    I-4 (SR 400) Ultimate Improvements

    From west of Orange Blossom Trailto west of Ivanhoe BoulevardFPID: 242484-4-32-01

    Public Information Meeting

    Orlando Public LibraryMonday, August 29, 2011

    5:30 P.M. to 7:30 P.M.

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    4/32

    Contact Information

    Ms. Beata Stys-Palasz, P.E.FDOT Project Manager

    Florida Department of Transportation719 S. Woodland Blvd

    DeLand, FL 32720(386) 943-5418

    [email protected]

    Mr. Gary Foster, P.E.Project ManagerURS Corporation

    315 E. Robinson Street, Suite 245Orlando, FL 32801

    (407) [email protected]

    Mr. Chris Rizzolo, P.E.Public Information Contact

    URS Corporation315 E. Robinson Street, Suite 245

    Orlando, FL 32801

    (407) [email protected]

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    5/32

    Central Florida Interstate 4 Facts

    73 miles from I-95 in Volusia Co.to the Osceola-Polk Co. line

    1,551,212 average daily trips

    58% commuters

    30% tourists

    12% non-work related & commercial vehicles

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    6/32

    Time is Money, the Cost of Congestion

    Orlando area drivers waste 55hours a year in rush hour trafficNational average is 47 hourswastedOur AM and PM Rush Hour is7.2 hours longAverage congestion costs perOrlando driver: $510 per year

    Source: Texas Transportation Institute:2005 Urban Mobility Study

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    7/32

    I-4 Ultimate Project Limits

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    8/32

    I-4/SR 408 Interim ProjectConstruction Completed in 2009

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    9/32

    I-4SR 408 Ultimate Improvements Design Underway Since 2003Utilizing the 2002 Approved PD&E Design Concept

    2002 A d PD&E D i f I 4

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    10/32

    One of the commitments FDOTmade to the FHWA (FederalHighway Administration) during the

    PD&E was to ensure I-4improvements are responsive tochanging conditions

    Resulting in the 2008 Re-evaluation and Systems Analysis ofthe I-4 Corridor conducted by an

    Independent FDOT Consultant

    In Section 4 of the I-4 DesignProject, Consultant identified theclosely spaced signals at theproposed SUL (Special Use Lane)interchange at South Street would

    result in significant delays indowntown Orlando, and trafficbackups along the SUL ramps toand from I-4.

    SUL RampIntersection

    5 Closely SpacedSignalized Intersections

    2002 Approved PD&E Design for I-4at South St SUL Interchange

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    11/32

    Value Engineering Study

    April 2009

    FDOT, City of Orlando and Consultant Support Staff

    29 Alternative Design Concepts were considered

    These alternatives were evaluated and the best and most

    effective ones were combined into a final alternative

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    12/32

    Timeline Summary

    Aug 2002 PD&E Approved

    2003 2008: DOT prepares I-4 Ultimate Improvement Plans

    Dec 2008: I-4/South St SUL Interchange Traffic Operations concerns identified

    Feb 2009: DOT proposes revised design solution to City Orlando

    April 14-16 2009: Value Engineering (VE) study held; 29 alternatives identified

    April June 2009: VE recommendations analyzed

    June 2009: Most promising VE recommendations combined for further analyses

    June 2009 May 2010: Refined preferred VE combination solution with City Staff

    May 2010: Solution determined; full analysis complete

    June 2010: Revised Design solution agreed upon by all

    November 2010 FHWA Approved Revised Design Concept (I-4 SAMR Update)

    November 2010 Present: FDOT in process of updating I-4 Ultimate Improvements

    plans due to Revised Design Concept at I-4/South St SUL Interchange

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    13/32

    2011 Revised I-4 at South St. InterchangeDesign Concept

    PRELIMINARY PLANS

    NOT FOR CONSTRUCTION

    Removed EB I-4 SUL OFF Ramp to South Street

    Removed EB I-4 SUL ON Ramp from South Street Added New EB I-4 SUL OFF Ramp to Ramp E Added New EB I-4 SUL ON Ramp from Anderson Street Anderson Street and Division Avenue widening Revised South Street Traffic Pattern and Lane Geometry

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    14/32

    BooneAvenue

    Divisio

    n

    Avenue

    Anderson Street

    From I-4 WB to East Downtown Orlando

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    15/32

    BooneAvenue

    Division

    Avenue

    Anderson Street

    From I-4 WB to West Downtown Orlando

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    16/32

    From I-4 EB to East Downtown Orlando

    BooneAvenue

    Division

    Avenue

    Anderson Street

    F I EB W D O l d

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    17/32

    BooneAvenue

    Division

    Avenue

    Anderson Street

    From I-4 EB to West Downtown Orlando

    F E D O l d I 4 WB

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    18/32

    BooneAvenue

    Division

    Avenue

    Anderson Street

    From East Downtown Orlando to I-4 WB

    F W t D t O l d t I 4 WB

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    19/32

    BooneAvenue

    Division

    Avenue

    Anderson Street

    From West Downtown Orlando to I-4 WB

    F E t D t O l d t I 4 EB

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    20/32

    BooneAvenue

    Division

    Avenue

    Anderson Street

    From East Downtown Orlando to I-4 EB

    F W t D t O l d t I 4 EB

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    21/32

    BooneAvenue

    Division

    Avenue

    Anderson Street

    From West Downtown Orlando to I-4 EB

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    22/32

    Results of I-4/South Street Interchange Analysis

    Revised design:

    Greatly improved downtown sub-area trafficperformance

    Eliminates traffic spillback onto I-4 SULs

    Significantly increased safety

    Meets expectations of both FDOT and City ofOrlando

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    23/32

    Improvements to Division Avenue

    Division Avenue widenedbetween South St. and Anderson

    St. to include exclusive median

    turn lanes

    Intersection improvements at

    Anderson Street to include:

    Dedicated left-turn from eastboundAnderson to northboundDivision Ave

    Dedicated right-turn from westboundAnderson St to northboundDivision Ave

    Dedicated right-turn from northboundDivision Ave to eastboundAnderson St.

    17.5 ft.PavementWidening

    8 ft. WideSidewalk

    11 ft.PavementWidening

    11 ft.PavementWidening

    ANDERSON ST

    6 ft. WideSidewalk

    11 ft.PavementWidening

    13 ft. WideSidewalk

    DIVISION

    AVENUE

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    24/32

    Right of Way Acquisition

    All Right-of-Way required for the original

    2002 PD&E concept has been acquired

    Additional right-of-way required for this

    revision includes:

    Acquisitions on the west side ofDivision Avenue between AndersonStreet and South Street toaccommodate the proposedwidening (30 FT- 35 FT STRIP)

    AdditionalRight-of-Way

    Required

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    25/32

    Right of Way Acquisition

    Additional right-of-wayrequired for this revision

    includes:

    Clip of a parcel alongRamp E as the new EB

    SUL ramp merges withRamp E over the

    intersection of Division

    Avenue and Gore Street.

    AdditionalRight-of-Way

    Required

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    26/32

    Typical Section I-4 Proposed through Metro Orlando

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    27/32

    Typical Section I-4 Proposed at Elevated EB SUL

    A h i I

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    28/32

    Aesthetic Improvements

    P j S h d l

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    29/32

    Project Schedule

    Public Information Meeting August 29, 2011

    60% Design Complete December 2011

    Right-of-Way Acquisition April 2012 May 2014

    Final Design Complete TBD (Not Funded)

    Project Construction TBD (Not Funded)

    C t Sh t

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    30/32

    Comment Sheet

    Fill Out Tonight

    Or

    Take it With Youand Mail in by

    September 12, 2011

    C t t I f ti

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    31/32

    Contact Information

    Ms. Beata Stys-Palasz, P.E.

    FDOT Project ManagerFlorida Department of Transportation

    719 S. Woodland BlvdDeLand, FL 32720

    (386) [email protected]

    Mr. Gary Foster, P.E.Project ManagerURS Corporation

    315 E. Robinson Street, Suite 245Orlando, FL 32801

    (407) [email protected]

    Mr. Chris Rizzolo, P.E.Public Information Contact

    URS Corporation315 E. Robinson Street, Suite 245

    Orlando, FL 32801

    (407) [email protected]

  • 8/4/2019 2011.08.29 -- FDOT Presentation on I-4

    32/32

    Visit Our Website at: www cflroads com