California Environmental Quality ActTrevor Macenski- Principal/ Director of Environmental Services- MBA/ First Carbon Solutions

Page 2: 2012 ceqa presentation for ce class

Rules and Regulations

• The Statute Public Resources Code §§ 21000-21178

(PRC)• The Guidelines

California Code of Regulations Title 14, §15000 et seq. (CCR)

• The Courts Ongoing court decisions (Case law)

Page 3: 2012 ceqa presentation for ce class

CEQA LingoCEQA: California Environmental Quality Act

IS: Initial Study

ND: Negative Declaration

NOP: Notice of Preparation of EIR

EIR: Environmental Impact Report

DEIR: Draft EIR

FEIR: Final EIR

NOC: Notice of Completion

NOD: Notice of Determination

NOA: Notice of Availability

Page 4: 2012 ceqa presentation for ce class

Introduction to CEQA• 1969: President Nixon signs National

Environmental Policy Act (NEPA)

• 1970: Governor Reagan signs California Environmental Quality Act (CEQA)

• CEQA (the Statute): Established by Legislature . . . and continuously modified by Legislature . . . and “interpreted” by the Courts

Page 5: 2012 ceqa presentation for ce class

Introduction to CEQA (cont.)

• Initially intended to apply to publicly-sponsored projects only

• 1972: Friends of Mammoth v. Board of Supervisors: CEQA applies to ‘all’ projects subject to public

agency discretionary action

Page 6: 2012 ceqa presentation for ce class

Who is “in charge” of CEQA? Lead Agency

CEQA is a “Self-executing Statute” meaning it is the Lead-Agency’s duty to determine what is and is not subject to CEQA, and to follow the process.

Public can go through the legal process (suing) to challenge decisions

Page 7: 2012 ceqa presentation for ce class

Basic Purposes of CEQA

1. Inform government decision makers and the public about the potential significant environmental impacts of proposed activities.

2. Identify ways that environmental impact(s) can be avoided or significantly reduced.

Page 8: 2012 ceqa presentation for ce class

Basic Purposes of CEQA (cont.)

3. Prevent significant avoidable damage to the environment by requiring changes in the project through the use of alternatives and mitigation

4. Disclose to the public the reason that an agency approved a project notwithstanding its environmental impacts

Page 9: 2012 ceqa presentation for ce class

The CEQAProcess

The CEQAProcess

(It can be a lengthy one!)

Page 10: 2012 ceqa presentation for ce class
Page 11: 2012 ceqa presentation for ce class

CEQA Process Overview

• An action is brought forth to the Lead Agency

• Is it a “project” or is it “exempt”?

• If subject to CEQA, what are the potential impacts? (prepare an Initial Study)

• Based on initial study, what type of CEQA document do you need? (Neg Dec, MND, EIR?)

• Prepare appropriate environmental document

• Public reviews and comments on document

• Decision and findings made on the project

Page 12: 2012 ceqa presentation for ce class

What is a “project” under CEQA?

• Comply with CEQA when you have a “project.”

• Project: activity undertaken by a public agency or a private activity which may cause a change in the environment and must receive discretionary approval from a government agency.

Page 13: 2012 ceqa presentation for ce class

• Discretionary projects (CEQA) Tentative maps

General plans

Conditional use permits

• Ministerial projects (no CEQA) Demolition permits

Building permits

Discretionary vs. Ministerial Projects

Page 14: 2012 ceqa presentation for ce class

Typical CEQA Projects Residential

Commercial

Transportation projects

Water and energy infrastructure

Page 15: 2012 ceqa presentation for ce class

Exemptions to CEQA

• Statutory Activities exempted from all or part of CEQA

by the State Legislature regardless of impacts (policy decision)

• Categorical Classes of projects which are exempted from

CEQA because they typically do not have significant impacts (there are exceptions)

Page 16: 2012 ceqa presentation for ce class

Statutory Exemption ExamplesArticle 18

• 1984 L.A. Olympic games• Family day care homes• Specified mass transit projects• State and regional transportation improvement

programs• Projects located outside California• Certain pipeline work • Air quality permits• Ministerial projects• Emergency projects• Other miscellaneous per CCR §15282

Page 17: 2012 ceqa presentation for ce class

Categorical ExemptionsArticle 19

• Classes of projects that do not have a significant impact on the environment

• Not applicable when cumulative impact is significant or when there is a potential significant impact due to unusual circumstances

Scenic highways

Hazardous waste sites

Historical resources

Page 18: 2012 ceqa presentation for ce class

Categorical Exemptions

• Existing facilities

• Reconstruction

• Small structures

• Minor alterations to land or land use

• Actions by regulatory agencies for natural resources protection or protection of the environment

• Surplus property sales

• Land acquisition for wildlife conservation

• Minor additions to school

• Minor land divisions

• Transfer of ownership for parks

• Total of 33 categories outlined in section 15301 of Guidelines

Page 19: 2012 ceqa presentation for ce class

Notice of Exemption

• If your “project” is exempt, a Notice of Exemption (NOE) may be filed with County Clerk

• The filing of an NOE shortens the time that someone can file a legal challenge to the exemption from 180 days to 35 days

Page 20: 2012 ceqa presentation for ce class

Preparing an Initial Study

Page 21: 2012 ceqa presentation for ce class

Initial Study

• Purpose Complete a project description

To decide between a Negative Declaration, Mitigated Negative Declaration, or EIR

Refine issues to be addressed in an EIR

• Initial Study is not required if it is known an EIR will be prepared

Page 22: 2012 ceqa presentation for ce class

Contents of Initial StudiesCCR §15063(d)

• Project description - location, project objectives and characteristics

• Environmental setting

• Discussion of environmental impacts using Appendix G checklist

• Mitigation measures if necessary

• List of preparers

Page 23: 2012 ceqa presentation for ce class

Checklist topics Aesthetics

Agriculture

Air Quality (GHG)

Biology

Cultural

Geology

Hazards

Hydrology

Land Use Minerals Noise Population/Housing Public

Services/Utilities Recreation Transportation/traffic Urban decay

Page 24: 2012 ceqa presentation for ce class

Appendix G Checklist

Page 25: 2012 ceqa presentation for ce class

Definition of“Significant Impact on the Environment”

• Substantial, or potentially substantial, adverse change in any of the physical conditions within the area affected by the project including land, air, water, minerals, flora, fauna, ambient noise, and objects of historic or aesthetic significance. A social or economic change by itself shall not be considered a significant effect on the environment (CCR §15382)

Page 26: 2012 ceqa presentation for ce class

After the checklist . . .

The IS checklist will help you determine what type of CEQA environmental document the Lead Agency will need to prepare (or have prepared for them)

Page 27: 2012 ceqa presentation for ce class

Environmental Documents

• Negative Declaration

• Mitigated Negative Declaration

• Environmental Impact Report

Page 28: 2012 ceqa presentation for ce class

Mitigation Measures Required for all potentially significant impacts if

possible

Should identify who, what, where and when

Be legally, technically, socially, politically and economically feasible

Should avoid the impact altogether or minimize impacts by limiting the magnitude

May rectify by repairing, rehabilitating, restoring

May reduce or eliminate over time

May compensate by replacing or providing substitute resources

Page 29: 2012 ceqa presentation for ce class

Preparing an Environmental Impact Report (EIR)

Page 30: 2012 ceqa presentation for ce class

When to Prepare an EIR

Substantial evidence in the record supports a fair argument that significant impacts may occur.

Fair Argument – Very Low Threshold

If there is any substantial evidence to support a fair argument that project may have significant environmental impacts, an EIR must be prepared

There is a presumption in CEQA in favor of preparing EIRs instead of Neg Decs

Page 31: 2012 ceqa presentation for ce class

Basic Types of EIRs

Project EIR

Program EIR

Tiered EIR

Subsequent/Supplemental

Focused EIR

Page 32: 2012 ceqa presentation for ce class

EIR Versions

Administrative Draft EIR (not public)

Draft EIR (public review)

Final EIR

Page 33: 2012 ceqa presentation for ce class

EIR Process Overview• Notice of Preparation (NOP) released for 30 days• Scoping meeting• Notice of Completion (NOC) and Notice of

Availability (NOA) to start minimum 45-day Draft EIR public review

• Responses to comments sent to responding public agencies 10 days before EIR certification

• Public hearing generally held for discretionary approval

• EIR certification, project approval, CEQA findings, statement of overriding considerations

• File Notice of Determination (NOD)

Page 34: 2012 ceqa presentation for ce class
Page 35: 2012 ceqa presentation for ce class

Diamond Springs Parkway EIR

Joint lead Agency

New Roadway

Existing Roadway Improvements

Water and Sewer Improvements

Sound walls

Power Lines

Much, much more

Page 36: 2012 ceqa presentation for ce class

Include:Description, location, and a discussion of the probable environmental effects.

EIR can be initiated while waiting for comments

Responsible agencies and public have 30 days to comment on an NOP.

The comments should to be addressed in the EIR.

EIR cannot be released for public review until 30 days after

distribution of the NOP.

Notice of Preparation (NOP)

Page 37: 2012 ceqa presentation for ce class
Page 38: 2012 ceqa presentation for ce class

Scoping Process During these 30 days, a scoping meeting

may be held to identify key environmental concerns and issues Identify possible impacts

Encourage inter-agency consultation

Consult with recognized experts

Involve public at an early stage of the review process (though not required)

Page 39: 2012 ceqa presentation for ce class
Page 40: 2012 ceqa presentation for ce class

What needs to be in the EIR?• Project description

• Environmental Setting

• Significant environmental effects

• Unavoidable significant adverse effects

• Growth-inducing impacts

• Cumulative impacts

• Mitigation measures

• Alternatives

• FEIR contains response to comments

Page 41: 2012 ceqa presentation for ce class

Typical EIR Impact Analysis Issues

• Air quality

• Biology

• Hydrology/Water quality

• Energy

• Geology/Soils

• Land Use & Planning

• Public Services

• Cultural Resources

• Traffic

• Recreation

• Agriculture

• Seismic safety

• Noise

• Aesthetics

• Hazardous materials

• Climate Change

Page 42: 2012 ceqa presentation for ce class
Page 43: 2012 ceqa presentation for ce class

Technical Studies Help provide supporting evidence for

the CEQA documents Useful to see what checklist questions

the consultant or planner is using, and tailor your report to answering those questions

Technical experts often called to give testimony at public hearing

Page 44: 2012 ceqa presentation for ce class

DSP EIR Challenges Surrounding Property Owners Noise Impacts Lighting Impacts Biological Impacts

RLF CTS

Utilities Cultural

Page 45: 2012 ceqa presentation for ce class

When the DEIR is Complete:

• Issue Public Notice of Availability (NOA)

Mailed to those previously requesting notice and,

General circulation newspaper or,

Posting in the project area or,

Direct mailing to owners/occupants of contiguous parcels

Page 46: 2012 ceqa presentation for ce class
Page 47: 2012 ceqa presentation for ce class

Sent to SCH

Brief description of project

Location

Address where environmental document is available

Notice of hearings(if one is scheduled)

Begins the 45-day public review period

Issue Notice of Completion (NOC)

Page 48: 2012 ceqa presentation for ce class

Final EIR• Includes text revisions to Draft EIR

• Includes responses to comments

• No separate public review period

• Written response to commenting agencies 10 days prior to certification

• Better to discuss everything than ignore difficult issues

Page 49: 2012 ceqa presentation for ce class

Final Decision Process

1. Consider and Certify EIR

2. Approve Project

Make Findings

Adopt Mitigation, Monitoring Program

Adopt Statement of Overriding Considerations (if necessary)

Page 50: 2012 ceqa presentation for ce class

Final CEQA Step: Notice of Determination (NOD)

• Filed within 5 working days after project

approval

• Posted with the county clerk and State

Clearinghouse for at least 30 days

Page 51: 2012 ceqa presentation for ce class

Project description Location Date of approval Determination whether will

have a significant effect on the environment

That ND/MND or EIR was prepared/certified pursuant to CEQA

Whether mitigation measures are a condition and whether Statement of Overriding Considerations was adopted

Address of where ND/MND or EIR and certification can be examined

Notice of Determination (NOD)

Page 52: 2012 ceqa presentation for ce class

The real final CEQA step . . .

After the NOD is filed…project isn’t “out of the woods”

Litigation timeframe = 30 days after NOD (or 180 days if NOD is not filed with the clerk’s office)

Page 53: 2012 ceqa presentation for ce class

CEQA and Engineers

Engineers provide: the tech studies on items such as hydrology and

drainage, traffic, geotechnical analysis

the drawings that enable CEQA writers to understand and analyze the Project

practical comments on mitigation measures

specific project design features, often to comply with mitigation measures

potential stumbling blocks for CEQA writers

Page 54: 2012 ceqa presentation for ce class

CEQA and the Public CEQA is the bridge between the hard

sciences and the public.

Technical studies will need to cater to public understanding.

Often, site plans, engineering drawings will need to be simplified for CEQA purposes.

Page 55: 2012 ceqa presentation for ce class

Take Home Tips• Be aware of possible environmental consequences of

your projects.

• When in doubt, contact the environmental division of your group. Early consultation will keep you and your project out of trouble.

• CEQA is can be a long, tedious process, but not following procedure could cause even more delays for the project.

• Engineers and environmental planners/consultants must be in close contact throughout a project to efficiently and effectively navigate the project through the environmental process.

Page 56: 2012 ceqa presentation for ce class

Helpful Websites

CEQA Statute and Guidelineshttp://ceres.ca.gov/ceqa/

Land Use Planning Information Network (LUPIN)http://ceres.ca.gov/planning/index.html

California Association of Environmental Professionals (AEP)http://www.califaep.org/

Page 57: 2012 ceqa presentation for ce class

Michael Brandman AssociatesEnvironmental Services ☼ Planning ☼

Natural Resources Management

Trevor Macenski, MSc, REAPrincipal/ Director Environmental ServicesBishop Ranch 32633 Camino Ramon, Suite 460San Ramon, CA 94583Office: 925.830.2733Mobile: 916.508.4170Email: [email protected]: CEQAplanner