2010 measure c facilities improvement program proposed implementation plan september 14, 2010
DESCRIPTION
2010 MEASURE C FACILITIES IMPROVEMENT PROGRAM Proposed Implementation Plan September 14, 2010. June 2001 Facilities Master Plan Update. $1,232,480,257 $250,000,000. School Facility Advisory Committee Criteria for Project Prioritization (2001). Health & Safety Systems Equity Technology - PowerPoint PPT PresentationTRANSCRIPT
2010 MEASURE CFACILITIES IMPROVEMENT PROGRAM
Proposed Implementation PlanProposed Implementation Plan
September 14, 2010
June 2001 Facilities Master Plan Update
$1,232,480,257
$250,000,000
School Facility Advisory Committee Criteria for Project Prioritization (2001)
Health & Safety
Systems Equity
Technology
Community Enhancement
Health & Safety
“Expenditures related to maintaining safe and healthy conditions for students” (e.g. building infrastructure, roofing, paving, fire protection systems, code compliance, power systems, access, etc.)
Systems Equity
“Expenditures which serve to promote equal access to equipment, programs and facilities throughout all District sites.” (e.g. accessibility improvements, sufficient uniform distribution of power, sufficient space to support programs)
Technology
“Expenditures related to enhancing the District’s technology program and the incorporation of new and emerging technologies in site implementation of curriculum.” (e.g. internet connectivity, additional elect. circuitry, relocation of circuitry, technology labs)
Community Enhancement
“Expenditures which benefit both the District and its employees, as well as community users.”
Project Priorities 1-3
• Priority 1: ‘Critical and immediate need’• Priority 2: ‘Necessary/to be activated as
funding became available’• Priority 3: ‘Deferrable without adversely
affecting continuity of programs, safety or security’
The commitment to the community was that MDUSD would complete all Priority 1 tasks.
2002 Project Categories(Priority 1)
Electrical Service: (increase/standardize)Site Improvements (e.g. ADA, paving, playground equip.)Building Shell Integrity (e.g. doors/hard, roofs, ext. paint)Interior Finish Upgrades (e.g. floors, restrooms, ADA)Tech Systems (e.g. classroom internet access, telecom. u/g)Electrical Service Distribution (e.g. classroom/admin
circuitry, prep for HVAC and proliferation of technology)Technology Centers (all secondary sites)New Facilities (e.g. portable replacement, sup. classrooms)Fire Protection: (SB 575)
Delivery of Program:
• Modernization Eligibility (OPSC): $100M+
• Program Support for Lower Performing Schools (<700 API)
2002 Measure ‘C’ Priority of Projectsby Delivery – OPSC – API Sort
Projects 2003 2004 2005 2006 2007CVHSCPHSYVHSNGHSCHSMDHSOak GroveRiverviewShore AcresCambridgeMeadow HomesBel AirOlympicRio VistaEl MonteYV ElFair OaksGlenbrookSun TerraceWren AveEl DoradoFoothillHidden ValleyValley ViewPine HollowHighlandsSeq. MidMt. Diablo ElWalnut AcresP.H. ElMount ViewSeq. ElWoodsideValle verdeMonte gardensValhallaBancroftAyersP.H.E.C.Gregory gardensHolbrookSilverwoodStrandwoodWestwoodSunrise/ShadelandsDiablo ViewCentral ServDent CtrWillow Creek/Charter
Group I
Group II
Group III
Group IV
Group V
April 2010 Facilities Master Plan Update
$764,445,281
$332,571,716
2010 Measure “C” Criteria for Project Prioritization
Health & Safety
Systems Equity
Technology
Community Enhancement
General Fund Relief: “Facility-related expenditures which will provide significant long-term relief to the General Fund”
2010 Project CategoriesResource Conservation (e.g. solar, irrigation)Site Improvements (e.g. concrete, paving, fencing)Building Shell Integrity (e.g. doors/hard, roofs, windows)Interior Finish Upgrades (e.g. floors, restroom, F.S. code)Mechanical Systems (e.g. classroom, admin, kitchen)Electrical Systems (e.g. security systems, interior lighting)Technology (1. Infrastructure; 2. Classroom Enhancements {e.g. comp labs, C/T, chem. lab ren})New Facilities (e.g. portable replacement, M.S. science labs)
Proposed Modernization ScheduleGroup I (Spring/Summer 2013)
2013
Clayton Valley
College Park
Ygnacio Valley High
Northgate
Concord
Mt Diablo High
Oak Grove
Group II (Spring/Summer 2014)
2014
Riverview
Shore Acres
Cambridge
Meadow Homes
Bel Air
Olympic
Rio Vista
El Monte
Ygnacio Valley Elementary
Fair Oaks
Glenbrook
Sun Terrace
Group III (Spring/Summer 2015)
2015
El Dorado
Foothill
Hidden Valley
Pine Hollow
Highlands
Sequoia Middle
Mt Diablo Elementary
Wren Ave
Group IV (Spring/Summer 2016)
2016
Walnut Acres
Pleasant Hill Elementary
Mountain View
Sequoia Elementary
Woodside
Valle Verde
Monte Gardens
Valhalla
Bancroft
Ayers
Pleasant Hill Ed Center
Group V (Spring/Summer 2017)
2017
Gregory Gardens
Holbrook
Silverwood
Strandwood
Westwood
Sunrise
Shadelands
Eagle Peak
Diablo View
Central Services
LVAC
Willow Creek/Diablo Day
Dent Center
Proposed Mechanical Schedule - 28 Sites
Phase I (Spring/Summer 2012)
2012
LVAC
Shadelands Center
Sunrise Center
Westwood
El Dorado
Strandwood
Silverwood
Holbrook
Phase II (Spring/Summer 2013)
2013
Gregory Gardens
Ayers
Bancroft
Valhalla
Monte Gardens
Valle Verde
Walnut Acres
Phase III (Spring/Summer 2014)
2014
Sequoia Elementary
Sequoia Middle
Mountain View
Pleasant Hill Elementary
Mt Diablo Elementary
Highlands
Pine Hollow
Valley View
Phase IV (Spring/Summer 2015)
2015
Hidden Valley
Foothill
Wren Ave
Sun Terrace
El Monte