DISTRICT 1 BARTOW VIRTUAL PUBLIC HEARING December 8, 2020 US 41 (SR 45) from Beneva Road to SR 72/Stickney Point Road Financial Project ID: 433550-4-52-01 & 433550-4-52-02 | 433550-5-52-01 & 433550-5-52-02 | 440685-1-52-01 Michael Johnson, P.E. GEC Consultant Project Manager District One Project Management Office Florida Department of Transportation

Upload: others

Post on 04-Oct-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

DISTRICT 1BARTOW

VIRTUAL PUBLIC HEARING

December 8, 2020

US 41 (SR 45) from Beneva Road toSR 72/Stickney Point Road

Financial Project ID: 433550-4-52-01 & 433550-4-52-02 | 433550-5-52-01 &

433550-5-52-02 | 440685-1-52-01

Michael Johnson, P.E. GEC Consultant Project Manager

District One Project Management Office Florida Department of Transportation

1. Webinar Information

2. Project Presentation

3. Public Comment

Agenda

2

This meeting is being recorded.

The recording will be posted on the project website.

All attendees will be placed in ‘Listen Only’

mode throughout the meeting.

3

For technical issues, visit GoToWebinar online at:

Or through your confirmation email, click on

check system requirements (below):

4

Support.goto.com

Control Panel Use

5

Information for Dial-in Attendees

Dial-in listeners Paper copy of meeting presentation

(requested or downloaded before the meeting)

swflroads.com/us41/benevatocaribbean | swflroads.com/us41/caribbeantostickneypoint 6

We want your input during the meeting!

We will address some of your

comments during the meeting, however all

correspondence will be posted on the website later.

Type your comments in the

control panel Questions pane.

?

7

Public Comment

3. 863-519-2834

Type comments in the Questions

pane on the control panel.

After meeting

?During meeting

2. Florida Department of Transportation801 N. Broadway Ave.Bartow, FL 33830

1. [email protected]

swflroads.com/us41/benevatocaribbeanswflroads.com/us41/caribbeantostickneypoint 8

Public Comment

All registrants will receive a link to the meeting

recording.

All comments and questions are part of the

Public Record.

Please submit your comments by December 21

9

Public Notice

Department or project webpageEmails to project contacts listProperty owner/tenant letters

Social mediaNewspaperFlorida Administrative Register

10

Title VI Information

The Florida Department of Transportation solicits public participation without regard to race, color, national origin, age, sex, religion, disability, or

family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI may do so by contacting:

Cynthia Sykes, FDOT District One Title VI Coordinator Email: [email protected]

TITLE VI INFORMATION

11

DISTRICT 1BARTOW

US 41 (SR 45) from Beneva

Road toSR 72/Stickney

Point Road12

Florida Department of Transportation Project Location

13

Florida Department of Transportation

In 2016/2017 a study was conducted to determine what improvements were needed to create a multi-modal corridor. This includes improvements for bicyclist, pedestrians, transit, and vehicles.

Public Involvement conducted for the project included:

Metropolitan Planning Organization (MPO) Citizen’s Advisory Committee on May 6, 2019

MPO Technical Advisory Committee on May 6, 2019

MPO Bike, Ped, Trails Advisory Committee on May 6, 2019

Public Information Workshop on January 24, 2017

GoToWebinar Public Meetingon November 4, 2020

Project Background

14

Florida Department of Transportation

Restripe the 12’ travel lanes to 11’ travel lanes

Resurface the road to change the paved shoulders from 4 feet to 6 feet to provide 6-foot-wide buffered bike lanes

v

Widen right turn lanes to provide 6-foot-wide bike lane “key hole”

Project Scope

6’

15

Florida Department of Transportation

Construct 6-foot-wide concrete sidewalks on both sides of the roadway

Review driveway widths and reduce to meet current standards where required

Project Scope

Provide sidewalks over creek crossings

16

Florida Department of Transportation Project Scope

Modifications to the signalized intersections include: Replacement of the signal at SR 72 / Stickney Point Road Adjusting signal head locations at Gulf Gate Drive Add or adjusting the crosswalks Providing ADA (Americans with Disabilities Act) enhancements Add intersection lighting

Corridor lighting Lighting already exists on east side of the road Add lighting to west side of the road

Modify drainage structures to accommodate improvements

Construct concrete bus pads and bus shelter pads in coordination with Sarasota County Area Transit (SCAT)

17

Florida Department of Transportation Typical Section

4 – Lane Divided

18

Florida Department of Transportation Project Scope

Pedestrian / Bicycle Accommodation at CreeksSegment 4 - Beneva Road to Caribbean Drive Construct pedestrian/bicycle facilities

over Oscar Creek by extending bridge culvert on east side

19

Florida Department of Transportation

20

Segment 5 - Caribbean Drive to SR 72 / Stickney Point Rd. Construct pedestrian/bicycle facilities over

Matheny Creek without culvert extensions

Project Scope

Pedestrian / Bicycle Accommodation at Creeks

Florida Department of Transportation Project Scope

Median Modifications(Access Management)

FDOT: https://www.fdot.gov/planning/systems/programs/sm/accman/default.shtm

FHWA: https://safety.fhwa.dot.gov/intersection/alter_design/pdf/fhwasa14069_mut_infoguide.pdf 21

Florida Department of Transportation

Corridor Crash History 484 total crashes between 2014 and 2018

219 from Beneva Road to Caribbean Drive 265 from Caribbean Drive to Stickney Point Road

78 total angle and left-turn crashes resulting in 35 injuries Project will reduce conflict points and improve visibility for turning vehicles Multimodal safety – sidewalk, bike lanes, transit connectivity

Four bike & four pedestrian total crashes resulting in three fatalities

Beneva Road to Caribbean Drive Caribbean Drive to SR 72

22

Florida Department of Transportation Project Scope

Median ModificationsSegments 4 and 5 Evaluate each median opening and determine

modification needed to improve safety.

23

Florida Department of Transportation

Median Modifications(Full Median Opening vs Directional Median Opening)

Project Scope

Directional Median OpeningFull Median Opening

24

Florida Department of Transportation

Median Modifications(Access Management)

Hobby Lobby Springfield Dr. /

Lake Pointe Blvd.

S Holiday Dr.

Beneva Rd.

Holiday Dr. N

Southpointe Dr. / Doud St.

NO CHANGE

Project Scope433550-4-52-02

25

Kia

Florida Department of Transportation

Median Modifications(Access Management)

Sandalwood Dr. / Kai Dr.

Pinehurst St.

Peterson Toyota

Brueckner Dr.

Caribbean Dr.

Project Scope433550-4-52-02

26

Florida Department of Transportation Project Scope

Median Modifications(Access Management)

Cass Way

Cass St.

Caribbean Dr.

Buccaneer Ln.

Upper Cove Ter.

433550-5-52-02

27

Florida Department of Transportation

Median Modifications(Access Management)

Reynolds St.

Baywood Dr.

SR 72 (Stickney Point Rd.)

Gulf Gate Dr.

Bispham Rd.

NO CHANGE

NO CHANGE

Buccaneer Ln.

Project Scope

NO CHANGE

433550-5-52-02

28

Mazda

Florida Department of Transportation

US 41 at SR 72(Stickney Point Road)

Remove free-flow right turn lanes Remove islands and

reconstruct curb and gutter at all corners

Right turn lanes controlled by signal

Shorter crosswalks curb to curb

Construct new signal New mast arms New intersection lighting

with crosswalk lighting

Project Scope

29

Bank

of A

mer

ica

Florida Statutes

This public hearing is held in accordance with Section 339.155, Florida Statutes; Section 339.199, Florida Statutes; and Section 120.525, Florida Statutes. This public hearing was advertised consistent with federal and state requirements and is conducted consistent with the Americans with Disabilities Act of 1990.

This hearing is held to give all interested people the right to understand the project and comment on their concerns to the department. Public participation at this hearing is encouraged and solicited without regard to race, color, religion, sex, age, national origin, disability or family status.

30

Mail or Email Comments to Us by December 21

Michael Johnson, PEGEC Consultant Project Manager

Florida Department of TransportationP.O. Box 1249

Bartow, FL 33831

863-519-2834

[email protected]

Or submit through the websites at:swflroads.com/us41/benevatocaribbean

swflroads.com/us41/caribbeantostickneypoint 31

Florida Department of Transportation

Concept plans are available at:

Gulf Gate Public Library7112 Curtiss Ave, Sarasota, FL 34231.

Hours:Monday through Thursday 10 a.m. to 6 p.m.,

Friday and Saturday from 10 a.m. through 5 p.m. and closed Sunday

32

Florida Department of Transportation

33

Public Comment