Presentation Overview
1. District 1 Capital Improvement Projects
2. Military Economy & Outlook
3. 2012 Fiscal Outlook
4. Citizen Engagement Survey
5. Redistricting and Realignment
District 1 Capital Improvement Projects
Completed in 2011
Timberview Filing 2 Subdivision Acceptance
Location:• Bridle Creek Court and Lamplight Drive / Furrow Road intersectionDescription: • Install a drainage system with inlet; establish and stabilize roadside
ditches; replace culvert Funding Source: • $52,243 / Subdivision Improvement Agreement Collateral (called by
BoCC to finish drainage not done by developer)
4
Highway 105 Guardrail Installation
Location:• Highway 105 at Monument Academy Charter SchoolDescription:• Installation of approximately 460 feet of guardrail along north side of
road Funding Source: • Materials on-hand / Road and Bridge
5
District 1 Capital Improvement Projects
Under Construction in 2011
Hodgen Road Improvements
Location: • State Highway 83 to Black Forest RoadDescription:• Safety Improvements – Improve vertical alignment; intersection site
distance; add auxiliary lanes; reduce impact of drifting snowFunding source: • $13.1M / PPRTA Capital
7
District 1 Capital Improvement Projects
Planning / Design Stage in 2011
Black Forest Road / Burgess Road Intersection
Location: • Intersection of Black Forest Road and Burgess Road Description: • Reconstruction – Improve the vertical alignments; add auxiliary lanes;
improve drainage; upgrade traffic signalFunding: • Estimated $1.85M (total project); $800,000 currently funded for utility
relocation and Right of Way acquisitions from Road & Bridge Funds
9
County Line Road / Black Forest Road
Location:• County Line Road from Thunder to Black Forest Road; Black Forest
Road from County Line to Walker Description:• Safety Improvements – County Line / Black Forest intersection,
drainage; add pavementFunding: • Estimated $6.5M (total project); Currently approved $800,000 from
Road and Bridge Funds for Right of Way Acquisition and Utility Relocation
10
County Line Road Improvements
Location: • I-25 to Furrow Road Description: • Safety Improvements-add shoulders, improve drainage, reconfigure
horizontal and vertical profile west of Furrow Road and realign the intersection at Furrow Road and provide turn lanes
Funding: • Est. cost – $7M-$7.5 M / PPRTA Capital
11
Baptist Rd (West) Improvements
Location: • I-25 to Mitchell Ave Description: • Planning and alternative traffic flow analysis. • Baptist Rd Widening Mitchell to I-25 and Baptist RR Xing. • Evaluate appropriate improvements for the corridor, including construction of a
grade separated RR crossing Funding: • Study – (approx) $181K / PPRTA Capital • Project – (approx) $11M / PPRTA Capital /BRRTA/Other
12
Highway 105 Improvements Location: • I-25 to SH 83 Description: • Examine capacity and safety
issues for the corridor and recommend improvements to address the identified issues
Funding: • $300,000 / Road and Bridge
(only study is funded)Project website: • www.105corridor.com
13
Gleneagle Enhancement
Location: • Gleneagle from Jesse to
Wuthering Heights DriveDescription: • Pedestrian safety improvements
Funding: • Est. $119,000
– $95,000 Federal Funds – $24,000 EPC Road and
Bridge
14
Beacon Lite Road Improvements
Location: • County Line Road to Wakonda WayDescription: • Safety Improvements – Horizontal
and vertical alignments• County Line / Beacon Lite
intersection and drainage• Pave road Funding: • Est. $2.8M TBD
15
District 1 Capital Improvement
Other Project Updates
Doewood Gate Location: • Doewood Drive from
Ridgeview Circle to Chisholm Trail
Description: • Vacate a portion of Doewood
Drive • Remove gate • Add emergency vehicle and
maintenance access and turnaround at both points of termination.
Status: • Survey Complete, Meetings to
be scheduled with Fire Dept and adjacent property owners
Gate Location
17
Northgate Boulevard Improvements
Location: • Struthers Drive from
Gleneagle to Northgate Boulevard
Description: • Shoulder and ditch
erosion• Built by Developer
formed Struthers Road District Bonds
• No storm drain system • As a result, regular
reconstruction of the shoulder is required.
Status:• Shoulder/ditch line repaired
to address the immediate safety hazard
• Ultimate solution requires curb and gutter and storm drain system.
18
Fox Run Regional Park
• Master Plan Calls for:– Restroom, Parking Lot and Trail Improvements
– Construction of Off Leash Dog Park
• Public Input Process Spring of 2012• Construction in Summer of 2012• Funding: $100,000 from Regional Park Fees
19
Black Forest Regional Park
• Master Plan Updated in 2010 Identified:– Needed Parking, Well, Restroom and Trail Improvements
– Required Upgrades to Signage
– Required Initiating Mistletoe Mitigation Plan
• Funding: – $400,000 From Developer (Cathedral Pines)
– $200,000 From GOCO Grant
• Scheduled Completion in Fall of 2012
20
Pineries Open Space
• County Accepted 1070 Acres in 2007• Master Plan Completed in 2010 Requires:
– Five Miles of Trails with Trailhead Parking and Restroom
– Outdoor Classroom and Appropriate Signage
• Cost: Est. Phase One Projects - $460,000• Funding: Regional Park Fees and Grants (still
needed)
21
Military Economy & Outlook
23
Economic Impact of Military InstallationsTotal Impact: $5.5B
Military Economy
24
Military Economy
25
Military Outlook
• Military is dealing with $450B in cuts over the next 10 years – painful but doable
• There is much concern about the “doomsday” scenario:– Super Committee allows sequestration to occur (i.e. it does
not come up with $1.2T in cuts over the next ten years)
– This automatically triggers a defense share for those cuts of about $500B more over ten years, beginning in FY13
– Such cuts would span across personnel, major programs, entitlements, etc.
26
Military Outlook
• On a positive note…– Army leadership is confident that the Combat
Aviation Brigade is on track– The MILCON is planned and in the FY12 budgets– Received briefing from by MG Joe Anderson, the
incoming Commanding General for the 4th Infantry Division and Ft Carson
27
Veterans Cemetery Update
• El Paso County Kane Ranch is Preferred Site by the Veterans Administration
• Fountain Has Adequate Water for the Site But VA Funds Cannot be Used to Build the Required Pipeline Estimated at $1.2 Million
• Stakeholders Including El Paso County, El Pomar and Others Working on Solution
• Outlook is Positive
28
2012 Fiscal Outlook
Understanding the Budget
Understanding the County Budget
2012 Budgeted Revenues $235.7M
Less: Restricted Funding Sources ($100.1M)
Less: Legally Restricted Uses ($ 48.9M)
Revenues Within BoCC Discretion $ 86.7M
Only 36% of the 2012 Budget is within BoCC discretion
30
Examples of Restricted Funding
• Enterprise Zone Contributions by Private Citizens to Non-Profits
• Fees Paid by Trash Haulers to Offset Disposal of Household Hazardous Waste
• Lotto Funds Restricted for Parks• Developer Fees for Specific Transportation Needs
*These cannot be used to offset jail inmate food and medical costs and other required services.
31
Use of Discretionary Revenue
Function $ in Millions %
Public Safety $52.7 61%
Other Elected Offices $11.1 13%
Administrative Support $7.7 9%
Information Technology $7.4 9%
Utilities $4.3 5%
Parks $1.1 1%
Health Department Support $2.4 3%
$86.7 100%
ALLOCATION OF REVENUES
32
Discretionary Revenue vs. Population Growth
33
Annual Cost Per Citizen
34
How Did We Offset the Decreasing Discretionary Revenue?
2006 – 2009 Historical Budget Reductions (in Millions)
35
BoCC & Administration $4.5Community Services (Parks) $3.9Public Services (Roads & Fleet) $12.9Support Services (IT) $4.8Department of Human Services $2.3
TOTAL Administrative Services: $28.4 27.5%
Elected/Appointed Offices:Assessor $0.2Clerk & Recorder $1.9Treasurer $0.1Public Safety $4.8Public Trustee $0.2
TOTAL Elected/Appointed Offices: $7.2 11.0%
County Attorney $0.2 20.6%
Health Department Support $2.2 57.6%
Other Budgeting Options $7.2
TOTAL Budget Reductions $45.2 21.9%
2012 Fiscal Outlook
Proactive Financial Strategies
Operational Sustainability• In 2009, County achieved operational sustainability
– Stopped using one-time funding sources to address on-going operational needs
• Projected budget shortfall for 2012 due to current market conditions and Property Tax Revenues– Established savings strategy
• Conservative Revenue Estimates
• Frozen Positions not filled
• Incorporated expenditure restrictions
Proactive Financial Strategies 2009 - “Turning Point”
37
Proactive Financial Strategies Historic Percentage Held In Reserves
38
Good Economic Times
Proactive Financial Strategies Breakdown of 39% Operational Reserve
39
2010 Strategic Moves Project• With the increasing cost of failing infrastructure
– Backlog of $385M
• County created the “Strategic Moves” project– Using only available restricted revenue sources
– Utilizing One-time market opportunities
– Addressed 52% of Critical Capital Needs ($199M)
• Currently working on a new critical capital needs master plan
Proactive Financial Strategies
40
County Bond Rating Improved in 2010Aa2 “County’s strong credit characteristics...historically well-
maintained financial operations with healthy fund balances...” - Moody’s
“Moody’s expects that the County’s financial position will remain healthy, given conservative budgeting practices and consistently improving financial results....”
- Moody’s
Proactive Financial Strategies
41
County Bond Rating improved in 2010
“El Paso County’s financial performance and reserve level position continue to be in our opinion, very strong..”
- Standard & Poor’s
“Standard & Poor’s deems El Paso County’s management practices “good” under its Financial Management Assessment methodology ....” - Standard & Poor’s
Proactive Financial Strategies
42
2012 Fiscal Outlook
Current Financial Condition
From a Financial Perspective, we are doing everything we should and more!– Conservative in our spending– Fiscally responsible with taxpayers dollars– Living within our means– Addressed over 50% of our Major Capital Needs
without any increase in taxpayer dollars– Proactively established an Operational Savings to
weather the storm in 2012- 2014
Current Financial Condition
44
During the worst economic downturn since the Great Depression, we have actually been able to improve our financial situation
But at what cost?
Current Financial Condition
45
Current Financial Condition
Operating Budgets:
• Are at the operational level they were in 1996: – No “Across the Board” operational increases since
1996 as:– Cost Drivers (Price Index) increased 38.7% – Service Drivers (Population) increased 30.1%
46
Personnel Budgets:• 2007-2009 eliminated 195 positions and froze 100 positions• 2003-2011 Federal Cost of Living (COLA)
• National Increases were 21.7%
• El Paso County only provided 5.0%
• High Turnover Rates– On average, employers have 5% turnover, El Paso County has 22%
turnover
– Industry studies show it costs an additional 49% of that position’s salary each time a turnover occurs in training
Current Financial Condition
47
Average Salaries (in thousands) Provided by Support Services - EBMS
48
This means County employees are paid on average 34% less than
our competitors
Number of Full-Time Employees vs. Population Growth
49
Citizens Served Per Employee
50
This means on average, County
Employee’s workload has
increased 20%
2012 Fiscal Outlook In Summary
• El Paso County is a fiscally responsible, strong, sustainable organization
• However, the County still has $48.5M of Critical Needs both on-going and one-time
• Now that the County has built operational savings, the responsible and appropriate thing to do is to start addressing those Critical Needs
51
County Strategic Plan
Citizen Engagement Survey
Citizen Engagement Survey
• Online public input survey
• Conducted in the summer 2011
• 1,300 respondents
53
Citizen Engagement Survey
54
Quality of Life Issues Excellent Good Fair Poor Not Sure
El Paso County as a place to live 33% 52% 13% 2% 0%
El Paso County as a place to raise children
30% 48% 14% 3% 5%
Overall quality of life in El Paso County
27% 55% 15% 3% 0%
El Paso County as a place to retire
28% 43% 17% 5% 7%
Citizen Engagement Survey
55
County Statements Strongly Agree
Agree DisagreeStrongly Disagree
Not Sure
I receive good value for my County taxes
11% 51% 20% 5% 13%
I understand how County funding is allocated and services I receive
8% 40% 27% 7% 18%
I am pleased with the overall direction of the County
5% 41% 31% 9% 14%
The County listens to its citizens 5% 33% 29% 11% 22%
Citizen Engagement Survey
56
Funding / Efficiency Strongly Agree
Agree DisagreeStrongly Disagree
Not Sure
I support the expansion of shared city / county services
44% 39% 6% 5% 6%
I support a minor increase in my property taxes to enhance County services
28% 24% 23% 20% 5%
I support a minor increase in sales tax to support enhanced County services
28% 30% 18% 19% 5%
Citizen Engagement Survey
Top Five Community Issues 1. Employment Opportunities
2. Drugs / Alcohol Abuse
3. Quality of Road System
4. Crime
5. Child Abuse
57
Citizen Engagement Survey
Top Five Most Used County Services 1. Visited a County Park
2. Utilized the County Website
3. Voted in El Paso County
4. Registered a Motor Vehicle
5. Visited a County Nature Center
58
Citizen Engagement Survey
Top Five County Priorities*1. Fire Protection Services
2. Road Maintenance
3. Crime Investigation Services
4. Emergency Management Services
5. Public Safety Efforts
(*If additional funding is available)
59
Redistricting and Realignment
Congressional Districts
State Lawmakers
Board of County Commissioners
Congressional Reapportionment
• The Colorado General Assembly Is to Draft a New Congressional District Map After the Census
• But They Couldn’t Reach an Agreement
• Two Lawsuits Are Pending in Denver District Court
• The Court Will Determine a Map and a Ruling is Expected in December of 2011
61
General Assembly Redistricting
• Appointed Bipartisan Panel Takes Public Comment and Drafts Initial map
• The Committee Seeks Public Comments On The Plan
• A Final Plan is Drafted After The Comments and is Submitted for Approval to the Colorado Supreme Court
• The Colorado Supreme Court Has Until December 14, 2011 to Rule
62
Redistricting
• Once redistricting and reapportionment are approved by the Courts new boundaries and precinct lines are drawn (in December)
• Total number of precincts will be reduced
• Fewer polling places and fewer election judges are needed as more citizens choose mail in ballots.
63
Redistricting Continued
• Clerk and Recorder plans to renumber precincts by School District Boundaries as follows:
0-199 Colorado Springs D-11– 200s Academy District 20– 300s Lewis Palmer D-38– 400s Falcon D-49– 500s Eastern Plains School Districts– 600s Harrison D-2 & Widefield D-3– 700s Cheyenne Mtn. D-12 and Manitou D-14– 800s Fountain-Fort Carson 8 and Hanover 28
– 900s Special (e.g. overseas)
64
Impacts of Redistricting
• County Clerk Wayne Williams is currently named as a plaintiff in the Congressional Redistricting lawsuit
• We are fighting to keep El Paso whole– Our five military bases give us a valuable position
on the Armed Services Committee
• We also hope because of our large population that we will have 8 State House Districts completely within the boundaries of El Paso County
65
County Commissioner Realignment
• Done every two years by the County Clerk
• Population Must Remain Balanced
• Open and Public Process With a 30 day Comment Period
• Relatively Minor Adjustments Were Made
• Approved Unanimously by the BoCC
66
Questions?