SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013
Page2
"24> "#,3"28 @:26;23% $6$$2#3
"#$ %&'%()$ (* +#,) -$$+,./ ,) *(' 0(&.1,2 3$-4$')5 0,+6 7+8** 8.9 0(&.)$2 +( '$:,$; +#$ 0&''$.+Agenda for this evenings Council Meeting. 0(&.1,2 ;,22 89(%+ +#$ +$-) -86 4$ -(:$9 +( +#$ ?@AA %=-= B$/,)28+,:$7$)),(. *(' *('-82 1(.),9$'8+,(. 46 +#$ 0(&.1,2 8+ +#$ '$C&$)+ (* 8.6 0(&.1,2 3$-4$'=
7DEF"I 0EJG0>B KL>HM>GN 7H77>EG7 OKHN>GG>GN TH7H77>EG7 OKHN>GG>GN TH EG 0>"I 0"H= "QH 7H77>EG7
-
8/13/2019 2013-12-16 Full Current Packet (1)
3/329
SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013
Page3
@:26;23% $6$$2#3(3:30 p.m.)
(Council Chambers Lower Level of City Hall)(No Public Testimony Taken)
Council Reports
Staff Reports
Committee Reports
Advance Agenda Review
Current Agenda Review
571232$4:54296 $6$$2#3Roll Call of Council
"#3$634 5%6375REPORTS, CONTRACTS AND CLAIMS RECOMMENDATION
The following item (OPR 2013-0864) will be considered under Special Considerations ItemS1.a.1. Collective Bargaining Agreement with the PoliceGuild covering wages and benefits for 2012-2015
2012: $778,501; 2013: $744,665; 2014: $900,439; 2015:$950,972.
OPR 2013-0864
2. Purchase of two 2013 Ford F250 Pickup Trucks fromColumbia Ford (Longview, WA) utilizing WashingtonState Contract #06912$54,672.18 (including tax).
Approve OPR 2013-0865
3. Purchase of an Adaptive Signal Control TechnologySystem for the North Division Corridor from WesternSystems (Everett, WA) utilizing State Contract
#03709
$282,879.67.
Approve OPR 2013-0866ENG 2011075
4. Bid of KVA Electric, Inc. (Arlington, WA) forupgrading existing Switchgear at Switchyard #1Upriver Dam$92,331.95.
Approve OPR 2013-0867BID 3978-13
5. Low Bids of:
a. Garco Construction, Inc. (Spokane, WA) forUnderhill CSO (34-2) Storage Facility and Freya-
ApproveAll PRO 2013-0035ENG 2011144
-
8/13/2019 2013-12-16 Full Current Packet (1)
4/329
SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013
Page4
Thor Trunk$7,688,700 (plus tax). Anadministrative reserve of $768,870 (plus tax),which is 10% of the contract price plus tax, will beset aside.
b. Aztech Electric, Inc. (Spokane Valley, WA) for
Hamilton Street / Nevada Street PedestrianCountdown Timers$29,531. An administrativereserve of $2,953.10, which is 10% of the contractprice, will be set aside.
PRO 2013-0036
ENG 2012072
The following item (OPR 2012-0649) has been tabled indefinitely:
6. Contract amendment to provide additional funds toOtto Klein and Summit Law Group (Seattle, WA) forSpecial Counsel and arbitration services related toPolice Guild Negotiations$60,000.
OPR 2012-0649
7. Contract Renewal with Northwest Vital RecordsCenter, Inc. (Spokane, WA) for off-site recordsstorage and retrieval services for City departmentsfrom January 1, 2014, through December 31, 2014estimated $50,000.
Approve OPR 2010-0936RFP 3745-10
8. Encumbrance for additional relocation expenses forRicky Rigg and Qin Zhao, dba AM Towing (Spokane,WA) in conjunction with the Combined SewerOverflow 33-1 projectincrease of $25,000 for a totalof $145,000.
Approve &Authorize
OPR 2011-0973ENG 2010089
9. Supplemental Agreement No. 1 with Epic LandSolutions, Inc. (Spokane, WA) for Real Estate Right-of-Way Acquisition and Relocation On-CallServicesnot to exceed $250,000. Total contractamount: $550,000.
Approve OPR 2012-0858
10. Grant Agreement with the State of WashingtonDepartment of Ecology for 2013-2015 MunicipalStormwater Capacity Grant Program$170,000revenue.
Approve OPR 2013-0868ENG 2013220
11. Grant/Loan Agreements with the State of WashingtonDepartment of Ecology for:
ApproveAll
a. Combined Sewer Overflow 24, 25 and 26 ControlFacilities$1,195,000 revenue.
OPR 2013-0869ENG 2010088
b. Combined Sewer Overflow (CSO) Basin 34-2 and34-3 Control Facilities$20,719,000 revenue.
OPR 2013-0870ENG 2011144/45
-
8/13/2019 2013-12-16 Full Current Packet (1)
5/329
SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013
Page5
c. Combined Sewer Overflow (CSO) 34-1 ControlFacilities$3,478,000 revenue.
OPR 2013-0871ENG 2012088
d. Cochran Basin Stormwater Conveyance$2,000,000 revenue.
OPR 2013-0872ENG 2012500
e. Union Basin
$1,000,000 revenue. OPR 2013-0873ENG 2013221f. Wet Weather Integrated Strategic Planning
$5,220,000 revenue.OPR 2013-0874
ENG 2013600
12. Contract with Corvell Healthcare Corporation(Seattle, WA) to provide medical bill review andrelated services for the City Workers' Compensationprogram for three years beginning January 1, 2014$80,000. (Contract may be extended for twoadditional one-year periods).
Approve OPR 2013-0875BID 3932-13
The following item (PRO 2013-0037) will be considered under Special Considerations ItemS2.13. Contract Award for Design-Build Services for the
Nelson Service Center to Garco Construction, Inc. asthe Design-Build General Contractor and Bernardo-Wills Architects as the Architect and Designer ofRecord$14,200,000.
PRO 2013-0037ENG 13633
BID 3970-13
14. Report of the Mayor of pending:
a. Claims and payments of previously approved
obligations, including those of Parks and Library,through December 9, 2013, total $5,120,073.04,with Parks and Library claims approved by theirrespective boards. Warrants excluding Parks andLibrary total $5,064,303.48.
b. Payroll claims of previously approved obligationsthrough December 7, 2013: $5,930,833.20.
Approve &AuthorizePayment CPR 2013-0002
CPR 2013-0003
6D6",4296 $6$$2#3(Closed Session of Council)
(Executive Session may be held or reconvened during the 6:00 p.m. Legislative Session)
"24> "#,3"28 $6$$2#3(May be held or reconvened following the 3:30 p.m. Administrative Session)
(Council Briefing Center)
-
8/13/2019 2013-12-16 Full Current Packet (1)
6/329
SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013
Page6
This session may be held for the purpose of City Council meeting with Mayoralnominees to Boards and/or Commissions. The session is open to the public.
86%2$854296 $6$$2#3(6:00 P.M.)(Council Reconvenes in Council Chamber)
WORDS OF INSPIRATION
PLEDGE OF ALLEGIANCE
ROLL CALL OF COUNCIL
ANNOUNCEMENTS(Announcements regarding Changes to the City Council Agenda)@#5:7$ 537 "#112$$2#3$ 5==#2341634$(Includes Announcements of Boards and Commissions Vacancies)APPOINTMENTS RECOMMENDATIONPlan Commission: Two Reappointments Confirm CPR 1981-0295Northeast Development Advisory Board:One Appointment and One Reappointment
Confirm CPR 2010-0038
CITY ADMINISTRATION REPORT
"#,3"28 "#1124466 :6=#:4$(Committee Reports for Finance, Neighborhoods, Public Safety, Public Works, andPlanning/Community and Economic Development Committees and other Boards and Commissions)
#=63 ;#:,1This is an opportunity for citizens to discuss items of interest not relating to the Current or AdvanceAgendas nor relating to political campaigns/items on upcoming election ballots. This Forum shall befor a period of time not to exceed thirty minutes. After all the matters on the Agenda have been actedon, unless it is 10:00 p.m. or later, the open forum shall continue for a period of time not to exceedthirty minutes. Each speaker will be limited to three minutes, unless otherwise deemed by the Chair.If you wish to speak at the forum, please sign up on the sign-up sheet located in the Chase Gallery.
-
8/13/2019 2013-12-16 Full Current Packet (1)
7/329
SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013
Page7
86%2$854296 5%6375
3# 616:%63"> @,7%64 #:72353"6$
3# 616:%63"> #:72353"6$
3# :6$#8,42#3$
;2358 :65723% #:72353"6(Require Four Affirmative, Recorded Roll Call Votes)
ORD C35068 Relating to sitting, lying on sidewalk in a designated zone; amendingSpokane Municipal Code Section 10.10.026.
ORD C35069 (To be considered under Special Considerations Item S1.b.)
;2:$4 :65723% #:72353"6
First Reading of ORD C35609 was held on Monday, December 9, 2013. Final Reading willbe considered under Special Considerations Item S1.b.ORD C35069 Relating to the Office of Police Ombudsman; amending SMC Sections
4.32.010, 4.32.020, 4.32.030, 4.32.060, 4.32.070, 4.32.080, 4.32.090,4.32.100, 4.32.110, 4.32.140, 4.32.150, and 4.32.160.
$=6"258 "#3$276:542#3$(If there are items listed you wish to speak on, please sign your name on the sign-up sheets in theChase Gallery).
RECOMMENDATION
S1. a. Collective Bargaining Agreement with thePolice Guild covering wages and benefits for2012-20152012: $778,501; 2013: $744,665;2014: $900,439; 2015: $950,972.
Approve &AuthorizeContract
OPR 2013-0864
b. Final Reading Ordinance relating to the Office
of Police Ombudsman; amending SMCSections 4.32.010, 4.32.020, 4.32.030, 4.32.060,4.32.070, 4.32.080, 4.32.090, 4.32.100, 4.32.110,4.32.140, 4.32.150, and 4.32.160.
Pass Upon
Roll CallVote
ORD C35069
S2. Contract Award for Design-Build Services for theNelson Service Center to Garco Construction, Inc.as the Design-Build General Contractor andBernardo-Wills Architects as the Architect andDesigner of Record$14,200,000.
Approve &AuthorizeContract
PRO 2013-0037ENG 13633
BID 3970-13
-
8/13/2019 2013-12-16 Full Current Packet (1)
8/329
SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013
Page8
Request for suspension of Council Rules to add the following item:
S3. Update on action steps taken by City Council tomove forward on Downtown Livability Initiative.
Accept CPR 2013-0851
3#
-
8/13/2019 2013-12-16 Full Current Packet (1)
9/329
Agenda Sheet for City Council Meeting of:"#$"%$#&"'
"#$% &%'() "#$($#&"'
*+%,-(. /0+% 1 )*+ #&"',&-%.
&%2%3. 1
45670$$028 "%9$ /0112 31+45613 *,:.. &%; 1*:2$#'$ ?:2% 7181 9:;:; %#.,?-%. >,:@%'$ 1
*:2$#'$ ABC#0+79:;:;@3*);:81652AB)+7
D0) 132 )/ C: 6)82
E8%2)# F$%7 GH9% *DEFGHIJ K$L 6LMNEHFN &%I50.0$0:2 1 +1 "%?O" P "%?O#
E8%2)# F$%7
-
8/13/2019 2013-12-16 Full Current Packet (1)
10/329
!"#$%#&' )*)$"
)+,-./ 01234 5166.7788
%-887 982:./84
&1:86,82 ;?@
For further information, please contact Rick Romero, Director of Utilities Division 625-6361 or [email protected].
9+,A8/7
Purchase of two !ton pickup trucks for the Water Department.
!B/3C21+DE
Purchase two Ford F-250 pickup trucks utilizing the Washington State contract for$54,672.16 including tax.
#6FB/7
These trucks will replace units that have reached the end of their economic servicelives.
*/7.1D
Recommend approval
%+DE.DC
Funds are available in the Water Departments 2013 budget.
-
8/13/2019 2013-12-16 Full Current Packet (1)
11/329
Agenda Sheet for City Council Meeting of:"#$"%$#&"'
"#$% &%'() "#$($#&"'
*+%,-(. /0+% 1 )*+ #&"',&-%%
&%2%3. 1
45670$$028 "%9$ ./+00/ *,:.. &%; 1*:2$#'$ ?:2% 12+3 .0+4)5.03 6&7,#'#,--"& >,:@%'$ 1 #&""&86
*:2$#'$ ABC#0+ 1.0+4)5.039.*)32:0;)+? D0) 1E8%2)# F$%7 GH9% ;@ABCDEB
-
8/13/2019 2013-12-16 Full Current Packet (1)
12/329
!"#$
&'(#)(*+ !,!#'
$-.-/0-1 23 2456
7809-.:;
North Division Adaptive Signal Control Technology (ASCT) vehicle detection.
&1?8@A;
Procurement of an ASCT system for the North Division corridor is underway. In order tooptimize ASCT performance, additional vehicle detection is needed at each of the twelveproject intersections. Lane-by lane stop bar and advanced detection is necessary tothoroughly evaluate traffic flow. Adaptive algorithms use this detector data in conjunctionwith high resolution signal timing data to achieve operational objectives set by the signalsystem operator. Operational objectives include directional progression, equitabledistribution, smooth flow and combinations of these objectives and will be established by timeof day.
Existing loop detection that is fully functional will be utilized. Where loops are unavailableSensys Wireless Vehicle Detection System will be employed. This wireless system utilizesmagneto-resistive sensors, utilizing low power radio technology to transmit data. The SensysSystem was selected after City Signal & Lighting completed an in-field evaluation of severalsystems including: PEEK IQ video detection; Iteris Video Detection; FLIR thermal detection;MSSEDCO microwave detection and Wavetronix Matrix microwave detection. In theabsence of loop detection, Sensys System proved the most reliable detection in field trials,provides a user-friendly interface and is affordable.
(/B
-
8/13/2019 2013-12-16 Full Current Packet (1)
13/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
14/329
Agenda Sheet for City Council Meeting of:"#$"%$#&"'
"#$% &%'() "#$($#&"'
*+%,-(. /0+% 1 )*+ #&"',&-%.
&%2%3. 1
45670$$028 "%9$ /012+ 3 456+)27281+98 :2+;982: *,:.. &%; 1*:2$#'$ ?:2% :12;2 : .(#,-"?( >,:@%'$ 1
*:2$#'$ ABC#0+::@:*)A0>28915B)+C
D0) 1'D.-,"'
E8%2)# F$%7 GH9% 8EFGHIJG 9GKL &%I50.0$0:2 1 8+"'DD'
E8%2)# F$%7 > Study Session
Division Director +)d2+)S +98A Other */8 "#$#$#&"'
Finance 72:2:>2S d984272 "0.$,065$0:2 O0.$
Legal :S 82S 1420 GYHQFJK
LRK\K\FK@\YE`IFKJQG]BEHU
-
8/13/2019 2013-12-16 Full Current Packet (1)
15/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
16/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
17/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
18/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
19/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
20/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
21/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
22/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
23/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
24/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
25/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
26/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
27/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
28/329
Agenda Sheet for City Council Meeting of:!"#!$#"%!&
"#$% &%'() !"#'#"%!&
*+%,-(. /0+% 1 )*+ "%!&,%%&-
&%2%3. 1
45670$$028 "%9$ ./01/..*1/0 2.*314.2 *,:.. &%; 1*:2$#'$ ?:2% 05*6 /.72+/ $"-,$$89 >,:@%'$ 1 "%!!!''
*:2$#'$ ABC#0+ 0/.72+/:2)+;5/.41?@ABC@ 1@DE
&%I50.0$0:2 14* !&F9$
E8%2)# F$%7 A "&=%%` S?PDA @WD .?YO?DDAcR .R@OEB@Dd ?O?D
>@WDA aOPR NDAD ADCDO_DP BR Q>XX>NRe
/0.'#+ F79#'$ D5)8%$ E'':52$.^UD?RD M FT!F&T&89=-F 1 '&8% '&'!$ F'%%% -$-%! !%%&'2DXDC@ M 12DXDC@
M 12DXDC@ M 1
E99,:N#+. *:52'0+
-
8/13/2019 2013-12-16 Full Current Packet (1)
29/329
!"#$%#&'$%"# ") *"+,%#-. /&00'+1. 2&,-3$. '#, 4%5$+%6&$%"#
7-3#,' *"+,%#-
/&00'+1 82'9:-+",;
"#$%&'%($& ")*+(&,-(.)* / 0%*%1$2$*( 3 45678569:5;*-; 3 4:6?5:678A;7A6 DE)##)6 >*-; 3 4:6A?86?5:;9
-
8/13/2019 2013-12-16 Full Current Packet (1)
30/329
City Of Spokane
Engineering Services Department
* * * Bid Tabulation * * *
Project Number: 2011144
Project Description CSO 34-2 Original Date
Update DatePreparerFunding Source
Addendum
10/24/2013 1:08:07 PM
11/25/2013 4:14:50 PM
Michael MyersFederal
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Garco ConstructionInc
Unit
Price Amount
ClearwaterConstruction &Mana ement
Unit
Price Amount
Halme ConstructionInc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
101 POST-CONSTRUCTIONSURVEYING
5,050.00 10,700.00 5,600.001 * * * * * * 5,000.00 * * * * * ** * * * * * * * * * * *LS
102 REIMBURSEMENT FORTHIRD PARTY DAMAGE
1.00 1.00 1.001 1.00 1.00 1.001.00 1.00EST
103 SPCC PLAN 1,010.00 600.00 500.001 * * * * * * 907.50 * * * * * ** * * * * * * * * * * *LS
104 POTHOLING 3,410.00 3,894.00 7,260.0022 550.00 12,100.00 177.00155.00 330.00EA
105 MOBILIZATION 767,696.00 589,400.00 803,500.001 * * * * * * 509,300.00 * * * * * ** * * * * * * * * * * *LS
106 PROJECT TEMPORARYTRAFFIC CONTROL
20,200.00 34,200.00 28,700.001 * * * * * * 55,000.00 * * * * * ** * * * * * * * * * * *LS
107 SPECIAL SIGNS 1,458.00 1,320.00 1,200.00120 20.00 2,400.00 11.0012.15 10.00SF
108 SEQUENTIAL ARROWSIGN
1,260.00 700.00 980.00700 4.25 2,975.00 1.001.80 1.40HR
109 PORTABLECHANGEABLE MESSAGESIGN
1,920.00 1,200.00 1,248.00400 6.25 2,500.00 3.004.80 3.12HR
110 TYPE III BARRICADE 2,091.00 1,785.00 1,703.4051 75.00 3,825.00 35.0041.00 33.40EA
111 CLEARING ANDGRUBBING
30,300.00 35,600.00 65,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
112 MATERIALS ON HAND,TREE PROTECTION
1,212.00 1,400.00 1,200.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS
113 PRIVATE TREE ROOTTREATMENT
4,545.00 5,295.00 13,500.0015 220.00 3,300.00 353.00303.00 900.00EA
114 PUBLIC TREE STUMPGRINDING
304.00 400.00 1,800.002 400.00 800.00 200.00152.00 900.00EA
Wednesday, November 27, 2013 Page 1
-
8/13/2019 2013-12-16 Full Current Packet (1)
31/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Garco ConstructionInc
Unit
Price Amount
ClearwaterConstruction &Management
Unit
Price Amount
Halme ConstructionInc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
115 REMOVE EXISTING CURB 6,805.00 8,166.00 4,083.001361 3.30 4,491.30 6.005.00 3.00LF
116 REMOVE CEMENTCONCRETE SIDEWALK
AND DRIVEWAY
5,922.00 6,580.00 2,632.00658 6.60 4,342.80 10.009.00 4.00SY
117 REMOVE INTEGRALCEMENT CONCRETESIDEWALK AND CURB 7'WIDE
1,845.00 2,160.00 1,260.00180 24.20 4,356.00 12.0010.25 7.00SY
118 REMOVE MANHOLE,CATCH BASIN ORDRYWELL
3,542.00 4,200.00 3,290.0014 825.00 11,550.00 300.00253.00 235.00EA
119 REMOVE EXISTING 24"DIAM. CONCRETE
STORM PIPE AND 8"GAS LINE
3,060.00 3,315.00 3,952.50255 110.00 28,050.00 13.0012.00 15.50LF
120 SAWCUTTING FLEXIBLEPAVEMENT
1,310.00 1,310.00 327.501310 1.10 1,441.00 1.001.00 0.25LFI
121 SAWCUTTING RIGIDPAVEMENT
380.00 380.00 425.60380 2.80 1,064.00 1.001.00 1.12LFI
122 EXISTING FENCEREMOVAL ANDREINSTALL INUNDERHILL PARK
810.00 1,200.00 640.0020 33.00 660.00 60.0040.50 32.00LF
123 PARK PICINIC TABLEAND PEDESTAL GRILLREMOVAL AND
REPLACEMENT
4,545.00 7,101.00 3,960.003 3,300.00 9,900.00 2,367.001,515.00 1,320.00EA
124 REMOVE , STORE ANDREINSTALL ROCKBOULDERS (UNDERHILLPARK)
690.00 828.00 897.0069 55.00 3,795.00 12.0010.00 13.00EA
125 ADDITIONAL ROCKBOULDERS (UNDERHILLPARKING LOT)
910.00 1,100.00 500.0010 165.00 1,650.00 110.0091.00 50.00EA
126 REMOVE ANDREINSTALL EXISTINGLIGHT POLE(VOLLEYBALL COURT)
1,135.00 7,100.00 5,600.001 5,500.00 5,500.00 7,100.001,135.00 5,600.00EA
127 REMOVE AND REPLACEPARKING LOT LIGHT
POLE
30,300.00 21,300.00 21,900.003 4,400.00 13,200.00 7,100.0010,100.00 7,300.00EA
128 ROADWAY EXCAVATIONINCL. HAUL
52,269.00 57,771.00 45,116.402751 13.20 36,313.20 21.0019.00 16.40CY
129 REMOVE UNSUITABLEFOUNDATION MATERIALINCL. HAUL
13,520.00 15,210.00 1,690.001690 33.00 55,770.00 9.008.00 1.00CY
130 REPLACE UNSUITABLEFOUNDATION MATERIALINCL. HAUL
30,758.00 35,490.00 1,690.001690 27.50 46,475.00 21.0018.20 1.00CY
Wednesday, November 27, 2013 Page 2
-
8/13/2019 2013-12-16 Full Current Packet (1)
32/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Garco ConstructionInc
Unit
Price Amount
ClearwaterConstruction &Management
Unit
Price Amount
Halme ConstructionInc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
131 COMMON BORROWINCL. HAUL
77,745.00 87,600.00 50,370.0010950 12.10 132,495.00 8.007.10 4.60CY
132 PREPARATION OFUNTREATED ROADWAY
23,802.00 23,802.00 13,924.1711901 3.90 46,413.90 2.002.00 1.17SY
133 SHORING 165,000.00 108,600.00 120,000.001 * * * * * * 134,000.00 * * * * * ** * * * * * * * * * * *LS
134 CONTROLLED DENSITYFILL
4,646.00 5,520.00 8,740.0046 220.00 10,120.00 120.00101.00 190.00CY
135 STRUCTUREEXCAVATION CLASS AFOR STORAGE FACILITYINCLUDING HAUL
324,300.00 366,600.00 245,340.0028200 12.10 341,220.00 13.0011.50 8.70CY
136 EXTRA WORKALLOWANCE FOR ROCKEXCAVATION
30,525.00 35,750.00 26,400.00550 110.00 60,500.00 65.0055.50 48.00CY
137 GRAVEL BACKFILL FORWALLS INCL. HAUL
16,650.00 19,980.00 19,785.75555 44.00 24,420.00 36.0030.00 35.65CY
138 PEA GRAVEL 765.00 1,800.00 832.5015 55.00 825.00 120.0051.00 55.50CY
139 CRUSHED SURFACINGTOP COURSE
20,513.00 24,166.00 23,323.00562 44.00 24,728.00 43.0036.50 41.50CY
140 CRUSHED SURFACINGTOP COURSE FOR
SIDEWALKS &DRIVEWAYS
1,769.00 2,088.00 1,479.0029 82.50 2,392.50 72.0061.00 51.00CY
141 CRUSHED SURFACINGBASE COURSE FORPAVEMENTREPLACEMENT
54,811.00 39,947.00 38,553.50929 44.00 40,876.00 43.0059.00 41.50CY
142 CRUSHED SURFACINGBASE COURSE FORSTORAGE FACILITY
29,250.00 34,320.00 47,580.00780 44.00 34,320.00 44.0037.50 61.00CY
143 GRAVEL ROADSTABILIZER
6,072.00 4,800.00 4,800.0024 550.00 13,200.00 200.00253.00 200.00TO
144 HMA CL. 1/2 IN. PG 64-28, 4 INCH THICK
111,197.00 124,279.00 118,522.926541 20.00 130,820.00 19.0017.00 18.12SY
145 HMA CL. 1/2 IN. PG 70-28, 6 INCH THICK
43,165.00 49,840.00 47,472.601780 30.00 53,400.00 28.0024.25 26.67SY
146 HMA FOR TRANSITION,CL. 1/2 IN. PG 64-28, 2INCH THICK
6,969.00 8,220.00 7,668.0060 66.00 3,960.00 137.00116.15 127.80SY
147 COMPACTION PRICEADJUSTMENT
4,000.00 4,000.00 4,000.001 4,000.00 4,000.00 4,000.004,000.00 4,000.00EST
148 JOB MIX COMPLIANCEPRICE ADJUSTMENT
1.00 1.00 1.001 1.00 1.00 1.001.00 1.00CAL
Wednesday, November 27, 2013 Page 3
-
8/13/2019 2013-12-16 Full Current Packet (1)
33/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Garco ConstructionInc
Unit
Price Amount
ClearwaterConstruction &Management
Unit
Price Amount
Halme ConstructionInc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
149 CAST IN PLACECONCRETE
2,565,000.00 2,765,070.00 3,052,350.005130 715.00 3,667,950.00 539.00500.00 595.00CY
150 COMMERCIALCONCRETE
103,530.00 99,267.00 133,980.00609 220.00 133,980.00 163.00170.00 220.00CY
151 PRE-CAST CONCRETEHARTSON CONNECTORVAULT
97,000.00 99,600.00 101,100.001 * * * * * * 49,500.00 * * * * * ** * * * * * * * * * * *LS
152 WATERPROOFING 38,433.00 45,117.00 41,674.74557 49.50 27,571.50 81.0069.00 74.82SY
153 EPOXY COATING 4,760.00 5,525.00 5,720.5085 66.00 5,610.00 65.0056.00 67.30SY
154 VAPOR RETARDERBARRIERS
1,914.00 1,595.00 6,380.00319 3.30 1,052.70 5.006.00 20.00SY
155 BOLLARDS 14,950.00 24,804.00 11,960.0013 1,067.00 13,871.00 1,908.001,150.00 920.00EA
156 CONNECT 6 IN.DIAMETER PIPE TOEXISTING CATCH BASIN,DRYWELL, OR MANHOLE
1,062.00 1,200.00 855.003 550.00 1,650.00 400.00354.00 285.00EA
157 CONNECT 8 IN.DIAMETER PIPE TOEXISTING CATCH BASIN,DRYWELL, OR MANHOLE
4,745.00 5,603.00 3,770.0013 550.00 7,150.00 431.00365.00 290.00EA
158 STORM SEWER PIPE 8
IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
1,587.00 1,794.00 1,669.8069 44.00 3,036.00 26.0023.00 24.20LF
159 DUCTILE IRON STORMSEWER PIPE 8 IN. DIAM.,INCL. STRUCTURALEXCAVATION CLASS B
11,800.00 13,570.00 11,416.50295 60.50 17,847.50 46.0040.00 38.70LF
160 DUCTILE IRON STORMSEWER PIPE 24 IN.DIAM., INCL.STRUCTURALEXCAVATION CLASS B
4,160.00 4,800.00 2,280.0016 165.00 2,640.00 300.00260.00 142.50LF
161 8 IN. DIAM. STEELCASING PIPE
710.00 830.00 885.0010 22.00 220.00 83.0071.00 88.50LF
162 10 IN. DIAM. STEELCASING PIPE
2,093.00 2,507.00 1,779.0523 24.20 556.60 109.0091.00 77.35LF
163 12 IN. DIAM. STEELCASING PIPE
1,420.00 1,700.00 1,968.0020 26.40 528.00 85.0071.00 98.40LF
164 HAND HOLES FOR FLOWMONITORINGEQUIPMENT
7,575.00 11,900.00 6,100.005 2,200.00 11,000.00 2,380.001,515.00 1,220.00EA
165 REMOVE AND REPLACE(COS) MH FRAME ANDGRATE
5,306.00 6,202.00 4,690.007 550.00 3,850.00 886.00758.00 670.00EA
Wednesday, November 27, 2013 Page 4
-
8/13/2019 2013-12-16 Full Current Packet (1)
34/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Garco ConstructionInc
Unit
Price Amount
ClearwaterConstruction &Management
Unit
Price Amount
Halme ConstructionInc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
166 MANHOLE TYPE I-48,BASIC PRICE
18,510.00 21,702.00 20,100.006 2,750.00 16,500.00 3,617.003,085.00 3,350.00EA
167 MANHOLE ADDITIONALHEIGHT 48 IN. DIAM.TYPE I
81.00 100.00 200.001 110.00 110.00 100.0081.00 200.00VF
168 MANHOLE TYPE III-72,BASIC PRICE
26,765.00 31,400.00 31,000.005 7,150.00 35,750.00 6,280.005,353.00 6,200.00EA
169 MANHOLE ADDITIONALHEIGHT 72 IN. DIAM.TYPE III
1,616.00 1,904.00 1,600.008 165.00 1,320.00 238.00202.00 200.00VF
170 MANHOLE TYPE III-96,BASIC PRICE
17,170.00 20,200.00 20,000.002 14,300.00 28,600.00 10,100.008,585.00 10,000.00EA
171 MANHOLE ADDITIONALHEIGHT 96 IN. DIAM.TYPE III
1,260.00 1,476.00 800.004 220.00 880.00 369.00315.00 200.00VF
172 MANHOLE TYPE V,BASIC PRICE
94,800.00 111,300.00 174,000.0012 6,050.00 72,600.00 9,275.007,900.00 14,500.00EA
173 MANHOLE ADDITIONALHEIGHT TYPE V
923.00 1,079.00 2,600.0013 165.00 2,145.00 83.0071.00 200.00VF
174 DRYWELL TYPE 2 3,232.00 3,800.00 3,270.001 4,400.00 4,400.00 3,800.003,232.00 3,270.00EA
175 ADJUST EXISTINGVALVE BOX IN ASPHALT
6,270.00 7,296.00 3,667.0019 330.00 6,270.00 384.00330.00 193.00EA
176 ADJUST EXISTINGVALVE BOX IN UNPAVED
AREA
1,239.00 1,498.00 1,351.007 165.00 1,155.00 214.00177.00 193.00EA
177 ADJUST EXISTINGMANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET IN
ASPHALT
4,880.00 5,704.00 3,000.008 330.00 2,640.00 713.00610.00 375.00EA
178 ADJUST EXISTINGMANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET INUNPAVED AREA
1,365.00 1,599.00 1,125.003 275.00 825.00 533.00455.00 375.00EA
179 CATCH BASIN TYPE 0 1,560.00 1,800.00 1,360.001 2,310.00 2,310.00 1,800.001,560.00 1,360.00EA
180 CATCH BASIN TYPE 1 7,680.00 9,000.00 6,560.004 2,750.00 11,000.00 2,250.001,920.00 1,640.00EA
181 CATCH BASIN TYPE 2 4,510.00 8,300.00 4,070.002 2,970.00 5,940.00 4,150.002,255.00 2,035.00EA
182 CATCH BASIN TYPE 4 5,200.00 6,100.00 4,200.002 3,300.00 6,600.00 3,050.002,600.00 2,100.00EA
Wednesday, November 27, 2013 Page 5
-
8/13/2019 2013-12-16 Full Current Packet (1)
35/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Garco ConstructionInc
Unit
Price Amount
ClearwaterConstruction &Management
Unit
Price Amount
Halme ConstructionInc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
183 FRAME AND GRATE FORCATCH BASIN ORGRATE INLET
2,430.00 2,799.00 6,570.009 550.00 4,950.00 311.00270.00 730.00EA
184 MANHOLE OR DRYWELLFRAME AND COVER(STANDARD)
2,505.00 2,901.00 2,010.003 440.00 1,320.00 967.00835.00 670.00EA
185 MANHOLE OR DRYWELLFRAME AND COVER(LOCKABLE)
23,895.00 27,999.00 19,035.0027 550.00 14,850.00 1,037.00885.00 705.00EA
186 CONNECT 24 IN. DIAM.(D.I.) PIPE TO EXISTINGCATCH BASIN,DRYWELL, OR MANHOLE
710.00 830.00 1,035.001 880.00 880.00 830.00710.00 1,035.00EA
187 RECONSTRUCT
MANHOLE INVERT
4,860.00 5,700.00 7,500.006 1,100.00 6,600.00 950.00810.00 1,250.00EA
188 MANHOLE TEST 3,210.00 3,798.00 4,200.006 550.00 3,300.00 633.00535.00 700.00EA
189 TRENCH SAFETYSYSTEM
6,870.00 8,100.00 19,500.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
190 REMOVE UNSUITABLEPIPE FOUNDATIONMATERIAL
3,000.00 3,600.00 5,700.00300 33.00 9,900.00 12.0010.00 19.00CY
191 REPLACE UNSUITABLEPIPE FOUNDATIONMATERIAL
7,575.00 9,000.00 4,000.00500 27.50 13,750.00 18.0015.15 8.00CY
192 SIDE SEWER VIDEO
INSPECTION
990.00 1,200.00 1,260.003 330.00 990.00 400.00330.00 420.00EA
193 TEMPORARY ADJACENTUTILITY SUPPORT
4,600.00 5,400.00 5,860.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
194 PHASE 1 GAS LINEWORK IN FREYA ST.
3,050.00 3,900.00 3,400.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS
195 PHASE 2 GAS LINEWORK IN FREYA ST.
8,960.00 10,560.00 13,312.00320 16.50 5,280.00 33.0028.00 41.60LF
196 SELECT BEDDING FOR8" GAS LINE IN FREYA
1,952.00 2,240.00 4,480.00320 30.80 9,856.00 7.006.10 14.00LF
197 EXTRA WORKALLOWANCE FORRESTRAINED WORK
AREAS
32,844.00 37,996.00 6,890.80644 11.00 7,084.00 59.0051.00 10.70LF
198 ENCASE WATER /SEWER AT CROSSINGS
1,700.00 2,000.00 4,050.0050 33.00 1,650.00 40.0034.00 81.00LF
199 CLEANING EXISTINGSANITARY/STORMSEWERS
7,070.00 8,300.00 11,100.001 * * * * * * 3,850.00 * * * * * ** * * * * * * * * * * *LS
200 FISKE WATER MAINEXTENSION
12,625.00 8,300.00 9,600.001 * * * * * * 1,950.00 * * * * * ** * * * * * * * * * * *LS
Wednesday, November 27, 2013 Page 6
-
8/13/2019 2013-12-16 Full Current Packet (1)
36/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Garco ConstructionInc
Unit
Price Amount
ClearwaterConstruction &Management
Unit
Price Amount
Halme ConstructionInc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
201 TAP & METERAPPLICATION FEE
5,050.00 2,155.00 2,155.001 7,920.00 7,920.00 2,155.005,050.00 2,155.00EA
202 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR 4"WATER SERVICE TAP(FISKE/9TH)
2,650.00 3,100.00 4,782.001 * * * * * * 7,150.00 * * * * * ** * * * * * * * * * * *LS
203 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/REINSTALLATION (REGAL/HARTSON)
1,750.00 2,100.00 4,782.001 * * * * * * 6,600.00 * * * * * ** * * * * * * * * * * *LS
204 TRENCH EXCAVATION,
COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/RELOCATION(RAY STREET)
1,750.00 2,100.00 4,782.001 * * * * * * 13,200.00 * * * * * ** * * * * * * * * * * *LS
205 CSO FACILITY WATERSUPPLY ANDBACKFLOW PREVENTER
ASSEMBLIES
33,350.00 39,200.00 51,000.001 * * * * * * 78,211.70 * * * * * ** * * * * * * * * * * *LS
206 SANITARY SEWER PIPE6 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
1,935.00 2,205.00 7,875.0045 55.00 2,475.00 49.0043.00 175.00LF
207 SANITARY SEWER PIPE8 IN. DIAM. INCL.
STRUCTURALEXCAVATION CLASS B
750.00 900.00 1,335.0015 66.00 990.00 60.0050.00 89.00LF
208 SANITARY SEWER PIPE10 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
1,560.00 1,800.00 2,070.0030 71.50 2,145.00 60.0052.00 69.00LF
209 SANITARY SEWER PIPE24 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
10,115.00 11,900.00 14,161.00119 165.00 19,635.00 100.0085.00 119.00LF
210 SANITARY SEWER PIPE36 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
1,560.00 1,800.00 2,256.0012 220.00 2,640.00 150.00130.00 188.00LF
211 SANITARY SEWER PIPE42 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
175,938.00 253,995.00 255,234.001239 253.00 313,467.00 205.00142.00 206.00LF
212 SANITARY SEWER PIPE48 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
227,040.00 302,280.00 294,360.001320 275.00 363,000.00 229.00172.00 223.00LF
213 SANITARY SEWER PIPE54 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
204,480.00 287,550.00 293,940.001065 385.00 410,025.00 270.00192.00 276.00LF
Wednesday, November 27, 2013 Page 7
-
8/13/2019 2013-12-16 Full Current Packet (1)
37/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Garco ConstructionInc
Unit
Price Amount
ClearwaterConstruction &Management
Unit
Price Amount
Halme ConstructionInc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
214 54 INCH RCP JOINTWRAP
3,636.00 4,300.00 3,055.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS
215 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW
AT THOR ST. SEWER
3,890.00 4,600.00 10,550.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
216 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW
AT FREYA ST.
9,115.00 10,700.00 14,700.001 * * * * * * 16,500.00 * * * * * ** * * * * * * * * * * *LS
217 MAINTENANCE ANDCONNECTION OFEXISTING STORM FLOW
AT FREYA ST.
3,890.00 4,600.00 8,300.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
218 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW
AT HARTSONCONNECTOR VAULT
14,585.00 17,125.00 37,000.001 * * * * * * 22,000.00 * * * * * ** * * * * * * * * * * *LS
219 SIDE SEWER PIPE 4 IN.DIAM. DUCTILE IRON
1,200.00 1,400.00 2,200.0020 55.00 1,100.00 70.0060.00 110.00LF
220 SIDE SEWER PIPE 6 IN.DIAM.
3,876.00 4,484.00 6,156.0076 55.00 4,180.00 59.0051.00 81.00LF
221 SIDE SEWER PIPE 6 IN.DIAM. DUCTILE IRON
1,300.00 1,500.00 2,080.0020 66.00 1,320.00 75.0065.00 104.00LF
222 SIDE SEWER PERMIT 4,120.00 9,500.00 160.004 44.00 176.00 2,375.001,030.00 40.00EA
223 SEWER CLEANOUT 3,030.00 2,400.00 880.002 825.00 1,650.00 1,200.001,515.00 440.00EA
224 FLOW CONTROLDEVICES & CONTROLS
252,500.00 224,600.00 192,000.001 * * * * * * 228,073.10 * * * * * ** * * * * * * * * * * *LS
225 DETENTION TANKAPPURTENANCES
378,750.00 254,900.00 300,000.001 * * * * * * 643,400.30 * * * * * ** * * * * * * * * * * *LS
226 ESC LEAD 5,050.00 1,200.00 5,680.001 * * * * * * 2,750.00 * * * * * ** * * * * * * * * * * *LS
227 INLET PROTECTION 1,720.00 2,000.00 1,100.0020 82.50 1,650.00 100.0086.00 55.00EA
228 SILT FENCE 5,600.00 4,000.00 2,600.00800 5.00 4,000.00 5.007.00 3.25LF
229 STABILIZEDCONSTRUCTIONENTRANCE
1,625.00 1,900.00 2,300.00100 38.50 3,850.00 19.0016.25 23.00SY
230 SOIL AERATION ANDDECOMPACTION FORUNDERHILL PARK
2,000.00 2,000.00 2,800.002000 0.70 1,400.00 1.001.00 1.40SY
Wednesday, November 27, 2013 Page 8
-
8/13/2019 2013-12-16 Full Current Packet (1)
38/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Garco ConstructionInc
Unit
Price Amount
ClearwaterConstruction &Management
Unit
Price Amount
Halme ConstructionInc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
231 TOPSOIL TYPE A, 4 INCHTHICK
68,328.00 63,072.00 49,406.4021024 5.00 105,120.00 3.003.25 2.35SY
232 HYDROSEEDING 2,388.00 2,388.00 4,477.501194 2.80 3,343.20 2.002.00 3.75SY
233 PARK AREA SODINSTALLATION(NEATLINE)
74,496.00 93,120.00 80,641.9218624 22.00 409,728.00 5.004.00 4.33SY
234 SOD INSTALLATION 1,350.00 1,350.00 3,532.50225 13.20 2,970.00 6.006.00 15.70SY
235 SHRUBS ANDLANDSCAPING FORUNDERHILL PARK
280.00 300.00 310.001 * * * * * * 1,760.00 * * * * * ** * * * * * * * * * * *LS
236 REPLACE EXISTINGIRRIGATION SYSTEM
35,600.00 41,800.00 39,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
237 DESIGN AND INSTALLNEW IRRIGATIONSYSTEM
11,600.00 13,600.00 12,750.001 * * * * * * 16,500.00 * * * * * ** * * * * * * * * * * *LS
238 WINTERIZATION OFTEMPORARY ANDEXISTING IRRIGATIONSYSTEM
1,415.00 1,700.00 1,120.001 * * * * * * 550.00 * * * * * ** * * * * * * * * * * *LS
239 REMOVE AND CAPIRRIGATION LINES
9,890.00 11,600.00 11,000.001 * * * * * * 1,650.00 * * * * * ** * * * * * * * * * * *LS
240 CEMENT CONCRETECURB
19,054.00 21,776.00 24,498.001361 16.50 22,456.50 16.0014.00 18.00LF
241 REMOVE AND REPLACEPARKING WHEEL STOPS
5,616.00 5,712.00 6,144.0048 107.30 5,150.40 119.00117.00 128.00EA
242 CEMENT CONCRETEDRIVEWAY NONCOMMERCIAL
7,030.00 8,325.00 8,510.00185 44.00 8,140.00 45.0038.00 46.00SY
243 CEMENT CONCRETEDRIVEWAY TRANSITION
1,638.00 1,890.00 1,932.0042 38.50 1,617.00 45.0039.00 46.00SY
244 TEMPORARYCONSTRUCTIONFENCING (6 FOOT HIGH-CYCLONE)
5,500.00 10,000.00 8,500.002500 33.00 82,500.00 4.002.20 3.40LF
245 CEMENT CONC.SIDEWALK
1,680.00 1,960.00 2,088.8056 55.00 3,080.00 35.0030.00 37.30SY
246 RAMP DETECTABLEWARNING
640.00 704.00 676.8032 46.20 1,478.40 22.0020.00 21.15SF
247 ELECTRICAL EQUIPMENT 133,800.00 129,500.00 176,750.001 * * * * * * 140,607.00 * * * * * ** * * * * * * * * * * *LS
248 ELECTRICAL &MECHANICALEQUIPMENT FREIGHT &STARTUP SERVICES
1,515.00 51,200.00 4,500.001 * * * * * * 39,600.00 * * * * * ** * * * * * * * * * * *LS
Wednesday, November 27, 2013 Page 9
-
8/13/2019 2013-12-16 Full Current Packet (1)
39/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Garco ConstructionInc
Unit
Price Amount
ClearwaterConstruction &Management
Unit
Price Amount
Halme ConstructionInc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
249 SIGNING, PERMANENT 1,060.00 2,400.00 1,160.001 * * * * * * 2,200.00 * * * * * ** * * * * * * * * * * *LS
250 PAVEMENT MARKING -DURABLE HEAT APPLIED
410.00 492.00 440.7541 11.00 451.00 12.0010.00 10.75SF
251 PAVEMENT MARKING -PAINT
635.00 500.00 700.001 * * * * * * 30.99 * * * * * ** * * * * * * * * * * *LS
252 BLOCK RETAINING WALL 8,710.00 10,140.00 9,802.00260 88.00 22,880.00 39.0033.50 37.70VSF
253 CEMENT CONCRETEINTEGRAL CURB ANDSIDEWALK 7 FT. WIDE
4,400.00 5,280.00 6,743.00220 60.50 13,310.00 24.0020.00 30.65LF
254 VEHICLE GATEASSEMBLY
3,535.00 9,500.00 2,930.001 * * * * * * 9,900.00 * * * * * ** * * * * * * * * * * *LS
255 MECHANICAL ANDODOR CONTROLEQUIPMENT
770,000.00 675,700.00 544,000.001 * * * * * * 666,894.00 * * * * * ** * * * * * * * * * * *LS
256 FINAL SITEPREPARATION
12,625.00 18,500.00 9,400.001 * * * * * * 22,000.00 * * * * * ** * * * * * * * * * * *LS
257 REMOVE AND REPLACEEXISTING BASEBALLDIAMOND
15,150.00 13,000.00 4,160.001 * * * * * * 19,800.00 * * * * * ** * * * * * * * * * * *LS
258 REMOVE AND REPLACEEXISTING VOLLEYBALLCOURT
15,150.00 28,700.00 12,000.001 * * * * * * 22,550.00 * * * * * ** * * * * * * * * * * *LS
7,688,700.00 7,957,487.00 8,163,399.909,985,901.09Schedule Totals
Wednesday, November 27, 2013 Page 10
-
8/13/2019 2013-12-16 Full Current Packet (1)
40/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Graham Construction& Management Inc
Unit
Price Amount
Apollo Inc
Unit
Price Amount
MDM Construction
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
101 POST-CONSTRUCTIONSURVEYING
10,000.00 5,000.00 19,080.001 * * * * * * 5,000.00 * * * * * ** * * * * * * * * * * *LS
102 REIMBURSEMENT FORTHIRD PARTY DAMAGE
1.00 1.00 1.001 1.00 1.00 1.001.00 1.00EST
103 SPCC PLAN 500.00 800.00 792.001 * * * * * * 907.50 * * * * * ** * * * * * * * * * * *LS
104 POTHOLING 3,300.00 17,380.00 9,438.0022 550.00 12,100.00 790.00150.00 429.00EA
105 MOBILIZATION 792,731.00 467,000.00 800,000.001 * * * * * * 509,300.00 * * * * * ** * * * * * * * * * * *LS
106 PROJECT TEMPORARYTRAFFIC CONTROL 60,000.00 73,000.00 96,640.001 * * * * * * 55,000.00 * * * * * ** * * * * * * * * * * *LS
107 SPECIAL SIGNS 2,400.00 2,040.00 2,100.00120 20.00 2,400.00 17.0020.00 17.50SF
108 SEQUENTIAL ARROWSIGN
2,100.00 3,395.00 3,430.00700 4.25 2,975.00 4.853.00 4.90HR
109 PORTABLECHANGEABLE MESSAGESIGN
2,000.00 3,440.00 3,480.00400 6.25 2,500.00 8.605.00 8.70HR
110 TYPE III BARRICADE 5,100.00 2,754.00 2,754.0051 75.00 3,825.00 54.00100.00 54.00EA
111 CLEARING ANDGRUBBING 30,000.00 30,000.00 52,910.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
112 MATERIALS ON HAND,TREE PROTECTION
1,200.00 10,000.00 20,000.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS
113 PRIVATE TREE ROOTTREATMENT
4,500.00 5,700.00 5,250.0015 220.00 3,300.00 380.00300.00 350.00EA
114 PUBLIC TREE STUMPGRINDING
300.00 2,600.00 600.002 400.00 800.00 1,300.00150.00 300.00EA
115 REMOVE EXISTING CURB 6,805.00 4,627.40 1,633.201361 3.30 4,491.30 3.405.00 1.20LF
116 REMOVE CEMENT
CONCRETE SIDEWALKAND DRIVEWAY
5,593.00 4,277.00 3,553.20658 6.60 4,342.80 6.508.50 5.40SY
117 REMOVE INTEGRALCEMENT CONCRETESIDEWALK AND CURB 7'WIDE
1,800.00 1,260.00 972.00180 24.20 4,356.00 7.0010.00 5.40SY
118 REMOVE MANHOLE,CATCH BASIN ORDRYWELL
3,500.00 6,580.00 3,010.0014 825.00 11,550.00 470.00250.00 215.00EA
Wednesday, November 27, 2013 Page 11
-
8/13/2019 2013-12-16 Full Current Packet (1)
41/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Graham Construction& Management Inc
Unit
Price Amount
Apollo Inc
Unit
Price Amount
MDM Construction
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
119 REMOVE EXISTING 24"DIAM. CONCRETESTORM PIPE AND 8"GAS LINE
2,805.00 9,881.25 561.00255 110.00 28,050.00 38.7511.00 2.20LF
120 SAWCUTTING FLEXIBLEPAVEMENT
393.00 1,048.00 393.001310 1.10 1,441.00 0.800.30 0.30LFI
121 SAWCUTTING RIGIDPAVEMENT
239.40 323.00 247.00380 2.80 1,064.00 0.850.63 0.65LFI
122 EXISTING FENCEREMOVAL ANDREINSTALL INUNDERHILL PARK
240.00 258.00 1,040.0020 33.00 660.00 12.9012.00 52.00LF
123 PARK PICINIC TABLE
AND PEDESTAL GRILLREMOVAL ANDREPLACEMENT
4,500.00 2,910.00 8,505.003 3,300.00 9,900.00 970.001,500.00 2,835.00EA
124 REMOVE , STORE ANDREINSTALL ROCKBOULDERS (UNDERHILLPARK)
690.00 3,450.00 5,244.0069 55.00 3,795.00 50.0010.00 76.00EA
125 ADDITIONAL ROCKBOULDERS (UNDERHILLPARKING LOT)
900.00 1,850.00 1,280.0010 165.00 1,650.00 185.0090.00 128.00EA
126 REMOVE ANDREINSTALL EXISTINGLIGHT POLE(VOLLEYBALL COURT)
1,120.00 1,600.00 1,210.001 5,500.00 5,500.00 1,600.001,120.00 1,210.00EA
127 REMOVE AND REPLACEPARKING LOT LIGHTPOLE
8,760.00 3,450.00 3,000.003 4,400.00 13,200.00 1,150.002,920.00 1,000.00EA
128 ROADWAY EXCAVATIONINCL. HAUL
49,518.00 20,632.50 31,636.502751 13.20 36,313.20 7.5018.00 11.50CY
129 REMOVE UNSUITABLEFOUNDATION MATERIALINCL. HAUL
13,520.00 13,942.50 18,590.001690 33.00 55,770.00 8.258.00 11.00CY
130 REPLACE UNSUITABLEFOUNDATION MATERIALINCL. HAUL
30,420.00 18,928.00 16,900.001690 27.50 46,475.00 11.2018.00 10.00CY
131 COMMON BORROWINCL. HAUL
76,650.00 142,350.00 164,250.0010950 12.10 132,495.00 13.007.00 15.00CY
132 PREPARATION OFUNTREATED ROADWAY
23,802.00 10,710.90 27,372.3011901 3.90 46,413.90 0.902.00 2.30SY
133 SHORING 50,000.00 105,000.00 180,000.001 * * * * * * 134,000.00 * * * * * ** * * * * * * * * * * *LS
134 CONTROLLED DENSITYFILL
4,600.00 4,508.00 4,876.0046 220.00 10,120.00 98.00100.00 106.00CY
Wednesday, November 27, 2013 Page 12
-
8/13/2019 2013-12-16 Full Current Packet (1)
42/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Graham Construction& Management Inc
Unit
Price Amount
Apollo Inc
Unit
Price Amount
MDM Construction
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
135 STRUCTUREEXCAVATION CLASS AFOR STORAGE FACILITYINCLUDING HAUL
317,250.00 250,980.00 296,100.0028200 12.10 341,220.00 8.9011.25 10.50CY
136 EXTRA WORKALLOWANCE FOR ROCKEXCAVATION
30,250.00 20,350.00 23,650.00550 110.00 60,500.00 37.0055.00 43.00CY
137 GRAVEL BACKFILL FORWALLS INCL. HAUL
16,650.00 28,110.75 14,430.00555 44.00 24,420.00 50.6530.00 26.00CY
138 PEA GRAVEL 900.00 1,725.00 382.5015 55.00 825.00 115.0060.00 25.50CY
139 CRUSHED SURFACINGTOP COURSE
20,232.00 28,662.00 30,629.00562 44.00 24,728.00 51.0036.00 54.50CY
140 CRUSHED SURFACINGTOP COURSE FORSIDEWALKS &DRIVEWAYS
1,595.00 1,073.00 710.5029 82.50 2,392.50 37.0055.00 24.50CY
141 CRUSHED SURFACINGBASE COURSE FORPAVEMENTREPLACEMENT
33,444.00 45,985.50 37,624.50929 44.00 40,876.00 49.5036.00 40.50CY
142 CRUSHED SURFACINGBASE COURSE FORSTORAGE FACILITY
28,860.00 38,376.00 31,200.00780 44.00 34,320.00 49.2037.00 40.00CY
143 GRAVEL ROADSTABILIZER
4,080.00 3,600.00 7,680.0024 550.00 13,200.00 150.00170.00 320.00TO
144 HMA CL. 1/2 IN. PG 64-28, 4 INCH THICK
106,618.30 114,467.50 114,467.506541 20.00 130,820.00 17.5016.30 17.50SY
145 HMA CL. 1/2 IN. PG 70-28, 6 INCH THICK
42,720.00 45,835.00 46,280.001780 30.00 53,400.00 25.7524.00 26.00SY
146 HMA FOR TRANSITION,CL. 1/2 IN. PG 64-28, 2INCH THICK
6,900.00 7,410.00 1,290.0060 66.00 3,960.00 123.50115.00 21.50SY
147 COMPACTION PRICEADJUSTMENT
4,000.00 4,000.00 4,000.001 4,000.00 4,000.00 4,000.004,000.00 4,000.00EST
148 JOB MIX COMPLIANCEPRICE ADJUSTMENT
1.00 1.00 1.001 1.00 1.00 1.001.00 1.00CAL
149 CAST IN PLACECONCRETE
3,175,470.00 3,298,590.00 3,078,000.005130 715.00 3,667,950.00 643.00619.00 600.00CY
150 COMMERCIALCONCRETE
164,430.00 133,980.00 176,610.00609 220.00 133,980.00 220.00270.00 290.00CY
151 PRE-CAST CONCRETEHARTSON CONNECTORVAULT
84,000.00 48,000.00 50,000.001 * * * * * * 49,500.00 * * * * * ** * * * * * * * * * * *LS
152 WATERPROOFING 37,497.24 40,104.00 40,661.00557 49.50 27,571.50 72.0067.32 73.00SY
Wednesday, November 27, 2013 Page 13
-
8/13/2019 2013-12-16 Full Current Packet (1)
43/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Graham Construction& Management Inc
Unit
Price Amount
Apollo Inc
Unit
Price Amount
MDM Construction
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
153 EPOXY COATING 4,250.85 4,930.00 4,972.5085 66.00 5,610.00 58.0050.01 58.50SY
154 VAPOR RETARDERBARRIERS
319.00 3,764.20 1,020.80319 3.30 1,052.70 11.801.00 3.20SY
155 BOLLARDS 15,600.00 9,750.00 15,990.0013 1,067.00 13,871.00 750.001,200.00 1,230.00EA
156 CONNECT 6 IN.DIAMETER PIPE TOEXISTING CATCH BASIN,DRYWELL, OR MANHOLE
1,050.00 2,880.00 846.003 550.00 1,650.00 960.00350.00 282.00EA
157 CONNECT 8 IN.DIAMETER PIPE TO
EXISTING CATCH BASIN,DRYWELL, OR MANHOLE
4,680.00 12,480.00 4,927.0013 550.00 7,150.00 960.00360.00 379.00EA
158 STORM SEWER PIPE 8IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
1,518.00 1,283.40 3,933.0069 44.00 3,036.00 18.6022.00 57.00LF
159 DUCTILE IRON STORMSEWER PIPE 8 IN. DIAM.,INCL. STRUCTURALEXCAVATION CLASS B
11,505.00 8,997.50 21,092.50295 60.50 17,847.50 30.5039.00 71.50LF
160 DUCTILE IRON STORMSEWER PIPE 24 IN.DIAM., INCL.STRUCTURALEXCAVATION CLASS B
4,080.00 2,912.00 4,240.0016 165.00 2,640.00 182.00255.00 265.00LF
161 8 IN. DIAM. STEELCASING PIPE
700.00 490.00 540.0010 22.00 220.00 49.0070.00 54.00LF
162 10 IN. DIAM. STEELCASING PIPE
2,070.00 1,288.00 1,437.5023 24.20 556.60 56.0090.00 62.50LF
163 12 IN. DIAM. STEELCASING PIPE
1,400.00 1,480.00 1,590.0020 26.40 528.00 74.0070.00 79.50LF
164 HAND HOLES FOR FLOWMONITORINGEQUIPMENT
1,250.00 8,200.00 6,850.005 2,200.00 11,000.00 1,640.00250.00 1,370.00EA
165 REMOVE AND REPLACE(COS) MH FRAME ANDGRATE
5,250.00 2,149.00 6,146.007 550.00 3,850.00 307.00750.00 878.00EA
166 MANHOLE TYPE I-48,BASIC PRICE
18,300.00 19,440.00 21,000.006 2,750.00 16,500.00 3,240.003,050.00 3,500.00EA
167 MANHOLE ADDITIONALHEIGHT 48 IN. DIAM.TYPE I
80.00 110.00 112.001 110.00 110.00 110.0080.00 112.00VF
168 MANHOLE TYPE III-72,BASIC PRICE
26,500.00 33,200.00 22,825.005 7,150.00 35,750.00 6,640.005,300.00 4,565.00EA
Wednesday, November 27, 2013 Page 14
-
8/13/2019 2013-12-16 Full Current Packet (1)
44/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Graham Construction& Management Inc
Unit
Price Amount
Apollo Inc
Unit
Price Amount
MDM Construction
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
169 MANHOLE ADDITIONALHEIGHT 72 IN. DIAM.TYPE III
1,600.00 880.00 1,560.008 165.00 1,320.00 110.00200.00 195.00VF
170 MANHOLE TYPE III-96,BASIC PRICE
17,000.00 23,800.00 14,380.002 14,300.00 28,600.00 11,900.008,500.00 7,190.00EA
171 MANHOLE ADDITIONALHEIGHT 96 IN. DIAM.TYPE III
1,244.00 440.00 1,004.004 220.00 880.00 110.00311.00 251.00VF
172 MANHOLE TYPE V,BASIC PRICE
93,840.00 82,800.00 34,680.0012 6,050.00 72,600.00 6,900.007,820.00 2,890.00EA
173 MANHOLE ADDITIONALHEIGHT TYPE V
910.00 1,430.00 955.5013 165.00 2,145.00 110.0070.00 73.50VF
174 DRYWELL TYPE 2 3,200.00 4,100.00 4,075.001 4,400.00 4,400.00 4,100.003,200.00 4,075.00EA
175 ADJUST EXISTINGVALVE BOX IN ASPHALT
6,175.00 1,900.00 4,522.0019 330.00 6,270.00 100.00325.00 238.00EA
176 ADJUST EXISTINGVALVE BOX IN UNPAVED
AREA
1,225.00 700.00 1,463.007 165.00 1,155.00 100.00175.00 209.00EA
177 ADJUST EXISTINGMANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET IN
ASPHALT
4,832.00 2,480.00 2,104.008 330.00 2,640.00 310.00604.00 263.00EA
178 ADJUST EXISTING
MANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET INUNPAVED AREA
1,350.00 930.00 654.003 275.00 825.00 310.00450.00 218.00EA
179 CATCH BASIN TYPE 0 1,542.00 2,900.00 2,025.001 2,310.00 2,310.00 2,900.001,542.00 2,025.00EA
180 CATCH BASIN TYPE 1 7,560.00 10,000.00 9,160.004 2,750.00 11,000.00 2,500.001,890.00 2,290.00EA
181 CATCH BASIN TYPE 2 4,460.00 3,400.00 4,340.002 2,970.00 5,940.00 1,700.002,230.00 2,170.00EA
182 CATCH BASIN TYPE 4 5,138.00 4,100.00 5,790.002 3,300.00 6,600.00 2,050.002,569.00 2,895.00EA
183 FRAME AND GRATE FORCATCH BASIN ORGRATE INLET
2,385.00 2,475.00 2,358.009 550.00 4,950.00 275.00265.00 262.00EA
184 MANHOLE OR DRYWELLFRAME AND COVER(STANDARD)
2,475.00 1,680.00 753.003 440.00 1,320.00 560.00825.00 251.00EA
185 MANHOLE OR DRYWELLFRAME AND COVER(LOCKABLE)
23,625.00 15,660.00 7,533.0027 550.00 14,850.00 580.00875.00 279.00EA
Wednesday, November 27, 2013 Page 15
-
8/13/2019 2013-12-16 Full Current Packet (1)
45/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Graham Construction& Management Inc
Unit
Price Amount
Apollo Inc
Unit
Price Amount
MDM Construction
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
186 CONNECT 24 IN. DIAM.(D.I.) PIPE TO EXISTINGCATCH BASIN,DRYWELL, OR MANHOLE
700.00 1,254.00 499.001 880.00 880.00 1,254.00700.00 499.00EA
187 RECONSTRUCTMANHOLE INVERT
4,800.00 6,600.00 8,040.006 1,100.00 6,600.00 1,100.00800.00 1,340.00EA
188 MANHOLE TEST 3,180.00 1,740.00 2,826.006 550.00 3,300.00 290.00530.00 471.00EA
189 TRENCH SAFETYSYSTEM
6,800.00 5,400.00 1,620.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
190 REMOVE UNSUITABLEPIPE FOUNDATION
MATERIAL
3,000.00 2,520.00 3,300.00300 33.00 9,900.00 8.4010.00 11.00CY
191 REPLACE UNSUITABLEPIPE FOUNDATIONMATERIAL
7,500.00 5,600.00 7,000.00500 27.50 13,750.00 11.2015.00 14.00CY
192 SIDE SEWER VIDEOINSPECTION
975.00 675.00 876.003 330.00 990.00 225.00325.00 292.00EA
193 TEMPORARY ADJACENTUTILITY SUPPORT
4,550.00 56,000.00 811.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
194 PHASE 1 GAS LINEWORK IN FREYA ST.
3,317.00 5,700.00 1,805.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS
195 PHASE 2 GAS LINEWORK IN FREYA ST.
8,800.00 44,480.00 6,560.00320 16.50 5,280.00 139.0027.50 20.50LF
196 SELECT BEDDING FOR8" GAS LINE IN FREYA
1,920.00 3,520.00 3,136.00320 30.80 9,856.00 11.006.00 9.80LF
197 EXTRA WORKALLOWANCE FORRESTRAINED WORK
AREAS
32,200.00 32,200.00 41,860.00644 11.00 7,084.00 50.0050.00 65.00LF
198 ENCASE WATER /SEWER AT CROSSINGS
1,650.00 1,500.00 1,525.0050 33.00 1,650.00 30.0033.00 30.50LF
199 CLEANING EXISTINGSANITARY/STORMSEWERS
7,000.00 9,000.00 3,785.001 * * * * * * 3,850.00 * * * * * ** * * * * * * * * * * *LS
200 FISKE WATER MAIN
EXTENSION
3,000.00 3,200.00 8,920.001 * * * * * * 1,950.00 * * * * * ** * * * * * * * * * * *LS
201 TAP & METERAPPLICATION FEE
2,155.00 2,200.00 2,725.001 7,920.00 7,920.00 2,200.002,155.00 2,725.00EA
202 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR 4"WATER SERVICE TAP(FISKE/9TH)
2,620.00 1,700.00 1,385.001 * * * * * * 7,150.00 * * * * * ** * * * * * * * * * * *LS
Wednesday, November 27, 2013 Page 16
-
8/13/2019 2013-12-16 Full Current Packet (1)
46/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Graham Construction& Management Inc
Unit
Price Amount
Apollo Inc
Unit
Price Amount
MDM Construction
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
203 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/REINSTALLATION (REGAL/HARTSON)
1,728.00 6,000.00 3,470.001 * * * * * * 6,600.00 * * * * * ** * * * * * * * * * * *LS
204 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/RELOCATION(RAY STREET)
1,728.00 4,900.00 3,470.001 * * * * * * 13,200.00 * * * * * ** * * * * * * * * * * *LS
205 CSO FACILITY WATERSUPPLY ANDBACKFLOW PREVENTER
ASSEMBLIES
33,019.00 25,000.00 85,000.001 * * * * * * 78,211.70 * * * * * ** * * * * * * * * * * *LS
206 SANITARY SEWER PIPE6 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
1,890.00 8,685.00 8,550.0045 55.00 2,475.00 193.0042.00 190.00LF
207 SANITARY SEWER PIPE8 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
735.00 3,075.00 4,440.0015 66.00 990.00 205.0049.00 296.00LF
208 SANITARY SEWER PIPE10 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
1,530.00 6,060.00 8,640.0030 71.50 2,145.00 202.0051.00 288.00LF
209 SANITARY SEWER PIPE24 IN. DIAM. INCL.
STRUCTURALEXCAVATION CLASS B
9,996.00 19,992.00 14,875.00119 165.00 19,635.00 168.0084.00 125.00LF
210 SANITARY SEWER PIPE36 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
1,512.00 2,472.00 5,712.0012 220.00 2,640.00 206.00126.00 476.00LF
211 SANITARY SEWER PIPE42 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
214,347.00 412,587.00 344,442.001239 253.00 313,467.00 333.00173.00 278.00LF
212 SANITARY SEWER PIPE48 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
254,760.00 326,040.00 388,080.001320 275.00 363,000.00 247.00193.00 294.00LF
213 SANITARY SEWER PIPE54 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
242,820.00 296,070.00 363,165.001065 385.00 410,025.00 278.00228.00 341.00LF
214 54 INCH RCP JOINTWRAP
3,600.00 4,400.00 3,555.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS
215 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW
AT THOR ST. SEWER
3,850.00 12,700.00 2,150.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
Wednesday, November 27, 2013 Page 17
-
8/13/2019 2013-12-16 Full Current Packet (1)
47/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Graham Construction& Management Inc
Unit
Price Amount
Apollo Inc
Unit
Price Amount
MDM Construction
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
216 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW
AT FREYA ST.
9,020.00 14,300.00 2,150.001 * * * * * * 16,500.00 * * * * * ** * * * * * * * * * * *LS
217 MAINTENANCE ANDCONNECTION OFEXISTING STORM FLOW
AT FREYA ST.
3,850.00 13,200.00 781.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
218 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW
AT HARTSONCONNECTOR VAULT
14,440.00 24,500.00 2,770.001 * * * * * * 22,000.00 * * * * * ** * * * * * * * * * * *LS
219 SIDE SEWER PIPE 4 IN.DIAM. DUCTILE IRON
1,180.00 2,140.00 2,300.0020 55.00 1,100.00 107.0059.00 115.00LF
220 SIDE SEWER PIPE 6 IN.DIAM.
3,800.00 2,660.00 3,648.0076 55.00 4,180.00 35.0050.00 48.00LF
221 SIDE SEWER PIPE 6 IN.DIAM. DUCTILE IRON
1,270.00 1,700.00 2,180.0020 66.00 1,320.00 85.0063.50 109.00LF
222 SIDE SEWER PERMIT 172.00 400.00 1,756.004 44.00 176.00 100.0043.00 439.00EA
223 SEWER CLEANOUT 2,032.00 850.00 1,838.002 825.00 1,650.00 425.001,016.00 919.00EA
224 FLOW CONTROLDEVICES & CONTROLS
232,000.00 178,000.00 250,000.001 * * * * * * 228,073.10 * * * * * ** * * * * * * * * * * *LS
225 DETENTION TANKAPPURTENANCES
301,000.00 269,000.00 300,000.001 * * * * * * 643,400.30 * * * * * ** * * * * * * * * * * *LS
226 ESC LEAD 1,500.00 100.00 13,700.001 * * * * * * 2,750.00 * * * * * ** * * * * * * * * * * *LS
227 INLET PROTECTION 1,700.00 1,860.00 1,740.0020 82.50 1,650.00 93.0085.00 87.00EA
228 SILT FENCE 5,200.00 2,720.00 2,640.00800 5.00 4,000.00 3.406.50 3.30LF
229 STABILIZEDCONSTRUCTIONENTRANCE
1,600.00 1,275.00 2,150.00100 38.50 3,850.00 12.7516.00 21.50SY
230 SOIL AERATION ANDDECOMPACTION FORUNDERHILL PARK
1,860.00 2,000.00 2,000.002000 0.70 1,400.00 1.000.93 1.00SY
231 TOPSOIL TYPE A, 4 INCHTHICK
44,360.64 48,355.20 42,048.0021024 5.00 105,120.00 2.302.11 2.00SY
232 HYDROSEEDING 2,208.90 2,388.00 2,388.001194 2.80 3,343.20 2.001.85 2.00SY
Wednesday, November 27, 2013 Page 18
-
8/13/2019 2013-12-16 Full Current Packet (1)
48/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Graham Construction& Management Inc
Unit
Price Amount
Apollo Inc
Unit
Price Amount
MDM Construction
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
233 PARK AREA SODINSTALLATION(NEATLINE)
71,329.92 78,220.80 78,220.8018624 22.00 409,728.00 4.203.83 4.20SY
234 SOD INSTALLATION 1,127.25 1,215.00 1,215.00225 13.20 2,970.00 5.405.01 5.40SY
235 SHRUBS ANDLANDSCAPING FORUNDERHILL PARK
276.00 500.00 299.001 * * * * * * 1,760.00 * * * * * ** * * * * * * * * * * *LS
236 REPLACE EXISTINGIRRIGATION SYSTEM
35,224.00 37,800.00 38,100.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
237 DESIGN AND INSTALLNEW IRRIGATIONSYSTEM
11,480.00 12,300.00 12,420.001 * * * * * * 16,500.00 * * * * * ** * * * * * * * * * * *LS
238 WINTERIZATION OFTEMPORARY ANDEXISTING IRRIGATIONSYSTEM
1,400.00 1,500.00 1,515.001 * * * * * * 550.00 * * * * * ** * * * * * * * * * * *LS
239 REMOVE AND CAPIRRIGATION LINES
9,786.00 10,000.00 10,590.001 * * * * * * 1,650.00 * * * * * ** * * * * * * * * * * *LS
240 CEMENT CONCRETECURB
18,890.68 22,048.20 23,137.001361 16.50 22,456.50 16.2013.88 17.00LF
241 REMOVE AND REPLACEPARKING WHEEL STOPS
2,400.00 3,840.00 3,240.0048 107.30 5,150.40 80.0050.00 67.50EA
242 CEMENT CONCRETEDRIVEWAY NON
COMMERCIAL
6,972.65 8,584.00 9,805.00185 44.00 8,140.00 46.4037.69 53.00SY
243 CEMENT CONCRETEDRIVEWAY TRANSITION
1,582.98 1,948.80 2,541.0042 38.50 1,617.00 46.4037.69 60.50SY
244 TEMPORARYCONSTRUCTIONFENCING (6 FOOT HIGH-CYCLONE)
11,250.00 18,750.00 7,500.002500 33.00 82,500.00 7.504.50 3.00LF
245 CEMENT CONC.SIDEWALK
1,659.28 2,016.00 2,912.0056 55.00 3,080.00 36.0029.63 52.00SY
246 RAMP DETECTABLEWARNING
608.00 640.00 656.0032 46.20 1,478.40 20.0019.00 20.50SF
247 ELECTRICAL EQUIPMENT 132,380.00 189,000.00 143,200.001 * * * * * * 140,607.00 * * * * * ** * * * * * * * * * * *LS
248 ELECTRICAL &MECHANICALEQUIPMENT FREIGHT &STARTUP SERVICES
10,000.00 5,000.00 1,620.001 * * * * * * 39,600.00 * * * * * ** * * * * * * * * * * *LS
249 SIGNING, PERMANENT 1,296.00 1,400.00 1,130.001 * * * * * * 2,200.00 * * * * * ** * * * * * * * * * * *LS
250 PAVEMENT MARKING -DURABLE HEAT APPLIED
583.84 656.00 430.5041 11.00 451.00 16.0014.24 10.50SF
Wednesday, November 27, 2013 Page 19
-
8/13/2019 2013-12-16 Full Current Packet (1)
49/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Graham Construction& Management Inc
Unit
Price Amount
Apollo Inc
Unit
Price Amount
MDM Construction
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
251 PAVEMENT MARKING -PAINT
525.00 590.00 676.001 * * * * * * 30.99 * * * * * ** * * * * * * * * * * *LS
252 BLOCK RETAINING WALL 8,580.00 9,100.00 8,060.00260 88.00 22,880.00 35.0033.00 31.00VSF
253 CEMENT CONCRETEINTEGRAL CURB ANDSIDEWALK 7 FT. WIDE
4,345.00 5,676.00 7,480.00220 60.50 13,310.00 25.8019.75 34.00LF
254 VEHICLE GATEASSEMBLY
3,000.00 1,700.00 3,785.001 * * * * * * 9,900.00 * * * * * ** * * * * * * * * * * *LS
255 MECHANICAL ANDODOR CONTROLEQUIPMENT
740,883.00 598,000.00 495,850.001 * * * * * * 666,894.00 * * * * * ** * * * * * * * * * * *LS
256 FINAL SITEPREPARATION
18,500.00 25,000.00 12,320.001 * * * * * * 22,000.00 * * * * * ** * * * * * * * * * * *LS
257 REMOVE AND REPLACEEXISTING BASEBALLDIAMOND
25,000.00 19,000.00 6,820.001 * * * * * * 19,800.00 * * * * * ** * * * * * * * * * * *LS
258 REMOVE AND REPLACEEXISTING VOLLEYBALLCOURT
15,000.00 19,000.00 34,220.001 * * * * * * 22,550.00 * * * * * ** * * * * * * * * * * *LS
8,178,953.93 8,315,178.40 8,533,396.309,985,901.09Schedule Totals
Wednesday, November 27, 2013 Page 20
-
8/13/2019 2013-12-16 Full Current Packet (1)
50/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Max J KuneyCompany
Unit
Price Amount
Stellar J Corporation
Unit
Price Amount
Goodfellow Bros Inc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
101 POST-CONSTRUCTIONSURVEYING
12,000.00 16,500.00 5,000.001 * * * * * * 5,000.00 * * * * * ** * * * * * * * * * * *LS
102 REIMBURSEMENT FORTHIRD PARTY DAMAGE
1.00 1.00 1.001 1.00 1.00 1.001.00 1.00EST
103 SPCC PLAN 500.00 1,000.00 1,000.001 * * * * * * 907.50 * * * * * ** * * * * * * * * * * *LS
104 POTHOLING 9,240.00 4,070.00 17,600.0022 550.00 12,100.00 185.00420.00 800.00EA
105 MOBILIZATION 960,000.00 673,300.00 425,000.001 * * * * * * 509,300.00 * * * * * ** * * * * * * * * * * *LS
106 PROJECT TEMPORARYTRAFFIC CONTROL 80,000.00 65,000.00 124,000.001 * * * * * * 55,000.00 * * * * * ** * * * * * * * * * * *LS
107 SPECIAL SIGNS 2,400.00 1,200.00 3,000.00120 20.00 2,400.00 10.0020.00 25.00SF
108 SEQUENTIAL ARROWSIGN
2,100.00 1,050.00 4,200.00700 4.25 2,975.00 1.503.00 6.00HR
109 PORTABLECHANGEABLE MESSAGESIGN
1,200.00 1,200.00 4,800.00400 6.25 2,500.00 3.003.00 12.00HR
110 TYPE III BARRICADE 2,295.00 1,785.00 5,100.0051 75.00 3,825.00 35.0045.00 100.00EA
111 CLEARING ANDGRUBBING 60,000.00 2,000.00 25,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
112 MATERIALS ON HAND,TREE PROTECTION
5,000.00 2,250.00 4,000.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS
113 PRIVATE TREE ROOTTREATMENT
6,300.00 3,000.00 3,750.0015 220.00 3,300.00 200.00420.00 250.00EA
114 PUBLIC TREE STUMPGRINDING
560.00 2,500.00 1,500.002 400.00 800.00 1,250.00280.00 750.00EA
115 REMOVE EXISTING CURB 2,722.00 4,763.50 5,444.001361 3.30 4,491.30 3.502.00 4.00LF
116 REMOVE CEMENT
CONCRETE SIDEWALKAND DRIVEWAY
3,948.00 4,935.00 5,922.00658 6.60 4,342.80 7.506.00 9.00SY
117 REMOVE INTEGRALCEMENT CONCRETESIDEWALK AND CURB 7'WIDE
1,620.00 1,260.00 1,620.00180 24.20 4,356.00 7.009.00 9.00SY
118 REMOVE MANHOLE,CATCH BASIN ORDRYWELL
4,200.00 12,600.00 4,900.0014 825.00 11,550.00 900.00300.00 350.00EA
Wednesday, November 27, 2013 Page 21
-
8/13/2019 2013-12-16 Full Current Packet (1)
51/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Max J KuneyCompany
Unit
Price Amount
Stellar J Corporation
Unit
Price Amount
Goodfellow Bros Inc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
119 REMOVE EXISTING 24"DIAM. CONCRETESTORM PIPE AND 8"GAS LINE
3,315.00 5,100.00 3,825.00255 110.00 28,050.00 20.0013.00 15.00LF
120 SAWCUTTING FLEXIBLEPAVEMENT
655.00 1,637.50 655.001310 1.10 1,441.00 1.250.50 0.50LFI
121 SAWCUTTING RIGIDPAVEMENT
380.00 1,710.00 380.00380 2.80 1,064.00 4.501.00 1.00LFI
122 EXISTING FENCEREMOVAL ANDREINSTALL INUNDERHILL PARK
600.00 1,100.00 800.0020 33.00 660.00 55.0030.00 40.00LF
123 PARK PICINIC TABLE
AND PEDESTAL GRILLREMOVAL ANDREPLACEMENT
2,700.00 6,000.00 4,500.003 3,300.00 9,900.00 2,000.00900.00 1,500.00EA
124 REMOVE , STORE ANDREINSTALL ROCKBOULDERS (UNDERHILLPARK)
828.00 5,865.00 4,140.0069 55.00 3,795.00 85.0012.00 60.00EA
125 ADDITIONAL ROCKBOULDERS (UNDERHILLPARKING LOT)
1,000.00 1,500.00 2,000.0010 165.00 1,650.00 150.00100.00 200.00EA
126 REMOVE ANDREINSTALL EXISTINGLIGHT POLE(VOLLEYBALL COURT)
1,200.00 1,750.00 1,200.001 5,500.00 5,500.00 1,750.001,200.00 1,200.00EA
127 REMOVE AND REPLACEPARKING LOT LIGHTPOLE
5,400.00 5,250.00 3,600.003 4,400.00 13,200.00 1,750.001,800.00 1,200.00EA
128 ROADWAY EXCAVATIONINCL. HAUL
82,530.00 49,518.00 66,024.002751 13.20 36,313.20 18.0030.00 24.00CY
129 REMOVE UNSUITABLEFOUNDATION MATERIALINCL. HAUL
13,520.00 23,660.00 33,800.001690 33.00 55,770.00 14.008.00 20.00CY
130 REPLACE UNSUITABLEFOUNDATION MATERIALINCL. HAUL
50,700.00 54,080.00 15,210.001690 27.50 46,475.00 32.0030.00 9.00CY
131 COMMON BORROWINCL. HAUL
43,800.00 131,400.00 98,550.0010950 12.10 132,495.00 12.004.00 9.00CY
132 PREPARATION OFUNTREATED ROADWAY
35,703.00 29,752.50 38,083.2011901 3.90 46,413.90 2.503.00 3.20SY
133 SHORING 225,000.00 225,000.00 0.001 * * * * * * 134,000.00 * * * * * ** * * * * * * * * * * *LS
134 CONTROLLED DENSITYFILL
5,060.00 5,060.00 5,060.0046 220.00 10,120.00 110.00110.00 110.00CY
Wednesday, November 27, 2013 Page 22
-
8/13/2019 2013-12-16 Full Current Packet (1)
52/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Max J KuneyCompany
Unit
Price Amount
Stellar J Corporation
Unit
Price Amount
Goodfellow Bros Inc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
135 STRUCTUREEXCAVATION CLASS AFOR STORAGE FACILITYINCLUDING HAUL
310,200.00 366,600.00 451,200.0028200 12.10 341,220.00 13.0011.00 16.00CY
136 EXTRA WORKALLOWANCE FOR ROCKEXCAVATION
68,750.00 35,750.00 44,000.00550 110.00 60,500.00 65.00125.00 80.00CY
137 GRAVEL BACKFILL FORWALLS INCL. HAUL
33,300.00 17,205.00 30,525.00555 44.00 24,420.00 31.0060.00 55.00CY
138 PEA GRAVEL 780.00 825.00 1,425.0015 55.00 825.00 55.0052.00 95.00CY
139 CRUSHED SURFACINGTOP COURSE
20,232.00 35,968.00 42,150.00562 44.00 24,728.00 64.0036.00 75.00CY
140 CRUSHED SURFACINGTOP COURSE FORSIDEWALKS &DRIVEWAYS
1,218.00 1,624.00 1,740.0029 82.50 2,392.50 56.0042.00 60.00CY
141 CRUSHED SURFACINGBASE COURSE FORPAVEMENTREPLACEMENT
33,444.00 46,450.00 55,740.00929 44.00 40,876.00 50.0036.00 60.00CY
142 CRUSHED SURFACINGBASE COURSE FORSTORAGE FACILITY
28,080.00 42,120.00 46,800.00780 44.00 34,320.00 54.0036.00 60.00CY
143 GRAVEL ROADSTABILIZER
4,128.00 6,600.00 4,800.0024 550.00 13,200.00 275.00172.00 200.00TO
144 HMA CL. 1/2 IN. PG 64-28, 4 INCH THICK
111,197.00 107,926.50 117,738.006541 20.00 130,820.00 16.5017.00 18.00SY
145 HMA CL. 1/2 IN. PG 70-28, 6 INCH THICK
44,500.00 43,610.00 46,280.001780 30.00 53,400.00 24.5025.00 26.00SY
146 HMA FOR TRANSITION,CL. 1/2 IN. PG 64-28, 2INCH THICK
7,200.00 7,200.00 7,440.0060 66.00 3,960.00 120.00120.00 124.00SY
147 COMPACTION PRICEADJUSTMENT
4,000.00 4,000.00 4,000.001 4,000.00 4,000.00 4,000.004,000.00 4,000.00EST
148 JOB MIX COMPLIANCEPRICE ADJUSTMENT
1.00 1.00 1.001 1.00 1.00 1.001.00 1.00CAL
149 CAST IN PLACECONCRETE
3,591,000.00 3,385,800.00 3,206,250.005130 715.00 3,667,950.00 660.00700.00 625.00CY
150 COMMERCIALCONCRETE
152,250.00 147,987.00 146,160.00609 220.00 133,980.00 243.00250.00 240.00CY
151 PRE-CAST CONCRETEHARTSON CONNECTORVAULT
85,000.00 158,000.00 150,000.001 * * * * * * 49,500.00 * * * * * ** * * * * * * * * * * *LS
152 WATERPROOFING 25,065.00 41,775.00 38,990.00557 49.50 27,571.50 75.0045.00 70.00SY
Wednesday, November 27, 2013 Page 23
-
8/13/2019 2013-12-16 Full Current Packet (1)
53/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Max J KuneyCompany
Unit
Price Amount
Stellar J Corporation
Unit
Price Amount
Goodfellow Bros Inc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
153 EPOXY COATING 4,675.00 5,100.00 4,675.0085 66.00 5,610.00 60.0055.00 55.00SY
154 VAPOR RETARDERBARRIERS
957.00 319.00 3,828.00319 3.30 1,052.70 1.003.00 12.00SY
155 BOLLARDS 7,800.00 11,700.00 13,000.0013 1,067.00 13,871.00 900.00600.00 1,000.00EA
156 CONNECT 6 IN.DIAMETER PIPE TOEXISTING CATCH BASIN,DRYWELL, OR MANHOLE
2,100.00 3,300.00 4,500.003 550.00 1,650.00 1,100.00700.00 1,500.00EA
157 CONNECT 8 IN.DIAMETER PIPE TO
EXISTING CATCH BASIN,DRYWELL, OR MANHOLE
9,100.00 14,300.00 21,450.0013 550.00 7,150.00 1,100.00700.00 1,650.00EA
158 STORM SEWER PIPE 8IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
1,518.00 2,622.00 4,830.0069 44.00 3,036.00 38.0022.00 70.00LF
159 DUCTILE IRON STORMSEWER PIPE 8 IN. DIAM.,INCL. STRUCTURALEXCAVATION CLASS B
11,210.00 17,405.00 26,550.00295 60.50 17,847.50 59.0038.00 90.00LF
160 DUCTILE IRON STORMSEWER PIPE 24 IN.DIAM., INCL.STRUCTURALEXCAVATION CLASS B
32,000.00 2,320.00 2,880.0016 165.00 2,640.00 145.002,000.00 180.00LF
161 8 IN. DIAM. STEELCASING PIPE
1,120.00 700.00 1,300.0010 22.00 220.00 70.00112.00 130.00LF
162 10 IN. DIAM. STEELCASING PIPE
2,576.00 2,231.00 2,990.0023 24.20 556.60 97.00112.00 130.00LF
163 12 IN. DIAM. STEELCASING PIPE
2,900.00 2,440.00 2,800.0020 26.40 528.00 122.00145.00 140.00LF
164 HAND HOLES FOR FLOWMONITORINGEQUIPMENT
7,500.00 7,500.00 7,000.005 2,200.00 11,000.00 1,500.001,500.00 1,400.00EA
165 REMOVE AND REPLACE(COS) MH FRAME ANDGRATE
4,900.00 2,800.00 5,250.007 550.00 3,850.00 400.00700.00 750.00EA
166 MANHOLE TYPE I-48,BASIC PRICE
11,400.00 15,000.00 30,000.006 2,750.00 16,500.00 2,500.001,900.00 5,000.00EA
167 MANHOLE ADDITIONALHEIGHT 48 IN. DIAM.TYPE I
125.00 120.00 100.001 110.00 110.00 120.00125.00 100.00VF
168 MANHOLE TYPE III-72,BASIC PRICE
19,000.00 32,500.00 25,000.005 7,150.00 35,750.00 6,500.003,800.00 5,000.00EA
Wednesday, November 27, 2013 Page 24
-
8/13/2019 2013-12-16 Full Current Packet (1)
54/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Max J KuneyCompany
Unit
Price Amount
Stellar J Corporation
Unit
Price Amount
Goodfellow Bros Inc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
169 MANHOLE ADDITIONALHEIGHT 72 IN. DIAM.TYPE III
1,680.00 1,200.00 1,200.008 165.00 1,320.00 150.00210.00 150.00VF
170 MANHOLE TYPE III-96,BASIC PRICE
11,000.00 25,000.00 18,000.002 14,300.00 28,600.00 12,500.005,500.00 9,000.00EA
171 MANHOLE ADDITIONALHEIGHT 96 IN. DIAM.TYPE III
1,200.00 720.00 800.004 220.00 880.00 180.00300.00 200.00VF
172 MANHOLE TYPE V,BASIC PRICE
74,400.00 204,000.00 204,000.0012 6,050.00 72,600.00 17,000.006,200.00 17,000.00EA
173 MANHOLE ADDITIONALHEIGHT TYPE V
1,430.00 1,690.00 1,300.0013 165.00 2,145.00 130.00110.00 100.00VF
174 DRYWELL TYPE 2 3,500.00 3,200.00 2,200.001 4,400.00 4,400.00 3,200.003,500.00 2,200.00EA
175 ADJUST EXISTINGVALVE BOX IN ASPHALT
5,225.00 3,800.00 7,600.0019 330.00 6,270.00 200.00275.00 400.00EA
176 ADJUST EXISTINGVALVE BOX IN UNPAVED
AREA
1,925.00 1,050.00 2,450.007 165.00 1,155.00 150.00275.00 350.00EA
177 ADJUST EXISTINGMANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET IN
ASPHALT
3,400.00 3,200.00 4,800.008 330.00 2,640.00 400.00425.00 600.00EA
178 ADJUST EXISTING
MANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET INUNPAVED AREA
1,275.00 900.00 1,650.003 275.00 825.00 300.00425.00 550.00EA
179 CATCH BASIN TYPE 0 2,500.00 1,250.00 2,000.001 2,310.00 2,310.00 1,250.002,500.00 2,000.00EA
180 CATCH BASIN TYPE 1 10,400.00 6,400.00 10,000.004 2,750.00 11,000.00 1,600.002,600.00 2,500.00EA
181 CATCH BASIN TYPE 2 5,000.00 4,000.00 6,000.002 2,970.00 5,940.00 2,000.002,500.00 3,000.00EA
182 CATCH BASIN TYPE 4 7,000.00 4,000.00 6,200.002 3,300.00 6,600.00 2,000.003,500.00 3,100.00EA
183 FRAME AND GRATE FORCATCH BASIN ORGRATE INLET
5,400.00 2,700.00 4,500.009 550.00 4,950.00 300.00600.00 500.00EA
184 MANHOLE OR DRYWELLFRAME AND COVER(STANDARD)
1,800.00 675.00 1,500.003 440.00 1,320.00 225.00600.00 500.00EA
185 MANHOLE OR DRYWELLFRAME AND COVER(LOCKABLE)
16,875.00 7,425.00 13,500.0027 550.00 14,850.00 275.00625.00 500.00EA
Wednesday, November 27, 2013 Page 25
-
8/13/2019 2013-12-16 Full Current Packet (1)
55/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Max J KuneyCompany
Unit
Price Amount
Stellar J Corporation
Unit
Price Amount
Goodfellow Bros Inc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
186 CONNECT 24 IN. DIAM.(D.I.) PIPE TO EXISTINGCATCH BASIN,DRYWELL, OR MANHOLE
1,800.00 1,775.00 1,500.001 880.00 880.00 1,775.001,800.00 1,500.00EA
187 RECONSTRUCTMANHOLE INVERT
3,900.00 3,900.00 6,000.006 1,100.00 6,600.00 650.00650.00 1,000.00EA
188 MANHOLE TEST 7,200.00 2,100.00 2,700.006 550.00 3,300.00 350.001,200.00 450.00EA
189 TRENCH SAFETYSYSTEM
550.00 6,000.00 5,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
190 REMOVE UNSUITABLEPIPE FOUNDATION
MATERIAL
2,700.00 9,300.00 6,000.00300 33.00 9,900.00 31.009.00 20.00CY
191 REPLACE UNSUITABLEPIPE FOUNDATIONMATERIAL
15,000.00 17,500.00 4,500.00500 27.50 13,750.00 35.0030.00 9.00CY
192 SIDE SEWER VIDEOINSPECTION
765.00 1,350.00 1,800.003 330.00 990.00 450.00255.00 600.00EA
193 TEMPORARY ADJACENTUTILITY SUPPORT
2,000.00 4,000.00 7,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
194 PHASE 1 GAS LINEWORK IN FREYA ST.
525.00 3,000.00 6,000.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS
195 PHASE 2 GAS LINEWORK IN FREYA ST.
3,840.00 6,080.00 4,160.00320 16.50 5,280.00 19.0012.00 13.00LF
196 SELECT BEDDING FOR8" GAS LINE IN FREYA
5,760.00 1,280.00 3,840.00320 30.80 9,856.00 4.0018.00 12.00LF
197 EXTRA WORKALLOWANCE FORRESTRAINED WORK
AREAS
22,540.00 3,220.00 16,100.00644 11.00 7,084.00 5.0035.00 25.00LF
198 ENCASE WATER /SEWER AT CROSSINGS
4,500.00 2,800.00 7,500.0050 33.00 1,650.00 56.0090.00 150.00LF
199 CLEANING EXISTINGSANITARY/STORMSEWERS
7,000.00 3,500.00 3,000.001 * * * * * * 3,850.00 * * * * * ** * * * * * * * * * * *LS
200 FISKE WATER MAIN
EXTENSION
2,200.00 3,000.00 6,000.001 * * * * * * 1,950.00 * * * * * ** * * * * * * * * * * *LS
201 TAP & METERAPPLICATION FEE
2,155.00 2,155.00 2,200.001 7,920.00 7,920.00 2,155.002,155.00 2,200.00EA
202 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR 4"WATER SERVICE TAP(FISKE/9TH)
1,200.00 1,900.00 4,000.001 * * * * * * 7,150.00 * * * * * ** * * * * * * * * * * *LS
Wednesday, November 27, 2013 Page 26
-
8/13/2019 2013-12-16 Full Current Packet (1)
56/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Max J KuneyCompany
Unit
Price Amount
Stellar J Corporation
Unit
Price Amount
Goodfellow Bros Inc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
203 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/REINSTALLATION (REGAL/HARTSON)
1,600.00 2,200.00 4,000.001 * * * * * * 6,600.00 * * * * * ** * * * * * * * * * * *LS
204 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/RELOCATION(RAY STREET)
3,800.00 2,000.00 4,000.001 * * * * * * 13,200.00 * * * * * ** * * * * * * * * * * *LS
205 CSO FACILITY WATERSUPPLY ANDBACKFLOW PREVENTER
ASSEMBLIES
30,000.00 44,000.00 43,000.001 * * * * * * 78,211.70 * * * * * ** * * * * * * * * * * *LS
206 SANITARY SEWER PIPE6 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
1,890.00 2,250.00 9,000.0045 55.00 2,475.00 50.0042.00 200.00LF
207 SANITARY SEWER PIPE8 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
825.00 1,050.00 3,000.0015 66.00 990.00 70.0055.00 200.00LF
208 SANITARY SEWER PIPE10 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B
1,950.00 2,250.00 6,000.0030 71.50 2,145.00 75.0065.00 200.00LF
209 SANITARY SEWER PIPE24 IN. DIAM. INCL.
STRUCTURALEXCAVATION CLASS B
13,090.00 12,495.00 16,660.00119 165.00 19,635.00 105.00110.00 140.00LF
210 SANITARY SEWER PIPE36 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
3,840.00 2,400.00 5,040.0012 220.00 2,640.00 200.00320.00 420.00LF
211 SANITARY SEWER PIPE42 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
179,655.00 260,190.00 284,970.001239 253.00 313,467.00 210.00145.00 230.00LF
212 SANITARY SEWER PIPE48 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
231,000.00 303,600.00 396,000.001320 275.00 363,000.00 230.00175.00 300.00LF
213 SANITARY SEWER PIPE54 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B
207,675.00 330,150.00 388,725.001065 385.00 410,025.00 310.00195.00 365.00LF
214 54 INCH RCP JOINTWRAP
5,200.00 1,200.00 4,000.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS
215 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW
AT THOR ST. SEWER
15,000.00 11,000.00 20,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS
Wednesday, November 27, 2013 Page 27
-
8/13/2019 2013-12-16 Full Current Packet (1)
57/329
-
8/13/2019 2013-12-16 Full Current Packet (1)
58/329
Item
No
Bid Item
Description
Estimated
Quantity
Unit
Price
Engineer's
Estimate
Amount
Max J KuneyCompany
Unit
Price Amount
Stellar J Corporation
Unit
Price Amount
Goodfellow Bros Inc
Unit
Price Amount
Project Number: 2011144
01Schedule
Schedule Description Tax Classification
Not Public Street Improvement
233 PARK AREA SODINSTALLATION(NEATLINE)
74,496.00 74,496.00 46,560.0018624 22.00 409,728.00 4.004.00 2.50SY
234 SOD INSTALLATION 1,125.00 1,125.00 562.50225 13.20 2,970.00 5.005.00 2.50SY
235 SHRUBS ANDLANDSCAPING FORUNDERHILL PARK
300.00 300.00 2,500.001 * * * * * * 1,760.00 * * * * * ** * * * * * * * * * * *LS
236 REPLACE EXISTINGIRRIGATION SYSTEM
36,000.00 36,000.00 2,500.001 * * * * * * 11,000.00 *