I-4 (SR 400) Ultimate Improvements
From west of Orange Blossom Trailto west of Ivanhoe BoulevardFPID: 242484-4-32-01
Public Information Meeting
Orlando Public LibraryMonday, August 29, 2011
5:30 P.M. to 7:30 P.M.
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
4/32
Contact Information
Ms. Beata Stys-Palasz, P.E.FDOT Project Manager
Florida Department of Transportation719 S. Woodland Blvd
DeLand, FL 32720(386) 943-5418
Mr. Gary Foster, P.E.Project ManagerURS Corporation
315 E. Robinson Street, Suite 245Orlando, FL 32801
(407) [email protected]
Mr. Chris Rizzolo, P.E.Public Information Contact
URS Corporation315 E. Robinson Street, Suite 245
Orlando, FL 32801
(407) [email protected]
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
5/32
Central Florida Interstate 4 Facts
73 miles from I-95 in Volusia Co.to the Osceola-Polk Co. line
1,551,212 average daily trips
58% commuters
30% tourists
12% non-work related & commercial vehicles
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
6/32
Time is Money, the Cost of Congestion
Orlando area drivers waste 55hours a year in rush hour trafficNational average is 47 hourswastedOur AM and PM Rush Hour is7.2 hours longAverage congestion costs perOrlando driver: $510 per year
Source: Texas Transportation Institute:2005 Urban Mobility Study
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
7/32
I-4 Ultimate Project Limits
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
8/32
I-4/SR 408 Interim ProjectConstruction Completed in 2009
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
9/32
I-4SR 408 Ultimate Improvements Design Underway Since 2003Utilizing the 2002 Approved PD&E Design Concept
2002 A d PD&E D i f I 4
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
10/32
One of the commitments FDOTmade to the FHWA (FederalHighway Administration) during the
PD&E was to ensure I-4improvements are responsive tochanging conditions
Resulting in the 2008 Re-evaluation and Systems Analysis ofthe I-4 Corridor conducted by an
Independent FDOT Consultant
In Section 4 of the I-4 DesignProject, Consultant identified theclosely spaced signals at theproposed SUL (Special Use Lane)interchange at South Street would
result in significant delays indowntown Orlando, and trafficbackups along the SUL ramps toand from I-4.
SUL RampIntersection
5 Closely SpacedSignalized Intersections
2002 Approved PD&E Design for I-4at South St SUL Interchange
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
11/32
Value Engineering Study
April 2009
FDOT, City of Orlando and Consultant Support Staff
29 Alternative Design Concepts were considered
These alternatives were evaluated and the best and most
effective ones were combined into a final alternative
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
12/32
Timeline Summary
Aug 2002 PD&E Approved
2003 2008: DOT prepares I-4 Ultimate Improvement Plans
Dec 2008: I-4/South St SUL Interchange Traffic Operations concerns identified
Feb 2009: DOT proposes revised design solution to City Orlando
April 14-16 2009: Value Engineering (VE) study held; 29 alternatives identified
April June 2009: VE recommendations analyzed
June 2009: Most promising VE recommendations combined for further analyses
June 2009 May 2010: Refined preferred VE combination solution with City Staff
May 2010: Solution determined; full analysis complete
June 2010: Revised Design solution agreed upon by all
November 2010 FHWA Approved Revised Design Concept (I-4 SAMR Update)
November 2010 Present: FDOT in process of updating I-4 Ultimate Improvements
plans due to Revised Design Concept at I-4/South St SUL Interchange
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
13/32
2011 Revised I-4 at South St. InterchangeDesign Concept
PRELIMINARY PLANS
NOT FOR CONSTRUCTION
Removed EB I-4 SUL OFF Ramp to South Street
Removed EB I-4 SUL ON Ramp from South Street Added New EB I-4 SUL OFF Ramp to Ramp E Added New EB I-4 SUL ON Ramp from Anderson Street Anderson Street and Division Avenue widening Revised South Street Traffic Pattern and Lane Geometry
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
14/32
BooneAvenue
Divisio
n
Avenue
Anderson Street
From I-4 WB to East Downtown Orlando
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
15/32
BooneAvenue
Division
Avenue
Anderson Street
From I-4 WB to West Downtown Orlando
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
16/32
From I-4 EB to East Downtown Orlando
BooneAvenue
Division
Avenue
Anderson Street
F I EB W D O l d
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
17/32
BooneAvenue
Division
Avenue
Anderson Street
From I-4 EB to West Downtown Orlando
F E D O l d I 4 WB
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
18/32
BooneAvenue
Division
Avenue
Anderson Street
From East Downtown Orlando to I-4 WB
F W t D t O l d t I 4 WB
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
19/32
BooneAvenue
Division
Avenue
Anderson Street
From West Downtown Orlando to I-4 WB
F E t D t O l d t I 4 EB
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
20/32
BooneAvenue
Division
Avenue
Anderson Street
From East Downtown Orlando to I-4 EB
F W t D t O l d t I 4 EB
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
21/32
BooneAvenue
Division
Avenue
Anderson Street
From West Downtown Orlando to I-4 EB
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
22/32
Results of I-4/South Street Interchange Analysis
Revised design:
Greatly improved downtown sub-area trafficperformance
Eliminates traffic spillback onto I-4 SULs
Significantly increased safety
Meets expectations of both FDOT and City ofOrlando
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
23/32
Improvements to Division Avenue
Division Avenue widenedbetween South St. and Anderson
St. to include exclusive median
turn lanes
Intersection improvements at
Anderson Street to include:
Dedicated left-turn from eastboundAnderson to northboundDivision Ave
Dedicated right-turn from westboundAnderson St to northboundDivision Ave
Dedicated right-turn from northboundDivision Ave to eastboundAnderson St.
17.5 ft.PavementWidening
8 ft. WideSidewalk
11 ft.PavementWidening
11 ft.PavementWidening
ANDERSON ST
6 ft. WideSidewalk
11 ft.PavementWidening
13 ft. WideSidewalk
DIVISION
AVENUE
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
24/32
Right of Way Acquisition
All Right-of-Way required for the original
2002 PD&E concept has been acquired
Additional right-of-way required for this
revision includes:
Acquisitions on the west side ofDivision Avenue between AndersonStreet and South Street toaccommodate the proposedwidening (30 FT- 35 FT STRIP)
AdditionalRight-of-Way
Required
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
25/32
Right of Way Acquisition
Additional right-of-wayrequired for this revision
includes:
Clip of a parcel alongRamp E as the new EB
SUL ramp merges withRamp E over the
intersection of Division
Avenue and Gore Street.
AdditionalRight-of-Way
Required
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
26/32
Typical Section I-4 Proposed through Metro Orlando
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
27/32
Typical Section I-4 Proposed at Elevated EB SUL
A h i I
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
28/32
Aesthetic Improvements
P j S h d l
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
29/32
Project Schedule
Public Information Meeting August 29, 2011
60% Design Complete December 2011
Right-of-Way Acquisition April 2012 May 2014
Final Design Complete TBD (Not Funded)
Project Construction TBD (Not Funded)
C t Sh t
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
30/32
Comment Sheet
Fill Out Tonight
Or
Take it With Youand Mail in by
September 12, 2011
C t t I f ti
-
8/4/2019 2011.08.29 -- FDOT Presentation on I-4
31/32
Contact Information
Ms. Beata Stys-Palasz, P.E.
FDOT Project ManagerFlorida Department of Transportation
719 S. Woodland BlvdDeLand, FL 32720
(386) [email protected]
Mr. Gary Foster, P.E.Project ManagerURS Corporation
315 E. Robinson Street, Suite 245Orlando, FL 32801
(407) [email protected]
Mr. Chris Rizzolo, P.E.Public Information Contact
URS Corporation315 E. Robinson Street, Suite 245
Orlando, FL 32801
(407) [email protected]
-