2013-12-16 full current packet (1)

Upload: heidigroover

Post on 04-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    1/329

    !"# %&!' () *+(,-.#

    %/00#.! %(/.%&1 -2#.3-

    4##!&.2 () 4(.3-'5 3#%#46#0 785 9:7;

    "#$%"&' "()*+,-. /0/12.3#4)%, 5)''. +'672"&89 ()'' .3#4)%,:1) ;;L "NEOPGKJ BAK 7GMGOPGK =Q: #; 82;6?

    15>#: 75927 5?"#37#3"#,3"28 =:6$27634 @63 $4,"A5:4

    "#,3"28 161@6: 12"

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    2/329

    SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013

    Page2

    "24> "#,3"28 @:26;23% $6$$2#3

    "#$ %&'%()$ (* +#,) -$$+,./ ,) *(' 0(&.1,2 3$-4$')5 0,+6 7+8** 8.9 0(&.)$2 +( '$:,$; +#$ 0&''$.+Agenda for this evenings Council Meeting. 0(&.1,2 ;,22 89(%+ +#$ +$-) -86 4$ -(:$9 +( +#$ ?@AA %=-= B$/,)28+,:$7$)),(. *(' *('-82 1(.),9$'8+,(. 46 +#$ 0(&.1,2 8+ +#$ '$C&$)+ (* 8.6 0(&.1,2 3$-4$'=

    7DEF"I 0EJG0>B KL>HM>GN 7H77>EG7 OKHN>GG>GN TH7H77>EG7 OKHN>GG>GN TH EG 0>"I 0"H= "QH 7H77>EG7

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    3/329

    SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013

    Page3

    @:26;23% $6$$2#3(3:30 p.m.)

    (Council Chambers Lower Level of City Hall)(No Public Testimony Taken)

    Council Reports

    Staff Reports

    Committee Reports

    Advance Agenda Review

    Current Agenda Review

    571232$4:54296 $6$$2#3Roll Call of Council

    "#3$634 5%6375REPORTS, CONTRACTS AND CLAIMS RECOMMENDATION

    The following item (OPR 2013-0864) will be considered under Special Considerations ItemS1.a.1. Collective Bargaining Agreement with the PoliceGuild covering wages and benefits for 2012-2015

    2012: $778,501; 2013: $744,665; 2014: $900,439; 2015:$950,972.

    OPR 2013-0864

    2. Purchase of two 2013 Ford F250 Pickup Trucks fromColumbia Ford (Longview, WA) utilizing WashingtonState Contract #06912$54,672.18 (including tax).

    Approve OPR 2013-0865

    3. Purchase of an Adaptive Signal Control TechnologySystem for the North Division Corridor from WesternSystems (Everett, WA) utilizing State Contract

    #03709

    $282,879.67.

    Approve OPR 2013-0866ENG 2011075

    4. Bid of KVA Electric, Inc. (Arlington, WA) forupgrading existing Switchgear at Switchyard #1Upriver Dam$92,331.95.

    Approve OPR 2013-0867BID 3978-13

    5. Low Bids of:

    a. Garco Construction, Inc. (Spokane, WA) forUnderhill CSO (34-2) Storage Facility and Freya-

    ApproveAll PRO 2013-0035ENG 2011144

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    4/329

    SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013

    Page4

    Thor Trunk$7,688,700 (plus tax). Anadministrative reserve of $768,870 (plus tax),which is 10% of the contract price plus tax, will beset aside.

    b. Aztech Electric, Inc. (Spokane Valley, WA) for

    Hamilton Street / Nevada Street PedestrianCountdown Timers$29,531. An administrativereserve of $2,953.10, which is 10% of the contractprice, will be set aside.

    PRO 2013-0036

    ENG 2012072

    The following item (OPR 2012-0649) has been tabled indefinitely:

    6. Contract amendment to provide additional funds toOtto Klein and Summit Law Group (Seattle, WA) forSpecial Counsel and arbitration services related toPolice Guild Negotiations$60,000.

    OPR 2012-0649

    7. Contract Renewal with Northwest Vital RecordsCenter, Inc. (Spokane, WA) for off-site recordsstorage and retrieval services for City departmentsfrom January 1, 2014, through December 31, 2014estimated $50,000.

    Approve OPR 2010-0936RFP 3745-10

    8. Encumbrance for additional relocation expenses forRicky Rigg and Qin Zhao, dba AM Towing (Spokane,WA) in conjunction with the Combined SewerOverflow 33-1 projectincrease of $25,000 for a totalof $145,000.

    Approve &Authorize

    OPR 2011-0973ENG 2010089

    9. Supplemental Agreement No. 1 with Epic LandSolutions, Inc. (Spokane, WA) for Real Estate Right-of-Way Acquisition and Relocation On-CallServicesnot to exceed $250,000. Total contractamount: $550,000.

    Approve OPR 2012-0858

    10. Grant Agreement with the State of WashingtonDepartment of Ecology for 2013-2015 MunicipalStormwater Capacity Grant Program$170,000revenue.

    Approve OPR 2013-0868ENG 2013220

    11. Grant/Loan Agreements with the State of WashingtonDepartment of Ecology for:

    ApproveAll

    a. Combined Sewer Overflow 24, 25 and 26 ControlFacilities$1,195,000 revenue.

    OPR 2013-0869ENG 2010088

    b. Combined Sewer Overflow (CSO) Basin 34-2 and34-3 Control Facilities$20,719,000 revenue.

    OPR 2013-0870ENG 2011144/45

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    5/329

    SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013

    Page5

    c. Combined Sewer Overflow (CSO) 34-1 ControlFacilities$3,478,000 revenue.

    OPR 2013-0871ENG 2012088

    d. Cochran Basin Stormwater Conveyance$2,000,000 revenue.

    OPR 2013-0872ENG 2012500

    e. Union Basin

    $1,000,000 revenue. OPR 2013-0873ENG 2013221f. Wet Weather Integrated Strategic Planning

    $5,220,000 revenue.OPR 2013-0874

    ENG 2013600

    12. Contract with Corvell Healthcare Corporation(Seattle, WA) to provide medical bill review andrelated services for the City Workers' Compensationprogram for three years beginning January 1, 2014$80,000. (Contract may be extended for twoadditional one-year periods).

    Approve OPR 2013-0875BID 3932-13

    The following item (PRO 2013-0037) will be considered under Special Considerations ItemS2.13. Contract Award for Design-Build Services for the

    Nelson Service Center to Garco Construction, Inc. asthe Design-Build General Contractor and Bernardo-Wills Architects as the Architect and Designer ofRecord$14,200,000.

    PRO 2013-0037ENG 13633

    BID 3970-13

    14. Report of the Mayor of pending:

    a. Claims and payments of previously approved

    obligations, including those of Parks and Library,through December 9, 2013, total $5,120,073.04,with Parks and Library claims approved by theirrespective boards. Warrants excluding Parks andLibrary total $5,064,303.48.

    b. Payroll claims of previously approved obligationsthrough December 7, 2013: $5,930,833.20.

    Approve &AuthorizePayment CPR 2013-0002

    CPR 2013-0003

    6D6",4296 $6$$2#3(Closed Session of Council)

    (Executive Session may be held or reconvened during the 6:00 p.m. Legislative Session)

    "24> "#,3"28 $6$$2#3(May be held or reconvened following the 3:30 p.m. Administrative Session)

    (Council Briefing Center)

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    6/329

    SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013

    Page6

    This session may be held for the purpose of City Council meeting with Mayoralnominees to Boards and/or Commissions. The session is open to the public.

    86%2$854296 $6$$2#3(6:00 P.M.)(Council Reconvenes in Council Chamber)

    WORDS OF INSPIRATION

    PLEDGE OF ALLEGIANCE

    ROLL CALL OF COUNCIL

    ANNOUNCEMENTS(Announcements regarding Changes to the City Council Agenda)@#5:7$ 537 "#112$$2#3$ 5==#2341634$(Includes Announcements of Boards and Commissions Vacancies)APPOINTMENTS RECOMMENDATIONPlan Commission: Two Reappointments Confirm CPR 1981-0295Northeast Development Advisory Board:One Appointment and One Reappointment

    Confirm CPR 2010-0038

    CITY ADMINISTRATION REPORT

    "#,3"28 "#1124466 :6=#:4$(Committee Reports for Finance, Neighborhoods, Public Safety, Public Works, andPlanning/Community and Economic Development Committees and other Boards and Commissions)

    #=63 ;#:,1This is an opportunity for citizens to discuss items of interest not relating to the Current or AdvanceAgendas nor relating to political campaigns/items on upcoming election ballots. This Forum shall befor a period of time not to exceed thirty minutes. After all the matters on the Agenda have been actedon, unless it is 10:00 p.m. or later, the open forum shall continue for a period of time not to exceedthirty minutes. Each speaker will be limited to three minutes, unless otherwise deemed by the Chair.If you wish to speak at the forum, please sign up on the sign-up sheet located in the Chase Gallery.

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    7/329

    SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013

    Page7

    86%2$854296 5%6375

    3# 616:%63"> @,7%64 #:72353"6$

    3# 616:%63"> #:72353"6$

    3# :6$#8,42#3$

    ;2358 :65723% #:72353"6(Require Four Affirmative, Recorded Roll Call Votes)

    ORD C35068 Relating to sitting, lying on sidewalk in a designated zone; amendingSpokane Municipal Code Section 10.10.026.

    ORD C35069 (To be considered under Special Considerations Item S1.b.)

    ;2:$4 :65723% #:72353"6

    First Reading of ORD C35609 was held on Monday, December 9, 2013. Final Reading willbe considered under Special Considerations Item S1.b.ORD C35069 Relating to the Office of Police Ombudsman; amending SMC Sections

    4.32.010, 4.32.020, 4.32.030, 4.32.060, 4.32.070, 4.32.080, 4.32.090,4.32.100, 4.32.110, 4.32.140, 4.32.150, and 4.32.160.

    $=6"258 "#3$276:542#3$(If there are items listed you wish to speak on, please sign your name on the sign-up sheets in theChase Gallery).

    RECOMMENDATION

    S1. a. Collective Bargaining Agreement with thePolice Guild covering wages and benefits for2012-20152012: $778,501; 2013: $744,665;2014: $900,439; 2015: $950,972.

    Approve &AuthorizeContract

    OPR 2013-0864

    b. Final Reading Ordinance relating to the Office

    of Police Ombudsman; amending SMCSections 4.32.010, 4.32.020, 4.32.030, 4.32.060,4.32.070, 4.32.080, 4.32.090, 4.32.100, 4.32.110,4.32.140, 4.32.150, and 4.32.160.

    Pass Upon

    Roll CallVote

    ORD C35069

    S2. Contract Award for Design-Build Services for theNelson Service Center to Garco Construction, Inc.as the Design-Build General Contractor andBernardo-Wills Architects as the Architect andDesigner of Record$14,200,000.

    Approve &AuthorizeContract

    PRO 2013-0037ENG 13633

    BID 3970-13

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    8/329

    SPOKANE CITY COUNCIL CURRENT AGENDA MONDAY,DECEMBER 16,2013

    Page8

    Request for suspension of Council Rules to add the following item:

    S3. Update on action steps taken by City Council tomove forward on Downtown Livability Initiative.

    Accept CPR 2013-0851

    3#

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    9/329

    Agenda Sheet for City Council Meeting of:"#$"%$#&"'

    "#$% &%'() "#$($#&"'

    *+%,-(. /0+% 1 )*+ #&"',&-%.

    &%2%3. 1

    45670$$028 "%9$ /0112 31+45613 *,:.. &%; 1*:2$#'$ ?:2% 7181 9:;:; %#.,?-%. >,:@%'$ 1

    *:2$#'$ ABC#0+79:;:;@3*);:81652AB)+7

    D0) 132 )/ C: 6)82

    E8%2)# F$%7 GH9% *DEFGHIJ K$L 6LMNEHFN &%I50.0$0:2 1 +1 "%?O" P "%?O#

    E8%2)# F$%7

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    10/329

    !"#$%#&' )*)$"

    )+,-./ 01234 5166.7788

    %-887 982:./84

    &1:86,82 ;?@

    For further information, please contact Rick Romero, Director of Utilities Division 625-6361 or [email protected].

    9+,A8/7

    Purchase of two !ton pickup trucks for the Water Department.

    !B/3C21+DE

    Purchase two Ford F-250 pickup trucks utilizing the Washington State contract for$54,672.16 including tax.

    #6FB/7

    These trucks will replace units that have reached the end of their economic servicelives.

    */7.1D

    Recommend approval

    %+DE.DC

    Funds are available in the Water Departments 2013 budget.

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    11/329

    Agenda Sheet for City Council Meeting of:"#$"%$#&"'

    "#$% &%'() "#$($#&"'

    *+%,-(. /0+% 1 )*+ #&"',&-%%

    &%2%3. 1

    45670$$028 "%9$ ./+00/ *,:.. &%; 1*:2$#'$ ?:2% 12+3 .0+4)5.03 6&7,#'#,--"& >,:@%'$ 1 #&""&86

    *:2$#'$ ABC#0+ 1.0+4)5.039.*)32:0;)+? D0) 1E8%2)# F$%7 GH9% ;@ABCDEB

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    12/329

    !"#$

    &'(#)(*+ !,!#'

    $-.-/0-1 23 2456

    7809-.:;

    North Division Adaptive Signal Control Technology (ASCT) vehicle detection.

    &1?8@A;

    Procurement of an ASCT system for the North Division corridor is underway. In order tooptimize ASCT performance, additional vehicle detection is needed at each of the twelveproject intersections. Lane-by lane stop bar and advanced detection is necessary tothoroughly evaluate traffic flow. Adaptive algorithms use this detector data in conjunctionwith high resolution signal timing data to achieve operational objectives set by the signalsystem operator. Operational objectives include directional progression, equitabledistribution, smooth flow and combinations of these objectives and will be established by timeof day.

    Existing loop detection that is fully functional will be utilized. Where loops are unavailableSensys Wireless Vehicle Detection System will be employed. This wireless system utilizesmagneto-resistive sensors, utilizing low power radio technology to transmit data. The SensysSystem was selected after City Signal & Lighting completed an in-field evaluation of severalsystems including: PEEK IQ video detection; Iteris Video Detection; FLIR thermal detection;MSSEDCO microwave detection and Wavetronix Matrix microwave detection. In theabsence of loop detection, Sensys System proved the most reliable detection in field trials,provides a user-friendly interface and is affordable.

    (/B

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    13/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    14/329

    Agenda Sheet for City Council Meeting of:"#$"%$#&"'

    "#$% &%'() "#$($#&"'

    *+%,-(. /0+% 1 )*+ #&"',&-%.

    &%2%3. 1

    45670$$028 "%9$ /012+ 3 456+)27281+98 :2+;982: *,:.. &%; 1*:2$#'$ ?:2% :12;2 : .(#,-"?( >,:@%'$ 1

    *:2$#'$ ABC#0+::@:*)A0>28915B)+C

    D0) 1'D.-,"'

    E8%2)# F$%7 GH9% 8EFGHIJG 9GKL &%I50.0$0:2 1 8+"'DD'

    E8%2)# F$%7 > Study Session

    Division Director +)d2+)S +98A Other */8 "#$#$#&"'

    Finance 72:2:>2S d984272 "0.$,065$0:2 O0.$

    Legal :S 82S 1420 GYHQFJK

    LRK\K\FK@\YE`IFKJQG]BEHU

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    15/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    16/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    17/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    18/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    19/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    20/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    21/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    22/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    23/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    24/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    25/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    26/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    27/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    28/329

    Agenda Sheet for City Council Meeting of:!"#!$#"%!&

    "#$% &%'() !"#'#"%!&

    *+%,-(. /0+% 1 )*+ "%!&,%%&-

    &%2%3. 1

    45670$$028 "%9$ ./01/..*1/0 2.*314.2 *,:.. &%; 1*:2$#'$ ?:2% 05*6 /.72+/ $"-,$$89 >,:@%'$ 1 "%!!!''

    *:2$#'$ ABC#0+ 0/.72+/:2)+;5/.41?@ABC@ 1@DE

    &%I50.0$0:2 14* !&F9$

    E8%2)# F$%7 A "&=%%` S?PDA @WD .?YO?DDAcR .R@OEB@Dd ?O?D

    >@WDA aOPR NDAD ADCDO_DP BR Q>XX>NRe

    /0.'#+ F79#'$ D5)8%$ E'':52$.^UD?RD M FT!F&T&89=-F 1 '&8% '&'!$ F'%%% -$-%! !%%&'2DXDC@ M 12DXDC@

    M 12DXDC@ M 1

    E99,:N#+. *:52'0+

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    29/329

    !"#$%#&'$%"# ") *"+,%#-. /&00'+1. 2&,-3$. '#, 4%5$+%6&$%"#

    7-3#,' *"+,%#-

    /&00'+1 82'9:-+",;

    "#$%&'%($& ")*+(&,-(.)* / 0%*%1$2$*( 3 45678569:5;*-; 3 4:6?5:678A;7A6 DE)##)6 >*-; 3 4:6A?86?5:;9

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    30/329

    City Of Spokane

    Engineering Services Department

    * * * Bid Tabulation * * *

    Project Number: 2011144

    Project Description CSO 34-2 Original Date

    Update DatePreparerFunding Source

    Addendum

    10/24/2013 1:08:07 PM

    11/25/2013 4:14:50 PM

    Michael MyersFederal

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Garco ConstructionInc

    Unit

    Price Amount

    ClearwaterConstruction &Mana ement

    Unit

    Price Amount

    Halme ConstructionInc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    101 POST-CONSTRUCTIONSURVEYING

    5,050.00 10,700.00 5,600.001 * * * * * * 5,000.00 * * * * * ** * * * * * * * * * * *LS

    102 REIMBURSEMENT FORTHIRD PARTY DAMAGE

    1.00 1.00 1.001 1.00 1.00 1.001.00 1.00EST

    103 SPCC PLAN 1,010.00 600.00 500.001 * * * * * * 907.50 * * * * * ** * * * * * * * * * * *LS

    104 POTHOLING 3,410.00 3,894.00 7,260.0022 550.00 12,100.00 177.00155.00 330.00EA

    105 MOBILIZATION 767,696.00 589,400.00 803,500.001 * * * * * * 509,300.00 * * * * * ** * * * * * * * * * * *LS

    106 PROJECT TEMPORARYTRAFFIC CONTROL

    20,200.00 34,200.00 28,700.001 * * * * * * 55,000.00 * * * * * ** * * * * * * * * * * *LS

    107 SPECIAL SIGNS 1,458.00 1,320.00 1,200.00120 20.00 2,400.00 11.0012.15 10.00SF

    108 SEQUENTIAL ARROWSIGN

    1,260.00 700.00 980.00700 4.25 2,975.00 1.001.80 1.40HR

    109 PORTABLECHANGEABLE MESSAGESIGN

    1,920.00 1,200.00 1,248.00400 6.25 2,500.00 3.004.80 3.12HR

    110 TYPE III BARRICADE 2,091.00 1,785.00 1,703.4051 75.00 3,825.00 35.0041.00 33.40EA

    111 CLEARING ANDGRUBBING

    30,300.00 35,600.00 65,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    112 MATERIALS ON HAND,TREE PROTECTION

    1,212.00 1,400.00 1,200.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS

    113 PRIVATE TREE ROOTTREATMENT

    4,545.00 5,295.00 13,500.0015 220.00 3,300.00 353.00303.00 900.00EA

    114 PUBLIC TREE STUMPGRINDING

    304.00 400.00 1,800.002 400.00 800.00 200.00152.00 900.00EA

    Wednesday, November 27, 2013 Page 1

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    31/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Garco ConstructionInc

    Unit

    Price Amount

    ClearwaterConstruction &Management

    Unit

    Price Amount

    Halme ConstructionInc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    115 REMOVE EXISTING CURB 6,805.00 8,166.00 4,083.001361 3.30 4,491.30 6.005.00 3.00LF

    116 REMOVE CEMENTCONCRETE SIDEWALK

    AND DRIVEWAY

    5,922.00 6,580.00 2,632.00658 6.60 4,342.80 10.009.00 4.00SY

    117 REMOVE INTEGRALCEMENT CONCRETESIDEWALK AND CURB 7'WIDE

    1,845.00 2,160.00 1,260.00180 24.20 4,356.00 12.0010.25 7.00SY

    118 REMOVE MANHOLE,CATCH BASIN ORDRYWELL

    3,542.00 4,200.00 3,290.0014 825.00 11,550.00 300.00253.00 235.00EA

    119 REMOVE EXISTING 24"DIAM. CONCRETE

    STORM PIPE AND 8"GAS LINE

    3,060.00 3,315.00 3,952.50255 110.00 28,050.00 13.0012.00 15.50LF

    120 SAWCUTTING FLEXIBLEPAVEMENT

    1,310.00 1,310.00 327.501310 1.10 1,441.00 1.001.00 0.25LFI

    121 SAWCUTTING RIGIDPAVEMENT

    380.00 380.00 425.60380 2.80 1,064.00 1.001.00 1.12LFI

    122 EXISTING FENCEREMOVAL ANDREINSTALL INUNDERHILL PARK

    810.00 1,200.00 640.0020 33.00 660.00 60.0040.50 32.00LF

    123 PARK PICINIC TABLEAND PEDESTAL GRILLREMOVAL AND

    REPLACEMENT

    4,545.00 7,101.00 3,960.003 3,300.00 9,900.00 2,367.001,515.00 1,320.00EA

    124 REMOVE , STORE ANDREINSTALL ROCKBOULDERS (UNDERHILLPARK)

    690.00 828.00 897.0069 55.00 3,795.00 12.0010.00 13.00EA

    125 ADDITIONAL ROCKBOULDERS (UNDERHILLPARKING LOT)

    910.00 1,100.00 500.0010 165.00 1,650.00 110.0091.00 50.00EA

    126 REMOVE ANDREINSTALL EXISTINGLIGHT POLE(VOLLEYBALL COURT)

    1,135.00 7,100.00 5,600.001 5,500.00 5,500.00 7,100.001,135.00 5,600.00EA

    127 REMOVE AND REPLACEPARKING LOT LIGHT

    POLE

    30,300.00 21,300.00 21,900.003 4,400.00 13,200.00 7,100.0010,100.00 7,300.00EA

    128 ROADWAY EXCAVATIONINCL. HAUL

    52,269.00 57,771.00 45,116.402751 13.20 36,313.20 21.0019.00 16.40CY

    129 REMOVE UNSUITABLEFOUNDATION MATERIALINCL. HAUL

    13,520.00 15,210.00 1,690.001690 33.00 55,770.00 9.008.00 1.00CY

    130 REPLACE UNSUITABLEFOUNDATION MATERIALINCL. HAUL

    30,758.00 35,490.00 1,690.001690 27.50 46,475.00 21.0018.20 1.00CY

    Wednesday, November 27, 2013 Page 2

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    32/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Garco ConstructionInc

    Unit

    Price Amount

    ClearwaterConstruction &Management

    Unit

    Price Amount

    Halme ConstructionInc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    131 COMMON BORROWINCL. HAUL

    77,745.00 87,600.00 50,370.0010950 12.10 132,495.00 8.007.10 4.60CY

    132 PREPARATION OFUNTREATED ROADWAY

    23,802.00 23,802.00 13,924.1711901 3.90 46,413.90 2.002.00 1.17SY

    133 SHORING 165,000.00 108,600.00 120,000.001 * * * * * * 134,000.00 * * * * * ** * * * * * * * * * * *LS

    134 CONTROLLED DENSITYFILL

    4,646.00 5,520.00 8,740.0046 220.00 10,120.00 120.00101.00 190.00CY

    135 STRUCTUREEXCAVATION CLASS AFOR STORAGE FACILITYINCLUDING HAUL

    324,300.00 366,600.00 245,340.0028200 12.10 341,220.00 13.0011.50 8.70CY

    136 EXTRA WORKALLOWANCE FOR ROCKEXCAVATION

    30,525.00 35,750.00 26,400.00550 110.00 60,500.00 65.0055.50 48.00CY

    137 GRAVEL BACKFILL FORWALLS INCL. HAUL

    16,650.00 19,980.00 19,785.75555 44.00 24,420.00 36.0030.00 35.65CY

    138 PEA GRAVEL 765.00 1,800.00 832.5015 55.00 825.00 120.0051.00 55.50CY

    139 CRUSHED SURFACINGTOP COURSE

    20,513.00 24,166.00 23,323.00562 44.00 24,728.00 43.0036.50 41.50CY

    140 CRUSHED SURFACINGTOP COURSE FOR

    SIDEWALKS &DRIVEWAYS

    1,769.00 2,088.00 1,479.0029 82.50 2,392.50 72.0061.00 51.00CY

    141 CRUSHED SURFACINGBASE COURSE FORPAVEMENTREPLACEMENT

    54,811.00 39,947.00 38,553.50929 44.00 40,876.00 43.0059.00 41.50CY

    142 CRUSHED SURFACINGBASE COURSE FORSTORAGE FACILITY

    29,250.00 34,320.00 47,580.00780 44.00 34,320.00 44.0037.50 61.00CY

    143 GRAVEL ROADSTABILIZER

    6,072.00 4,800.00 4,800.0024 550.00 13,200.00 200.00253.00 200.00TO

    144 HMA CL. 1/2 IN. PG 64-28, 4 INCH THICK

    111,197.00 124,279.00 118,522.926541 20.00 130,820.00 19.0017.00 18.12SY

    145 HMA CL. 1/2 IN. PG 70-28, 6 INCH THICK

    43,165.00 49,840.00 47,472.601780 30.00 53,400.00 28.0024.25 26.67SY

    146 HMA FOR TRANSITION,CL. 1/2 IN. PG 64-28, 2INCH THICK

    6,969.00 8,220.00 7,668.0060 66.00 3,960.00 137.00116.15 127.80SY

    147 COMPACTION PRICEADJUSTMENT

    4,000.00 4,000.00 4,000.001 4,000.00 4,000.00 4,000.004,000.00 4,000.00EST

    148 JOB MIX COMPLIANCEPRICE ADJUSTMENT

    1.00 1.00 1.001 1.00 1.00 1.001.00 1.00CAL

    Wednesday, November 27, 2013 Page 3

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    33/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Garco ConstructionInc

    Unit

    Price Amount

    ClearwaterConstruction &Management

    Unit

    Price Amount

    Halme ConstructionInc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    149 CAST IN PLACECONCRETE

    2,565,000.00 2,765,070.00 3,052,350.005130 715.00 3,667,950.00 539.00500.00 595.00CY

    150 COMMERCIALCONCRETE

    103,530.00 99,267.00 133,980.00609 220.00 133,980.00 163.00170.00 220.00CY

    151 PRE-CAST CONCRETEHARTSON CONNECTORVAULT

    97,000.00 99,600.00 101,100.001 * * * * * * 49,500.00 * * * * * ** * * * * * * * * * * *LS

    152 WATERPROOFING 38,433.00 45,117.00 41,674.74557 49.50 27,571.50 81.0069.00 74.82SY

    153 EPOXY COATING 4,760.00 5,525.00 5,720.5085 66.00 5,610.00 65.0056.00 67.30SY

    154 VAPOR RETARDERBARRIERS

    1,914.00 1,595.00 6,380.00319 3.30 1,052.70 5.006.00 20.00SY

    155 BOLLARDS 14,950.00 24,804.00 11,960.0013 1,067.00 13,871.00 1,908.001,150.00 920.00EA

    156 CONNECT 6 IN.DIAMETER PIPE TOEXISTING CATCH BASIN,DRYWELL, OR MANHOLE

    1,062.00 1,200.00 855.003 550.00 1,650.00 400.00354.00 285.00EA

    157 CONNECT 8 IN.DIAMETER PIPE TOEXISTING CATCH BASIN,DRYWELL, OR MANHOLE

    4,745.00 5,603.00 3,770.0013 550.00 7,150.00 431.00365.00 290.00EA

    158 STORM SEWER PIPE 8

    IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    1,587.00 1,794.00 1,669.8069 44.00 3,036.00 26.0023.00 24.20LF

    159 DUCTILE IRON STORMSEWER PIPE 8 IN. DIAM.,INCL. STRUCTURALEXCAVATION CLASS B

    11,800.00 13,570.00 11,416.50295 60.50 17,847.50 46.0040.00 38.70LF

    160 DUCTILE IRON STORMSEWER PIPE 24 IN.DIAM., INCL.STRUCTURALEXCAVATION CLASS B

    4,160.00 4,800.00 2,280.0016 165.00 2,640.00 300.00260.00 142.50LF

    161 8 IN. DIAM. STEELCASING PIPE

    710.00 830.00 885.0010 22.00 220.00 83.0071.00 88.50LF

    162 10 IN. DIAM. STEELCASING PIPE

    2,093.00 2,507.00 1,779.0523 24.20 556.60 109.0091.00 77.35LF

    163 12 IN. DIAM. STEELCASING PIPE

    1,420.00 1,700.00 1,968.0020 26.40 528.00 85.0071.00 98.40LF

    164 HAND HOLES FOR FLOWMONITORINGEQUIPMENT

    7,575.00 11,900.00 6,100.005 2,200.00 11,000.00 2,380.001,515.00 1,220.00EA

    165 REMOVE AND REPLACE(COS) MH FRAME ANDGRATE

    5,306.00 6,202.00 4,690.007 550.00 3,850.00 886.00758.00 670.00EA

    Wednesday, November 27, 2013 Page 4

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    34/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Garco ConstructionInc

    Unit

    Price Amount

    ClearwaterConstruction &Management

    Unit

    Price Amount

    Halme ConstructionInc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    166 MANHOLE TYPE I-48,BASIC PRICE

    18,510.00 21,702.00 20,100.006 2,750.00 16,500.00 3,617.003,085.00 3,350.00EA

    167 MANHOLE ADDITIONALHEIGHT 48 IN. DIAM.TYPE I

    81.00 100.00 200.001 110.00 110.00 100.0081.00 200.00VF

    168 MANHOLE TYPE III-72,BASIC PRICE

    26,765.00 31,400.00 31,000.005 7,150.00 35,750.00 6,280.005,353.00 6,200.00EA

    169 MANHOLE ADDITIONALHEIGHT 72 IN. DIAM.TYPE III

    1,616.00 1,904.00 1,600.008 165.00 1,320.00 238.00202.00 200.00VF

    170 MANHOLE TYPE III-96,BASIC PRICE

    17,170.00 20,200.00 20,000.002 14,300.00 28,600.00 10,100.008,585.00 10,000.00EA

    171 MANHOLE ADDITIONALHEIGHT 96 IN. DIAM.TYPE III

    1,260.00 1,476.00 800.004 220.00 880.00 369.00315.00 200.00VF

    172 MANHOLE TYPE V,BASIC PRICE

    94,800.00 111,300.00 174,000.0012 6,050.00 72,600.00 9,275.007,900.00 14,500.00EA

    173 MANHOLE ADDITIONALHEIGHT TYPE V

    923.00 1,079.00 2,600.0013 165.00 2,145.00 83.0071.00 200.00VF

    174 DRYWELL TYPE 2 3,232.00 3,800.00 3,270.001 4,400.00 4,400.00 3,800.003,232.00 3,270.00EA

    175 ADJUST EXISTINGVALVE BOX IN ASPHALT

    6,270.00 7,296.00 3,667.0019 330.00 6,270.00 384.00330.00 193.00EA

    176 ADJUST EXISTINGVALVE BOX IN UNPAVED

    AREA

    1,239.00 1,498.00 1,351.007 165.00 1,155.00 214.00177.00 193.00EA

    177 ADJUST EXISTINGMANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET IN

    ASPHALT

    4,880.00 5,704.00 3,000.008 330.00 2,640.00 713.00610.00 375.00EA

    178 ADJUST EXISTINGMANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET INUNPAVED AREA

    1,365.00 1,599.00 1,125.003 275.00 825.00 533.00455.00 375.00EA

    179 CATCH BASIN TYPE 0 1,560.00 1,800.00 1,360.001 2,310.00 2,310.00 1,800.001,560.00 1,360.00EA

    180 CATCH BASIN TYPE 1 7,680.00 9,000.00 6,560.004 2,750.00 11,000.00 2,250.001,920.00 1,640.00EA

    181 CATCH BASIN TYPE 2 4,510.00 8,300.00 4,070.002 2,970.00 5,940.00 4,150.002,255.00 2,035.00EA

    182 CATCH BASIN TYPE 4 5,200.00 6,100.00 4,200.002 3,300.00 6,600.00 3,050.002,600.00 2,100.00EA

    Wednesday, November 27, 2013 Page 5

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    35/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Garco ConstructionInc

    Unit

    Price Amount

    ClearwaterConstruction &Management

    Unit

    Price Amount

    Halme ConstructionInc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    183 FRAME AND GRATE FORCATCH BASIN ORGRATE INLET

    2,430.00 2,799.00 6,570.009 550.00 4,950.00 311.00270.00 730.00EA

    184 MANHOLE OR DRYWELLFRAME AND COVER(STANDARD)

    2,505.00 2,901.00 2,010.003 440.00 1,320.00 967.00835.00 670.00EA

    185 MANHOLE OR DRYWELLFRAME AND COVER(LOCKABLE)

    23,895.00 27,999.00 19,035.0027 550.00 14,850.00 1,037.00885.00 705.00EA

    186 CONNECT 24 IN. DIAM.(D.I.) PIPE TO EXISTINGCATCH BASIN,DRYWELL, OR MANHOLE

    710.00 830.00 1,035.001 880.00 880.00 830.00710.00 1,035.00EA

    187 RECONSTRUCT

    MANHOLE INVERT

    4,860.00 5,700.00 7,500.006 1,100.00 6,600.00 950.00810.00 1,250.00EA

    188 MANHOLE TEST 3,210.00 3,798.00 4,200.006 550.00 3,300.00 633.00535.00 700.00EA

    189 TRENCH SAFETYSYSTEM

    6,870.00 8,100.00 19,500.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    190 REMOVE UNSUITABLEPIPE FOUNDATIONMATERIAL

    3,000.00 3,600.00 5,700.00300 33.00 9,900.00 12.0010.00 19.00CY

    191 REPLACE UNSUITABLEPIPE FOUNDATIONMATERIAL

    7,575.00 9,000.00 4,000.00500 27.50 13,750.00 18.0015.15 8.00CY

    192 SIDE SEWER VIDEO

    INSPECTION

    990.00 1,200.00 1,260.003 330.00 990.00 400.00330.00 420.00EA

    193 TEMPORARY ADJACENTUTILITY SUPPORT

    4,600.00 5,400.00 5,860.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    194 PHASE 1 GAS LINEWORK IN FREYA ST.

    3,050.00 3,900.00 3,400.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS

    195 PHASE 2 GAS LINEWORK IN FREYA ST.

    8,960.00 10,560.00 13,312.00320 16.50 5,280.00 33.0028.00 41.60LF

    196 SELECT BEDDING FOR8" GAS LINE IN FREYA

    1,952.00 2,240.00 4,480.00320 30.80 9,856.00 7.006.10 14.00LF

    197 EXTRA WORKALLOWANCE FORRESTRAINED WORK

    AREAS

    32,844.00 37,996.00 6,890.80644 11.00 7,084.00 59.0051.00 10.70LF

    198 ENCASE WATER /SEWER AT CROSSINGS

    1,700.00 2,000.00 4,050.0050 33.00 1,650.00 40.0034.00 81.00LF

    199 CLEANING EXISTINGSANITARY/STORMSEWERS

    7,070.00 8,300.00 11,100.001 * * * * * * 3,850.00 * * * * * ** * * * * * * * * * * *LS

    200 FISKE WATER MAINEXTENSION

    12,625.00 8,300.00 9,600.001 * * * * * * 1,950.00 * * * * * ** * * * * * * * * * * *LS

    Wednesday, November 27, 2013 Page 6

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    36/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Garco ConstructionInc

    Unit

    Price Amount

    ClearwaterConstruction &Management

    Unit

    Price Amount

    Halme ConstructionInc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    201 TAP & METERAPPLICATION FEE

    5,050.00 2,155.00 2,155.001 7,920.00 7,920.00 2,155.005,050.00 2,155.00EA

    202 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR 4"WATER SERVICE TAP(FISKE/9TH)

    2,650.00 3,100.00 4,782.001 * * * * * * 7,150.00 * * * * * ** * * * * * * * * * * *LS

    203 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/REINSTALLATION (REGAL/HARTSON)

    1,750.00 2,100.00 4,782.001 * * * * * * 6,600.00 * * * * * ** * * * * * * * * * * *LS

    204 TRENCH EXCAVATION,

    COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/RELOCATION(RAY STREET)

    1,750.00 2,100.00 4,782.001 * * * * * * 13,200.00 * * * * * ** * * * * * * * * * * *LS

    205 CSO FACILITY WATERSUPPLY ANDBACKFLOW PREVENTER

    ASSEMBLIES

    33,350.00 39,200.00 51,000.001 * * * * * * 78,211.70 * * * * * ** * * * * * * * * * * *LS

    206 SANITARY SEWER PIPE6 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    1,935.00 2,205.00 7,875.0045 55.00 2,475.00 49.0043.00 175.00LF

    207 SANITARY SEWER PIPE8 IN. DIAM. INCL.

    STRUCTURALEXCAVATION CLASS B

    750.00 900.00 1,335.0015 66.00 990.00 60.0050.00 89.00LF

    208 SANITARY SEWER PIPE10 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    1,560.00 1,800.00 2,070.0030 71.50 2,145.00 60.0052.00 69.00LF

    209 SANITARY SEWER PIPE24 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    10,115.00 11,900.00 14,161.00119 165.00 19,635.00 100.0085.00 119.00LF

    210 SANITARY SEWER PIPE36 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    1,560.00 1,800.00 2,256.0012 220.00 2,640.00 150.00130.00 188.00LF

    211 SANITARY SEWER PIPE42 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    175,938.00 253,995.00 255,234.001239 253.00 313,467.00 205.00142.00 206.00LF

    212 SANITARY SEWER PIPE48 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    227,040.00 302,280.00 294,360.001320 275.00 363,000.00 229.00172.00 223.00LF

    213 SANITARY SEWER PIPE54 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    204,480.00 287,550.00 293,940.001065 385.00 410,025.00 270.00192.00 276.00LF

    Wednesday, November 27, 2013 Page 7

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    37/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Garco ConstructionInc

    Unit

    Price Amount

    ClearwaterConstruction &Management

    Unit

    Price Amount

    Halme ConstructionInc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    214 54 INCH RCP JOINTWRAP

    3,636.00 4,300.00 3,055.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS

    215 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW

    AT THOR ST. SEWER

    3,890.00 4,600.00 10,550.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    216 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW

    AT FREYA ST.

    9,115.00 10,700.00 14,700.001 * * * * * * 16,500.00 * * * * * ** * * * * * * * * * * *LS

    217 MAINTENANCE ANDCONNECTION OFEXISTING STORM FLOW

    AT FREYA ST.

    3,890.00 4,600.00 8,300.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    218 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW

    AT HARTSONCONNECTOR VAULT

    14,585.00 17,125.00 37,000.001 * * * * * * 22,000.00 * * * * * ** * * * * * * * * * * *LS

    219 SIDE SEWER PIPE 4 IN.DIAM. DUCTILE IRON

    1,200.00 1,400.00 2,200.0020 55.00 1,100.00 70.0060.00 110.00LF

    220 SIDE SEWER PIPE 6 IN.DIAM.

    3,876.00 4,484.00 6,156.0076 55.00 4,180.00 59.0051.00 81.00LF

    221 SIDE SEWER PIPE 6 IN.DIAM. DUCTILE IRON

    1,300.00 1,500.00 2,080.0020 66.00 1,320.00 75.0065.00 104.00LF

    222 SIDE SEWER PERMIT 4,120.00 9,500.00 160.004 44.00 176.00 2,375.001,030.00 40.00EA

    223 SEWER CLEANOUT 3,030.00 2,400.00 880.002 825.00 1,650.00 1,200.001,515.00 440.00EA

    224 FLOW CONTROLDEVICES & CONTROLS

    252,500.00 224,600.00 192,000.001 * * * * * * 228,073.10 * * * * * ** * * * * * * * * * * *LS

    225 DETENTION TANKAPPURTENANCES

    378,750.00 254,900.00 300,000.001 * * * * * * 643,400.30 * * * * * ** * * * * * * * * * * *LS

    226 ESC LEAD 5,050.00 1,200.00 5,680.001 * * * * * * 2,750.00 * * * * * ** * * * * * * * * * * *LS

    227 INLET PROTECTION 1,720.00 2,000.00 1,100.0020 82.50 1,650.00 100.0086.00 55.00EA

    228 SILT FENCE 5,600.00 4,000.00 2,600.00800 5.00 4,000.00 5.007.00 3.25LF

    229 STABILIZEDCONSTRUCTIONENTRANCE

    1,625.00 1,900.00 2,300.00100 38.50 3,850.00 19.0016.25 23.00SY

    230 SOIL AERATION ANDDECOMPACTION FORUNDERHILL PARK

    2,000.00 2,000.00 2,800.002000 0.70 1,400.00 1.001.00 1.40SY

    Wednesday, November 27, 2013 Page 8

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    38/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Garco ConstructionInc

    Unit

    Price Amount

    ClearwaterConstruction &Management

    Unit

    Price Amount

    Halme ConstructionInc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    231 TOPSOIL TYPE A, 4 INCHTHICK

    68,328.00 63,072.00 49,406.4021024 5.00 105,120.00 3.003.25 2.35SY

    232 HYDROSEEDING 2,388.00 2,388.00 4,477.501194 2.80 3,343.20 2.002.00 3.75SY

    233 PARK AREA SODINSTALLATION(NEATLINE)

    74,496.00 93,120.00 80,641.9218624 22.00 409,728.00 5.004.00 4.33SY

    234 SOD INSTALLATION 1,350.00 1,350.00 3,532.50225 13.20 2,970.00 6.006.00 15.70SY

    235 SHRUBS ANDLANDSCAPING FORUNDERHILL PARK

    280.00 300.00 310.001 * * * * * * 1,760.00 * * * * * ** * * * * * * * * * * *LS

    236 REPLACE EXISTINGIRRIGATION SYSTEM

    35,600.00 41,800.00 39,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    237 DESIGN AND INSTALLNEW IRRIGATIONSYSTEM

    11,600.00 13,600.00 12,750.001 * * * * * * 16,500.00 * * * * * ** * * * * * * * * * * *LS

    238 WINTERIZATION OFTEMPORARY ANDEXISTING IRRIGATIONSYSTEM

    1,415.00 1,700.00 1,120.001 * * * * * * 550.00 * * * * * ** * * * * * * * * * * *LS

    239 REMOVE AND CAPIRRIGATION LINES

    9,890.00 11,600.00 11,000.001 * * * * * * 1,650.00 * * * * * ** * * * * * * * * * * *LS

    240 CEMENT CONCRETECURB

    19,054.00 21,776.00 24,498.001361 16.50 22,456.50 16.0014.00 18.00LF

    241 REMOVE AND REPLACEPARKING WHEEL STOPS

    5,616.00 5,712.00 6,144.0048 107.30 5,150.40 119.00117.00 128.00EA

    242 CEMENT CONCRETEDRIVEWAY NONCOMMERCIAL

    7,030.00 8,325.00 8,510.00185 44.00 8,140.00 45.0038.00 46.00SY

    243 CEMENT CONCRETEDRIVEWAY TRANSITION

    1,638.00 1,890.00 1,932.0042 38.50 1,617.00 45.0039.00 46.00SY

    244 TEMPORARYCONSTRUCTIONFENCING (6 FOOT HIGH-CYCLONE)

    5,500.00 10,000.00 8,500.002500 33.00 82,500.00 4.002.20 3.40LF

    245 CEMENT CONC.SIDEWALK

    1,680.00 1,960.00 2,088.8056 55.00 3,080.00 35.0030.00 37.30SY

    246 RAMP DETECTABLEWARNING

    640.00 704.00 676.8032 46.20 1,478.40 22.0020.00 21.15SF

    247 ELECTRICAL EQUIPMENT 133,800.00 129,500.00 176,750.001 * * * * * * 140,607.00 * * * * * ** * * * * * * * * * * *LS

    248 ELECTRICAL &MECHANICALEQUIPMENT FREIGHT &STARTUP SERVICES

    1,515.00 51,200.00 4,500.001 * * * * * * 39,600.00 * * * * * ** * * * * * * * * * * *LS

    Wednesday, November 27, 2013 Page 9

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    39/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Garco ConstructionInc

    Unit

    Price Amount

    ClearwaterConstruction &Management

    Unit

    Price Amount

    Halme ConstructionInc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    249 SIGNING, PERMANENT 1,060.00 2,400.00 1,160.001 * * * * * * 2,200.00 * * * * * ** * * * * * * * * * * *LS

    250 PAVEMENT MARKING -DURABLE HEAT APPLIED

    410.00 492.00 440.7541 11.00 451.00 12.0010.00 10.75SF

    251 PAVEMENT MARKING -PAINT

    635.00 500.00 700.001 * * * * * * 30.99 * * * * * ** * * * * * * * * * * *LS

    252 BLOCK RETAINING WALL 8,710.00 10,140.00 9,802.00260 88.00 22,880.00 39.0033.50 37.70VSF

    253 CEMENT CONCRETEINTEGRAL CURB ANDSIDEWALK 7 FT. WIDE

    4,400.00 5,280.00 6,743.00220 60.50 13,310.00 24.0020.00 30.65LF

    254 VEHICLE GATEASSEMBLY

    3,535.00 9,500.00 2,930.001 * * * * * * 9,900.00 * * * * * ** * * * * * * * * * * *LS

    255 MECHANICAL ANDODOR CONTROLEQUIPMENT

    770,000.00 675,700.00 544,000.001 * * * * * * 666,894.00 * * * * * ** * * * * * * * * * * *LS

    256 FINAL SITEPREPARATION

    12,625.00 18,500.00 9,400.001 * * * * * * 22,000.00 * * * * * ** * * * * * * * * * * *LS

    257 REMOVE AND REPLACEEXISTING BASEBALLDIAMOND

    15,150.00 13,000.00 4,160.001 * * * * * * 19,800.00 * * * * * ** * * * * * * * * * * *LS

    258 REMOVE AND REPLACEEXISTING VOLLEYBALLCOURT

    15,150.00 28,700.00 12,000.001 * * * * * * 22,550.00 * * * * * ** * * * * * * * * * * *LS

    7,688,700.00 7,957,487.00 8,163,399.909,985,901.09Schedule Totals

    Wednesday, November 27, 2013 Page 10

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    40/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Graham Construction& Management Inc

    Unit

    Price Amount

    Apollo Inc

    Unit

    Price Amount

    MDM Construction

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    101 POST-CONSTRUCTIONSURVEYING

    10,000.00 5,000.00 19,080.001 * * * * * * 5,000.00 * * * * * ** * * * * * * * * * * *LS

    102 REIMBURSEMENT FORTHIRD PARTY DAMAGE

    1.00 1.00 1.001 1.00 1.00 1.001.00 1.00EST

    103 SPCC PLAN 500.00 800.00 792.001 * * * * * * 907.50 * * * * * ** * * * * * * * * * * *LS

    104 POTHOLING 3,300.00 17,380.00 9,438.0022 550.00 12,100.00 790.00150.00 429.00EA

    105 MOBILIZATION 792,731.00 467,000.00 800,000.001 * * * * * * 509,300.00 * * * * * ** * * * * * * * * * * *LS

    106 PROJECT TEMPORARYTRAFFIC CONTROL 60,000.00 73,000.00 96,640.001 * * * * * * 55,000.00 * * * * * ** * * * * * * * * * * *LS

    107 SPECIAL SIGNS 2,400.00 2,040.00 2,100.00120 20.00 2,400.00 17.0020.00 17.50SF

    108 SEQUENTIAL ARROWSIGN

    2,100.00 3,395.00 3,430.00700 4.25 2,975.00 4.853.00 4.90HR

    109 PORTABLECHANGEABLE MESSAGESIGN

    2,000.00 3,440.00 3,480.00400 6.25 2,500.00 8.605.00 8.70HR

    110 TYPE III BARRICADE 5,100.00 2,754.00 2,754.0051 75.00 3,825.00 54.00100.00 54.00EA

    111 CLEARING ANDGRUBBING 30,000.00 30,000.00 52,910.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    112 MATERIALS ON HAND,TREE PROTECTION

    1,200.00 10,000.00 20,000.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS

    113 PRIVATE TREE ROOTTREATMENT

    4,500.00 5,700.00 5,250.0015 220.00 3,300.00 380.00300.00 350.00EA

    114 PUBLIC TREE STUMPGRINDING

    300.00 2,600.00 600.002 400.00 800.00 1,300.00150.00 300.00EA

    115 REMOVE EXISTING CURB 6,805.00 4,627.40 1,633.201361 3.30 4,491.30 3.405.00 1.20LF

    116 REMOVE CEMENT

    CONCRETE SIDEWALKAND DRIVEWAY

    5,593.00 4,277.00 3,553.20658 6.60 4,342.80 6.508.50 5.40SY

    117 REMOVE INTEGRALCEMENT CONCRETESIDEWALK AND CURB 7'WIDE

    1,800.00 1,260.00 972.00180 24.20 4,356.00 7.0010.00 5.40SY

    118 REMOVE MANHOLE,CATCH BASIN ORDRYWELL

    3,500.00 6,580.00 3,010.0014 825.00 11,550.00 470.00250.00 215.00EA

    Wednesday, November 27, 2013 Page 11

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    41/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Graham Construction& Management Inc

    Unit

    Price Amount

    Apollo Inc

    Unit

    Price Amount

    MDM Construction

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    119 REMOVE EXISTING 24"DIAM. CONCRETESTORM PIPE AND 8"GAS LINE

    2,805.00 9,881.25 561.00255 110.00 28,050.00 38.7511.00 2.20LF

    120 SAWCUTTING FLEXIBLEPAVEMENT

    393.00 1,048.00 393.001310 1.10 1,441.00 0.800.30 0.30LFI

    121 SAWCUTTING RIGIDPAVEMENT

    239.40 323.00 247.00380 2.80 1,064.00 0.850.63 0.65LFI

    122 EXISTING FENCEREMOVAL ANDREINSTALL INUNDERHILL PARK

    240.00 258.00 1,040.0020 33.00 660.00 12.9012.00 52.00LF

    123 PARK PICINIC TABLE

    AND PEDESTAL GRILLREMOVAL ANDREPLACEMENT

    4,500.00 2,910.00 8,505.003 3,300.00 9,900.00 970.001,500.00 2,835.00EA

    124 REMOVE , STORE ANDREINSTALL ROCKBOULDERS (UNDERHILLPARK)

    690.00 3,450.00 5,244.0069 55.00 3,795.00 50.0010.00 76.00EA

    125 ADDITIONAL ROCKBOULDERS (UNDERHILLPARKING LOT)

    900.00 1,850.00 1,280.0010 165.00 1,650.00 185.0090.00 128.00EA

    126 REMOVE ANDREINSTALL EXISTINGLIGHT POLE(VOLLEYBALL COURT)

    1,120.00 1,600.00 1,210.001 5,500.00 5,500.00 1,600.001,120.00 1,210.00EA

    127 REMOVE AND REPLACEPARKING LOT LIGHTPOLE

    8,760.00 3,450.00 3,000.003 4,400.00 13,200.00 1,150.002,920.00 1,000.00EA

    128 ROADWAY EXCAVATIONINCL. HAUL

    49,518.00 20,632.50 31,636.502751 13.20 36,313.20 7.5018.00 11.50CY

    129 REMOVE UNSUITABLEFOUNDATION MATERIALINCL. HAUL

    13,520.00 13,942.50 18,590.001690 33.00 55,770.00 8.258.00 11.00CY

    130 REPLACE UNSUITABLEFOUNDATION MATERIALINCL. HAUL

    30,420.00 18,928.00 16,900.001690 27.50 46,475.00 11.2018.00 10.00CY

    131 COMMON BORROWINCL. HAUL

    76,650.00 142,350.00 164,250.0010950 12.10 132,495.00 13.007.00 15.00CY

    132 PREPARATION OFUNTREATED ROADWAY

    23,802.00 10,710.90 27,372.3011901 3.90 46,413.90 0.902.00 2.30SY

    133 SHORING 50,000.00 105,000.00 180,000.001 * * * * * * 134,000.00 * * * * * ** * * * * * * * * * * *LS

    134 CONTROLLED DENSITYFILL

    4,600.00 4,508.00 4,876.0046 220.00 10,120.00 98.00100.00 106.00CY

    Wednesday, November 27, 2013 Page 12

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    42/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Graham Construction& Management Inc

    Unit

    Price Amount

    Apollo Inc

    Unit

    Price Amount

    MDM Construction

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    135 STRUCTUREEXCAVATION CLASS AFOR STORAGE FACILITYINCLUDING HAUL

    317,250.00 250,980.00 296,100.0028200 12.10 341,220.00 8.9011.25 10.50CY

    136 EXTRA WORKALLOWANCE FOR ROCKEXCAVATION

    30,250.00 20,350.00 23,650.00550 110.00 60,500.00 37.0055.00 43.00CY

    137 GRAVEL BACKFILL FORWALLS INCL. HAUL

    16,650.00 28,110.75 14,430.00555 44.00 24,420.00 50.6530.00 26.00CY

    138 PEA GRAVEL 900.00 1,725.00 382.5015 55.00 825.00 115.0060.00 25.50CY

    139 CRUSHED SURFACINGTOP COURSE

    20,232.00 28,662.00 30,629.00562 44.00 24,728.00 51.0036.00 54.50CY

    140 CRUSHED SURFACINGTOP COURSE FORSIDEWALKS &DRIVEWAYS

    1,595.00 1,073.00 710.5029 82.50 2,392.50 37.0055.00 24.50CY

    141 CRUSHED SURFACINGBASE COURSE FORPAVEMENTREPLACEMENT

    33,444.00 45,985.50 37,624.50929 44.00 40,876.00 49.5036.00 40.50CY

    142 CRUSHED SURFACINGBASE COURSE FORSTORAGE FACILITY

    28,860.00 38,376.00 31,200.00780 44.00 34,320.00 49.2037.00 40.00CY

    143 GRAVEL ROADSTABILIZER

    4,080.00 3,600.00 7,680.0024 550.00 13,200.00 150.00170.00 320.00TO

    144 HMA CL. 1/2 IN. PG 64-28, 4 INCH THICK

    106,618.30 114,467.50 114,467.506541 20.00 130,820.00 17.5016.30 17.50SY

    145 HMA CL. 1/2 IN. PG 70-28, 6 INCH THICK

    42,720.00 45,835.00 46,280.001780 30.00 53,400.00 25.7524.00 26.00SY

    146 HMA FOR TRANSITION,CL. 1/2 IN. PG 64-28, 2INCH THICK

    6,900.00 7,410.00 1,290.0060 66.00 3,960.00 123.50115.00 21.50SY

    147 COMPACTION PRICEADJUSTMENT

    4,000.00 4,000.00 4,000.001 4,000.00 4,000.00 4,000.004,000.00 4,000.00EST

    148 JOB MIX COMPLIANCEPRICE ADJUSTMENT

    1.00 1.00 1.001 1.00 1.00 1.001.00 1.00CAL

    149 CAST IN PLACECONCRETE

    3,175,470.00 3,298,590.00 3,078,000.005130 715.00 3,667,950.00 643.00619.00 600.00CY

    150 COMMERCIALCONCRETE

    164,430.00 133,980.00 176,610.00609 220.00 133,980.00 220.00270.00 290.00CY

    151 PRE-CAST CONCRETEHARTSON CONNECTORVAULT

    84,000.00 48,000.00 50,000.001 * * * * * * 49,500.00 * * * * * ** * * * * * * * * * * *LS

    152 WATERPROOFING 37,497.24 40,104.00 40,661.00557 49.50 27,571.50 72.0067.32 73.00SY

    Wednesday, November 27, 2013 Page 13

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    43/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Graham Construction& Management Inc

    Unit

    Price Amount

    Apollo Inc

    Unit

    Price Amount

    MDM Construction

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    153 EPOXY COATING 4,250.85 4,930.00 4,972.5085 66.00 5,610.00 58.0050.01 58.50SY

    154 VAPOR RETARDERBARRIERS

    319.00 3,764.20 1,020.80319 3.30 1,052.70 11.801.00 3.20SY

    155 BOLLARDS 15,600.00 9,750.00 15,990.0013 1,067.00 13,871.00 750.001,200.00 1,230.00EA

    156 CONNECT 6 IN.DIAMETER PIPE TOEXISTING CATCH BASIN,DRYWELL, OR MANHOLE

    1,050.00 2,880.00 846.003 550.00 1,650.00 960.00350.00 282.00EA

    157 CONNECT 8 IN.DIAMETER PIPE TO

    EXISTING CATCH BASIN,DRYWELL, OR MANHOLE

    4,680.00 12,480.00 4,927.0013 550.00 7,150.00 960.00360.00 379.00EA

    158 STORM SEWER PIPE 8IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    1,518.00 1,283.40 3,933.0069 44.00 3,036.00 18.6022.00 57.00LF

    159 DUCTILE IRON STORMSEWER PIPE 8 IN. DIAM.,INCL. STRUCTURALEXCAVATION CLASS B

    11,505.00 8,997.50 21,092.50295 60.50 17,847.50 30.5039.00 71.50LF

    160 DUCTILE IRON STORMSEWER PIPE 24 IN.DIAM., INCL.STRUCTURALEXCAVATION CLASS B

    4,080.00 2,912.00 4,240.0016 165.00 2,640.00 182.00255.00 265.00LF

    161 8 IN. DIAM. STEELCASING PIPE

    700.00 490.00 540.0010 22.00 220.00 49.0070.00 54.00LF

    162 10 IN. DIAM. STEELCASING PIPE

    2,070.00 1,288.00 1,437.5023 24.20 556.60 56.0090.00 62.50LF

    163 12 IN. DIAM. STEELCASING PIPE

    1,400.00 1,480.00 1,590.0020 26.40 528.00 74.0070.00 79.50LF

    164 HAND HOLES FOR FLOWMONITORINGEQUIPMENT

    1,250.00 8,200.00 6,850.005 2,200.00 11,000.00 1,640.00250.00 1,370.00EA

    165 REMOVE AND REPLACE(COS) MH FRAME ANDGRATE

    5,250.00 2,149.00 6,146.007 550.00 3,850.00 307.00750.00 878.00EA

    166 MANHOLE TYPE I-48,BASIC PRICE

    18,300.00 19,440.00 21,000.006 2,750.00 16,500.00 3,240.003,050.00 3,500.00EA

    167 MANHOLE ADDITIONALHEIGHT 48 IN. DIAM.TYPE I

    80.00 110.00 112.001 110.00 110.00 110.0080.00 112.00VF

    168 MANHOLE TYPE III-72,BASIC PRICE

    26,500.00 33,200.00 22,825.005 7,150.00 35,750.00 6,640.005,300.00 4,565.00EA

    Wednesday, November 27, 2013 Page 14

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    44/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Graham Construction& Management Inc

    Unit

    Price Amount

    Apollo Inc

    Unit

    Price Amount

    MDM Construction

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    169 MANHOLE ADDITIONALHEIGHT 72 IN. DIAM.TYPE III

    1,600.00 880.00 1,560.008 165.00 1,320.00 110.00200.00 195.00VF

    170 MANHOLE TYPE III-96,BASIC PRICE

    17,000.00 23,800.00 14,380.002 14,300.00 28,600.00 11,900.008,500.00 7,190.00EA

    171 MANHOLE ADDITIONALHEIGHT 96 IN. DIAM.TYPE III

    1,244.00 440.00 1,004.004 220.00 880.00 110.00311.00 251.00VF

    172 MANHOLE TYPE V,BASIC PRICE

    93,840.00 82,800.00 34,680.0012 6,050.00 72,600.00 6,900.007,820.00 2,890.00EA

    173 MANHOLE ADDITIONALHEIGHT TYPE V

    910.00 1,430.00 955.5013 165.00 2,145.00 110.0070.00 73.50VF

    174 DRYWELL TYPE 2 3,200.00 4,100.00 4,075.001 4,400.00 4,400.00 4,100.003,200.00 4,075.00EA

    175 ADJUST EXISTINGVALVE BOX IN ASPHALT

    6,175.00 1,900.00 4,522.0019 330.00 6,270.00 100.00325.00 238.00EA

    176 ADJUST EXISTINGVALVE BOX IN UNPAVED

    AREA

    1,225.00 700.00 1,463.007 165.00 1,155.00 100.00175.00 209.00EA

    177 ADJUST EXISTINGMANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET IN

    ASPHALT

    4,832.00 2,480.00 2,104.008 330.00 2,640.00 310.00604.00 263.00EA

    178 ADJUST EXISTING

    MANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET INUNPAVED AREA

    1,350.00 930.00 654.003 275.00 825.00 310.00450.00 218.00EA

    179 CATCH BASIN TYPE 0 1,542.00 2,900.00 2,025.001 2,310.00 2,310.00 2,900.001,542.00 2,025.00EA

    180 CATCH BASIN TYPE 1 7,560.00 10,000.00 9,160.004 2,750.00 11,000.00 2,500.001,890.00 2,290.00EA

    181 CATCH BASIN TYPE 2 4,460.00 3,400.00 4,340.002 2,970.00 5,940.00 1,700.002,230.00 2,170.00EA

    182 CATCH BASIN TYPE 4 5,138.00 4,100.00 5,790.002 3,300.00 6,600.00 2,050.002,569.00 2,895.00EA

    183 FRAME AND GRATE FORCATCH BASIN ORGRATE INLET

    2,385.00 2,475.00 2,358.009 550.00 4,950.00 275.00265.00 262.00EA

    184 MANHOLE OR DRYWELLFRAME AND COVER(STANDARD)

    2,475.00 1,680.00 753.003 440.00 1,320.00 560.00825.00 251.00EA

    185 MANHOLE OR DRYWELLFRAME AND COVER(LOCKABLE)

    23,625.00 15,660.00 7,533.0027 550.00 14,850.00 580.00875.00 279.00EA

    Wednesday, November 27, 2013 Page 15

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    45/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Graham Construction& Management Inc

    Unit

    Price Amount

    Apollo Inc

    Unit

    Price Amount

    MDM Construction

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    186 CONNECT 24 IN. DIAM.(D.I.) PIPE TO EXISTINGCATCH BASIN,DRYWELL, OR MANHOLE

    700.00 1,254.00 499.001 880.00 880.00 1,254.00700.00 499.00EA

    187 RECONSTRUCTMANHOLE INVERT

    4,800.00 6,600.00 8,040.006 1,100.00 6,600.00 1,100.00800.00 1,340.00EA

    188 MANHOLE TEST 3,180.00 1,740.00 2,826.006 550.00 3,300.00 290.00530.00 471.00EA

    189 TRENCH SAFETYSYSTEM

    6,800.00 5,400.00 1,620.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    190 REMOVE UNSUITABLEPIPE FOUNDATION

    MATERIAL

    3,000.00 2,520.00 3,300.00300 33.00 9,900.00 8.4010.00 11.00CY

    191 REPLACE UNSUITABLEPIPE FOUNDATIONMATERIAL

    7,500.00 5,600.00 7,000.00500 27.50 13,750.00 11.2015.00 14.00CY

    192 SIDE SEWER VIDEOINSPECTION

    975.00 675.00 876.003 330.00 990.00 225.00325.00 292.00EA

    193 TEMPORARY ADJACENTUTILITY SUPPORT

    4,550.00 56,000.00 811.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    194 PHASE 1 GAS LINEWORK IN FREYA ST.

    3,317.00 5,700.00 1,805.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS

    195 PHASE 2 GAS LINEWORK IN FREYA ST.

    8,800.00 44,480.00 6,560.00320 16.50 5,280.00 139.0027.50 20.50LF

    196 SELECT BEDDING FOR8" GAS LINE IN FREYA

    1,920.00 3,520.00 3,136.00320 30.80 9,856.00 11.006.00 9.80LF

    197 EXTRA WORKALLOWANCE FORRESTRAINED WORK

    AREAS

    32,200.00 32,200.00 41,860.00644 11.00 7,084.00 50.0050.00 65.00LF

    198 ENCASE WATER /SEWER AT CROSSINGS

    1,650.00 1,500.00 1,525.0050 33.00 1,650.00 30.0033.00 30.50LF

    199 CLEANING EXISTINGSANITARY/STORMSEWERS

    7,000.00 9,000.00 3,785.001 * * * * * * 3,850.00 * * * * * ** * * * * * * * * * * *LS

    200 FISKE WATER MAIN

    EXTENSION

    3,000.00 3,200.00 8,920.001 * * * * * * 1,950.00 * * * * * ** * * * * * * * * * * *LS

    201 TAP & METERAPPLICATION FEE

    2,155.00 2,200.00 2,725.001 7,920.00 7,920.00 2,200.002,155.00 2,725.00EA

    202 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR 4"WATER SERVICE TAP(FISKE/9TH)

    2,620.00 1,700.00 1,385.001 * * * * * * 7,150.00 * * * * * ** * * * * * * * * * * *LS

    Wednesday, November 27, 2013 Page 16

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    46/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Graham Construction& Management Inc

    Unit

    Price Amount

    Apollo Inc

    Unit

    Price Amount

    MDM Construction

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    203 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/REINSTALLATION (REGAL/HARTSON)

    1,728.00 6,000.00 3,470.001 * * * * * * 6,600.00 * * * * * ** * * * * * * * * * * *LS

    204 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/RELOCATION(RAY STREET)

    1,728.00 4,900.00 3,470.001 * * * * * * 13,200.00 * * * * * ** * * * * * * * * * * *LS

    205 CSO FACILITY WATERSUPPLY ANDBACKFLOW PREVENTER

    ASSEMBLIES

    33,019.00 25,000.00 85,000.001 * * * * * * 78,211.70 * * * * * ** * * * * * * * * * * *LS

    206 SANITARY SEWER PIPE6 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    1,890.00 8,685.00 8,550.0045 55.00 2,475.00 193.0042.00 190.00LF

    207 SANITARY SEWER PIPE8 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    735.00 3,075.00 4,440.0015 66.00 990.00 205.0049.00 296.00LF

    208 SANITARY SEWER PIPE10 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    1,530.00 6,060.00 8,640.0030 71.50 2,145.00 202.0051.00 288.00LF

    209 SANITARY SEWER PIPE24 IN. DIAM. INCL.

    STRUCTURALEXCAVATION CLASS B

    9,996.00 19,992.00 14,875.00119 165.00 19,635.00 168.0084.00 125.00LF

    210 SANITARY SEWER PIPE36 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    1,512.00 2,472.00 5,712.0012 220.00 2,640.00 206.00126.00 476.00LF

    211 SANITARY SEWER PIPE42 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    214,347.00 412,587.00 344,442.001239 253.00 313,467.00 333.00173.00 278.00LF

    212 SANITARY SEWER PIPE48 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    254,760.00 326,040.00 388,080.001320 275.00 363,000.00 247.00193.00 294.00LF

    213 SANITARY SEWER PIPE54 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    242,820.00 296,070.00 363,165.001065 385.00 410,025.00 278.00228.00 341.00LF

    214 54 INCH RCP JOINTWRAP

    3,600.00 4,400.00 3,555.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS

    215 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW

    AT THOR ST. SEWER

    3,850.00 12,700.00 2,150.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    Wednesday, November 27, 2013 Page 17

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    47/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Graham Construction& Management Inc

    Unit

    Price Amount

    Apollo Inc

    Unit

    Price Amount

    MDM Construction

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    216 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW

    AT FREYA ST.

    9,020.00 14,300.00 2,150.001 * * * * * * 16,500.00 * * * * * ** * * * * * * * * * * *LS

    217 MAINTENANCE ANDCONNECTION OFEXISTING STORM FLOW

    AT FREYA ST.

    3,850.00 13,200.00 781.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    218 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW

    AT HARTSONCONNECTOR VAULT

    14,440.00 24,500.00 2,770.001 * * * * * * 22,000.00 * * * * * ** * * * * * * * * * * *LS

    219 SIDE SEWER PIPE 4 IN.DIAM. DUCTILE IRON

    1,180.00 2,140.00 2,300.0020 55.00 1,100.00 107.0059.00 115.00LF

    220 SIDE SEWER PIPE 6 IN.DIAM.

    3,800.00 2,660.00 3,648.0076 55.00 4,180.00 35.0050.00 48.00LF

    221 SIDE SEWER PIPE 6 IN.DIAM. DUCTILE IRON

    1,270.00 1,700.00 2,180.0020 66.00 1,320.00 85.0063.50 109.00LF

    222 SIDE SEWER PERMIT 172.00 400.00 1,756.004 44.00 176.00 100.0043.00 439.00EA

    223 SEWER CLEANOUT 2,032.00 850.00 1,838.002 825.00 1,650.00 425.001,016.00 919.00EA

    224 FLOW CONTROLDEVICES & CONTROLS

    232,000.00 178,000.00 250,000.001 * * * * * * 228,073.10 * * * * * ** * * * * * * * * * * *LS

    225 DETENTION TANKAPPURTENANCES

    301,000.00 269,000.00 300,000.001 * * * * * * 643,400.30 * * * * * ** * * * * * * * * * * *LS

    226 ESC LEAD 1,500.00 100.00 13,700.001 * * * * * * 2,750.00 * * * * * ** * * * * * * * * * * *LS

    227 INLET PROTECTION 1,700.00 1,860.00 1,740.0020 82.50 1,650.00 93.0085.00 87.00EA

    228 SILT FENCE 5,200.00 2,720.00 2,640.00800 5.00 4,000.00 3.406.50 3.30LF

    229 STABILIZEDCONSTRUCTIONENTRANCE

    1,600.00 1,275.00 2,150.00100 38.50 3,850.00 12.7516.00 21.50SY

    230 SOIL AERATION ANDDECOMPACTION FORUNDERHILL PARK

    1,860.00 2,000.00 2,000.002000 0.70 1,400.00 1.000.93 1.00SY

    231 TOPSOIL TYPE A, 4 INCHTHICK

    44,360.64 48,355.20 42,048.0021024 5.00 105,120.00 2.302.11 2.00SY

    232 HYDROSEEDING 2,208.90 2,388.00 2,388.001194 2.80 3,343.20 2.001.85 2.00SY

    Wednesday, November 27, 2013 Page 18

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    48/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Graham Construction& Management Inc

    Unit

    Price Amount

    Apollo Inc

    Unit

    Price Amount

    MDM Construction

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    233 PARK AREA SODINSTALLATION(NEATLINE)

    71,329.92 78,220.80 78,220.8018624 22.00 409,728.00 4.203.83 4.20SY

    234 SOD INSTALLATION 1,127.25 1,215.00 1,215.00225 13.20 2,970.00 5.405.01 5.40SY

    235 SHRUBS ANDLANDSCAPING FORUNDERHILL PARK

    276.00 500.00 299.001 * * * * * * 1,760.00 * * * * * ** * * * * * * * * * * *LS

    236 REPLACE EXISTINGIRRIGATION SYSTEM

    35,224.00 37,800.00 38,100.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    237 DESIGN AND INSTALLNEW IRRIGATIONSYSTEM

    11,480.00 12,300.00 12,420.001 * * * * * * 16,500.00 * * * * * ** * * * * * * * * * * *LS

    238 WINTERIZATION OFTEMPORARY ANDEXISTING IRRIGATIONSYSTEM

    1,400.00 1,500.00 1,515.001 * * * * * * 550.00 * * * * * ** * * * * * * * * * * *LS

    239 REMOVE AND CAPIRRIGATION LINES

    9,786.00 10,000.00 10,590.001 * * * * * * 1,650.00 * * * * * ** * * * * * * * * * * *LS

    240 CEMENT CONCRETECURB

    18,890.68 22,048.20 23,137.001361 16.50 22,456.50 16.2013.88 17.00LF

    241 REMOVE AND REPLACEPARKING WHEEL STOPS

    2,400.00 3,840.00 3,240.0048 107.30 5,150.40 80.0050.00 67.50EA

    242 CEMENT CONCRETEDRIVEWAY NON

    COMMERCIAL

    6,972.65 8,584.00 9,805.00185 44.00 8,140.00 46.4037.69 53.00SY

    243 CEMENT CONCRETEDRIVEWAY TRANSITION

    1,582.98 1,948.80 2,541.0042 38.50 1,617.00 46.4037.69 60.50SY

    244 TEMPORARYCONSTRUCTIONFENCING (6 FOOT HIGH-CYCLONE)

    11,250.00 18,750.00 7,500.002500 33.00 82,500.00 7.504.50 3.00LF

    245 CEMENT CONC.SIDEWALK

    1,659.28 2,016.00 2,912.0056 55.00 3,080.00 36.0029.63 52.00SY

    246 RAMP DETECTABLEWARNING

    608.00 640.00 656.0032 46.20 1,478.40 20.0019.00 20.50SF

    247 ELECTRICAL EQUIPMENT 132,380.00 189,000.00 143,200.001 * * * * * * 140,607.00 * * * * * ** * * * * * * * * * * *LS

    248 ELECTRICAL &MECHANICALEQUIPMENT FREIGHT &STARTUP SERVICES

    10,000.00 5,000.00 1,620.001 * * * * * * 39,600.00 * * * * * ** * * * * * * * * * * *LS

    249 SIGNING, PERMANENT 1,296.00 1,400.00 1,130.001 * * * * * * 2,200.00 * * * * * ** * * * * * * * * * * *LS

    250 PAVEMENT MARKING -DURABLE HEAT APPLIED

    583.84 656.00 430.5041 11.00 451.00 16.0014.24 10.50SF

    Wednesday, November 27, 2013 Page 19

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    49/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Graham Construction& Management Inc

    Unit

    Price Amount

    Apollo Inc

    Unit

    Price Amount

    MDM Construction

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    251 PAVEMENT MARKING -PAINT

    525.00 590.00 676.001 * * * * * * 30.99 * * * * * ** * * * * * * * * * * *LS

    252 BLOCK RETAINING WALL 8,580.00 9,100.00 8,060.00260 88.00 22,880.00 35.0033.00 31.00VSF

    253 CEMENT CONCRETEINTEGRAL CURB ANDSIDEWALK 7 FT. WIDE

    4,345.00 5,676.00 7,480.00220 60.50 13,310.00 25.8019.75 34.00LF

    254 VEHICLE GATEASSEMBLY

    3,000.00 1,700.00 3,785.001 * * * * * * 9,900.00 * * * * * ** * * * * * * * * * * *LS

    255 MECHANICAL ANDODOR CONTROLEQUIPMENT

    740,883.00 598,000.00 495,850.001 * * * * * * 666,894.00 * * * * * ** * * * * * * * * * * *LS

    256 FINAL SITEPREPARATION

    18,500.00 25,000.00 12,320.001 * * * * * * 22,000.00 * * * * * ** * * * * * * * * * * *LS

    257 REMOVE AND REPLACEEXISTING BASEBALLDIAMOND

    25,000.00 19,000.00 6,820.001 * * * * * * 19,800.00 * * * * * ** * * * * * * * * * * *LS

    258 REMOVE AND REPLACEEXISTING VOLLEYBALLCOURT

    15,000.00 19,000.00 34,220.001 * * * * * * 22,550.00 * * * * * ** * * * * * * * * * * *LS

    8,178,953.93 8,315,178.40 8,533,396.309,985,901.09Schedule Totals

    Wednesday, November 27, 2013 Page 20

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    50/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Max J KuneyCompany

    Unit

    Price Amount

    Stellar J Corporation

    Unit

    Price Amount

    Goodfellow Bros Inc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    101 POST-CONSTRUCTIONSURVEYING

    12,000.00 16,500.00 5,000.001 * * * * * * 5,000.00 * * * * * ** * * * * * * * * * * *LS

    102 REIMBURSEMENT FORTHIRD PARTY DAMAGE

    1.00 1.00 1.001 1.00 1.00 1.001.00 1.00EST

    103 SPCC PLAN 500.00 1,000.00 1,000.001 * * * * * * 907.50 * * * * * ** * * * * * * * * * * *LS

    104 POTHOLING 9,240.00 4,070.00 17,600.0022 550.00 12,100.00 185.00420.00 800.00EA

    105 MOBILIZATION 960,000.00 673,300.00 425,000.001 * * * * * * 509,300.00 * * * * * ** * * * * * * * * * * *LS

    106 PROJECT TEMPORARYTRAFFIC CONTROL 80,000.00 65,000.00 124,000.001 * * * * * * 55,000.00 * * * * * ** * * * * * * * * * * *LS

    107 SPECIAL SIGNS 2,400.00 1,200.00 3,000.00120 20.00 2,400.00 10.0020.00 25.00SF

    108 SEQUENTIAL ARROWSIGN

    2,100.00 1,050.00 4,200.00700 4.25 2,975.00 1.503.00 6.00HR

    109 PORTABLECHANGEABLE MESSAGESIGN

    1,200.00 1,200.00 4,800.00400 6.25 2,500.00 3.003.00 12.00HR

    110 TYPE III BARRICADE 2,295.00 1,785.00 5,100.0051 75.00 3,825.00 35.0045.00 100.00EA

    111 CLEARING ANDGRUBBING 60,000.00 2,000.00 25,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    112 MATERIALS ON HAND,TREE PROTECTION

    5,000.00 2,250.00 4,000.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS

    113 PRIVATE TREE ROOTTREATMENT

    6,300.00 3,000.00 3,750.0015 220.00 3,300.00 200.00420.00 250.00EA

    114 PUBLIC TREE STUMPGRINDING

    560.00 2,500.00 1,500.002 400.00 800.00 1,250.00280.00 750.00EA

    115 REMOVE EXISTING CURB 2,722.00 4,763.50 5,444.001361 3.30 4,491.30 3.502.00 4.00LF

    116 REMOVE CEMENT

    CONCRETE SIDEWALKAND DRIVEWAY

    3,948.00 4,935.00 5,922.00658 6.60 4,342.80 7.506.00 9.00SY

    117 REMOVE INTEGRALCEMENT CONCRETESIDEWALK AND CURB 7'WIDE

    1,620.00 1,260.00 1,620.00180 24.20 4,356.00 7.009.00 9.00SY

    118 REMOVE MANHOLE,CATCH BASIN ORDRYWELL

    4,200.00 12,600.00 4,900.0014 825.00 11,550.00 900.00300.00 350.00EA

    Wednesday, November 27, 2013 Page 21

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    51/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Max J KuneyCompany

    Unit

    Price Amount

    Stellar J Corporation

    Unit

    Price Amount

    Goodfellow Bros Inc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    119 REMOVE EXISTING 24"DIAM. CONCRETESTORM PIPE AND 8"GAS LINE

    3,315.00 5,100.00 3,825.00255 110.00 28,050.00 20.0013.00 15.00LF

    120 SAWCUTTING FLEXIBLEPAVEMENT

    655.00 1,637.50 655.001310 1.10 1,441.00 1.250.50 0.50LFI

    121 SAWCUTTING RIGIDPAVEMENT

    380.00 1,710.00 380.00380 2.80 1,064.00 4.501.00 1.00LFI

    122 EXISTING FENCEREMOVAL ANDREINSTALL INUNDERHILL PARK

    600.00 1,100.00 800.0020 33.00 660.00 55.0030.00 40.00LF

    123 PARK PICINIC TABLE

    AND PEDESTAL GRILLREMOVAL ANDREPLACEMENT

    2,700.00 6,000.00 4,500.003 3,300.00 9,900.00 2,000.00900.00 1,500.00EA

    124 REMOVE , STORE ANDREINSTALL ROCKBOULDERS (UNDERHILLPARK)

    828.00 5,865.00 4,140.0069 55.00 3,795.00 85.0012.00 60.00EA

    125 ADDITIONAL ROCKBOULDERS (UNDERHILLPARKING LOT)

    1,000.00 1,500.00 2,000.0010 165.00 1,650.00 150.00100.00 200.00EA

    126 REMOVE ANDREINSTALL EXISTINGLIGHT POLE(VOLLEYBALL COURT)

    1,200.00 1,750.00 1,200.001 5,500.00 5,500.00 1,750.001,200.00 1,200.00EA

    127 REMOVE AND REPLACEPARKING LOT LIGHTPOLE

    5,400.00 5,250.00 3,600.003 4,400.00 13,200.00 1,750.001,800.00 1,200.00EA

    128 ROADWAY EXCAVATIONINCL. HAUL

    82,530.00 49,518.00 66,024.002751 13.20 36,313.20 18.0030.00 24.00CY

    129 REMOVE UNSUITABLEFOUNDATION MATERIALINCL. HAUL

    13,520.00 23,660.00 33,800.001690 33.00 55,770.00 14.008.00 20.00CY

    130 REPLACE UNSUITABLEFOUNDATION MATERIALINCL. HAUL

    50,700.00 54,080.00 15,210.001690 27.50 46,475.00 32.0030.00 9.00CY

    131 COMMON BORROWINCL. HAUL

    43,800.00 131,400.00 98,550.0010950 12.10 132,495.00 12.004.00 9.00CY

    132 PREPARATION OFUNTREATED ROADWAY

    35,703.00 29,752.50 38,083.2011901 3.90 46,413.90 2.503.00 3.20SY

    133 SHORING 225,000.00 225,000.00 0.001 * * * * * * 134,000.00 * * * * * ** * * * * * * * * * * *LS

    134 CONTROLLED DENSITYFILL

    5,060.00 5,060.00 5,060.0046 220.00 10,120.00 110.00110.00 110.00CY

    Wednesday, November 27, 2013 Page 22

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    52/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Max J KuneyCompany

    Unit

    Price Amount

    Stellar J Corporation

    Unit

    Price Amount

    Goodfellow Bros Inc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    135 STRUCTUREEXCAVATION CLASS AFOR STORAGE FACILITYINCLUDING HAUL

    310,200.00 366,600.00 451,200.0028200 12.10 341,220.00 13.0011.00 16.00CY

    136 EXTRA WORKALLOWANCE FOR ROCKEXCAVATION

    68,750.00 35,750.00 44,000.00550 110.00 60,500.00 65.00125.00 80.00CY

    137 GRAVEL BACKFILL FORWALLS INCL. HAUL

    33,300.00 17,205.00 30,525.00555 44.00 24,420.00 31.0060.00 55.00CY

    138 PEA GRAVEL 780.00 825.00 1,425.0015 55.00 825.00 55.0052.00 95.00CY

    139 CRUSHED SURFACINGTOP COURSE

    20,232.00 35,968.00 42,150.00562 44.00 24,728.00 64.0036.00 75.00CY

    140 CRUSHED SURFACINGTOP COURSE FORSIDEWALKS &DRIVEWAYS

    1,218.00 1,624.00 1,740.0029 82.50 2,392.50 56.0042.00 60.00CY

    141 CRUSHED SURFACINGBASE COURSE FORPAVEMENTREPLACEMENT

    33,444.00 46,450.00 55,740.00929 44.00 40,876.00 50.0036.00 60.00CY

    142 CRUSHED SURFACINGBASE COURSE FORSTORAGE FACILITY

    28,080.00 42,120.00 46,800.00780 44.00 34,320.00 54.0036.00 60.00CY

    143 GRAVEL ROADSTABILIZER

    4,128.00 6,600.00 4,800.0024 550.00 13,200.00 275.00172.00 200.00TO

    144 HMA CL. 1/2 IN. PG 64-28, 4 INCH THICK

    111,197.00 107,926.50 117,738.006541 20.00 130,820.00 16.5017.00 18.00SY

    145 HMA CL. 1/2 IN. PG 70-28, 6 INCH THICK

    44,500.00 43,610.00 46,280.001780 30.00 53,400.00 24.5025.00 26.00SY

    146 HMA FOR TRANSITION,CL. 1/2 IN. PG 64-28, 2INCH THICK

    7,200.00 7,200.00 7,440.0060 66.00 3,960.00 120.00120.00 124.00SY

    147 COMPACTION PRICEADJUSTMENT

    4,000.00 4,000.00 4,000.001 4,000.00 4,000.00 4,000.004,000.00 4,000.00EST

    148 JOB MIX COMPLIANCEPRICE ADJUSTMENT

    1.00 1.00 1.001 1.00 1.00 1.001.00 1.00CAL

    149 CAST IN PLACECONCRETE

    3,591,000.00 3,385,800.00 3,206,250.005130 715.00 3,667,950.00 660.00700.00 625.00CY

    150 COMMERCIALCONCRETE

    152,250.00 147,987.00 146,160.00609 220.00 133,980.00 243.00250.00 240.00CY

    151 PRE-CAST CONCRETEHARTSON CONNECTORVAULT

    85,000.00 158,000.00 150,000.001 * * * * * * 49,500.00 * * * * * ** * * * * * * * * * * *LS

    152 WATERPROOFING 25,065.00 41,775.00 38,990.00557 49.50 27,571.50 75.0045.00 70.00SY

    Wednesday, November 27, 2013 Page 23

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    53/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Max J KuneyCompany

    Unit

    Price Amount

    Stellar J Corporation

    Unit

    Price Amount

    Goodfellow Bros Inc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    153 EPOXY COATING 4,675.00 5,100.00 4,675.0085 66.00 5,610.00 60.0055.00 55.00SY

    154 VAPOR RETARDERBARRIERS

    957.00 319.00 3,828.00319 3.30 1,052.70 1.003.00 12.00SY

    155 BOLLARDS 7,800.00 11,700.00 13,000.0013 1,067.00 13,871.00 900.00600.00 1,000.00EA

    156 CONNECT 6 IN.DIAMETER PIPE TOEXISTING CATCH BASIN,DRYWELL, OR MANHOLE

    2,100.00 3,300.00 4,500.003 550.00 1,650.00 1,100.00700.00 1,500.00EA

    157 CONNECT 8 IN.DIAMETER PIPE TO

    EXISTING CATCH BASIN,DRYWELL, OR MANHOLE

    9,100.00 14,300.00 21,450.0013 550.00 7,150.00 1,100.00700.00 1,650.00EA

    158 STORM SEWER PIPE 8IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    1,518.00 2,622.00 4,830.0069 44.00 3,036.00 38.0022.00 70.00LF

    159 DUCTILE IRON STORMSEWER PIPE 8 IN. DIAM.,INCL. STRUCTURALEXCAVATION CLASS B

    11,210.00 17,405.00 26,550.00295 60.50 17,847.50 59.0038.00 90.00LF

    160 DUCTILE IRON STORMSEWER PIPE 24 IN.DIAM., INCL.STRUCTURALEXCAVATION CLASS B

    32,000.00 2,320.00 2,880.0016 165.00 2,640.00 145.002,000.00 180.00LF

    161 8 IN. DIAM. STEELCASING PIPE

    1,120.00 700.00 1,300.0010 22.00 220.00 70.00112.00 130.00LF

    162 10 IN. DIAM. STEELCASING PIPE

    2,576.00 2,231.00 2,990.0023 24.20 556.60 97.00112.00 130.00LF

    163 12 IN. DIAM. STEELCASING PIPE

    2,900.00 2,440.00 2,800.0020 26.40 528.00 122.00145.00 140.00LF

    164 HAND HOLES FOR FLOWMONITORINGEQUIPMENT

    7,500.00 7,500.00 7,000.005 2,200.00 11,000.00 1,500.001,500.00 1,400.00EA

    165 REMOVE AND REPLACE(COS) MH FRAME ANDGRATE

    4,900.00 2,800.00 5,250.007 550.00 3,850.00 400.00700.00 750.00EA

    166 MANHOLE TYPE I-48,BASIC PRICE

    11,400.00 15,000.00 30,000.006 2,750.00 16,500.00 2,500.001,900.00 5,000.00EA

    167 MANHOLE ADDITIONALHEIGHT 48 IN. DIAM.TYPE I

    125.00 120.00 100.001 110.00 110.00 120.00125.00 100.00VF

    168 MANHOLE TYPE III-72,BASIC PRICE

    19,000.00 32,500.00 25,000.005 7,150.00 35,750.00 6,500.003,800.00 5,000.00EA

    Wednesday, November 27, 2013 Page 24

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    54/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Max J KuneyCompany

    Unit

    Price Amount

    Stellar J Corporation

    Unit

    Price Amount

    Goodfellow Bros Inc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    169 MANHOLE ADDITIONALHEIGHT 72 IN. DIAM.TYPE III

    1,680.00 1,200.00 1,200.008 165.00 1,320.00 150.00210.00 150.00VF

    170 MANHOLE TYPE III-96,BASIC PRICE

    11,000.00 25,000.00 18,000.002 14,300.00 28,600.00 12,500.005,500.00 9,000.00EA

    171 MANHOLE ADDITIONALHEIGHT 96 IN. DIAM.TYPE III

    1,200.00 720.00 800.004 220.00 880.00 180.00300.00 200.00VF

    172 MANHOLE TYPE V,BASIC PRICE

    74,400.00 204,000.00 204,000.0012 6,050.00 72,600.00 17,000.006,200.00 17,000.00EA

    173 MANHOLE ADDITIONALHEIGHT TYPE V

    1,430.00 1,690.00 1,300.0013 165.00 2,145.00 130.00110.00 100.00VF

    174 DRYWELL TYPE 2 3,500.00 3,200.00 2,200.001 4,400.00 4,400.00 3,200.003,500.00 2,200.00EA

    175 ADJUST EXISTINGVALVE BOX IN ASPHALT

    5,225.00 3,800.00 7,600.0019 330.00 6,270.00 200.00275.00 400.00EA

    176 ADJUST EXISTINGVALVE BOX IN UNPAVED

    AREA

    1,925.00 1,050.00 2,450.007 165.00 1,155.00 150.00275.00 350.00EA

    177 ADJUST EXISTINGMANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET IN

    ASPHALT

    3,400.00 3,200.00 4,800.008 330.00 2,640.00 400.00425.00 600.00EA

    178 ADJUST EXISTING

    MANHOLE, CATCHBASIN, DRYWELL,CLEANOUT OR INLET INUNPAVED AREA

    1,275.00 900.00 1,650.003 275.00 825.00 300.00425.00 550.00EA

    179 CATCH BASIN TYPE 0 2,500.00 1,250.00 2,000.001 2,310.00 2,310.00 1,250.002,500.00 2,000.00EA

    180 CATCH BASIN TYPE 1 10,400.00 6,400.00 10,000.004 2,750.00 11,000.00 1,600.002,600.00 2,500.00EA

    181 CATCH BASIN TYPE 2 5,000.00 4,000.00 6,000.002 2,970.00 5,940.00 2,000.002,500.00 3,000.00EA

    182 CATCH BASIN TYPE 4 7,000.00 4,000.00 6,200.002 3,300.00 6,600.00 2,000.003,500.00 3,100.00EA

    183 FRAME AND GRATE FORCATCH BASIN ORGRATE INLET

    5,400.00 2,700.00 4,500.009 550.00 4,950.00 300.00600.00 500.00EA

    184 MANHOLE OR DRYWELLFRAME AND COVER(STANDARD)

    1,800.00 675.00 1,500.003 440.00 1,320.00 225.00600.00 500.00EA

    185 MANHOLE OR DRYWELLFRAME AND COVER(LOCKABLE)

    16,875.00 7,425.00 13,500.0027 550.00 14,850.00 275.00625.00 500.00EA

    Wednesday, November 27, 2013 Page 25

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    55/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Max J KuneyCompany

    Unit

    Price Amount

    Stellar J Corporation

    Unit

    Price Amount

    Goodfellow Bros Inc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    186 CONNECT 24 IN. DIAM.(D.I.) PIPE TO EXISTINGCATCH BASIN,DRYWELL, OR MANHOLE

    1,800.00 1,775.00 1,500.001 880.00 880.00 1,775.001,800.00 1,500.00EA

    187 RECONSTRUCTMANHOLE INVERT

    3,900.00 3,900.00 6,000.006 1,100.00 6,600.00 650.00650.00 1,000.00EA

    188 MANHOLE TEST 7,200.00 2,100.00 2,700.006 550.00 3,300.00 350.001,200.00 450.00EA

    189 TRENCH SAFETYSYSTEM

    550.00 6,000.00 5,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    190 REMOVE UNSUITABLEPIPE FOUNDATION

    MATERIAL

    2,700.00 9,300.00 6,000.00300 33.00 9,900.00 31.009.00 20.00CY

    191 REPLACE UNSUITABLEPIPE FOUNDATIONMATERIAL

    15,000.00 17,500.00 4,500.00500 27.50 13,750.00 35.0030.00 9.00CY

    192 SIDE SEWER VIDEOINSPECTION

    765.00 1,350.00 1,800.003 330.00 990.00 450.00255.00 600.00EA

    193 TEMPORARY ADJACENTUTILITY SUPPORT

    2,000.00 4,000.00 7,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    194 PHASE 1 GAS LINEWORK IN FREYA ST.

    525.00 3,000.00 6,000.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS

    195 PHASE 2 GAS LINEWORK IN FREYA ST.

    3,840.00 6,080.00 4,160.00320 16.50 5,280.00 19.0012.00 13.00LF

    196 SELECT BEDDING FOR8" GAS LINE IN FREYA

    5,760.00 1,280.00 3,840.00320 30.80 9,856.00 4.0018.00 12.00LF

    197 EXTRA WORKALLOWANCE FORRESTRAINED WORK

    AREAS

    22,540.00 3,220.00 16,100.00644 11.00 7,084.00 5.0035.00 25.00LF

    198 ENCASE WATER /SEWER AT CROSSINGS

    4,500.00 2,800.00 7,500.0050 33.00 1,650.00 56.0090.00 150.00LF

    199 CLEANING EXISTINGSANITARY/STORMSEWERS

    7,000.00 3,500.00 3,000.001 * * * * * * 3,850.00 * * * * * ** * * * * * * * * * * *LS

    200 FISKE WATER MAIN

    EXTENSION

    2,200.00 3,000.00 6,000.001 * * * * * * 1,950.00 * * * * * ** * * * * * * * * * * *LS

    201 TAP & METERAPPLICATION FEE

    2,155.00 2,155.00 2,200.001 7,920.00 7,920.00 2,155.002,155.00 2,200.00EA

    202 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR 4"WATER SERVICE TAP(FISKE/9TH)

    1,200.00 1,900.00 4,000.001 * * * * * * 7,150.00 * * * * * ** * * * * * * * * * * *LS

    Wednesday, November 27, 2013 Page 26

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    56/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Max J KuneyCompany

    Unit

    Price Amount

    Stellar J Corporation

    Unit

    Price Amount

    Goodfellow Bros Inc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    203 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/REINSTALLATION (REGAL/HARTSON)

    1,600.00 2,200.00 4,000.001 * * * * * * 6,600.00 * * * * * ** * * * * * * * * * * *LS

    204 TRENCH EXCAVATION,COMPACTION ANDBACKFILL FOR WATERLINEREMOVAL/RELOCATION(RAY STREET)

    3,800.00 2,000.00 4,000.001 * * * * * * 13,200.00 * * * * * ** * * * * * * * * * * *LS

    205 CSO FACILITY WATERSUPPLY ANDBACKFLOW PREVENTER

    ASSEMBLIES

    30,000.00 44,000.00 43,000.001 * * * * * * 78,211.70 * * * * * ** * * * * * * * * * * *LS

    206 SANITARY SEWER PIPE6 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    1,890.00 2,250.00 9,000.0045 55.00 2,475.00 50.0042.00 200.00LF

    207 SANITARY SEWER PIPE8 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    825.00 1,050.00 3,000.0015 66.00 990.00 70.0055.00 200.00LF

    208 SANITARY SEWER PIPE10 IN. DIAM. INCL.STRUCTURALEXCAVATION CLASS B

    1,950.00 2,250.00 6,000.0030 71.50 2,145.00 75.0065.00 200.00LF

    209 SANITARY SEWER PIPE24 IN. DIAM. INCL.

    STRUCTURALEXCAVATION CLASS B

    13,090.00 12,495.00 16,660.00119 165.00 19,635.00 105.00110.00 140.00LF

    210 SANITARY SEWER PIPE36 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    3,840.00 2,400.00 5,040.0012 220.00 2,640.00 200.00320.00 420.00LF

    211 SANITARY SEWER PIPE42 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    179,655.00 260,190.00 284,970.001239 253.00 313,467.00 210.00145.00 230.00LF

    212 SANITARY SEWER PIPE48 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    231,000.00 303,600.00 396,000.001320 275.00 363,000.00 230.00175.00 300.00LF

    213 SANITARY SEWER PIPE54 IN. DIAM. RCP CL IVINCL. STRUCTURALEXCAVATION CLASS B

    207,675.00 330,150.00 388,725.001065 385.00 410,025.00 310.00195.00 365.00LF

    214 54 INCH RCP JOINTWRAP

    5,200.00 1,200.00 4,000.001 * * * * * * 5,500.00 * * * * * ** * * * * * * * * * * *LS

    215 MAINTENANCE ANDCONNECTION OFEXISTING SEWER FLOW

    AT THOR ST. SEWER

    15,000.00 11,000.00 20,000.001 * * * * * * 11,000.00 * * * * * ** * * * * * * * * * * *LS

    Wednesday, November 27, 2013 Page 27

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    57/329

  • 8/13/2019 2013-12-16 Full Current Packet (1)

    58/329

    Item

    No

    Bid Item

    Description

    Estimated

    Quantity

    Unit

    Price

    Engineer's

    Estimate

    Amount

    Max J KuneyCompany

    Unit

    Price Amount

    Stellar J Corporation

    Unit

    Price Amount

    Goodfellow Bros Inc

    Unit

    Price Amount

    Project Number: 2011144

    01Schedule

    Schedule Description Tax Classification

    Not Public Street Improvement

    233 PARK AREA SODINSTALLATION(NEATLINE)

    74,496.00 74,496.00 46,560.0018624 22.00 409,728.00 4.004.00 2.50SY

    234 SOD INSTALLATION 1,125.00 1,125.00 562.50225 13.20 2,970.00 5.005.00 2.50SY

    235 SHRUBS ANDLANDSCAPING FORUNDERHILL PARK

    300.00 300.00 2,500.001 * * * * * * 1,760.00 * * * * * ** * * * * * * * * * * *LS

    236 REPLACE EXISTINGIRRIGATION SYSTEM

    36,000.00 36,000.00 2,500.001 * * * * * * 11,000.00 *