2010 ssp primary example

Upload: btitty

Post on 05-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 2010 SSP Primary Example

    1/8

    School Strategic Plan forSample Primary School 1234ABC region2011-2014

    [Insert here the logo and/or name of the school review contractor responsible for this review]

    Endorsement by

    School Principal

    Signed.

    Name.

    Date

    Endorsement by

    School Council

    Signed.

    Name.

    Date

  • 7/31/2019 2010 SSP Primary Example

    2/8

  • 7/31/2019 2010 SSP Primary Example

    3/8

  • 7/31/2019 2010 SSP Primary Example

    4/8

    Strategic Intent

    Goals Targets Key Improvement Strategies

    Student Learning

    Improve student outcomes at all abilitylevels in English and mathematics.

    By 2013, teacher assessment against theVELS will indicate xx% of students achievingat or better than the expected standards.

    Build the capacity of teachers to implement acohesive school wide approach to teachingand learning.

    Student Engagement andWellbeing

    Improve student engagement in their

    learning.

    By 2013, student opinion surveys will show

    an improvement in the mean scores for

    student responses to wellbeing, teaching &

    learning, and student relationships.

    Build the capacity of teachers to implement an

    approach to teaching and classroom

    management that supports an engaging and

    productive learning environment.

    Student Pathways andTransitions

    Improve the transition of students at key

    points in their schooling.

    By 2013, parent opinion surveys will show

    an improvement in the mean scores for the

    transition variable

    Improve the school processes and programs

    for preparation of students moving from pre-

    school to school, from year to year,

    transferring into the school, and moving from

    primary to secondary settings.

  • 7/31/2019 2010 SSP Primary Example

    5/8

    School Strategic Planner 2011- 2014: Indicative Planner

    Key Improvement Strategies

    (KIS across the three student outcomes areas)Actions Achievement Milestones

    (Changes in practice and behaviours)

    Year 1 Review curriculum team leadership composition, roles, responsibilities andestablish Professional Learning Teams withfocus on teacher assessment practices

    Use Principles of Teaching and Learning(PoLT) as basis for staff discussion ofteaching and learning approaches focused onimproving teacher practice

    Enhance understanding and use ofperformance data through timetabled wholestaff discussion sessions

    Establish literacy coaching program withexternal coach

    Establish structured team peer feedbackprocesses focused on literacy teaching

    Professional Learning Teams established andmeeting regularly with discussion focused onpedagogical issues and peer feedbacksessions established

    Staff trialling new understandings of VELSassessment approaches in classrooms

    Each team planning session having a link tostudent performance data

    Staff demonstrating use of literacy coachingideas in classrooms

    Year 2 Professional Learning Teams focus further onimproved teacher assessment practices andclear understanding of VELS progressionpoints

    Develop practice of regular use ofachievement data in teaching teams to driveteacher planning

    Establish numeracy coaching program, trainin-house coaches for both literacy and

    numeracy

    Develop regular peer observation scheduleacross school

    All staff using VELS progression points asbasis for assessments and demonstratinghow peer feedback is influencing teaching andlearning approaches

    Teacher performance plans demonstratinguse of performance data for class planning

    Staff demonstrating use of numeracy coachingideas in classrooms

    Build the capacity of teachers to implement a

    cohesive school wide approach to teaching and

    learning.

    Year 3 PLT focus on moderation of assessment

    Review of reporting to parents policy andpractices

    Evaluation of PoLT implementation

    Team moderation groups meeting regularlyand all student assessment showingmoderation influences

  • 7/31/2019 2010 SSP Primary Example

    6/8

  • 7/31/2019 2010 SSP Primary Example

    7/8

    Implementation of agreed student behaviourmanagement protocols

    Year 4 Focus on student engagement and classroom

    management - staff/team meeting sessions,curriculum day focus revisit alignmentbetween PoLT and student connectedness

    Review of student behaviour managementprotocols implementation

    Each teachers classroom practice

    demonstrating PoLT implementation

    Year 1 Establish Professional Learning Team (PLT)with focus on student transition staff/teammeeting sessions, curriculum day focus,parent & student forums

    Review the current processes for studenttransition into, through and out of the school

    Visit other schools to see transition programs,visit local pre-schools and secondary schoolsto strengthen networks and discuss transitionissues

    Revise current school entry program anddevelop and implement pilot pre-school toprep transition program

    Networks between school and local pre-schools and secondary schools established

    Pre-school to prep transition programimplemented for all incoming prep students

    Year 2 Continue the PLT focus on student transition staff/team meeting sessions, curriculum dayfocus

    Revise current year 6 exit program, develop &implement pilot year 6 to secondary schooltransition program

    Evaluate pilot pre-school to prep transitionprogram

    Continue to build connections and sharedlearning opportunities with local pre andsecondary schools

    Joint secondary/primary curriculum day ontransition held

    Year 6 to secondary school transition programimplemented for all exiting year 6 students

    Improve the school processes and programs for

    preparation of students moving from pre-school to

    school, from year to year, transferring into the

    school, and moving from primary to secondary

    settings.

    Year 3 PLT focus on student movement through theschool staff/team meeting sessions,curriculum day focus

    Use student performance data to track studentlearning through the school and considerimpact of movement and change on studentlearning and explore methods for electronic

    Electronic portfolios created for each studentby end of year

    Critical movement points (between VELSlevels) documented and understood byteachers

    All classes participated in whole school

  • 7/31/2019 2010 SSP Primary Example

    8/8

    tracking

    Protocols and processes established for

    transition of students from year to year withtrial whole school transition program in term 4with student feedback

    transition program in term 4

    Year 4 PLT focus on review of current schoolprocesses that assist students to move intothe school at times other than prep entry

    Protocols and processes established for thetransfer of students into the school during theyear

    Evaluation of transition protocols andprocesses throughout the school

    Transition processes for entry of students, attimes other than prep, put into action

    Transition programs evaluated