 2003
• 5 Construction Contracts - $500 million
![Page 5: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/5.jpg)
TMTM
DOT’s VisionDEVELOPMENT OF DEPARTMENT WIDE SCHEDULING TOOL
One tool for Planning, Design & Construction that facilitates teamwork with other DOT program areas and Industry partners.
One tool facilitating both project management & program management.
A multi-user tool that is available via the DOT LAN or the Internet. Development and issuance of technical policies, standards and
guidance. Training
![Page 6: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/6.jpg)
TMTM
The schedule as a Project Management tool
§
• Plan for building the project, manage project changes, and anticipate corrective actions.
• Monitor and measure progress, and schedule inspection staff.
• Use for coordination with Utilities, municipalities and elected officials.
• Substantiate/Evaluate Contractor’s Time-Related Delay Disputes.
![Page 7: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/7.jpg)
TMTM
My perspective as a Construction Supervisor
Past•Schedule not relevant
• Typically outdated – old information
• Schedule discussed monthly• Lengthy Baseline acceptance
process• Could not use schedule to
manage project
![Page 8: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/8.jpg)
TMTM
My perspective as a Construction Supervisor
Goal•Timely submissions of schedules•Use schedule to manage project•Use schedule to communicate•Proactive, not Reactive•Accurate schedule data
•Get everyone to think about schedule
![Page 9: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/9.jpg)
TMTM
My perspective as a Construction Supervisor
We are doing it on AHB Project!•Schedule discussed twice weekly
• Get everyone involved• Contractor Mgmt.• Contractor Supers.• NYSDOT Mgmt.• NYSDOT Inspectors• NYSDOT Office Staff• Other key personnel
![Page 10: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/10.jpg)
TMTM
My perspective as a Construction Supervisor
Meeting the Goal•Timely data•Verified data (accurate data)•Communication•Use the information to support informed decisions
![Page 11: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/11.jpg)
TMTM
Patrick J. Prancl, PE – El Sol Contracting & Construction Project Manager / Project Scheduler
• NYSDOT R-11 Construction 1991 - 2005 Engineer In Charge 1996 to 2005 Founded R-11 In-House CPM Review Unit in 2000 Served as R-11 CPM Coordinator from 2001 to 2005 Assisted in drafting R-11 CPM Special Note. Assisted in drafting present CPM Item Specification
• Minuteman Construction Management 2004 - Present Serve as president/ owner of independent consultant, Minuteman Construction Management LLC.,
provide scheduling and structural engineering services for various clients. Provide CPM Scheduling and Monthly Updates for various contractor clients on heavy construction
projects.
• El Sol Contracting and Construction Corp. 2005 - Present Serve as Project Manager for the Gowanus Expressway / Prospect Expressway Rehabilitation ($149
million). Also, serve as project scheduler for various projects.
![Page 12: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/12.jpg)
TMTM
Contractor’s Scheduler Perspective
![Page 13: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/13.jpg)
TMTM
Frank A. Perricelli, P.E. – Senior Scheduler - AECOM
Example Projects: I-287/I-87 Interchange 8 – Westchester County, NY Belt Parkway Reconstruction – NYC Secaucus Interchange & Seaview Drive Extension – Secaucus, NJ Route 1 & 9, Section 4T Viaduct Replacement – Elizabeth, NJ Marquette Interchange – Milwaukee, WI Northstar Commuter Rail – Minneapolis, MN Trunk Highway 212 – Design/Build - Minnesota
Adjunct Professor: Manhattan College, Riverdale, NY
![Page 14: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/14.jpg)
TMTM
Consultant Schedule Reviewer
Project: Alexander Hamilton BridgeProject Cost: $407 millionProject Location: NYC – Region 11
NYSDOT EIC: Michael McCotterNYSDOT AS: Manny Silva
Contractor: CCA HalmarContractor Scheduler: Nicolas Vanier
Level IV Schedule Specification
![Page 15: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/15.jpg)
TMTM
t
![Page 16: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/16.jpg)
TMTM
CPM Specification
Very detailed specification CPM Manual
Baseline template provided with bid documents
Needs to be project specific Needs to include project bid items
Resource loading requirements
Man-hours or specific labor categories?
![Page 17: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/17.jpg)
TMTM
Project Implementation• Difficulty copying calendars• Calendar work-hours
Specification allows for 1/10 of a day input Issue - fractional float values/remaining durations Option - keep all calendars on same work-hours
• Submittal durations NYSDOT Steel Construction Manual 3rd Edition, Section 2, Page 10
![Page 18: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/18.jpg)
TMTM
Ideas and SuggestionsNotebook function can speed schedule narrative preparation
Customized report – Nicolas Vanier – CCA/Halmar
![Page 19: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/19.jpg)
TMTM
Ideas and Suggestions
Use 1 schedule for working schedule Update existing with new revisions Allows reviewer to maintain layouts, filters, etc.
Add notebook categories Helps with narrative
Resource Template Project Specific Settings
![Page 20: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/20.jpg)
TMTM
Brent VanZandt – NYSDOT Region 8 Construction Engineer In Charge D260694 - Route 9 Peekskill
• NYSDOT R-8 Construction 1991 - Present Engineer In Charge 1996 to 2005
• 2004 - Present Served as .
![Page 21: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/21.jpg)
TMTM
EIC Perspective
![Page 22: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/22.jpg)
Jonathan McNatty – D.R. McNatty & Associates
Operations Manager of NY Office• D. R. McNatty & Associates, Inc. – offices in Orchard Park N.Y 14127
• Primavera Certified Trainers and Consultants.• Provide hosting, implementation and remote support services for US
and Global Primavera clients.• Provide Consulting/Mentoring/Training support CPM project schedules
to be in compliance with the NYSDOT CPM Schedule Specifications.• ROLE – Consultant to companies awarded/constructing NYSDOT
projects.• Create Baseline CPM Schedules per project plan & specifications.• Monthly Updates recording actual progress of work & changes to
schedule.
![Page 23: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/23.jpg)
2009 AGC Construction Industry Conference
• Access to the (EPMD) Enterprise Project Management Database.
• Experience with the NYSDOT CPM Schedule Specifications.
• Experience with the NYSDOT & the Implementation of P6.
• Experience with P6, P6 Web and Contract Management 13
• Expectations for the future.
![Page 24: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/24.jpg)
TMTM
Cindy Lancelot – NYSDOT M.O., Office of Construction Primavera Enterprise Administrator
• NYSDOT Region 11 (NYC) Construction 1981 – 1992 Inspector, Contracts Administrator, Office Engineer.
• NYSDOT Region 1 (Albany) (1992-1998)
Construction Inspector, Highway Designer• NYSDOT M.O. - Planning & Strategy Group (1998-
2001) Transportation Analyst/GIS
• NYS Thruway Authority (2001-2008) Albany Division Construction (2001 – 2004)
• Inspector/Office Engineer/EIC Construction Management Headquarters (Albany) (2004-2008)
• Project Liaison
• NYSDOT M.O. Office of Construction (2008-Present) CPM Scheduling and Time-Related Disputes
![Page 25: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/25.jpg)
TMTM
Primavera P6 Administrator Role• Create user accounts• Assign Security Profiles to user accounts • Coordinate with ITD Information Security• Respond to user HelpDesk tickets, troubleshoot issues & provide
resolution • Provide Primavera P6 training to new users• Assist with development of new policies/guidance/specifications• Assist Regional CPM Coordinators• Create schedule templates for Methodology Manager• Manage Enterprise database, files, global data, settings, etc• Test new software versions/enhancements prior to implementation
![Page 26: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/26.jpg)
TMTM
What is my role? Assist new users in getting access to software applications. Assist DOT Field Office staff in review of schedules. Troubleshoot users HELPDESK ticket issues related to
Primavera. Serve as Consultant Managers for CPM Support Services. Coordinate and provide all Primavera training for users. Develop Statewide policies, procedures and guidance for
CPM Scheduling and Contract Manager. Coordinate with industry partners.
![Page 27: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/27.jpg)
TMTM
Primavera P6 Administrator issues
• Templates Available to Contractor’s for Baseline Schedules
• Common Problems for Schedulers/Reviewers in P6
• Contacts and Assistance
![Page 28: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/28.jpg)
TMTM
Examples of Successes •Suretrak Spec vs Current CPM Specification•Current Spec Types
Some Baseline Schedules submitted prior to Award More Timely submittal of Progress Schedule Updates Reduced turnaround time for schedule approvals Reduced time and cost to review schedules Timely approval of time extensions Timely approval of costs to accelerate work Improved communication of work schedule between Contractor
and DOT staff
![Page 29: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/29.jpg)
TMTM
CPM Contacts & AssistanceNYSDOT website for Primavera users https://www.nysdot.gov/main/business-center/contractors/construction-division/primavera
ITD HelpDesk Email: [email protected] Phone: (518) 485-8111 Regional Construction CPM Coordinators
Cindy Lancelot – CPM Scheduling Admin Email: [email protected] Phone: (518) 457-2550
Mark White, PE – State Scheduling Engineer & Time-Related Disputes Email: [email protected] Phone: (518) 485-5990
Frank Hartley, PE – Contract Disputes & Automation Email: [email protected] Phone: (518) 457-4369
![Page 30: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/30.jpg)
TMTM
PANEL 1 – Questions & Answers
![Page 31: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/31.jpg)
TMTM
Primavera Contract Manager
Panel MembersManuel Silva PE, NYSDOT Region 11 Construction Kenny Lucien, CCA/HalmarSorin Nour, NYSDOT Region 11 ConstructionRichard Marchione, NYSDOT Office of Structures
![Page 32: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/32.jpg)
TMTM
Manny Silva, PE – NYSDOT Region 11 Construction Area Construction Supervisor
• NYSDOT R-11 Construction 1999 - Present Area Construction Supervisor CPM Coordinator for Construction (2007 – 2009) AGC/NYSDOT Emerging Technologies Subcommittee
• Task Force Meeting on CPM (2008 – 2009)• NYSDOT R-8 Construction 1984 - 1999
Engineer in Charge 1991 - 1999 Inspector 1984 - 1991
• Projects Alexander Hamilton Bridge and Highbridge Ramps - Present
• Largest NYSDOT Construction Contract - $407 million West Side Highway Rehabilitation (Battery Place to W. 59th Street) –
1999 - 2003• 5 Construction Contracts - $500 million
![Page 33: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/33.jpg)
TMTM
PRIMAVERA CONTRACT MANAGER
Construction Project Management Tool• Implements Project Controls• Facilitates Project Team Collaboration• Administration of Contract Documents
![Page 34: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/34.jpg)
TMTM
Project Controls• Structured Enterprise Database • Configurable Process Workflow• Ball-In-Court (BIC) feature (who has action)• Document Version Control• Standard Reports• User Dashboards with Key Performance
Indicators• Issue Tracking – history of events or actions
![Page 35: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/35.jpg)
TMTM
Project Team Collaboration• Prime Contractor’s staff
Subcontractors Fabricators
• NYSDOT staff Office of Construction
Field Office (includes consultant for Construction Support Services) Regional Office Main Office
Office of Structures - Structural Engineering Services Bureau Metals Engineering Section Concrete Engineering Section Foundations Engineering Section
Office of Technical Services Geotechnical Engineering Bureau Materials Bureau
• Federal Highway Administration (FHWA)
![Page 36: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/36.jpg)
TMTM
Contract Document Administration• Manages submission & tracking of:
Contractor Submittals - Shop Drawings, Catalog Cuts Requests For information (RFI) Progress Meeting Minutes Correspondence Contract Plan Sheet revisions Issues
![Page 37: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/37.jpg)
TMTM
Benefits Reduces RFI turnaround times Shortens submittal (Shop Drawing) approval times Improves Field Office tracking of document submitals Reduces costs. No mailing costs, reduced printing costs. Increases productivity. Data is easily accessed. Improves Team Collaboration. Reduces Disputes due to improved communication
![Page 38: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/38.jpg)
TMTM
Sorin Nour, PE – NYSDOT Region 11 Construction Assistant Engineer-in-Charge
NYSDOT R-11 Construction 1991 – Present
Engineer in Charge 1993 to Present on various State Project.
Assistant Engineer-in-Charge on Alexander Hamilton Bridge.
Ammann & Whitney CE 1988 – 1991
Senior Civil Engineer in the Highway Design Group.
![Page 39: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/39.jpg)
TMTM
Submittal Coordinator
Routing of RFI’s and Submittals to and from Approving Authority (both Contract Manager Users & Non-Users).
Assist Contractor personnel with proper use and practices of Contract Manager. Administer Correspondence – Preparation and Routing of Letters & Transmittals. Prepare various Status Reports for both RFI & Submittals to monitor progress and
delays. Assist Contractor with Status information and Reviewers with Priority concerns
regarding submittals they are BIC (Ball-in-Court). Assign Responsibility (BIC) for all new documents. Monitor Impact of Review and Detention Times on Project Schedule and act
accordingly. Create and Manage Issues used for linkage of various documents across Contract
Manager. Assist in the Cross Integration process and data migration between Contract
Manager and Primavera P6.
![Page 40: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/40.jpg)
TMTM
Kenny Lucien – CCA Civil/Halmar Document Control Specialist
![Page 41: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/41.jpg)
TMTM
Contractors Viewpoint
![Page 42: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/42.jpg)
TMTM
Richard Marchione, PE – NYSDOT M.O. Structures Director, Structural Engineering Services Bureau
![Page 43: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/43.jpg)
TMTM
Structural Engineering Services Bureau
![Page 44: 2009 AGC Technical Conference P6-CM Sessions FAP MS SN](https://reader034.vdocument.in/reader034/viewer/2022051520/587d0dee1a28abae148b52a3/html5/thumbnails/44.jpg)
TMTM
PANEL 2 – Questions & Answers